SlideShare a Scribd company logo
Wayne R. Kubica
804 Iowa Drive • Le Claire, IA 52753
Wrkubic1@Yahoo.com • (563) 729-11399 (h)
1
Production Paint Supervisor
Passionate Leader • Organized • Problem Solver
Throughout my 20-year career, I have demonstrated a strong pattern of success. My combination of experience in the areas of
Industrial Paint Systems and Industrial Controls has helped me develop a deep understanding of Industrial Paint System
operation. My intentions are to leverage these experiences and successes to develop and lead teams to attain sustainable
business results beyond expectations focused on quality, delivery, safety and cost management/avoidance. Areas of expertise
include...
• Developing talent
• PLC controls
• Project Management
• ABB/Fanuc robot experience
• Blueprint comprehension
• Wet-on-Wet and Powder Paint
applications
• Continuous Process Improvement
• Safety and OHSA regulations
• Policy / Procedure Development
• Knowledge of the SAP System
Summary of Qualifications
Passionate Leader
I have led multi-functional teams in the delivery and start-up of multi-million dollar paint systems.
Organized
My ability to not only think strategically and systematically but I can also deliver on ideas through careful planning
and pinpoint execution.
Problem Solver
Makes timely decisions based on careful examination of the available details in order to deliver consistent and
sustainable results.
Professional Experience
John Deere Davenport Works, Davenport, IA, March 2014 -Present
Module Leader, Maintenance Supervisor, and Manufacturing Engineer for Paint Operations
First Shift Module Leader for Paint Operations for manual paint system, robotic paint system, reclaim paint system,
bucket and transmission assembly and paint kitchen operations:
Module Leader for the Paint Department which consisted of 75 employees including skilled tradesmen. Developed
paint schedules, maintenance schedules, shut down schedules, troubleshooting paint and conveyor system
deficiencies, assisting with OMS development, SAP purchase order approvals, employee certification approvals,
employee DTR approvals, continuous improvement and 5S, safety coordination, attend daily production meetings,
attend weekly staff meetings, attend paint operations budget meetings.
Manufacturing Engineer for Paint System Operations to include supervisor of Maintenance personnel.
Implemented strategies to support 5S, Continuous Improvement, Lean Manufacturing, Preventative Maintenance,
masking studies, Trouble shoot Production Systems to include conveyors, controllers, panel views, piping, concrete,
mechanical, electrical, fire systems, structural support, and communications.
WR Kubica LLC, Riverview, MI, March 2005 - 2014
Project Manager / Field Supervisor / Owner
Self- employed as an Installation/Start-up Consultant to oversee the installation of Industrial Paint Finishing
Systems. Start-up and Debug of Industrial Paint Systems and troubleshoot problems with existing paint systems.
Provided Site Management services for AB Myr, Industries, Eisenmann Corporation and The Case New Holland
Company to oversee the installation of Industrial Paint Process equipment. Installation to include Air Handling
Wayne R. Kubica
804 Iowa Drive • Le Claire, IA 52753
Wrkubic1@Yahoo.com • (563) 729-11399 (h)
2
Heater Boxes, Pre-Treatment Washer Systems, Cure and Dry-Off Oven Systems, Powder Coat Systems, Wet on Wet
Robotic Paint Systems and Booths, Conveyor Systems and Control Systems.
Provide all trade(s) consultation for installations and assist with system start-up and debug, commissioning,
troubleshooting of Allen-Bradley programs, Allen-Bradley panel views and ladder logic debug and programming.
Perform standby services of production equipment and system field devices.
Provided Site Management services for both Union and Non-Union Contractors to oversee the installation of
Industrial Paint Process equipment for the following John Deere Facilities, JD Waterloo, IA, JD Waterloo Foundry, IA,
JD Ottumwa Works, IA, JD Davenport Works, IA, JD Seeding new Powder Coat System.
Prime Technologies, Dearborn, MI, April 2002 - March 2005
Assistant Project Manager / Construction Manager / Project Estimator
Lead Project Estimator for a variety of control systems. Shop Manager and Lead in the construction and fabrication
of control systems and enclosures:
Assistant Project Manager at the Tennant Corporation in Golden Valley, MN. Ensured Trade Sub-Contractors
installed equipment correctly. Ensured all installations were installed per Local and National codes. Field
equipment included pH probes, conductivity probes, flow meters and totalizers, level controls, AB Myr Eight Stage
Washer System, Dry-Off and Cure Ovens and Nordson Powder Coat System.
Constructed all Control Panels and assisted in field start-up of the Oakland County, Elizabeth Lake Lift Station
Rehabilitation, consisting of multiple lift pumps, level control of a sewage lift station, requiring continuous
operation and remote monitoring of running and alarm status.
DWSD Remote Sewage site calibration of Pressure and Flow meters and electrical installation and modifications.
Field Support for Electrical Installation of new Phosphate System at the GM Fairfax Facility in Kansas City, MO.
Assisted in start-up and validation of the overall system.
Cadre Corporation, Madison Heights, MI, Nov 2000 – April 2002
Controls Programmer / Field Supervisor
Field support and Electrical Lead on completion of the DWSD Retention Basin CSO sites located at Hubbell-
Southfield, Five-Mile and Seven-Mile Locations.
Field Installation and Programmer of the Interim Level Metricom Radio network for DWSD. Included was
programming SCADA screens and PLC to interface with CSO Basin and Head End Data Collection CPU located
Downtown Detroit, MI. Equipment was used for monitoring and control of Sewerage Water Flow.
Calibrated, repaired and troubleshoot flow meters, pressure meters, switches, I/P transducers, level transmitters,
RFID readers, PLC I/O, SCADA Systems, relays and timers.
Haden Environmental, Auburn Hills, MI, Feb 1995 – Nov 2000
Supervisor
Supervisor of Maintenance and Service contract at the Chrysler JNAP Facility in Detroit, MI. Operated and serviced
4 VOC Abatement Systems for the Paint Facility.
Submitted daily, weekly and monthly operation and budget reports to Plant personnel on all activities associated
with the operation of the VOC System. Attended operation meetings with the Plant personnel and scheduled
maintenance activities during production downtime.
Education: Actively Pursuing Bachelor’s of Science Degree – Kaplan University, Davenport, IA
Additional Skills
Microsoft Office Suite, CAD 2000, All trades troubleshooting, Instrumentation troubleshooting, PLC troubleshooting,
Field Start-up, O & M Manuals, leadership, inspections of electrical systems per NEC Code.

More Related Content

What's hot

Final Resume 2015KR
Final Resume 2015KRFinal Resume 2015KR
Final Resume 2015KRKevin Rabe
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
Gary Giblock
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
Gary Giblock
 
Charles.Henderson.Res.2016
Charles.Henderson.Res.2016Charles.Henderson.Res.2016
Charles.Henderson.Res.2016Mark Henderson
 
Maurice Jordan Resume 1
Maurice Jordan Resume 1Maurice Jordan Resume 1
Maurice Jordan Resume 1Maurice Jordan
 
Professional Resume sep 2016
Professional Resume sep 2016Professional Resume sep 2016
Professional Resume sep 2016Yodani Quezada
 
Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16
Harjeet Gill
 
Resume - Zonal Manager
Resume - Zonal ManagerResume - Zonal Manager
Resume - Zonal ManagerHassan Safeer
 
Resume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb UaeResume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb Uae
Cobra143
 
Phil Suter Resume April 22 2009 Rev 2
Phil Suter Resume April 22 2009  Rev 2Phil Suter Resume April 22 2009  Rev 2
Phil Suter Resume April 22 2009 Rev 2
PhilSuter
 
Resume.RaysonLascano PH
Resume.RaysonLascano PHResume.RaysonLascano PH
Resume.RaysonLascano PHRayson Lascano
 

What's hot (20)

Final Resume 2015KR
Final Resume 2015KRFinal Resume 2015KR
Final Resume 2015KR
 
Gary giblock resume 2 21-17
Gary giblock resume 2 21-17Gary giblock resume 2 21-17
Gary giblock resume 2 21-17
 
Gary giblock resume 1 31-17
Gary giblock resume 1 31-17Gary giblock resume 1 31-17
Gary giblock resume 1 31-17
 
Charles.Henderson.Res.2016
Charles.Henderson.Res.2016Charles.Henderson.Res.2016
Charles.Henderson.Res.2016
 
CV-Jose - 2015
CV-Jose - 2015CV-Jose - 2015
CV-Jose - 2015
 
QA Weld
QA WeldQA Weld
QA Weld
 
Maurice Jordan Resume 1
Maurice Jordan Resume 1Maurice Jordan Resume 1
Maurice Jordan Resume 1
 
Marks Resume
Marks ResumeMarks Resume
Marks Resume
 
Pankaj-prajapati
Pankaj-prajapatiPankaj-prajapati
Pankaj-prajapati
 
Professional Resume sep 2016
Professional Resume sep 2016Professional Resume sep 2016
Professional Resume sep 2016
 
Wayne_Williams_CV
Wayne_Williams_CVWayne_Williams_CV
Wayne_Williams_CV
 
Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16Quality harjeet gill 11 19_16
Quality harjeet gill 11 19_16
 
Resume - Zonal Manager
Resume - Zonal ManagerResume - Zonal Manager
Resume - Zonal Manager
 
Faruk_Syed_Engineer
Faruk_Syed_EngineerFaruk_Syed_Engineer
Faruk_Syed_Engineer
 
Robert E Bruders
Robert E BrudersRobert E Bruders
Robert E Bruders
 
Resume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb UaeResume Leonardo Edwin Manzana Tdcb Uae
Resume Leonardo Edwin Manzana Tdcb Uae
 
David Resume'
David Resume'David Resume'
David Resume'
 
Phil Suter Resume April 22 2009 Rev 2
Phil Suter Resume April 22 2009  Rev 2Phil Suter Resume April 22 2009  Rev 2
Phil Suter Resume April 22 2009 Rev 2
 
Resume.RaysonLascano PH
Resume.RaysonLascano PHResume.RaysonLascano PH
Resume.RaysonLascano PH
 
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 

Viewers also liked

Top 8 riding instructor resume samples
Top 8 riding instructor resume samplesTop 8 riding instructor resume samples
Top 8 riding instructor resume samplesparrifari
 
Top 8 internet marketing manager resume samples
Top 8 internet marketing manager resume samplesTop 8 internet marketing manager resume samples
Top 8 internet marketing manager resume samplestonychoper2705
 
AnandhR_Resume_2016
AnandhR_Resume_2016AnandhR_Resume_2016
AnandhR_Resume_2016Anandh R
 
Zhen-Yu Li from Taiwan Resume 150720
Zhen-Yu Li from Taiwan Resume 150720Zhen-Yu Li from Taiwan Resume 150720
Zhen-Yu Li from Taiwan Resume 150720Zhen-Yu Li
 
Sena yuret resume dec 15 2015
Sena yuret   resume dec 15 2015Sena yuret   resume dec 15 2015
Sena yuret resume dec 15 2015
Yuret Sena
 
RESUME-HENRY TAGOE (2)
RESUME-HENRY TAGOE (2)RESUME-HENRY TAGOE (2)
RESUME-HENRY TAGOE (2)HENRY TAGOE
 
Philip Gilbert Resume
Philip Gilbert ResumePhilip Gilbert Resume
Philip Gilbert ResumePhil Gilbert
 
Paul Marples Resume
Paul Marples ResumePaul Marples Resume
Paul Marples ResumePaul Marples
 
Raj_Kamal_Sharma_Resume.doc
Raj_Kamal_Sharma_Resume.docRaj_Kamal_Sharma_Resume.doc
Raj_Kamal_Sharma_Resume.docRaj Kamal Sharma
 
Dean Ricks - Resume 2015 with virtualization
Dean Ricks - Resume 2015 with virtualizationDean Ricks - Resume 2015 with virtualization
Dean Ricks - Resume 2015 with virtualizationDean Ricks
 
EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016
Erwin D. Gibson
 
Nethaji Resume
Nethaji ResumeNethaji Resume
Nethaji ResumeNethaji S
 

Viewers also liked (20)

Top 8 riding instructor resume samples
Top 8 riding instructor resume samplesTop 8 riding instructor resume samples
Top 8 riding instructor resume samples
 
Top 8 internet marketing manager resume samples
Top 8 internet marketing manager resume samplesTop 8 internet marketing manager resume samples
Top 8 internet marketing manager resume samples
 
AnandhR_Resume_2016
AnandhR_Resume_2016AnandhR_Resume_2016
AnandhR_Resume_2016
 
Zhen-Yu Li from Taiwan Resume 150720
Zhen-Yu Li from Taiwan Resume 150720Zhen-Yu Li from Taiwan Resume 150720
Zhen-Yu Li from Taiwan Resume 150720
 
5-15 Resume
5-15 Resume5-15 Resume
5-15 Resume
 
Sena yuret resume dec 15 2015
Sena yuret   resume dec 15 2015Sena yuret   resume dec 15 2015
Sena yuret resume dec 15 2015
 
Chris Resume 10_13_2015
Chris Resume 10_13_2015Chris Resume 10_13_2015
Chris Resume 10_13_2015
 
RESUME-HENRY TAGOE (2)
RESUME-HENRY TAGOE (2)RESUME-HENRY TAGOE (2)
RESUME-HENRY TAGOE (2)
 
Resume - Copy
Resume - CopyResume - Copy
Resume - Copy
 
Philip Gilbert Resume
Philip Gilbert ResumePhilip Gilbert Resume
Philip Gilbert Resume
 
John_Salvador_Y_Bayog - Resume
John_Salvador_Y_Bayog - ResumeJohn_Salvador_Y_Bayog - Resume
John_Salvador_Y_Bayog - Resume
 
BJ Fardi - Resume
BJ Fardi - ResumeBJ Fardi - Resume
BJ Fardi - Resume
 
Resume
ResumeResume
Resume
 
Paul Marples Resume
Paul Marples ResumePaul Marples Resume
Paul Marples Resume
 
Raj_Kamal_Sharma_Resume.doc
Raj_Kamal_Sharma_Resume.docRaj_Kamal_Sharma_Resume.doc
Raj_Kamal_Sharma_Resume.doc
 
Dean Ricks - Resume 2015 with virtualization
Dean Ricks - Resume 2015 with virtualizationDean Ricks - Resume 2015 with virtualization
Dean Ricks - Resume 2015 with virtualization
 
Resume
ResumeResume
Resume
 
EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016
 
Abd Al Rahman Aweis - Personal Resume
Abd Al Rahman Aweis - Personal ResumeAbd Al Rahman Aweis - Personal Resume
Abd Al Rahman Aweis - Personal Resume
 
Nethaji Resume
Nethaji ResumeNethaji Resume
Nethaji Resume
 

Similar to Wayne Kubica resume r02162016

Albert (Marty) Ogg Final Resume 02282015[1]
Albert (Marty) Ogg Final Resume  02282015[1]Albert (Marty) Ogg Final Resume  02282015[1]
Albert (Marty) Ogg Final Resume 02282015[1]Albert Ogg
 
Scott Miller Resume
Scott Miller ResumeScott Miller Resume
Scott Miller ResumeScott Miller
 
John c heidler_resume_20190724
John c heidler_resume_20190724John c heidler_resume_20190724
John c heidler_resume_20190724
JohnHeidler
 
Darlene Kelley Revised Resume
Darlene Kelley Revised ResumeDarlene Kelley Revised Resume
Darlene Kelley Revised ResumeDarlene Kelley
 
J H Scott Resume
J H Scott ResumeJ H Scott Resume
J H Scott Resumejames scott
 
Erwin Flowers Resume Nov1 2015
Erwin Flowers Resume Nov1 2015Erwin Flowers Resume Nov1 2015
Erwin Flowers Resume Nov1 2015Erwin Flowers
 
Matt Misiak 2016
Matt Misiak 2016Matt Misiak 2016
Matt Misiak 2016Matt Misiak
 
Jason Limoges Resume
Jason Limoges ResumeJason Limoges Resume
Jason Limoges ResumeJason Limoges
 
david melara current resume
david melara current resumedavid melara current resume
david melara current resumeDavid Melara
 
Aaron Watson Resume
Aaron Watson ResumeAaron Watson Resume
Aaron Watson ResumeAaron Watson
 
Judy Bellamy_Resume_2016
Judy Bellamy_Resume_2016Judy Bellamy_Resume_2016
Judy Bellamy_Resume_2016Judy Bellamy
 
Resume (MES) Online
Resume (MES) OnlineResume (MES) Online
Resume (MES) Online
Larry Beifeld
 
Experienced,_Highly_Skilled_Production_Manager_Mechanic
Experienced,_Highly_Skilled_Production_Manager_MechanicExperienced,_Highly_Skilled_Production_Manager_Mechanic
Experienced,_Highly_Skilled_Production_Manager_MechanicSteve Dunlevy
 
2016 David R. Todd resume
2016 David R. Todd resume2016 David R. Todd resume
2016 David R. Todd resumeDavid Todd
 
Yves Juste Proj Manager 2016
Yves Juste Proj Manager 2016Yves Juste Proj Manager 2016
Yves Juste Proj Manager 2016
TBC Corporation
 

Similar to Wayne Kubica resume r02162016 (20)

Albert (Marty) Ogg Final Resume 02282015[1]
Albert (Marty) Ogg Final Resume  02282015[1]Albert (Marty) Ogg Final Resume  02282015[1]
Albert (Marty) Ogg Final Resume 02282015[1]
 
Scott Miller Resume
Scott Miller ResumeScott Miller Resume
Scott Miller Resume
 
John c heidler_resume_20190724
John c heidler_resume_20190724John c heidler_resume_20190724
John c heidler_resume_20190724
 
Darlene Kelley Revised Resume
Darlene Kelley Revised ResumeDarlene Kelley Revised Resume
Darlene Kelley Revised Resume
 
J H Scott Resume
J H Scott ResumeJ H Scott Resume
J H Scott Resume
 
Erwin Flowers Resume Nov1 2015
Erwin Flowers Resume Nov1 2015Erwin Flowers Resume Nov1 2015
Erwin Flowers Resume Nov1 2015
 
Matt Misiak 2016
Matt Misiak 2016Matt Misiak 2016
Matt Misiak 2016
 
Jason Limoges Resume
Jason Limoges ResumeJason Limoges Resume
Jason Limoges Resume
 
Hawkersmith Dec 2015 Resume
Hawkersmith Dec 2015 ResumeHawkersmith Dec 2015 Resume
Hawkersmith Dec 2015 Resume
 
david melara current resume
david melara current resumedavid melara current resume
david melara current resume
 
Aaron Watson Resume
Aaron Watson ResumeAaron Watson Resume
Aaron Watson Resume
 
Judy Bellamy_Resume_2016
Judy Bellamy_Resume_2016Judy Bellamy_Resume_2016
Judy Bellamy_Resume_2016
 
Resume (MES) Online
Resume (MES) OnlineResume (MES) Online
Resume (MES) Online
 
Experienced,_Highly_Skilled_Production_Manager_Mechanic
Experienced,_Highly_Skilled_Production_Manager_MechanicExperienced,_Highly_Skilled_Production_Manager_Mechanic
Experienced,_Highly_Skilled_Production_Manager_Mechanic
 
Zackhayer3
Zackhayer3Zackhayer3
Zackhayer3
 
SNeshevich_2016
SNeshevich_2016SNeshevich_2016
SNeshevich_2016
 
Cyndee_Blenkush_Resume
Cyndee_Blenkush_ResumeCyndee_Blenkush_Resume
Cyndee_Blenkush_Resume
 
SiessJulie
SiessJulieSiessJulie
SiessJulie
 
2016 David R. Todd resume
2016 David R. Todd resume2016 David R. Todd resume
2016 David R. Todd resume
 
Yves Juste Proj Manager 2016
Yves Juste Proj Manager 2016Yves Juste Proj Manager 2016
Yves Juste Proj Manager 2016
 

Wayne Kubica resume r02162016

  • 1. Wayne R. Kubica 804 Iowa Drive • Le Claire, IA 52753 Wrkubic1@Yahoo.com • (563) 729-11399 (h) 1 Production Paint Supervisor Passionate Leader • Organized • Problem Solver Throughout my 20-year career, I have demonstrated a strong pattern of success. My combination of experience in the areas of Industrial Paint Systems and Industrial Controls has helped me develop a deep understanding of Industrial Paint System operation. My intentions are to leverage these experiences and successes to develop and lead teams to attain sustainable business results beyond expectations focused on quality, delivery, safety and cost management/avoidance. Areas of expertise include... • Developing talent • PLC controls • Project Management • ABB/Fanuc robot experience • Blueprint comprehension • Wet-on-Wet and Powder Paint applications • Continuous Process Improvement • Safety and OHSA regulations • Policy / Procedure Development • Knowledge of the SAP System Summary of Qualifications Passionate Leader I have led multi-functional teams in the delivery and start-up of multi-million dollar paint systems. Organized My ability to not only think strategically and systematically but I can also deliver on ideas through careful planning and pinpoint execution. Problem Solver Makes timely decisions based on careful examination of the available details in order to deliver consistent and sustainable results. Professional Experience John Deere Davenport Works, Davenport, IA, March 2014 -Present Module Leader, Maintenance Supervisor, and Manufacturing Engineer for Paint Operations First Shift Module Leader for Paint Operations for manual paint system, robotic paint system, reclaim paint system, bucket and transmission assembly and paint kitchen operations: Module Leader for the Paint Department which consisted of 75 employees including skilled tradesmen. Developed paint schedules, maintenance schedules, shut down schedules, troubleshooting paint and conveyor system deficiencies, assisting with OMS development, SAP purchase order approvals, employee certification approvals, employee DTR approvals, continuous improvement and 5S, safety coordination, attend daily production meetings, attend weekly staff meetings, attend paint operations budget meetings. Manufacturing Engineer for Paint System Operations to include supervisor of Maintenance personnel. Implemented strategies to support 5S, Continuous Improvement, Lean Manufacturing, Preventative Maintenance, masking studies, Trouble shoot Production Systems to include conveyors, controllers, panel views, piping, concrete, mechanical, electrical, fire systems, structural support, and communications. WR Kubica LLC, Riverview, MI, March 2005 - 2014 Project Manager / Field Supervisor / Owner Self- employed as an Installation/Start-up Consultant to oversee the installation of Industrial Paint Finishing Systems. Start-up and Debug of Industrial Paint Systems and troubleshoot problems with existing paint systems. Provided Site Management services for AB Myr, Industries, Eisenmann Corporation and The Case New Holland Company to oversee the installation of Industrial Paint Process equipment. Installation to include Air Handling
  • 2. Wayne R. Kubica 804 Iowa Drive • Le Claire, IA 52753 Wrkubic1@Yahoo.com • (563) 729-11399 (h) 2 Heater Boxes, Pre-Treatment Washer Systems, Cure and Dry-Off Oven Systems, Powder Coat Systems, Wet on Wet Robotic Paint Systems and Booths, Conveyor Systems and Control Systems. Provide all trade(s) consultation for installations and assist with system start-up and debug, commissioning, troubleshooting of Allen-Bradley programs, Allen-Bradley panel views and ladder logic debug and programming. Perform standby services of production equipment and system field devices. Provided Site Management services for both Union and Non-Union Contractors to oversee the installation of Industrial Paint Process equipment for the following John Deere Facilities, JD Waterloo, IA, JD Waterloo Foundry, IA, JD Ottumwa Works, IA, JD Davenport Works, IA, JD Seeding new Powder Coat System. Prime Technologies, Dearborn, MI, April 2002 - March 2005 Assistant Project Manager / Construction Manager / Project Estimator Lead Project Estimator for a variety of control systems. Shop Manager and Lead in the construction and fabrication of control systems and enclosures: Assistant Project Manager at the Tennant Corporation in Golden Valley, MN. Ensured Trade Sub-Contractors installed equipment correctly. Ensured all installations were installed per Local and National codes. Field equipment included pH probes, conductivity probes, flow meters and totalizers, level controls, AB Myr Eight Stage Washer System, Dry-Off and Cure Ovens and Nordson Powder Coat System. Constructed all Control Panels and assisted in field start-up of the Oakland County, Elizabeth Lake Lift Station Rehabilitation, consisting of multiple lift pumps, level control of a sewage lift station, requiring continuous operation and remote monitoring of running and alarm status. DWSD Remote Sewage site calibration of Pressure and Flow meters and electrical installation and modifications. Field Support for Electrical Installation of new Phosphate System at the GM Fairfax Facility in Kansas City, MO. Assisted in start-up and validation of the overall system. Cadre Corporation, Madison Heights, MI, Nov 2000 – April 2002 Controls Programmer / Field Supervisor Field support and Electrical Lead on completion of the DWSD Retention Basin CSO sites located at Hubbell- Southfield, Five-Mile and Seven-Mile Locations. Field Installation and Programmer of the Interim Level Metricom Radio network for DWSD. Included was programming SCADA screens and PLC to interface with CSO Basin and Head End Data Collection CPU located Downtown Detroit, MI. Equipment was used for monitoring and control of Sewerage Water Flow. Calibrated, repaired and troubleshoot flow meters, pressure meters, switches, I/P transducers, level transmitters, RFID readers, PLC I/O, SCADA Systems, relays and timers. Haden Environmental, Auburn Hills, MI, Feb 1995 – Nov 2000 Supervisor Supervisor of Maintenance and Service contract at the Chrysler JNAP Facility in Detroit, MI. Operated and serviced 4 VOC Abatement Systems for the Paint Facility. Submitted daily, weekly and monthly operation and budget reports to Plant personnel on all activities associated with the operation of the VOC System. Attended operation meetings with the Plant personnel and scheduled maintenance activities during production downtime. Education: Actively Pursuing Bachelor’s of Science Degree – Kaplan University, Davenport, IA Additional Skills Microsoft Office Suite, CAD 2000, All trades troubleshooting, Instrumentation troubleshooting, PLC troubleshooting, Field Start-up, O & M Manuals, leadership, inspections of electrical systems per NEC Code.