Replacement Analysis
MUHAMMAD IRFAN
Assistant Professor, Sarhad University, Peshawar.
MAINTENANCE…
OBJECTIVES OF MAINTENANCE…
CAUSES FOR EQUIPMENT BREAKDOWN…
WHAT TO DO WITH AN EXISTING ASSET?
 Keep it
 Abandon it (do not replace)
 Replace it, but keep it for backup purposes
 Augment the capacity of the asset
 Dispose of it, and replace it with another.
REPLACEMENT…
REPLACEMENT ANALYSIS…
Replacement Analysis in needed for the following
Reasons:
Reduced Performance: It results in increased costs
(reliability, productivity).
Altered Requirements: New features (speed,
accuracy, etc).
Obsolescence: New products and developments.
IMPORTANT TO LEARN…
 Defender: The existing alternative.
 Challenger: The new alternative.
…OR…
Existing Asset is known as the
DEFENDER
New Asset is known as the
CHALLENGER.
IN OTHER WORDS…
DEFENDER is the Asset already
Owned…
While…
CHALLENGERS are the alternatives
with which the already owned asset is
compared with…
REPLACEMENT…
Using the equipments, as time passes, the new
question arises as;
Should the in-place alternative be replaced?
If so, With What and When?
means,
 Has the Economic Life of the Asset been Reached?
 Which alternative should be selected as its
replacement?
REASONS FOR REPLACEMENT…
1. Reduced Performance.
Due to,
- Deterioration of Parts
- Reliability and Productivity Decrease.
- Increased Cost of Operation.
- Higher Scrap.
- Higher Maintenance Costs and
- Need to Replace…
CONT…
2. Changing Requirements.
- New Requirements on;
- Accuracy
- Speed
- Other Specifications like pollution reduction etc. that
may not be met by the existing asset.
CONT…
2. Obsolescence.
- New Technological Innovations make existing
assets obsolete.
- The decrease in the time of the development
cycle of new products causes replacement
analysis to be performed before the completion
of expected economic life of assets.
REPLACEMENT ANALYSIS DETAIL…
When should a new truck replace the existing truck?
When should a process be redesigned?
When should a product be redesigned?
Defender: the existing equipment, building, or
decision previously implemented.
Challenger: the proposed replacement currently under
consideration.
The most common question asked in industry is:
When should the existing asset(s) be replaced?
ISSUES TO CONSIDER BEFORE STARTING…
 Is it morally or ethically right to do this project?
 If a unit fails, must it be removed permanently
from service? Or repaired?
 Are standby units available if the system should
fail?
 Do components or units fail independently of the
failure of other components?
 Is there a budget constraint?
CONT…
 Is there only one replacement allowed over the
planning horizon?
 Do future replacement units differ over time?
 Are technological improvements considered?
 Are periodic operating and maintenance costs
constant or variable over time?
 Are consequences other than economic impacts, i.e.,
socio-technical issues considered?
 Are income tax consequences considered?
 Is inflation considered?
Thank You…

More Related Content

Similar to (Week 8)

Value Engineering
Value Engineering Value Engineering
Value Engineering
Gopi Krishna Kureti
 
TRIZ by Egineer Muwowo Samuel.pdf
TRIZ by Egineer Muwowo Samuel.pdfTRIZ by Egineer Muwowo Samuel.pdf
TRIZ by Egineer Muwowo Samuel.pdf
muwowosamuel
 
Maintenace policy
Maintenace policyMaintenace policy
Maintenace policy
SAMEER VISHWAKARMA
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Amirul Faiz Amil Azman
 
value engineering--conversion- Copy.pdf
value engineering--conversion- Copy.pdfvalue engineering--conversion- Copy.pdf
value engineering--conversion- Copy.pdf
AhmedMostafaNagi
 
Fundamentals of machine design
Fundamentals of machine designFundamentals of machine design
Fundamentals of machine design
rameshRameshraja
 
VA-VE Presentation.pptx
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptx
DevenJally1
 
Ch#1 MET 304 Mechanical design
Ch#1 MET 304 Mechanical design Ch#1 MET 304 Mechanical design
Ch#1 MET 304 Mechanical design
hotman1991
 
Plant layout by Rishabh gupta
Plant layout by Rishabh guptaPlant layout by Rishabh gupta
Plant layout by Rishabh gupta
rishabh gupta
 
Tech connect spring 2014 technology to job mapping v2
Tech connect spring 2014   technology to job mapping v2Tech connect spring 2014   technology to job mapping v2
Tech connect spring 2014 technology to job mapping v2
Lassonde School of Engineering
 
Value engineering case study ppt
Value engineering case study pptValue engineering case study ppt
Value engineering case study ppt
AnuragTewari2
 
Application of CAE: DURABILITY ANALYSIS.pptx
Application of CAE: DURABILITY ANALYSIS.pptxApplication of CAE: DURABILITY ANALYSIS.pptx
Application of CAE: DURABILITY ANALYSIS.pptx
SahilBagnikar1
 
Chapter#5
Chapter#5Chapter#5
Value Engineering
Value EngineeringValue Engineering
Value Engineering
Farzad Vasheghani Farahani
 
Technology assessment
Technology assessmentTechnology assessment
Technology assessment
Lassonde School of Engineering
 
Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes)
Priyanshu
 
Engineered Maintenance by Waqas Ali Tunio
Engineered Maintenance by Waqas Ali TunioEngineered Maintenance by Waqas Ali Tunio
Engineered Maintenance by Waqas Ali Tunio
Waqas Ali Tunio
 
Est's assessment owes 14122017
Est's assessment   owes 14122017Est's assessment   owes 14122017
Est's assessment owes 14122017
Steve Halls
 
Maintenance_6.pdf
Maintenance_6.pdfMaintenance_6.pdf
Maintenance_6.pdf
IgorKuzle1
 
Basic Instruments-Equipment; Application and Management.pptx
Basic Instruments-Equipment; Application and Management.pptxBasic Instruments-Equipment; Application and Management.pptx
Basic Instruments-Equipment; Application and Management.pptx
Rajendra Dev Bhatt
 

Similar to (Week 8) (20)

Value Engineering
Value Engineering Value Engineering
Value Engineering
 
TRIZ by Egineer Muwowo Samuel.pdf
TRIZ by Egineer Muwowo Samuel.pdfTRIZ by Egineer Muwowo Samuel.pdf
TRIZ by Egineer Muwowo Samuel.pdf
 
Maintenace policy
Maintenace policyMaintenace policy
Maintenace policy
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...
 
value engineering--conversion- Copy.pdf
value engineering--conversion- Copy.pdfvalue engineering--conversion- Copy.pdf
value engineering--conversion- Copy.pdf
 
Fundamentals of machine design
Fundamentals of machine designFundamentals of machine design
Fundamentals of machine design
 
VA-VE Presentation.pptx
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptx
 
Ch#1 MET 304 Mechanical design
Ch#1 MET 304 Mechanical design Ch#1 MET 304 Mechanical design
Ch#1 MET 304 Mechanical design
 
Plant layout by Rishabh gupta
Plant layout by Rishabh guptaPlant layout by Rishabh gupta
Plant layout by Rishabh gupta
 
Tech connect spring 2014 technology to job mapping v2
Tech connect spring 2014   technology to job mapping v2Tech connect spring 2014   technology to job mapping v2
Tech connect spring 2014 technology to job mapping v2
 
Value engineering case study ppt
Value engineering case study pptValue engineering case study ppt
Value engineering case study ppt
 
Application of CAE: DURABILITY ANALYSIS.pptx
Application of CAE: DURABILITY ANALYSIS.pptxApplication of CAE: DURABILITY ANALYSIS.pptx
Application of CAE: DURABILITY ANALYSIS.pptx
 
Chapter#5
Chapter#5Chapter#5
Chapter#5
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Technology assessment
Technology assessmentTechnology assessment
Technology assessment
 
Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes)
 
Engineered Maintenance by Waqas Ali Tunio
Engineered Maintenance by Waqas Ali TunioEngineered Maintenance by Waqas Ali Tunio
Engineered Maintenance by Waqas Ali Tunio
 
Est's assessment owes 14122017
Est's assessment   owes 14122017Est's assessment   owes 14122017
Est's assessment owes 14122017
 
Maintenance_6.pdf
Maintenance_6.pdfMaintenance_6.pdf
Maintenance_6.pdf
 
Basic Instruments-Equipment; Application and Management.pptx
Basic Instruments-Equipment; Application and Management.pptxBasic Instruments-Equipment; Application and Management.pptx
Basic Instruments-Equipment; Application and Management.pptx
 

More from sayyed sabir

Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02
sayyed sabir
 
Automatic door using arduino
Automatic door using arduinoAutomatic door using arduino
Automatic door using arduino
sayyed sabir
 
Importance of coal water slurry
Importance of coal water slurryImportance of coal water slurry
Importance of coal water slurry
sayyed sabir
 
(Week 15)
(Week 15)(Week 15)
(Week 15)
sayyed sabir
 
(Week 14)
(Week 14)(Week 14)
(Week 14)
sayyed sabir
 
(Week 13)
(Week 13)(Week 13)
(Week 13)
sayyed sabir
 
(Week 12)
(Week 12)(Week 12)
(Week 12)
sayyed sabir
 
(Week 11)
(Week 11)(Week 11)
(Week 11)
sayyed sabir
 
(Week 10)
(Week 10)(Week 10)
(Week 10)
sayyed sabir
 
(Week 9)
(Week 9)(Week 9)
(Week 9)
sayyed sabir
 
(Week 7)
(Week 7)(Week 7)
(Week 7)
sayyed sabir
 
(Week 6)
(Week 6)(Week 6)
(Week 6)
sayyed sabir
 
(Week 5)
(Week 5)(Week 5)
(Week 5)
sayyed sabir
 
(Week 4)
(Week 4)(Week 4)
(Week 4)
sayyed sabir
 
(Week 3)
(Week 3)(Week 3)
(Week 3)
sayyed sabir
 
(Week 2)
(Week 2)(Week 2)
(Week 2)
sayyed sabir
 
(Week 1)
(Week 1)(Week 1)
(Week 1)
sayyed sabir
 
Transmission modes
Transmission modesTransmission modes
Transmission modes
sayyed sabir
 
Osi model
Osi modelOsi model
Osi model
sayyed sabir
 
Ch3 4 v1
Ch3 4 v1Ch3 4 v1
Ch3 4 v1
sayyed sabir
 

More from sayyed sabir (20)

Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02
 
Automatic door using arduino
Automatic door using arduinoAutomatic door using arduino
Automatic door using arduino
 
Importance of coal water slurry
Importance of coal water slurryImportance of coal water slurry
Importance of coal water slurry
 
(Week 15)
(Week 15)(Week 15)
(Week 15)
 
(Week 14)
(Week 14)(Week 14)
(Week 14)
 
(Week 13)
(Week 13)(Week 13)
(Week 13)
 
(Week 12)
(Week 12)(Week 12)
(Week 12)
 
(Week 11)
(Week 11)(Week 11)
(Week 11)
 
(Week 10)
(Week 10)(Week 10)
(Week 10)
 
(Week 9)
(Week 9)(Week 9)
(Week 9)
 
(Week 7)
(Week 7)(Week 7)
(Week 7)
 
(Week 6)
(Week 6)(Week 6)
(Week 6)
 
(Week 5)
(Week 5)(Week 5)
(Week 5)
 
(Week 4)
(Week 4)(Week 4)
(Week 4)
 
(Week 3)
(Week 3)(Week 3)
(Week 3)
 
(Week 2)
(Week 2)(Week 2)
(Week 2)
 
(Week 1)
(Week 1)(Week 1)
(Week 1)
 
Transmission modes
Transmission modesTransmission modes
Transmission modes
 
Osi model
Osi modelOsi model
Osi model
 
Ch3 4 v1
Ch3 4 v1Ch3 4 v1
Ch3 4 v1
 

Recently uploaded

Seeman_Fiintouch_LLP_Newsletter_Jun_2024.pdf
Seeman_Fiintouch_LLP_Newsletter_Jun_2024.pdfSeeman_Fiintouch_LLP_Newsletter_Jun_2024.pdf
Seeman_Fiintouch_LLP_Newsletter_Jun_2024.pdf
Ashis Kumar Dey
 
University of North Carolina at Charlotte degree offer diploma Transcript
University of North Carolina at Charlotte degree offer diploma TranscriptUniversity of North Carolina at Charlotte degree offer diploma Transcript
University of North Carolina at Charlotte degree offer diploma Transcript
tscdzuip
 
Budgeting as a Control Tool in Govt Accounting in Nigeria Prof Oyedokun.pptx
Budgeting as a Control Tool in Govt Accounting in Nigeria Prof Oyedokun.pptxBudgeting as a Control Tool in Govt Accounting in Nigeria Prof Oyedokun.pptx
Budgeting as a Control Tool in Govt Accounting in Nigeria Prof Oyedokun.pptx
Godwin Emmanuel Oyedokun MBA MSc PhD FCA FCTI FCNA CFE FFAR
 
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
yeuwffu
 
Ending stagnation: How to boost prosperity across Scotland
Ending stagnation: How to boost prosperity across ScotlandEnding stagnation: How to boost prosperity across Scotland
Ending stagnation: How to boost prosperity across Scotland
ResolutionFoundation
 
PM pre reads for the product manager framework
PM pre reads for the product manager frameworkPM pre reads for the product manager framework
PM pre reads for the product manager framework
KishoreKatta6
 
Monthly Market Risk Update: June 2024 [SlideShare]
Monthly Market Risk Update: June 2024 [SlideShare]Monthly Market Risk Update: June 2024 [SlideShare]
Monthly Market Risk Update: June 2024 [SlideShare]
Commonwealth
 
Economic trends from a business point of view (May 2024)
Economic trends from a business point of view (May 2024)Economic trends from a business point of view (May 2024)
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
mukeshomran942
 
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptxExploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
cosmo-soil
 
What Lessons Can New Investors Learn from Newman Leech’s Success?
What Lessons Can New Investors Learn from Newman Leech’s Success?What Lessons Can New Investors Learn from Newman Leech’s Success?
What Lessons Can New Investors Learn from Newman Leech’s Success?
Newman Leech
 
KYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
KYC Compliance: A Cornerstone of Global Crypto Regulatory FrameworksKYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
KYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
Any kyc Account
 
Understanding-Stocks-and-Real-Estate.pptx
Understanding-Stocks-and-Real-Estate.pptxUnderstanding-Stocks-and-Real-Estate.pptx
Understanding-Stocks-and-Real-Estate.pptx
cosmo-soil
 
Accounting Information Systems (AIS).pptx
Accounting Information Systems (AIS).pptxAccounting Information Systems (AIS).pptx
Accounting Information Systems (AIS).pptx
TIZITAWMASRESHA
 
South Dakota State University degree offer diploma Transcript
South Dakota State University degree offer diploma TranscriptSouth Dakota State University degree offer diploma Transcript
South Dakota State University degree offer diploma Transcript
ynfqplhm
 
真实可查(nwu毕业证书)美国西北大学毕业证学位证书范本原版一模一样
真实可查(nwu毕业证书)美国西北大学毕业证学位证书范本原版一模一样真实可查(nwu毕业证书)美国西北大学毕业证学位证书范本原版一模一样
真实可查(nwu毕业证书)美国西北大学毕业证学位证书范本原版一模一样
28xo7hf
 
TechnoXander Confirmation of Payee Product Pack 1.pdf
TechnoXander Confirmation of Payee Product Pack 1.pdfTechnoXander Confirmation of Payee Product Pack 1.pdf
TechnoXander Confirmation of Payee Product Pack 1.pdf
richardwellington119
 
高仿英国伦敦艺术大学毕业证(ual毕业证书)文凭证书原版一模一样
高仿英国伦敦艺术大学毕业证(ual毕业证书)文凭证书原版一模一样高仿英国伦敦艺术大学毕业证(ual毕业证书)文凭证书原版一模一样
高仿英国伦敦艺术大学毕业证(ual毕业证书)文凭证书原版一模一样
234knry
 
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
Falcon Invoice Discounting
 
一比一原版宾夕法尼亚大学毕业证(UPenn毕业证书)学历如何办理
一比一原版宾夕法尼亚大学毕业证(UPenn毕业证书)学历如何办理一比一原版宾夕法尼亚大学毕业证(UPenn毕业证书)学历如何办理
一比一原版宾夕法尼亚大学毕业证(UPenn毕业证书)学历如何办理
vpqasyb
 

Recently uploaded (20)

Seeman_Fiintouch_LLP_Newsletter_Jun_2024.pdf
Seeman_Fiintouch_LLP_Newsletter_Jun_2024.pdfSeeman_Fiintouch_LLP_Newsletter_Jun_2024.pdf
Seeman_Fiintouch_LLP_Newsletter_Jun_2024.pdf
 
University of North Carolina at Charlotte degree offer diploma Transcript
University of North Carolina at Charlotte degree offer diploma TranscriptUniversity of North Carolina at Charlotte degree offer diploma Transcript
University of North Carolina at Charlotte degree offer diploma Transcript
 
Budgeting as a Control Tool in Govt Accounting in Nigeria Prof Oyedokun.pptx
Budgeting as a Control Tool in Govt Accounting in Nigeria Prof Oyedokun.pptxBudgeting as a Control Tool in Govt Accounting in Nigeria Prof Oyedokun.pptx
Budgeting as a Control Tool in Govt Accounting in Nigeria Prof Oyedokun.pptx
 
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
 
Ending stagnation: How to boost prosperity across Scotland
Ending stagnation: How to boost prosperity across ScotlandEnding stagnation: How to boost prosperity across Scotland
Ending stagnation: How to boost prosperity across Scotland
 
PM pre reads for the product manager framework
PM pre reads for the product manager frameworkPM pre reads for the product manager framework
PM pre reads for the product manager framework
 
Monthly Market Risk Update: June 2024 [SlideShare]
Monthly Market Risk Update: June 2024 [SlideShare]Monthly Market Risk Update: June 2024 [SlideShare]
Monthly Market Risk Update: June 2024 [SlideShare]
 
Economic trends from a business point of view (May 2024)
Economic trends from a business point of view (May 2024)Economic trends from a business point of view (May 2024)
Economic trends from a business point of view (May 2024)
 
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
 
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptxExploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
 
What Lessons Can New Investors Learn from Newman Leech’s Success?
What Lessons Can New Investors Learn from Newman Leech’s Success?What Lessons Can New Investors Learn from Newman Leech’s Success?
What Lessons Can New Investors Learn from Newman Leech’s Success?
 
KYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
KYC Compliance: A Cornerstone of Global Crypto Regulatory FrameworksKYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
KYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
 
Understanding-Stocks-and-Real-Estate.pptx
Understanding-Stocks-and-Real-Estate.pptxUnderstanding-Stocks-and-Real-Estate.pptx
Understanding-Stocks-and-Real-Estate.pptx
 
Accounting Information Systems (AIS).pptx
Accounting Information Systems (AIS).pptxAccounting Information Systems (AIS).pptx
Accounting Information Systems (AIS).pptx
 
South Dakota State University degree offer diploma Transcript
South Dakota State University degree offer diploma TranscriptSouth Dakota State University degree offer diploma Transcript
South Dakota State University degree offer diploma Transcript
 
真实可查(nwu毕业证书)美国西北大学毕业证学位证书范本原版一模一样
真实可查(nwu毕业证书)美国西北大学毕业证学位证书范本原版一模一样真实可查(nwu毕业证书)美国西北大学毕业证学位证书范本原版一模一样
真实可查(nwu毕业证书)美国西北大学毕业证学位证书范本原版一模一样
 
TechnoXander Confirmation of Payee Product Pack 1.pdf
TechnoXander Confirmation of Payee Product Pack 1.pdfTechnoXander Confirmation of Payee Product Pack 1.pdf
TechnoXander Confirmation of Payee Product Pack 1.pdf
 
高仿英国伦敦艺术大学毕业证(ual毕业证书)文凭证书原版一模一样
高仿英国伦敦艺术大学毕业证(ual毕业证书)文凭证书原版一模一样高仿英国伦敦艺术大学毕业证(ual毕业证书)文凭证书原版一模一样
高仿英国伦敦艺术大学毕业证(ual毕业证书)文凭证书原版一模一样
 
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
 
一比一原版宾夕法尼亚大学毕业证(UPenn毕业证书)学历如何办理
一比一原版宾夕法尼亚大学毕业证(UPenn毕业证书)学历如何办理一比一原版宾夕法尼亚大学毕业证(UPenn毕业证书)学历如何办理
一比一原版宾夕法尼亚大学毕业证(UPenn毕业证书)学历如何办理
 

(Week 8)

  • 1.
  • 2. Replacement Analysis MUHAMMAD IRFAN Assistant Professor, Sarhad University, Peshawar.
  • 5. CAUSES FOR EQUIPMENT BREAKDOWN…
  • 6. WHAT TO DO WITH AN EXISTING ASSET?  Keep it  Abandon it (do not replace)  Replace it, but keep it for backup purposes  Augment the capacity of the asset  Dispose of it, and replace it with another.
  • 8. REPLACEMENT ANALYSIS… Replacement Analysis in needed for the following Reasons: Reduced Performance: It results in increased costs (reliability, productivity). Altered Requirements: New features (speed, accuracy, etc). Obsolescence: New products and developments.
  • 9. IMPORTANT TO LEARN…  Defender: The existing alternative.  Challenger: The new alternative. …OR… Existing Asset is known as the DEFENDER New Asset is known as the CHALLENGER.
  • 10. IN OTHER WORDS… DEFENDER is the Asset already Owned… While… CHALLENGERS are the alternatives with which the already owned asset is compared with…
  • 11. REPLACEMENT… Using the equipments, as time passes, the new question arises as; Should the in-place alternative be replaced? If so, With What and When? means,  Has the Economic Life of the Asset been Reached?  Which alternative should be selected as its replacement?
  • 12. REASONS FOR REPLACEMENT… 1. Reduced Performance. Due to, - Deterioration of Parts - Reliability and Productivity Decrease. - Increased Cost of Operation. - Higher Scrap. - Higher Maintenance Costs and - Need to Replace…
  • 13. CONT… 2. Changing Requirements. - New Requirements on; - Accuracy - Speed - Other Specifications like pollution reduction etc. that may not be met by the existing asset.
  • 14. CONT… 2. Obsolescence. - New Technological Innovations make existing assets obsolete. - The decrease in the time of the development cycle of new products causes replacement analysis to be performed before the completion of expected economic life of assets.
  • 15. REPLACEMENT ANALYSIS DETAIL… When should a new truck replace the existing truck? When should a process be redesigned? When should a product be redesigned? Defender: the existing equipment, building, or decision previously implemented. Challenger: the proposed replacement currently under consideration. The most common question asked in industry is: When should the existing asset(s) be replaced?
  • 16. ISSUES TO CONSIDER BEFORE STARTING…  Is it morally or ethically right to do this project?  If a unit fails, must it be removed permanently from service? Or repaired?  Are standby units available if the system should fail?  Do components or units fail independently of the failure of other components?  Is there a budget constraint?
  • 17. CONT…  Is there only one replacement allowed over the planning horizon?  Do future replacement units differ over time?  Are technological improvements considered?  Are periodic operating and maintenance costs constant or variable over time?  Are consequences other than economic impacts, i.e., socio-technical issues considered?  Are income tax consequences considered?  Is inflation considered?