SlideShare a Scribd company logo
International Competitive BiddingBid Opening, Evaluation, and Award of Contract Guidelines Procurement under IBRD Loans and IDA Credits
Table of Contents Time for Preparation of Bids Bid Opening Procedures Clarifications or Alterations of Bids Confidentiality Examination of Bids Evaluation and Comparison of Bids
Time for Preparation of Bids Guidelines Procurement under IBRD Loans and IDA Credits
Time for Preparation of Bids Para 2.44 The time allowed for the preparation and submission of bids shall be determined with due consideration of the particular circumstances of the project and the magnitude and complexity of the contract.  Generally, not less than six weeks from the date of the invitation to bid or the date of availability of bidding documents, whichever is later, shall be allowed for ICB.
Time for Preparation of Bids Para 2.44 Where large works or complex items of equipment are involved, this period shall generally be not less than twelve weeks to enable prospective bidders to conduct investigations before submitting their bids.  In such cases, the Borrower is encouraged to convene pre-bid conferences and arrange site visits. Bidders shall be permitted to submit bids by mail or by hand.
Time for Preparation of Bids Para 2.44 Borrowers may also use electronic systems permitting bidders to submit bids by electronic means, provided the Bank is satisfied with the adequacy of the system, including, inter alia, that the system is secure, maintains the confidentiality and authenticity of bids submitted, uses an electronic signature system or equivalent to keep bidders bound to their bids, and only allows bids to be opened with due simultaneous electronic authorization of the bidder and the Borrower.  In this case, bidders shall continue to have the option to submit their bids in hard copy.
Time for Preparation of Bids Para 2.44 The deadline and place for receipt of bids shall be specified in the invitation to bid.
Bid Opening Procedures Guidelines Procurement under IBRD Loans and IDA Credits
Bid Opening Procedures Para 2.45 The time for the bid opening shall be the same as for the deadline for receipt of bids or promptly thereafter, and shall be announced, together with the place for bid opening, in the invitation to bid.  The Borrower shall open all bids at the stipulated time and place.  Bids shall be opened in public; bidders or their representatives shall be allowed to be present (in person or online, when electronic bidding is used).
Bid Opening Procedures Para 2.45 The name of the bidder and total amount of each bid, and of any alternative bids if they have been requested or permitted, shall be read aloud (and posted online when electronic bidding is used) and  recorded when opened and a copy of this record shall be promptly sent to the Bank and to all bidders who submitted bids in time.  Bids received after the time stipulated, as well as those not opened and read out at bid opening, shall not be considered.
Clarifications or Alterations of Bids Guidelines Procurement under IBRD Loans and IDA Credits
Clarifications or Alterations of Bids Para 2.46 Except as otherwise provided in paragraphs 2.63 and 2.64 of these Guidelines, bidders shall not be requested or permitted to alter their bids after the deadline for receipt of bids.  The Borrower shall ask bidders for clarification needed to evaluate their bids but shall not ask or permit bidders to change the substance or price of their bids after the bid opening.  Requests for clarification and the bidders’ responses shall be made in writing, in hard copy or by an electronic system satisfactory to the Bank.
Confidentiality Guidelines Procurement under IBRD Loans and IDA Credits
Confidentiality Para 2.47 After the public opening of bids, information relating to the examination, clarification, and evaluation of bids and recommendations concerning awards shall not be disclosed to bidders or other persons not officially concerned with this process until the publication of contract award.
Examination of Bids Guidelines Procurement under IBRD Loans and IDA Credits
Examination of Bids Para 2.48 The Borrower shall ascertain whether the bids  meet the eligibility requirements specified in paragraph 1.6, 1.7 and 1.8 of these Guidelines,  have been properly signed,  are accompanied by the required securities or required declaration signed as specified in paragraph 2.14 of the Guidelines,  are substantially responsive to the bidding documents, and  are otherwise generally in order.
Examination of Bids Para 2.48 ,[object Object],[object Object]
Evaluation and Comparison of Bids Para 2.49 The purpose of bid evaluation is to determine the cost to the Borrower of each bid in a manner that permits a comparison on the basis of their evaluated cost.  Subject to paragraph 2.58, the bid with the lowest evaluated cost, but not necessarily the lowest submitted price, shall be selected for award.See para. 2.52.
Evaluation and Comparison of Bids Para 2.50 The bid price read out at the bid opening shall be adjusted to correct any arithmetical errors.  Also, for the purpose of evaluation, adjustments shall be made for any quantifiable nonmaterial deviations or reservations.  Price adjustment provisions applying to the period of implementation of the contract shall not be taken into account in the evaluation.
Evaluation and Comparison of Bids Para 2.51 The evaluation and comparison of bids shall be onCIP (place of destination) prices for the supply of imported goods and EXW prices, plus cost of inland transportation and insurance to the place of destination, for goods manufactured within the Borrower’s country, together with prices for any required  installation,  training,  commissioning, and  other similar services.
Evaluation and Comparison of Bids Para 2.52 Bidding documents shall also specify the relevant factors in addition to price to be considered in bid evaluation and the manner in which they will be applied for the purpose of determining the lowest evaluated bid.  For goods and equipment, other factors may be taken into consideration including, among others,  payment schedule,  delivery time,  operating costs,  efficiency and compatibility of the equipment,  availability of service and spare parts, and  related training, safety, and environmental benefits.
Evaluation and Comparison of Bids Para 2.52 ,[object Object],[object Object]
Evaluation and Comparison of Bids Para 2.54 The Borrower shall prepare a detailed report on the evaluation and comparison of bids setting forth the specific reasons on which the recommendation is based for the award of the contract.
Wb procurement icb c1
Wb procurement icb c1
Wb procurement icb c1

More Related Content

What's hot

Wb procurement icb a
Wb procurement icb aWb procurement icb a
Wb procurement icb a
Joy Irman
 
03 11-capillaryrheometer
03 11-capillaryrheometer03 11-capillaryrheometer
03 11-capillaryrheometer
slideseeing
 
Document samples
Document samplesDocument samples
Document samples
Arthur Wilson
 
16 tender document khawaja fareed university 09112017
16   tender document khawaja fareed university 0911201716   tender document khawaja fareed university 09112017
16 tender document khawaja fareed university 09112017
Salman Kharal
 
GUSII MWALIMU SACCO TENDER DOCUMENTS 2015_2016
GUSII MWALIMU SACCO TENDER DOCUMENTS 2015_2016GUSII MWALIMU SACCO TENDER DOCUMENTS 2015_2016
GUSII MWALIMU SACCO TENDER DOCUMENTS 2015_2016
Collo Juma
 
Tender Document for Solar Project in Himachal Pradesh
Tender Document for Solar Project in Himachal PradeshTender Document for Solar Project in Himachal Pradesh
Tender Document for Solar Project in Himachal Pradesh
Headway Solar
 
Tenders
TendersTenders
Tenders
GANESH KUMAR
 
Tenders, their types and process
Tenders, their types and processTenders, their types and process
Tenders, their types and process
Pradipta Vaskar Mukherjee
 
Adb procurement guidelines icb-c2
Adb procurement guidelines   icb-c2Adb procurement guidelines   icb-c2
Adb procurement guidelines icb-c2
Joy Irman
 
Haryana Solar Bid Document RFS
Haryana Solar Bid Document RFSHaryana Solar Bid Document RFS
Haryana Solar Bid Document RFS
Headway Solar
 
Pre Bid Risk Assessment
Pre Bid Risk AssessmentPre Bid Risk Assessment
Pre Bid Risk Assessment
Sukhdarshan Singh
 
Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.
Sukhdarshan Singh
 
Determination of enginer sbd2
Determination of enginer sbd2Determination of enginer sbd2
Determination of enginer sbd2
Prasanna Warnasooriya
 
Wb appendix 3 guidance to bidders
Wb appendix 3 guidance to biddersWb appendix 3 guidance to bidders
Wb appendix 3 guidance to bidders
Joy Irman
 
Bid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandBid document for Solar Plant in Jharkhand
Bid document for Solar Plant in Jharkhand
Headway Solar
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Joy Irman
 
Instructions to bidders
Instructions to biddersInstructions to bidders
Instructions to bidders
RISHARD FAIS
 
Adb procurement guidelines icb-b2
Adb procurement guidelines   icb-b2Adb procurement guidelines   icb-b2
Adb procurement guidelines icb-b2
Joy Irman
 
Appendix 3 guidance to bidders
Appendix 3   guidance to biddersAppendix 3   guidance to bidders
Appendix 3 guidance to bidders
Joy Irman
 
Tendering and Procurement - Basic Principles
Tendering and Procurement   - Basic PrinciplesTendering and Procurement   - Basic Principles
Tendering and Procurement - Basic Principles
SHKLaw
 

What's hot (20)

Wb procurement icb a
Wb procurement icb aWb procurement icb a
Wb procurement icb a
 
03 11-capillaryrheometer
03 11-capillaryrheometer03 11-capillaryrheometer
03 11-capillaryrheometer
 
Document samples
Document samplesDocument samples
Document samples
 
16 tender document khawaja fareed university 09112017
16   tender document khawaja fareed university 0911201716   tender document khawaja fareed university 09112017
16 tender document khawaja fareed university 09112017
 
GUSII MWALIMU SACCO TENDER DOCUMENTS 2015_2016
GUSII MWALIMU SACCO TENDER DOCUMENTS 2015_2016GUSII MWALIMU SACCO TENDER DOCUMENTS 2015_2016
GUSII MWALIMU SACCO TENDER DOCUMENTS 2015_2016
 
Tender Document for Solar Project in Himachal Pradesh
Tender Document for Solar Project in Himachal PradeshTender Document for Solar Project in Himachal Pradesh
Tender Document for Solar Project in Himachal Pradesh
 
Tenders
TendersTenders
Tenders
 
Tenders, their types and process
Tenders, their types and processTenders, their types and process
Tenders, their types and process
 
Adb procurement guidelines icb-c2
Adb procurement guidelines   icb-c2Adb procurement guidelines   icb-c2
Adb procurement guidelines icb-c2
 
Haryana Solar Bid Document RFS
Haryana Solar Bid Document RFSHaryana Solar Bid Document RFS
Haryana Solar Bid Document RFS
 
Pre Bid Risk Assessment
Pre Bid Risk AssessmentPre Bid Risk Assessment
Pre Bid Risk Assessment
 
Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.Study on DMRC tenders and JICA guidelines.
Study on DMRC tenders and JICA guidelines.
 
Determination of enginer sbd2
Determination of enginer sbd2Determination of enginer sbd2
Determination of enginer sbd2
 
Wb appendix 3 guidance to bidders
Wb appendix 3 guidance to biddersWb appendix 3 guidance to bidders
Wb appendix 3 guidance to bidders
 
Bid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandBid document for Solar Plant in Jharkhand
Bid document for Solar Plant in Jharkhand
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
 
Instructions to bidders
Instructions to biddersInstructions to bidders
Instructions to bidders
 
Adb procurement guidelines icb-b2
Adb procurement guidelines   icb-b2Adb procurement guidelines   icb-b2
Adb procurement guidelines icb-b2
 
Appendix 3 guidance to bidders
Appendix 3   guidance to biddersAppendix 3   guidance to bidders
Appendix 3 guidance to bidders
 
Tendering and Procurement - Basic Principles
Tendering and Procurement   - Basic PrinciplesTendering and Procurement   - Basic Principles
Tendering and Procurement - Basic Principles
 

Viewers also liked

Insurance tendering, is it such a challenge? London - May 2016
Insurance tendering, is it such a challenge? London - May 2016Insurance tendering, is it such a challenge? London - May 2016
Insurance tendering, is it such a challenge? London - May 2016
Browne Jacobson LLP
 
FM Procurement Good Practice
FM Procurement Good PracticeFM Procurement Good Practice
FM Procurement Good Practice
johnjbowen
 
Mybbs-Company profile
Mybbs-Company profileMybbs-Company profile
Mybbs-Company profile
Chris Yap
 
Placa Arduino
Placa ArduinoPlaca Arduino
Placa Arduino
Felipe Nascimento
 
Masters Thesis Literature Review Tips
Masters Thesis Literature Review TipsMasters Thesis Literature Review Tips
Masters Thesis Literature Review Tips
Jennifer Rowland
 
Sbd procurement of goods section iii evaluation and qualification criteria
Sbd procurement of goods   section iii evaluation and qualification criteriaSbd procurement of goods   section iii evaluation and qualification criteria
Sbd procurement of goods section iii evaluation and qualification criteria
Joy Irman
 
Contour crafting
Contour craftingContour crafting
Contour crafting
Anshi Verma
 
mini projects titles for electronics engineering:design for visually impaired...
mini projects titles for electronics engineering:design for visually impaired...mini projects titles for electronics engineering:design for visually impaired...
mini projects titles for electronics engineering:design for visually impaired...
ASHOKKUMAR RAMAR
 
FINAL YEAR DIPLOMA PROJECTS LIST FOR DECE/DEEE/DCT/DME
FINAL YEAR DIPLOMA PROJECTS LIST FOR DECE/DEEE/DCT/DMEFINAL YEAR DIPLOMA PROJECTS LIST FOR DECE/DEEE/DCT/DME
FINAL YEAR DIPLOMA PROJECTS LIST FOR DECE/DEEE/DCT/DME
ASHOKKUMAR RAMAR
 
Research Integrity - Supervision Enhancement Program, Feb 2016
Research Integrity - Supervision Enhancement Program, Feb 2016Research Integrity - Supervision Enhancement Program, Feb 2016
Research Integrity - Supervision Enhancement Program, Feb 2016
Merilyn Childs @ Macquarie University
 
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAM
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAMBEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAM
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAM
ASHOKKUMAR RAMAR
 
New Earth Nation Brazil The New Earth Nikola Tesla Academy (Global Resonanc...
New Earth Nation Brazil   The New Earth Nikola Tesla Academy (Global Resonanc...New Earth Nation Brazil   The New Earth Nikola Tesla Academy (Global Resonanc...
New Earth Nation Brazil The New Earth Nikola Tesla Academy (Global Resonanc...
Boris Petrovic
 
FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system
FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system
FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system
ASHOKKUMAR RAMAR
 
Aquecimento global 9g
Aquecimento global 9gAquecimento global 9g
Aquecimento global 9g
Mayjö .
 
Presentation on cartel
Presentation on cartelPresentation on cartel
Presentation on cartel
Gaurav Singh
 

Viewers also liked (15)

Insurance tendering, is it such a challenge? London - May 2016
Insurance tendering, is it such a challenge? London - May 2016Insurance tendering, is it such a challenge? London - May 2016
Insurance tendering, is it such a challenge? London - May 2016
 
FM Procurement Good Practice
FM Procurement Good PracticeFM Procurement Good Practice
FM Procurement Good Practice
 
Mybbs-Company profile
Mybbs-Company profileMybbs-Company profile
Mybbs-Company profile
 
Placa Arduino
Placa ArduinoPlaca Arduino
Placa Arduino
 
Masters Thesis Literature Review Tips
Masters Thesis Literature Review TipsMasters Thesis Literature Review Tips
Masters Thesis Literature Review Tips
 
Sbd procurement of goods section iii evaluation and qualification criteria
Sbd procurement of goods   section iii evaluation and qualification criteriaSbd procurement of goods   section iii evaluation and qualification criteria
Sbd procurement of goods section iii evaluation and qualification criteria
 
Contour crafting
Contour craftingContour crafting
Contour crafting
 
mini projects titles for electronics engineering:design for visually impaired...
mini projects titles for electronics engineering:design for visually impaired...mini projects titles for electronics engineering:design for visually impaired...
mini projects titles for electronics engineering:design for visually impaired...
 
FINAL YEAR DIPLOMA PROJECTS LIST FOR DECE/DEEE/DCT/DME
FINAL YEAR DIPLOMA PROJECTS LIST FOR DECE/DEEE/DCT/DMEFINAL YEAR DIPLOMA PROJECTS LIST FOR DECE/DEEE/DCT/DME
FINAL YEAR DIPLOMA PROJECTS LIST FOR DECE/DEEE/DCT/DME
 
Research Integrity - Supervision Enhancement Program, Feb 2016
Research Integrity - Supervision Enhancement Program, Feb 2016Research Integrity - Supervision Enhancement Program, Feb 2016
Research Integrity - Supervision Enhancement Program, Feb 2016
 
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAM
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAMBEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAM
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAM
 
New Earth Nation Brazil The New Earth Nikola Tesla Academy (Global Resonanc...
New Earth Nation Brazil   The New Earth Nikola Tesla Academy (Global Resonanc...New Earth Nation Brazil   The New Earth Nikola Tesla Academy (Global Resonanc...
New Earth Nation Brazil The New Earth Nikola Tesla Academy (Global Resonanc...
 
FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system
FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system
FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system
 
Aquecimento global 9g
Aquecimento global 9gAquecimento global 9g
Aquecimento global 9g
 
Presentation on cartel
Presentation on cartelPresentation on cartel
Presentation on cartel
 

Similar to Wb procurement icb c1

Adb procurement guidelines icb-b1
Adb procurement guidelines   icb-b1Adb procurement guidelines   icb-b1
Adb procurement guidelines icb-b1
Joy Irman
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post q
umes manandhar
 
Adb procurement guidelines icb-b3
Adb procurement guidelines   icb-b3Adb procurement guidelines   icb-b3
Adb procurement guidelines icb-b3
Joy Irman
 
Adb procurement guidelines icb-a
Adb procurement guidelines   icb-aAdb procurement guidelines   icb-a
Adb procurement guidelines icb-a
Joy Irman
 
Wb consultant 2c
Wb consultant 2cWb consultant 2c
Wb consultant 2c
Joy Irman
 
Procurement_SOP_ENG.pdf
Procurement_SOP_ENG.pdfProcurement_SOP_ENG.pdf
Procurement_SOP_ENG.pdf
DeveshUpadhyaya4
 
Sbd procurement of goods 6 award of contract
Sbd procurement of goods   6 award of contractSbd procurement of goods   6 award of contract
Sbd procurement of goods 6 award of contract
Joy Irman
 
PowerPoint Presentation -Getachew M.pptx
PowerPoint Presentation -Getachew M.pptxPowerPoint Presentation -Getachew M.pptx
PowerPoint Presentation -Getachew M.pptx
GetachewMekonnen22
 
capaicty buidling program to make nation clean
capaicty buidling program to make nation cleancapaicty buidling program to make nation clean
capaicty buidling program to make nation clean
chiragvyas32
 
Topic 1 - Bidding Documents.pptx
Topic 1 - Bidding Documents.pptxTopic 1 - Bidding Documents.pptx
Topic 1 - Bidding Documents.pptx
VanJasperCastillo
 
BIDDING PROCEDURES AND UPDATES.pptx
BIDDING PROCEDURES AND UPDATES.pptxBIDDING PROCEDURES AND UPDATES.pptx
BIDDING PROCEDURES AND UPDATES.pptx
benito procia
 
Wb procurement other method-1
Wb procurement other method-1Wb procurement other method-1
Wb procurement other method-1
Joy Irman
 
CIDA SBD 03.pdf
CIDA SBD 03.pdfCIDA SBD 03.pdf
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSPURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
Ganesh Bhorkade
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
ManaliChitranshi
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTAD
Vj NiroSh
 
Adb procurement guidelines introduction1
Adb procurement guidelines   introduction1Adb procurement guidelines   introduction1
Adb procurement guidelines introduction1
Joy Irman
 
2. Project Procurement Process.pptx
2. Project Procurement Process.pptx2. Project Procurement Process.pptx
2. Project Procurement Process.pptx
DoctorOkelloBen
 
Tender and Bidding in Construction Projects
Tender and Bidding in Construction ProjectsTender and Bidding in Construction Projects
Tender and Bidding in Construction Projects
IJERA Editor
 
World bank price adjustment documents.PDF
World bank price adjustment documents.PDFWorld bank price adjustment documents.PDF
World bank price adjustment documents.PDF
Govinda Gaire
 

Similar to Wb procurement icb c1 (20)

Adb procurement guidelines icb-b1
Adb procurement guidelines   icb-b1Adb procurement guidelines   icb-b1
Adb procurement guidelines icb-b1
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post q
 
Adb procurement guidelines icb-b3
Adb procurement guidelines   icb-b3Adb procurement guidelines   icb-b3
Adb procurement guidelines icb-b3
 
Adb procurement guidelines icb-a
Adb procurement guidelines   icb-aAdb procurement guidelines   icb-a
Adb procurement guidelines icb-a
 
Wb consultant 2c
Wb consultant 2cWb consultant 2c
Wb consultant 2c
 
Procurement_SOP_ENG.pdf
Procurement_SOP_ENG.pdfProcurement_SOP_ENG.pdf
Procurement_SOP_ENG.pdf
 
Sbd procurement of goods 6 award of contract
Sbd procurement of goods   6 award of contractSbd procurement of goods   6 award of contract
Sbd procurement of goods 6 award of contract
 
PowerPoint Presentation -Getachew M.pptx
PowerPoint Presentation -Getachew M.pptxPowerPoint Presentation -Getachew M.pptx
PowerPoint Presentation -Getachew M.pptx
 
capaicty buidling program to make nation clean
capaicty buidling program to make nation cleancapaicty buidling program to make nation clean
capaicty buidling program to make nation clean
 
Topic 1 - Bidding Documents.pptx
Topic 1 - Bidding Documents.pptxTopic 1 - Bidding Documents.pptx
Topic 1 - Bidding Documents.pptx
 
BIDDING PROCEDURES AND UPDATES.pptx
BIDDING PROCEDURES AND UPDATES.pptxBIDDING PROCEDURES AND UPDATES.pptx
BIDDING PROCEDURES AND UPDATES.pptx
 
Wb procurement other method-1
Wb procurement other method-1Wb procurement other method-1
Wb procurement other method-1
 
CIDA SBD 03.pdf
CIDA SBD 03.pdfCIDA SBD 03.pdf
CIDA SBD 03.pdf
 
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSPURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTAD
 
Adb procurement guidelines introduction1
Adb procurement guidelines   introduction1Adb procurement guidelines   introduction1
Adb procurement guidelines introduction1
 
2. Project Procurement Process.pptx
2. Project Procurement Process.pptx2. Project Procurement Process.pptx
2. Project Procurement Process.pptx
 
Tender and Bidding in Construction Projects
Tender and Bidding in Construction ProjectsTender and Bidding in Construction Projects
Tender and Bidding in Construction Projects
 
World bank price adjustment documents.PDF
World bank price adjustment documents.PDFWorld bank price adjustment documents.PDF
World bank price adjustment documents.PDF
 

More from Joy Irman

Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Joy Irman
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Joy Irman
 
Lampiran iv b jasa konsultansi - perorangan
Lampiran iv b   jasa konsultansi - peroranganLampiran iv b   jasa konsultansi - perorangan
Lampiran iv b jasa konsultansi - peroranganJoy Irman
 
Lampiran iv a jasa konsultansi - badan usaha
Lampiran iv a   jasa konsultansi - badan usahaLampiran iv a   jasa konsultansi - badan usaha
Lampiran iv a jasa konsultansi - badan usahaJoy Irman
 
Consulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development BankConsulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development Bank
Joy Irman
 
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank FinancingGuidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Joy Irman
 
Guidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA LoansGuidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA Loans
Joy Irman
 
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Joy Irman
 
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
Joy Irman
 
12 konsep ramah lingkungan
12 konsep ramah lingkungan12 konsep ramah lingkungan
12 konsep ramah lingkungan
Joy Irman
 
13 pengadaan secara elektronik
13 pengadaan secara elektronik13 pengadaan secara elektronik
13 pengadaan secara elektronik
Joy Irman
 
6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan
Joy Irman
 
3 1 organisasi pengadaan
3 1 organisasi pengadaan3 1 organisasi pengadaan
3 1 organisasi pengadaan
Joy Irman
 
4 rencana umum pengadaan barang
4 rencana umum pengadaan barang4 rencana umum pengadaan barang
4 rencana umum pengadaan barang
Joy Irman
 
5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola
Joy Irman
 
5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola
Joy Irman
 
3 7 penyedia barang jasa
3 7 penyedia barang jasa3 7 penyedia barang jasa
3 7 penyedia barang jasa
Joy Irman
 
3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan
Joy Irman
 
3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan
Joy Irman
 
3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen
Joy Irman
 

More from Joy Irman (20)

Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
 
Lampiran iv b jasa konsultansi - perorangan
Lampiran iv b   jasa konsultansi - peroranganLampiran iv b   jasa konsultansi - perorangan
Lampiran iv b jasa konsultansi - perorangan
 
Lampiran iv a jasa konsultansi - badan usaha
Lampiran iv a   jasa konsultansi - badan usahaLampiran iv a   jasa konsultansi - badan usaha
Lampiran iv a jasa konsultansi - badan usaha
 
Consulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development BankConsulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development Bank
 
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank FinancingGuidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank Financing
 
Guidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA LoansGuidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA Loans
 
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
 
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
 
12 konsep ramah lingkungan
12 konsep ramah lingkungan12 konsep ramah lingkungan
12 konsep ramah lingkungan
 
13 pengadaan secara elektronik
13 pengadaan secara elektronik13 pengadaan secara elektronik
13 pengadaan secara elektronik
 
6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan
 
3 1 organisasi pengadaan
3 1 organisasi pengadaan3 1 organisasi pengadaan
3 1 organisasi pengadaan
 
4 rencana umum pengadaan barang
4 rencana umum pengadaan barang4 rencana umum pengadaan barang
4 rencana umum pengadaan barang
 
5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola
 
5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola
 
3 7 penyedia barang jasa
3 7 penyedia barang jasa3 7 penyedia barang jasa
3 7 penyedia barang jasa
 
3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan
 
3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan
 
3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen
 

Recently uploaded

Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
IPLTech Electric
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
HajeJanKamps
 
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
Cambridge Product Management Network
 
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women MagazineEllen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
CIOWomenMagazine
 
Call8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessingCall8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessing
➑➌➋➑➒➎➑➑➊➍
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
Rbc Rbcua
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
thesiliconleaders
 
Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
obriengroupinc04
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
Arijit Dutta
 
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Niswey
 
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
dpbossdpboss69
 
Innovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & InnovationInnovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & Innovation
Operational Excellence Consulting
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
GraceKohler1
 
Virtual Leadership and the managing work
Virtual Leadership and the managing workVirtual Leadership and the managing work
Virtual Leadership and the managing work
IruniUshara1
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
Operational Excellence Consulting
 
Lukas Rycek - GreenChemForCE - project structure.pptx
Lukas Rycek - GreenChemForCE - project structure.pptxLukas Rycek - GreenChemForCE - project structure.pptx
Lukas Rycek - GreenChemForCE - project structure.pptx
pavelborek
 

Recently uploaded (20)

Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
 
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
2024.06 CPMN Cambridge - Beyond Now-Next-Later.pdf
 
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women MagazineEllen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
 
Call8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessingCall8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessing
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
 
Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
 
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
 
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
Call 8867766396 Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian M...
 
Innovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & InnovationInnovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & Innovation
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
 
Virtual Leadership and the managing work
Virtual Leadership and the managing workVirtual Leadership and the managing work
Virtual Leadership and the managing work
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
 
Lukas Rycek - GreenChemForCE - project structure.pptx
Lukas Rycek - GreenChemForCE - project structure.pptxLukas Rycek - GreenChemForCE - project structure.pptx
Lukas Rycek - GreenChemForCE - project structure.pptx
 

Wb procurement icb c1

  • 1. International Competitive BiddingBid Opening, Evaluation, and Award of Contract Guidelines Procurement under IBRD Loans and IDA Credits
  • 2. Table of Contents Time for Preparation of Bids Bid Opening Procedures Clarifications or Alterations of Bids Confidentiality Examination of Bids Evaluation and Comparison of Bids
  • 3. Time for Preparation of Bids Guidelines Procurement under IBRD Loans and IDA Credits
  • 4. Time for Preparation of Bids Para 2.44 The time allowed for the preparation and submission of bids shall be determined with due consideration of the particular circumstances of the project and the magnitude and complexity of the contract. Generally, not less than six weeks from the date of the invitation to bid or the date of availability of bidding documents, whichever is later, shall be allowed for ICB.
  • 5. Time for Preparation of Bids Para 2.44 Where large works or complex items of equipment are involved, this period shall generally be not less than twelve weeks to enable prospective bidders to conduct investigations before submitting their bids. In such cases, the Borrower is encouraged to convene pre-bid conferences and arrange site visits. Bidders shall be permitted to submit bids by mail or by hand.
  • 6. Time for Preparation of Bids Para 2.44 Borrowers may also use electronic systems permitting bidders to submit bids by electronic means, provided the Bank is satisfied with the adequacy of the system, including, inter alia, that the system is secure, maintains the confidentiality and authenticity of bids submitted, uses an electronic signature system or equivalent to keep bidders bound to their bids, and only allows bids to be opened with due simultaneous electronic authorization of the bidder and the Borrower. In this case, bidders shall continue to have the option to submit their bids in hard copy.
  • 7. Time for Preparation of Bids Para 2.44 The deadline and place for receipt of bids shall be specified in the invitation to bid.
  • 8. Bid Opening Procedures Guidelines Procurement under IBRD Loans and IDA Credits
  • 9. Bid Opening Procedures Para 2.45 The time for the bid opening shall be the same as for the deadline for receipt of bids or promptly thereafter, and shall be announced, together with the place for bid opening, in the invitation to bid. The Borrower shall open all bids at the stipulated time and place. Bids shall be opened in public; bidders or their representatives shall be allowed to be present (in person or online, when electronic bidding is used).
  • 10. Bid Opening Procedures Para 2.45 The name of the bidder and total amount of each bid, and of any alternative bids if they have been requested or permitted, shall be read aloud (and posted online when electronic bidding is used) and recorded when opened and a copy of this record shall be promptly sent to the Bank and to all bidders who submitted bids in time. Bids received after the time stipulated, as well as those not opened and read out at bid opening, shall not be considered.
  • 11. Clarifications or Alterations of Bids Guidelines Procurement under IBRD Loans and IDA Credits
  • 12. Clarifications or Alterations of Bids Para 2.46 Except as otherwise provided in paragraphs 2.63 and 2.64 of these Guidelines, bidders shall not be requested or permitted to alter their bids after the deadline for receipt of bids. The Borrower shall ask bidders for clarification needed to evaluate their bids but shall not ask or permit bidders to change the substance or price of their bids after the bid opening. Requests for clarification and the bidders’ responses shall be made in writing, in hard copy or by an electronic system satisfactory to the Bank.
  • 13. Confidentiality Guidelines Procurement under IBRD Loans and IDA Credits
  • 14. Confidentiality Para 2.47 After the public opening of bids, information relating to the examination, clarification, and evaluation of bids and recommendations concerning awards shall not be disclosed to bidders or other persons not officially concerned with this process until the publication of contract award.
  • 15. Examination of Bids Guidelines Procurement under IBRD Loans and IDA Credits
  • 16. Examination of Bids Para 2.48 The Borrower shall ascertain whether the bids meet the eligibility requirements specified in paragraph 1.6, 1.7 and 1.8 of these Guidelines, have been properly signed, are accompanied by the required securities or required declaration signed as specified in paragraph 2.14 of the Guidelines, are substantially responsive to the bidding documents, and are otherwise generally in order.
  • 17.
  • 18. Evaluation and Comparison of Bids Para 2.49 The purpose of bid evaluation is to determine the cost to the Borrower of each bid in a manner that permits a comparison on the basis of their evaluated cost. Subject to paragraph 2.58, the bid with the lowest evaluated cost, but not necessarily the lowest submitted price, shall be selected for award.See para. 2.52.
  • 19. Evaluation and Comparison of Bids Para 2.50 The bid price read out at the bid opening shall be adjusted to correct any arithmetical errors. Also, for the purpose of evaluation, adjustments shall be made for any quantifiable nonmaterial deviations or reservations. Price adjustment provisions applying to the period of implementation of the contract shall not be taken into account in the evaluation.
  • 20. Evaluation and Comparison of Bids Para 2.51 The evaluation and comparison of bids shall be onCIP (place of destination) prices for the supply of imported goods and EXW prices, plus cost of inland transportation and insurance to the place of destination, for goods manufactured within the Borrower’s country, together with prices for any required installation, training, commissioning, and other similar services.
  • 21. Evaluation and Comparison of Bids Para 2.52 Bidding documents shall also specify the relevant factors in addition to price to be considered in bid evaluation and the manner in which they will be applied for the purpose of determining the lowest evaluated bid. For goods and equipment, other factors may be taken into consideration including, among others, payment schedule, delivery time, operating costs, efficiency and compatibility of the equipment, availability of service and spare parts, and related training, safety, and environmental benefits.
  • 22.
  • 23. Evaluation and Comparison of Bids Para 2.54 The Borrower shall prepare a detailed report on the evaluation and comparison of bids setting forth the specific reasons on which the recommendation is based for the award of the contract.