Guidance to Bidders Guidelines Procurement under IBRD Loans and IDA Credits
Purpose Para 1 This Appendix provides guidance to potential bidders wishing to participate in Bank-financed procurement.
Responsibility for Procurement Para 2 The responsibility for the implementation of the project, and therefore for the payment of goods, works, and services under the project, rests solely with the Borrower.  The Bank, for its part, is required by its Articles of Agreement to ensure that funds are paid from a Bank loan only as expenditures are incurred.  Disbursements of the proceeds of a loan are made only at the Borrower's request. Supporting evidence that the funds are used in accordance with the Loan Agreement and/or the Procurement Plan shall be submitted with the Borrower's withdrawal application.
Responsibility for Procurement Para 2 Payment may be made  to reimburse the Borrower for payment(s) already made from its own resources,  directly to a third party (usually to a supplier or contractor), or  to a commercial bank for expenditures against a World Bank Special Commitment covering a commercial bank's letter of credit.  As emphasized in paragraph 1.2 of the Guidelines, the Borrower is legally responsible for the procurement. It invites, receives, and evaluates bids, and awards the contract.  The contract is between the Borrower and the supplier or contractor. The Bank is not a party to the contract.
Bank’s Role Para 3 As stated in paragraph 1.11 of the Guidelines, the Bank reviews the procurement procedures, documents, bid evaluations, award recommendations, and the contract to ensure that the process is carried out in accordance with agreed procedures, as required in the Loan Agreement.  In the case of major contracts, the documents are reviewed by the Bank prior to their issue, as described in Appendix 1. Also, if, at any time in the procurement process (even after the award of contract), the Bank concludes that the agreed procedures were not followed in any material respect, the Bank may declare misprocurement, as described in paragraph 1.12.
Bank’s Role Para 3 However, if a Borrower has awarded a contract after obtaining the Bank’s “no objection,” the Bank will declare misprocurement only if the “no objection” was issued on the basis of incomplete, inaccurate, or misleading information furnished by the Borrower.  Furthermore, if the Bank determines that corrupt or fraudulent practices were engaged in by representatives of the Borrower or of the bidder, the Bank may impose the applicable sanctions set forth in paragraph 1.14 of the Guidelines.
Bank’s Role Para 4 The Bank has published Standard Bidding Documents (SBDs) for various types of procurement. As stated in paragraph 2.12 of the Guidelines, it is mandatory for the Borrower to use these documents, with minimum changes to address country- and project-specific issues. The prequalification and bidding documents are finalized and issued by the Borrower.
Information on Bidding Para 5 Information on bidding opportunities under ICB may be obtained from the General Procurement Notice and the Specific Procurement Notices as described in paragraphs 2.7 and 2.8 of the Guidelines.  General guidance on participation, as well as advance information on business opportunities in upcoming projects, may be obtained from the World Bank website as well as from the Infoshop.  Project Appraisal Documents (PAD) are also available from the Infoshop and on the Bank’s website upon approval of the loan.
Bidder’s Role Para 6 Once a bidder receives the prequalification or bidding document, the bidder should study the documents carefully to decide if it can meet the technical, commercial, and contractual conditions, and if so, proceed to prepare its bid.  The bidder should then critically review the documents to see if there is any ambiguity, omission, or internal contradiction, or any feature of specifications or other conditions which are unclear or appear discriminatory or restrictive; if so, it should seek clarification from the Borrower, in writing, within the time period specified in the bidding documents for seeking clarifications.
Bidder’s Role Para 7 The criteria and methodology for selection of the successful bidder are outlined in the bidding documents, generally under Instructions to Bidders and Specifications.  If these are not clear, clarification should be similarly sought from the Borrower.
Bidder’s Role Para 8 In this connection it should be emphasized that the specific bidding documents issued by the Borrower govern each procurement, as stated in paragraph 1.1 of the Guidelines.  If a bidder feels that any of the provisions in the documents are inconsistent with the Guidelines, it should also raise this with the Borrower.
Bidder’s Role Para 9 It is the responsibility of the bidder to raise any issue of ambiguity, contradiction, omission, etc., prior to the submission of its bid, to assure submission of a fully responsive and compliant bid, including all the supporting documents requested in the bidding documents.  Noncompliance with critical (technical and commercial) requirements will result in rejection of the bid. If a bidder wishes to propose deviations to a noncritical requirement, or propose an alternative solution, the bidder should quote the price for the fully compliant bid and then separately indicate the adjustment in price that can be offered if the deviation is accepted.
Bidder’s Role Para 9 Alternative solutions should be offered only when authorized in the bidding documents.  Once bids are received and publicly opened, bidders will not be required or permitted to change the price or substance of a bid.
Confidentiality Para 10 As stated in paragraph 2.47 of the Guidelines, the process of bid evaluation shall be confidential until the publication of contract award .  This is essential to enable the Borrower and Bank reviewers to avoid either the reality or perception of improper interference.  If at this stage a bidder wishes to bring additional information to the notice of the Borrower, the Bank, or both, it should do so in writing.
Action by the Bank Para 11 Bidders are free to send copies of their communications on issues and questions with the Borrower to the Bank or to write to the Bank directly, when Borrowers do not respond promptly, or the communication is a complaint against the Borrower. All such communications should be addressed to the Task Team Leader for the project, with a copy to the Country Director for the borrowing country and to the Regional Procurement Adviser. Names of Task Team Leaders are available in the PAD.
Action by the Bank Para 12 References received by the Bank from potential bidders, prior to the closing date for submission of the bids, will, if appropriate, be referred to the Borrower with the Bank’s comments and advice, for action or response.
Action by the Bank Para 13 Communication received from bidders after the opening of the bids, will be handled as follows. In the case of contracts not subject to prior review by the Bank, the communication will be sent to the Borrower for due consideration and appropriate action, if any, and these will be reviewed during subsequent supervision of the project by Bank staff. In the cases of contracts subject to the prior review process, the communication will be examined by the Bank, in consultation with the Borrower. If additional data is required to complete this process, these will be obtained from the Borrower. If additional information or clarification is required from the bidder, the Bank will ask the Borrower to obtain it and comment or incorporate it, as appropriate, in the evaluation report. The Bank’s review will not be completed until the communication is fully examined and considered.
Action by the Bank Para 14 Except for acknowledgment, the Bank will not enter into discussion or correspondence with any bidder during the evaluation and review process of the procurement, until award of the contract is published.
Debriefing Para 15 As stated in paragraph 2.65, if, after notification of award, a bidder wishes to ascertain the grounds on which its bid was not selected, it should address its request to the Borrower.  If the bidder is not satisfied with the explanation given and wishes to seek a meeting with the Bank, it may do so by addressing the Regional Procurement Adviser for the borrowing country, who will arrange a meeting at the appropriate level and with the relevant staff.  In this discussion, only the bidder’s bid can be discussed and not the bids of competitors.
Wb appendix 3 guidance to bidders

More Related Content

What's hot

Instructions to bidders
Instructions to biddersInstructions to bidders
Instructions to bidders
RISHARD FAIS
 
e auction in india
e auction in indiae auction in india
e auction in india
Pavan Reddy
 
Wb procurement icb c1
Wb procurement icb c1Wb procurement icb c1
Wb procurement icb c1
Joy Irman
 
Wb consultant 1b
Wb consultant 1bWb consultant 1b
Wb consultant 1b
Joy Irman
 
Wb consultant 1a
Wb consultant 1aWb consultant 1a
Wb consultant 1a
Joy Irman
 
bChannels Terms & Conditions
bChannels Terms & ConditionsbChannels Terms & Conditions
bChannels Terms & Conditions
bChannels
 
Objective Criteria used to evaluate and award bids R Esau
Objective Criteria used to evaluate and award bids R EsauObjective Criteria used to evaluate and award bids R Esau
Objective Criteria used to evaluate and award bids R Esau
Raymond Esau
 
Wb procurement icb a
Wb procurement icb aWb procurement icb a
Wb procurement icb a
Joy Irman
 
!Rfq 9119 13-7035 final draft for approval (jan 30)
!Rfq 9119 13-7035 final draft for approval (jan 30)!Rfq 9119 13-7035 final draft for approval (jan 30)
!Rfq 9119 13-7035 final draft for approval (jan 30)
Bob Gaspirc
 
Opposition to registration of a Trademark
Opposition to registration of a TrademarkOpposition to registration of a Trademark
Opposition to registration of a Trademark
Solubilis
 
Appendix 1 adb review of procurement decisions
Appendix 1   adb review of procurement decisionsAppendix 1   adb review of procurement decisions
Appendix 1 adb review of procurement decisions
Joy Irman
 
Ucp unit 1 definitions and interpretations
Ucp unit  1 definitions and interpretationsUcp unit  1 definitions and interpretations
Ucp unit 1 definitions and interpretations
Asad Hameed
 
Ipg2
Ipg2Ipg2
Ucp unit 2 examination of documents
Ucp unit 2 examination of documentsUcp unit 2 examination of documents
Ucp unit 2 examination of documents
Asad Hameed
 
9 valid conditions that constitutes a valid offer
9 valid conditions that constitutes a valid offer9 valid conditions that constitutes a valid offer
9 valid conditions that constitutes a valid offer
MuhammadArslan488
 
4. international procurement guideline
4. international procurement guideline4. international procurement guideline
4. international procurement guideline
Hyoyoung Kim
 
SBP Export/Import Regulations: Unit 2
SBP Export/Import Regulations: Unit 2SBP Export/Import Regulations: Unit 2
SBP Export/Import Regulations: Unit 2
Asad Hameed
 
Documentation & legal aspects in Bank
Documentation & legal aspects in BankDocumentation & legal aspects in Bank
Documentation & legal aspects in Bank
Abinash Mandilwar
 
Summary of the main features and rational of the hospital do suburbio bidding...
Summary of the main features and rational of the hospital do suburbio bidding...Summary of the main features and rational of the hospital do suburbio bidding...
Summary of the main features and rational of the hospital do suburbio bidding...
Mauricio Portugal Ribeiro
 
Adb procurement guidelines icb-c2
Adb procurement guidelines   icb-c2Adb procurement guidelines   icb-c2
Adb procurement guidelines icb-c2
Joy Irman
 

What's hot (20)

Instructions to bidders
Instructions to biddersInstructions to bidders
Instructions to bidders
 
e auction in india
e auction in indiae auction in india
e auction in india
 
Wb procurement icb c1
Wb procurement icb c1Wb procurement icb c1
Wb procurement icb c1
 
Wb consultant 1b
Wb consultant 1bWb consultant 1b
Wb consultant 1b
 
Wb consultant 1a
Wb consultant 1aWb consultant 1a
Wb consultant 1a
 
bChannels Terms & Conditions
bChannels Terms & ConditionsbChannels Terms & Conditions
bChannels Terms & Conditions
 
Objective Criteria used to evaluate and award bids R Esau
Objective Criteria used to evaluate and award bids R EsauObjective Criteria used to evaluate and award bids R Esau
Objective Criteria used to evaluate and award bids R Esau
 
Wb procurement icb a
Wb procurement icb aWb procurement icb a
Wb procurement icb a
 
!Rfq 9119 13-7035 final draft for approval (jan 30)
!Rfq 9119 13-7035 final draft for approval (jan 30)!Rfq 9119 13-7035 final draft for approval (jan 30)
!Rfq 9119 13-7035 final draft for approval (jan 30)
 
Opposition to registration of a Trademark
Opposition to registration of a TrademarkOpposition to registration of a Trademark
Opposition to registration of a Trademark
 
Appendix 1 adb review of procurement decisions
Appendix 1   adb review of procurement decisionsAppendix 1   adb review of procurement decisions
Appendix 1 adb review of procurement decisions
 
Ucp unit 1 definitions and interpretations
Ucp unit  1 definitions and interpretationsUcp unit  1 definitions and interpretations
Ucp unit 1 definitions and interpretations
 
Ipg2
Ipg2Ipg2
Ipg2
 
Ucp unit 2 examination of documents
Ucp unit 2 examination of documentsUcp unit 2 examination of documents
Ucp unit 2 examination of documents
 
9 valid conditions that constitutes a valid offer
9 valid conditions that constitutes a valid offer9 valid conditions that constitutes a valid offer
9 valid conditions that constitutes a valid offer
 
4. international procurement guideline
4. international procurement guideline4. international procurement guideline
4. international procurement guideline
 
SBP Export/Import Regulations: Unit 2
SBP Export/Import Regulations: Unit 2SBP Export/Import Regulations: Unit 2
SBP Export/Import Regulations: Unit 2
 
Documentation & legal aspects in Bank
Documentation & legal aspects in BankDocumentation & legal aspects in Bank
Documentation & legal aspects in Bank
 
Summary of the main features and rational of the hospital do suburbio bidding...
Summary of the main features and rational of the hospital do suburbio bidding...Summary of the main features and rational of the hospital do suburbio bidding...
Summary of the main features and rational of the hospital do suburbio bidding...
 
Adb procurement guidelines icb-c2
Adb procurement guidelines   icb-c2Adb procurement guidelines   icb-c2
Adb procurement guidelines icb-c2
 

Viewers also liked

Aeromovel
AeromovelAeromovel
Pps portafolio daniela_daniela
Pps portafolio daniela_danielaPps portafolio daniela_daniela
Pps portafolio daniela_daniela
danieladaymastyle
 
Purcell Resume
Purcell ResumePurcell Resume
Purcell Resume
Therese Purcell
 
2003 g7 energia nuclear 2003
2003 g7 energia nuclear 20032003 g7 energia nuclear 2003
2003 g7 energia nuclear 2003
cristbarb
 
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAI
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAIFINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAI
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAI
ASHOKKUMAR RAMAR
 
HDR Supervision enhancement - curriculum renewal
HDR Supervision enhancement - curriculum renewalHDR Supervision enhancement - curriculum renewal
HDR Supervision enhancement - curriculum renewal
Merilyn Childs @ Macquarie University
 
What's new in the MQ HDR supervision space?
What's new in the MQ HDR supervision space?What's new in the MQ HDR supervision space?
What's new in the MQ HDR supervision space?
Merilyn Childs @ Macquarie University
 
sparepartsmanagment
sparepartsmanagmentsparepartsmanagment
sparepartsmanagment
RAKESH SINGH
 
STOCK EXCHANGE
STOCK EXCHANGE STOCK EXCHANGE
STOCK EXCHANGE
Home
 

Viewers also liked (9)

Aeromovel
AeromovelAeromovel
Aeromovel
 
Pps portafolio daniela_daniela
Pps portafolio daniela_danielaPps portafolio daniela_daniela
Pps portafolio daniela_daniela
 
Purcell Resume
Purcell ResumePurcell Resume
Purcell Resume
 
2003 g7 energia nuclear 2003
2003 g7 energia nuclear 20032003 g7 energia nuclear 2003
2003 g7 energia nuclear 2003
 
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAI
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAIFINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAI
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAI
 
HDR Supervision enhancement - curriculum renewal
HDR Supervision enhancement - curriculum renewalHDR Supervision enhancement - curriculum renewal
HDR Supervision enhancement - curriculum renewal
 
What's new in the MQ HDR supervision space?
What's new in the MQ HDR supervision space?What's new in the MQ HDR supervision space?
What's new in the MQ HDR supervision space?
 
sparepartsmanagment
sparepartsmanagmentsparepartsmanagment
sparepartsmanagment
 
STOCK EXCHANGE
STOCK EXCHANGE STOCK EXCHANGE
STOCK EXCHANGE
 

Similar to Wb appendix 3 guidance to bidders

Wb consultants 8
Wb consultants 8Wb consultants 8
Wb consultants 8
Joy Irman
 
Wb procurement intro 1
Wb procurement intro 1Wb procurement intro 1
Wb procurement intro 1
Joy Irman
 
Wb procurement intro 2
Wb procurement intro 2Wb procurement intro 2
Wb procurement intro 2
Joy Irman
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Joy Irman
 
Wb consultants 6
Wb consultants 6Wb consultants 6
Wb consultants 6
Joy Irman
 
Wb appendix 1 review by the bank
Wb appendix 1 review by the bankWb appendix 1 review by the bank
Wb appendix 1 review by the bank
Joy Irman
 
International Trade & Finance PPTs.pptx
International Trade & Finance PPTs.pptxInternational Trade & Finance PPTs.pptx
International Trade & Finance PPTs.pptx
AyanRocks
 
Wb procurement other method-2
Wb procurement other method-2Wb procurement other method-2
Wb procurement other method-2
Joy Irman
 
Documentation and procedure in international trade and business of rupali ban...
Documentation and procedure in international trade and business of rupali ban...Documentation and procedure in international trade and business of rupali ban...
Documentation and procedure in international trade and business of rupali ban...
Md. Mostahidur Rahman, CDCS
 
Documentation and procedure in international trade and business of rupali ban...
Documentation and procedure in international trade and business of rupali ban...Documentation and procedure in international trade and business of rupali ban...
Documentation and procedure in international trade and business of rupali ban...
Md. Mostahidur Rahman, CDCS
 
BID DOCUMENT.doc
BID DOCUMENT.docBID DOCUMENT.doc
BID DOCUMENT.doc
YitayihAsnake
 
Overview on UCP 600.pptx
Overview on UCP 600.pptxOverview on UCP 600.pptx
Overview on UCP 600.pptx
TohedJoma
 
Letter Of Credit
Letter Of CreditLetter Of Credit
Letter Of Credit
Jubayer Alam Shoikat
 
Letter of credit short term markatable securities
Letter of credit short term markatable securitiesLetter of credit short term markatable securities
Letter of credit short term markatable securities
santhosh77
 
GrantWritertermsandconditions
GrantWritertermsandconditionsGrantWritertermsandconditions
GrantWritertermsandconditions
Irene Lemon
 
Adb procurement guidelines icb-c1
Adb procurement guidelines   icb-c1Adb procurement guidelines   icb-c1
Adb procurement guidelines icb-c1
Joy Irman
 
Document samples
Document samplesDocument samples
Document samples
Arthur Wilson
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Joy Irman
 
Ppt on unit 8 Electrical Design Estimate
Ppt on unit 8 Electrical Design EstimatePpt on unit 8 Electrical Design Estimate
Ppt on unit 8 Electrical Design Estimate
biplabskfgi
 
Wb procurement icb b1
Wb procurement icb b1Wb procurement icb b1
Wb procurement icb b1
Joy Irman
 

Similar to Wb appendix 3 guidance to bidders (20)

Wb consultants 8
Wb consultants 8Wb consultants 8
Wb consultants 8
 
Wb procurement intro 1
Wb procurement intro 1Wb procurement intro 1
Wb procurement intro 1
 
Wb procurement intro 2
Wb procurement intro 2Wb procurement intro 2
Wb procurement intro 2
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
 
Wb consultants 6
Wb consultants 6Wb consultants 6
Wb consultants 6
 
Wb appendix 1 review by the bank
Wb appendix 1 review by the bankWb appendix 1 review by the bank
Wb appendix 1 review by the bank
 
International Trade & Finance PPTs.pptx
International Trade & Finance PPTs.pptxInternational Trade & Finance PPTs.pptx
International Trade & Finance PPTs.pptx
 
Wb procurement other method-2
Wb procurement other method-2Wb procurement other method-2
Wb procurement other method-2
 
Documentation and procedure in international trade and business of rupali ban...
Documentation and procedure in international trade and business of rupali ban...Documentation and procedure in international trade and business of rupali ban...
Documentation and procedure in international trade and business of rupali ban...
 
Documentation and procedure in international trade and business of rupali ban...
Documentation and procedure in international trade and business of rupali ban...Documentation and procedure in international trade and business of rupali ban...
Documentation and procedure in international trade and business of rupali ban...
 
BID DOCUMENT.doc
BID DOCUMENT.docBID DOCUMENT.doc
BID DOCUMENT.doc
 
Overview on UCP 600.pptx
Overview on UCP 600.pptxOverview on UCP 600.pptx
Overview on UCP 600.pptx
 
Letter Of Credit
Letter Of CreditLetter Of Credit
Letter Of Credit
 
Letter of credit short term markatable securities
Letter of credit short term markatable securitiesLetter of credit short term markatable securities
Letter of credit short term markatable securities
 
GrantWritertermsandconditions
GrantWritertermsandconditionsGrantWritertermsandconditions
GrantWritertermsandconditions
 
Adb procurement guidelines icb-c1
Adb procurement guidelines   icb-c1Adb procurement guidelines   icb-c1
Adb procurement guidelines icb-c1
 
Document samples
Document samplesDocument samples
Document samples
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
 
Ppt on unit 8 Electrical Design Estimate
Ppt on unit 8 Electrical Design EstimatePpt on unit 8 Electrical Design Estimate
Ppt on unit 8 Electrical Design Estimate
 
Wb procurement icb b1
Wb procurement icb b1Wb procurement icb b1
Wb procurement icb b1
 

More from Joy Irman

Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Joy Irman
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Joy Irman
 
Lampiran iv b jasa konsultansi - perorangan
Lampiran iv b   jasa konsultansi - peroranganLampiran iv b   jasa konsultansi - perorangan
Lampiran iv b jasa konsultansi - peroranganJoy Irman
 
Lampiran iv a jasa konsultansi - badan usaha
Lampiran iv a   jasa konsultansi - badan usahaLampiran iv a   jasa konsultansi - badan usaha
Lampiran iv a jasa konsultansi - badan usahaJoy Irman
 
Consulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development BankConsulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development Bank
Joy Irman
 
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank FinancingGuidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Joy Irman
 
Guidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA LoansGuidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA Loans
Joy Irman
 
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Joy Irman
 
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
Joy Irman
 
12 konsep ramah lingkungan
12 konsep ramah lingkungan12 konsep ramah lingkungan
12 konsep ramah lingkungan
Joy Irman
 
13 pengadaan secara elektronik
13 pengadaan secara elektronik13 pengadaan secara elektronik
13 pengadaan secara elektronik
Joy Irman
 
6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan
Joy Irman
 
3 1 organisasi pengadaan
3 1 organisasi pengadaan3 1 organisasi pengadaan
3 1 organisasi pengadaan
Joy Irman
 
4 rencana umum pengadaan barang
4 rencana umum pengadaan barang4 rencana umum pengadaan barang
4 rencana umum pengadaan barang
Joy Irman
 
5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola
Joy Irman
 
5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola
Joy Irman
 
3 7 penyedia barang jasa
3 7 penyedia barang jasa3 7 penyedia barang jasa
3 7 penyedia barang jasa
Joy Irman
 
3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan
Joy Irman
 
3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan
Joy Irman
 
3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen
Joy Irman
 

More from Joy Irman (20)

Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
 
Lampiran iv b jasa konsultansi - perorangan
Lampiran iv b   jasa konsultansi - peroranganLampiran iv b   jasa konsultansi - perorangan
Lampiran iv b jasa konsultansi - perorangan
 
Lampiran iv a jasa konsultansi - badan usaha
Lampiran iv a   jasa konsultansi - badan usahaLampiran iv a   jasa konsultansi - badan usaha
Lampiran iv a jasa konsultansi - badan usaha
 
Consulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development BankConsulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development Bank
 
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank FinancingGuidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank Financing
 
Guidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA LoansGuidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA Loans
 
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
 
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
 
12 konsep ramah lingkungan
12 konsep ramah lingkungan12 konsep ramah lingkungan
12 konsep ramah lingkungan
 
13 pengadaan secara elektronik
13 pengadaan secara elektronik13 pengadaan secara elektronik
13 pengadaan secara elektronik
 
6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan
 
3 1 organisasi pengadaan
3 1 organisasi pengadaan3 1 organisasi pengadaan
3 1 organisasi pengadaan
 
4 rencana umum pengadaan barang
4 rencana umum pengadaan barang4 rencana umum pengadaan barang
4 rencana umum pengadaan barang
 
5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola
 
5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola
 
3 7 penyedia barang jasa
3 7 penyedia barang jasa3 7 penyedia barang jasa
3 7 penyedia barang jasa
 
3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan
 
3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan
 
3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen
 

Recently uploaded

The Heart of Leadership_ How Emotional Intelligence Drives Business Success B...
The Heart of Leadership_ How Emotional Intelligence Drives Business Success B...The Heart of Leadership_ How Emotional Intelligence Drives Business Success B...
The Heart of Leadership_ How Emotional Intelligence Drives Business Success B...
Stephen Cashman
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
AnnySerafinaLove
 
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Lviv Startup Club
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
thesiliconleaders
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
MJ Global
 
Top 10 Free Accounting and Bookkeeping Apps for Small Businesses
Top 10 Free Accounting and Bookkeeping Apps for Small BusinessesTop 10 Free Accounting and Bookkeeping Apps for Small Businesses
Top 10 Free Accounting and Bookkeeping Apps for Small Businesses
YourLegal Accounting
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
GraceKohler1
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
my Pandit
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
Operational Excellence Consulting
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
APCO
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
Alexandra Fulford
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
Digital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on SustainabilityDigital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on Sustainability
sssourabhsharma
 

Recently uploaded (20)

The Heart of Leadership_ How Emotional Intelligence Drives Business Success B...
The Heart of Leadership_ How Emotional Intelligence Drives Business Success B...The Heart of Leadership_ How Emotional Intelligence Drives Business Success B...
The Heart of Leadership_ How Emotional Intelligence Drives Business Success B...
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
 
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
Maksym Vyshnivetskyi: PMO KPIs (UA) (#12)
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
 
Top 10 Free Accounting and Bookkeeping Apps for Small Businesses
Top 10 Free Accounting and Bookkeeping Apps for Small BusinessesTop 10 Free Accounting and Bookkeeping Apps for Small Businesses
Top 10 Free Accounting and Bookkeeping Apps for Small Businesses
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
Digital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on SustainabilityDigital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on Sustainability
 

Wb appendix 3 guidance to bidders

  • 1. Guidance to Bidders Guidelines Procurement under IBRD Loans and IDA Credits
  • 2. Purpose Para 1 This Appendix provides guidance to potential bidders wishing to participate in Bank-financed procurement.
  • 3. Responsibility for Procurement Para 2 The responsibility for the implementation of the project, and therefore for the payment of goods, works, and services under the project, rests solely with the Borrower. The Bank, for its part, is required by its Articles of Agreement to ensure that funds are paid from a Bank loan only as expenditures are incurred. Disbursements of the proceeds of a loan are made only at the Borrower's request. Supporting evidence that the funds are used in accordance with the Loan Agreement and/or the Procurement Plan shall be submitted with the Borrower's withdrawal application.
  • 4. Responsibility for Procurement Para 2 Payment may be made to reimburse the Borrower for payment(s) already made from its own resources, directly to a third party (usually to a supplier or contractor), or to a commercial bank for expenditures against a World Bank Special Commitment covering a commercial bank's letter of credit. As emphasized in paragraph 1.2 of the Guidelines, the Borrower is legally responsible for the procurement. It invites, receives, and evaluates bids, and awards the contract. The contract is between the Borrower and the supplier or contractor. The Bank is not a party to the contract.
  • 5. Bank’s Role Para 3 As stated in paragraph 1.11 of the Guidelines, the Bank reviews the procurement procedures, documents, bid evaluations, award recommendations, and the contract to ensure that the process is carried out in accordance with agreed procedures, as required in the Loan Agreement. In the case of major contracts, the documents are reviewed by the Bank prior to their issue, as described in Appendix 1. Also, if, at any time in the procurement process (even after the award of contract), the Bank concludes that the agreed procedures were not followed in any material respect, the Bank may declare misprocurement, as described in paragraph 1.12.
  • 6. Bank’s Role Para 3 However, if a Borrower has awarded a contract after obtaining the Bank’s “no objection,” the Bank will declare misprocurement only if the “no objection” was issued on the basis of incomplete, inaccurate, or misleading information furnished by the Borrower. Furthermore, if the Bank determines that corrupt or fraudulent practices were engaged in by representatives of the Borrower or of the bidder, the Bank may impose the applicable sanctions set forth in paragraph 1.14 of the Guidelines.
  • 7. Bank’s Role Para 4 The Bank has published Standard Bidding Documents (SBDs) for various types of procurement. As stated in paragraph 2.12 of the Guidelines, it is mandatory for the Borrower to use these documents, with minimum changes to address country- and project-specific issues. The prequalification and bidding documents are finalized and issued by the Borrower.
  • 8. Information on Bidding Para 5 Information on bidding opportunities under ICB may be obtained from the General Procurement Notice and the Specific Procurement Notices as described in paragraphs 2.7 and 2.8 of the Guidelines. General guidance on participation, as well as advance information on business opportunities in upcoming projects, may be obtained from the World Bank website as well as from the Infoshop. Project Appraisal Documents (PAD) are also available from the Infoshop and on the Bank’s website upon approval of the loan.
  • 9. Bidder’s Role Para 6 Once a bidder receives the prequalification or bidding document, the bidder should study the documents carefully to decide if it can meet the technical, commercial, and contractual conditions, and if so, proceed to prepare its bid. The bidder should then critically review the documents to see if there is any ambiguity, omission, or internal contradiction, or any feature of specifications or other conditions which are unclear or appear discriminatory or restrictive; if so, it should seek clarification from the Borrower, in writing, within the time period specified in the bidding documents for seeking clarifications.
  • 10. Bidder’s Role Para 7 The criteria and methodology for selection of the successful bidder are outlined in the bidding documents, generally under Instructions to Bidders and Specifications. If these are not clear, clarification should be similarly sought from the Borrower.
  • 11. Bidder’s Role Para 8 In this connection it should be emphasized that the specific bidding documents issued by the Borrower govern each procurement, as stated in paragraph 1.1 of the Guidelines. If a bidder feels that any of the provisions in the documents are inconsistent with the Guidelines, it should also raise this with the Borrower.
  • 12. Bidder’s Role Para 9 It is the responsibility of the bidder to raise any issue of ambiguity, contradiction, omission, etc., prior to the submission of its bid, to assure submission of a fully responsive and compliant bid, including all the supporting documents requested in the bidding documents. Noncompliance with critical (technical and commercial) requirements will result in rejection of the bid. If a bidder wishes to propose deviations to a noncritical requirement, or propose an alternative solution, the bidder should quote the price for the fully compliant bid and then separately indicate the adjustment in price that can be offered if the deviation is accepted.
  • 13. Bidder’s Role Para 9 Alternative solutions should be offered only when authorized in the bidding documents. Once bids are received and publicly opened, bidders will not be required or permitted to change the price or substance of a bid.
  • 14. Confidentiality Para 10 As stated in paragraph 2.47 of the Guidelines, the process of bid evaluation shall be confidential until the publication of contract award . This is essential to enable the Borrower and Bank reviewers to avoid either the reality or perception of improper interference. If at this stage a bidder wishes to bring additional information to the notice of the Borrower, the Bank, or both, it should do so in writing.
  • 15. Action by the Bank Para 11 Bidders are free to send copies of their communications on issues and questions with the Borrower to the Bank or to write to the Bank directly, when Borrowers do not respond promptly, or the communication is a complaint against the Borrower. All such communications should be addressed to the Task Team Leader for the project, with a copy to the Country Director for the borrowing country and to the Regional Procurement Adviser. Names of Task Team Leaders are available in the PAD.
  • 16. Action by the Bank Para 12 References received by the Bank from potential bidders, prior to the closing date for submission of the bids, will, if appropriate, be referred to the Borrower with the Bank’s comments and advice, for action or response.
  • 17. Action by the Bank Para 13 Communication received from bidders after the opening of the bids, will be handled as follows. In the case of contracts not subject to prior review by the Bank, the communication will be sent to the Borrower for due consideration and appropriate action, if any, and these will be reviewed during subsequent supervision of the project by Bank staff. In the cases of contracts subject to the prior review process, the communication will be examined by the Bank, in consultation with the Borrower. If additional data is required to complete this process, these will be obtained from the Borrower. If additional information or clarification is required from the bidder, the Bank will ask the Borrower to obtain it and comment or incorporate it, as appropriate, in the evaluation report. The Bank’s review will not be completed until the communication is fully examined and considered.
  • 18. Action by the Bank Para 14 Except for acknowledgment, the Bank will not enter into discussion or correspondence with any bidder during the evaluation and review process of the procurement, until award of the contract is published.
  • 19. Debriefing Para 15 As stated in paragraph 2.65, if, after notification of award, a bidder wishes to ascertain the grounds on which its bid was not selected, it should address its request to the Borrower. If the bidder is not satisfied with the explanation given and wishes to seek a meeting with the Bank, it may do so by addressing the Regional Procurement Adviser for the borrowing country, who will arrange a meeting at the appropriate level and with the relevant staff. In this discussion, only the bidder’s bid can be discussed and not the bids of competitors.