User Experience Research Centre fhios The Media Centre 3-8 Carburton Street  London W1W 5AJ www.fhios.com www.fhiosinsights.com Dr Martin Hicks, PhD, MSc, BSc (Hons.)  Erdeniz Hassan MSc, BSc (Hons.) 12 th  November 2009 Webinar: Usagility - Agile usability for rapid development
Established in 2002, now with around 300 clients Over 30 full time staff, who are highly qualified and commercially experienced Specialists in customer experience strategy, research and design Experience across all platforms including digital (e.g. web, intranets, mobile devices, PDA’s, i-TV, etc.), call centres, retail environments and physical products (e.g. laptops, printers, etc.)
Presenters ERDENIZ HASSAN, MSc, BSc (Hons) Erdeniz holds a MSc in Human Centred Systems from City University. He has a wealth of knowledge of conducting user testing sessions and heuristic evaluations. His main interests include eye tracking this is evident within his thesis which is titled ‘Seeing the web the way we want them to: The benefits of eye tracking for web design.’ Erdeniz is a Senior research consultant at fhios. Dr. MARTIN HICKS, Ph.D. MSc. BSc. (Hons.) Martin holds a Ph.D. in Information Visualisation and Human-Computer Interaction (HCI) from the University of Nottingham. He gained a Masters degree in Ergonomics with HCI in 1999 from University College London. Before joining fhios, Martin worked as a Teaching Fellow at the University of Essex and as a Usability Specialist for Microsoft Research Cambridge. He has published widely and has gained experience in user interface design and usability studies based on mobile communication and web-based applications.  Martin is a Senior research consultant at fhios.
Agenda What is agile usability? Why agile usability? Benefits & issues Case study: Agile usability for a financial services provider Conclusions and recommendations Questions
What is agile usability? Agile methods has roots in software engineering, a well known process, e.g. Extreme Programming (XP): Code implementation occurs in small increments & iterations XP teamwork, e.g., paired programming Small releases are delivered to the customer after each development cycle Maintain tight communication between stakeholders and programmers Agile approach to interface design has been questioned (Memmel, 2006): Continuous changes to UI may conflict with users’ expectations & learnability - may lead to user dissatisfaction Evaluating small releases with stakeholders does not guarantee the system provides a consistent conceptual, navigational or content model
What is agile usability? Neilsen (2008) - problems with agile approach: Breaking tasks down into smaller user stories can obscure total user experience - features are developed inconsistently As a solution:.  Usability testing quickly and repeatedly  ‘ Parallel tracks’ allows usability work to be done one step ahead of development Low fidelity prototypes   Patton (2008) proposes best practice guidelines for adding UX to agile development, including: UX practitioners are part of customer/product team   Parallel track development  User validation Leverage user time for multiple activities   Low fidelity prototyping Design facilitation
Why agile usability? – Benefits & issues Key benefits of integrating user experience in agile environments : Feedback & validation provided at earlier stage during development lifecycle  Progression of products can be tracked Feedback can be directly fed into next iteration Modifications need not be restricted to iterations  Reduced costs But; for UX to be effective in agile environments, key factors should be addressed: A responsive design team able to work on design during iterations   Ongoing communication between UX team and developers (co-located is best) Iterative testing of functions should not obscure the holistic user experience  Overarching requirements should not be overlooked Project lifecycle should not be too far advanced
Case study: Agile usability for a financial services provider  Context Financial services provider redesigned sites for mortgage, savings and bank accounts products – required: 3 iterations of usability testing for each product Objectives  Understand the user experience of prototype sites with focus on: Navigation, content, ease of use, search, consistency, graphic design  Design Testing over 3 weeks, 45 participants split into 3 groups of 15 Each group (of 15) reviewed one prototype site (mortgages, savings or bank accounts) Each group (of 15)   further split into 3 groups of 5, each group (of 5) in iteration 1, 2 or 3 Activities Participant observation Talk aloud protocols  Participant interviews and debriefing Questionnaire completion
Case study: Agile usability for a financial services provider  Overview of agile user testing and development iterations
Case study: Agile usability for a financial services provider  Testing priorities Priorities based on product complexity: Most complex first (mortgages, then savings and bank accounts)  1 st  and 2 nd  iterations of mortgages were tested, general findings fed into savings prototype  Cycle repeated for savings and bank accounts Findings fed into final iterations of all 3 prototypes Testing iterations process
Case study: Agile usability for a financial services provider  Summary reports In addition to debriefs, developers received UX summary reports following each test iteration: ‘ Evolving’ reports presented findings from all iterations for each of the prototypes tested Helped validate the relevant usability issues exposed
Case study: Agile usability for a financial services provider  Task findings
Case study: Agile usability for a financial services provider  5.8 5.9 5.10 Annotated prototype
Case study: Agile usability for a financial services provider  Conclusions Ongoing debrief and reporting process helped developers to quickly identify outstanding or new issues with the prototypes 70% of usability issues were identified in the first round of iterative testing Number of issues diminished as prototypes were modified and refined following testing iterations  Agile approach enabled: Fast turnaround on subsequent testing iterations to work within ‘sprint’ and ‘scrum’  Continuing user validation culture between UX consultants and developers  Costs to be reduced as agile testing can support multiple projects on a smaller budget
Agile usability – Points to consider  Agile testing can be beneficial in the right context, but need to consider:  Reporting can be problematic if you set ambitions too high – need to be concise   Project objectives should be explicit and signed off before project starts Leverage the opportunity to test changes to the prototype   Close client contact is essential  Discuss with developers the time needed to implement design changes between iterations   Benefit to clients is that agile testing enables development with high user acceptance on comparatively small budgets  Further research could identify the optimal iterations and time frame required to develop products with fewest usability issues
Questions? Martin Hicks: mhicks@fhios.com Erdeniz Hassan: ehassan@fhios.com   For copies of presentation or further info on fhios services:  marketing@fhios.com

Webinar Agile Presentation V.1.0

  • 1.
    User Experience ResearchCentre fhios The Media Centre 3-8 Carburton Street London W1W 5AJ www.fhios.com www.fhiosinsights.com Dr Martin Hicks, PhD, MSc, BSc (Hons.) Erdeniz Hassan MSc, BSc (Hons.) 12 th November 2009 Webinar: Usagility - Agile usability for rapid development
  • 2.
    Established in 2002,now with around 300 clients Over 30 full time staff, who are highly qualified and commercially experienced Specialists in customer experience strategy, research and design Experience across all platforms including digital (e.g. web, intranets, mobile devices, PDA’s, i-TV, etc.), call centres, retail environments and physical products (e.g. laptops, printers, etc.)
  • 3.
    Presenters ERDENIZ HASSAN,MSc, BSc (Hons) Erdeniz holds a MSc in Human Centred Systems from City University. He has a wealth of knowledge of conducting user testing sessions and heuristic evaluations. His main interests include eye tracking this is evident within his thesis which is titled ‘Seeing the web the way we want them to: The benefits of eye tracking for web design.’ Erdeniz is a Senior research consultant at fhios. Dr. MARTIN HICKS, Ph.D. MSc. BSc. (Hons.) Martin holds a Ph.D. in Information Visualisation and Human-Computer Interaction (HCI) from the University of Nottingham. He gained a Masters degree in Ergonomics with HCI in 1999 from University College London. Before joining fhios, Martin worked as a Teaching Fellow at the University of Essex and as a Usability Specialist for Microsoft Research Cambridge. He has published widely and has gained experience in user interface design and usability studies based on mobile communication and web-based applications. Martin is a Senior research consultant at fhios.
  • 4.
    Agenda What isagile usability? Why agile usability? Benefits & issues Case study: Agile usability for a financial services provider Conclusions and recommendations Questions
  • 5.
    What is agileusability? Agile methods has roots in software engineering, a well known process, e.g. Extreme Programming (XP): Code implementation occurs in small increments & iterations XP teamwork, e.g., paired programming Small releases are delivered to the customer after each development cycle Maintain tight communication between stakeholders and programmers Agile approach to interface design has been questioned (Memmel, 2006): Continuous changes to UI may conflict with users’ expectations & learnability - may lead to user dissatisfaction Evaluating small releases with stakeholders does not guarantee the system provides a consistent conceptual, navigational or content model
  • 6.
    What is agileusability? Neilsen (2008) - problems with agile approach: Breaking tasks down into smaller user stories can obscure total user experience - features are developed inconsistently As a solution:. Usability testing quickly and repeatedly ‘ Parallel tracks’ allows usability work to be done one step ahead of development Low fidelity prototypes Patton (2008) proposes best practice guidelines for adding UX to agile development, including: UX practitioners are part of customer/product team Parallel track development User validation Leverage user time for multiple activities Low fidelity prototyping Design facilitation
  • 7.
    Why agile usability?– Benefits & issues Key benefits of integrating user experience in agile environments : Feedback & validation provided at earlier stage during development lifecycle Progression of products can be tracked Feedback can be directly fed into next iteration Modifications need not be restricted to iterations Reduced costs But; for UX to be effective in agile environments, key factors should be addressed: A responsive design team able to work on design during iterations Ongoing communication between UX team and developers (co-located is best) Iterative testing of functions should not obscure the holistic user experience Overarching requirements should not be overlooked Project lifecycle should not be too far advanced
  • 8.
    Case study: Agileusability for a financial services provider Context Financial services provider redesigned sites for mortgage, savings and bank accounts products – required: 3 iterations of usability testing for each product Objectives Understand the user experience of prototype sites with focus on: Navigation, content, ease of use, search, consistency, graphic design Design Testing over 3 weeks, 45 participants split into 3 groups of 15 Each group (of 15) reviewed one prototype site (mortgages, savings or bank accounts) Each group (of 15) further split into 3 groups of 5, each group (of 5) in iteration 1, 2 or 3 Activities Participant observation Talk aloud protocols Participant interviews and debriefing Questionnaire completion
  • 9.
    Case study: Agileusability for a financial services provider Overview of agile user testing and development iterations
  • 10.
    Case study: Agileusability for a financial services provider Testing priorities Priorities based on product complexity: Most complex first (mortgages, then savings and bank accounts) 1 st and 2 nd iterations of mortgages were tested, general findings fed into savings prototype Cycle repeated for savings and bank accounts Findings fed into final iterations of all 3 prototypes Testing iterations process
  • 11.
    Case study: Agileusability for a financial services provider Summary reports In addition to debriefs, developers received UX summary reports following each test iteration: ‘ Evolving’ reports presented findings from all iterations for each of the prototypes tested Helped validate the relevant usability issues exposed
  • 12.
    Case study: Agileusability for a financial services provider Task findings
  • 13.
    Case study: Agileusability for a financial services provider 5.8 5.9 5.10 Annotated prototype
  • 14.
    Case study: Agileusability for a financial services provider Conclusions Ongoing debrief and reporting process helped developers to quickly identify outstanding or new issues with the prototypes 70% of usability issues were identified in the first round of iterative testing Number of issues diminished as prototypes were modified and refined following testing iterations Agile approach enabled: Fast turnaround on subsequent testing iterations to work within ‘sprint’ and ‘scrum’ Continuing user validation culture between UX consultants and developers Costs to be reduced as agile testing can support multiple projects on a smaller budget
  • 15.
    Agile usability –Points to consider Agile testing can be beneficial in the right context, but need to consider: Reporting can be problematic if you set ambitions too high – need to be concise Project objectives should be explicit and signed off before project starts Leverage the opportunity to test changes to the prototype Close client contact is essential Discuss with developers the time needed to implement design changes between iterations Benefit to clients is that agile testing enables development with high user acceptance on comparatively small budgets Further research could identify the optimal iterations and time frame required to develop products with fewest usability issues
  • 16.
    Questions? Martin Hicks:mhicks@fhios.com Erdeniz Hassan: ehassan@fhios.com For copies of presentation or further info on fhios services: marketing@fhios.com

Editor's Notes

  • #6 fMRI is an expensive tool (the machine costs are in the millions), creating the necessity to locate studies in a hospital setting, and there are limitations as to the activities that can be completed while scanning takes place (e.g. it would not be possible to test the use of websites inside the machine). EEG has advantages of relatively lower cost and vastly increased portability and manoeuvrability.
  • #7 fMRI is an expensive tool (the machine costs are in the millions), creating the necessity to locate studies in a hospital setting, and there are limitations as to the activities that can be completed while scanning takes place (e.g. it would not be possible to test the use of websites inside the machine). EEG has advantages of relatively lower cost and vastly increased portability and manoeuvrability.
  • #8 fMRI is an expensive tool (the machine costs are in the millions), creating the necessity to locate studies in a hospital setting, and there are limitations as to the activities that can be completed while scanning takes place (e.g. it would not be possible to test the use of websites inside the machine). EEG has advantages of relatively lower cost and vastly increased portability and manoeuvrability.
  • #9 fMRI is an expensive tool (the machine costs are in the millions), creating the necessity to locate studies in a hospital setting, and there are limitations as to the activities that can be completed while scanning takes place (e.g. it would not be possible to test the use of websites inside the machine). EEG has advantages of relatively lower cost and vastly increased portability and manoeuvrability.
  • #10 fMRI is an expensive tool (the machine costs are in the millions), creating the necessity to locate studies in a hospital setting, and there are limitations as to the activities that can be completed while scanning takes place (e.g. it would not be possible to test the use of websites inside the machine). EEG has advantages of relatively lower cost and vastly increased portability and manoeuvrability.
  • #11 fMRI is an expensive tool (the machine costs are in the millions), creating the necessity to locate studies in a hospital setting, and there are limitations as to the activities that can be completed while scanning takes place (e.g. it would not be possible to test the use of websites inside the machine). EEG has advantages of relatively lower cost and vastly increased portability and manoeuvrability.
  • #12 fMRI is an expensive tool (the machine costs are in the millions), creating the necessity to locate studies in a hospital setting, and there are limitations as to the activities that can be completed while scanning takes place (e.g. it would not be possible to test the use of websites inside the machine). EEG has advantages of relatively lower cost and vastly increased portability and manoeuvrability.
  • #13 fMRI is an expensive tool (the machine costs are in the millions), creating the necessity to locate studies in a hospital setting, and there are limitations as to the activities that can be completed while scanning takes place (e.g. it would not be possible to test the use of websites inside the machine). EEG has advantages of relatively lower cost and vastly increased portability and manoeuvrability.
  • #14 fMRI is an expensive tool (the machine costs are in the millions), creating the necessity to locate studies in a hospital setting, and there are limitations as to the activities that can be completed while scanning takes place (e.g. it would not be possible to test the use of websites inside the machine). EEG has advantages of relatively lower cost and vastly increased portability and manoeuvrability.
  • #15 fMRI is an expensive tool (the machine costs are in the millions), creating the necessity to locate studies in a hospital setting, and there are limitations as to the activities that can be completed while scanning takes place (e.g. it would not be possible to test the use of websites inside the machine). EEG has advantages of relatively lower cost and vastly increased portability and manoeuvrability.
  • #16 fMRI is an expensive tool (the machine costs are in the millions), creating the necessity to locate studies in a hospital setting, and there are limitations as to the activities that can be completed while scanning takes place (e.g. it would not be possible to test the use of websites inside the machine). EEG has advantages of relatively lower cost and vastly increased portability and manoeuvrability.