SlideShare a Scribd company logo
1 of 3
ERWIN B. FLOWERS
742 E. Oliviabrook Drive
OakBrook Terrace, Illinois 60181
Telephone: (708) 271-2712 / Email: Flowerserwin@gmail.com
____________________________________________________________________________________
OBJECTIVE:
Seeking leadership position in the areas of Chief Technical Reliability Engineer, Program Manager, Director
of Cost Reductions Sr. Engineering Manager, Sr. Continuous Improvement Manager, Sr. Manager
Quality/Reliability Engineering. My goal is to direct business leaders, maximize profits, reduce cost, waste,
variation, defects, to improve productivity and Reliability, achieve customer Satisfaction, using Program
Management, Sigma Methodologies for DMAIC, DFSS, CAPA, Lean and Kaizen, VSM, approaches for
continuous improvement. Specialist in developing suppliers in PPAP, APQP, Engineering design review,
DFMEA, Strategic MS project planning, root cause analysis, continuous improvement projects within cross
functional TEAM environment.
EDUCATION: FLORIDA A&M UNIVERSITY, Tallahassee,Florida
B.S. Mechanical Engineering
CERTIFICATION: Lean Six Sigma Master Black Belt,ASQ Certified Reliability Engineer, Champion Belt
2014 - Present: Navistar Inc,Lisle, Illinois
Advanced Reliability Team Lead/ LewisB. Campbell Quality Award Chairman
Responsible for providing professional input to a risk management plan that will anticipate
reliability-related, and non-reliability-related risks that could adversely impact product
development. Systematically initiate acceptance tests and inspection criteria to identify and
manage reliability risks, growth, allocations, life expectancy, prediction, and demonstration
testing methodology using ReliaSoft & MiniTab Software. Pinpoint and reduce risk related to
FMEA - Failure Modes and Effects Analysis, by utilization of Data Analysis Techniques
which include: Statistical Process Control; Reliability Modeling and Prediction; Fault Tree
Analysis; Weibull Tree Analysis; Six Sigma (6σ) Methodology; Root-cause and Root-Cause
Failure Analysis (RCA, RCFA); Failure Reporting, Analysis and Corrective Action System
(FRACAS). Participate in building solid, professional relationships with cross functional
teams. Implement strategies to eliminate or reduce any losses through root cause analysis, by
managing risk related to essential objectives in the areas of environmental health and safety,
quality and production.
06/2008 to 01/2014 Navistar Inc,Lisle, Illinois
Medium Duty Engine Cost Reduction Manager
Medium Duty Engine Cost Reduction Manager responsible for $20 mm cost reduction by
championing innovative idea generation, and Supplier Resourcing. Concurrently Reducing 3
Month in service warranty by 50% by using Six Sigma Black Belt Problem Solving
Methodologies within a cross functional team environment to obtain root cause. Promoted
ASQ Certified Reliability Engineering methodology to ensure reliability.
04/2006 to 06/2008 EMERSON POWER TRANSMISSION, Valparaiso,Indiana
Senior Product Engineer
Senior engineer responsible for design and development of industrial bearings for the
material handling, HVAC, aggregate and packaging industries. Utilize Microsoft Project and
new product development methodology to track activities and milestones in a shared portal
style environment. Managed cross functional teams including engineering, manufacturing,
marketing, sales, quality, and international procurement address issues from original concepts
to inventory management. Led current product optimizations through outsourcing of
domestic products to Mexico, China and India. Designed tests to validate new products.
Designed components and assemblies using Solid Edge software. Analyzed compliance and
best practices in the areas of risk management and standards, as well as ensured that products
meet all cost, quality and performance objectives.
9/2002 to 12/2005 FTI Corporation, Chicago, Illinois
Product Engineering Manager
Responsible for product development of manufacturers of domestic designed bearings for the
industrial electric motor industry. Developed domestic suppliers with seals, retainers and
steel rings per ISO 9000. Responsible for the manufacture of all samples for customers using
the P.P.A.P. (Production Part Approval Process). Led Kaizen events using statistical data to
identify and reduce marginal manufacturing processes. Designed test fixtures using
AUTOCAD software.
12/1999 to 8/2002 Federal Mogul Visibility Group, Franklin Park,Illinois
Mechanical Product Engineering Group Leader
Overall responsibility of automotive OEM lighting programs from concept through
production. Supervised the activities of product engineering personnel with project related
purchases ranging from $200M to $2MM per project. Developed tool quotes from Asian and
local machine shops. Designed test fixtures using PRO ENGINEER CAD software.
Monitored performance of employees and equipment while providing management reports on
transactions, including statistics on volume, productivity, new development and service
impact to clients. Interacted with various operational areas to resolve problems or client
inquiries. Ensured that products were developed on schedule, within budget, while meeting
functional and unit cost specifications. Interfaced with manufacturers to determine feasibility,
cost and development estimates for generating ROI analysis. Prepared monthly financial
reporting package for management staff regarding profits and expense forecasts which were
presented via quarterly interim review conference calls. Led design engineers in project
designs. Maintained and supported QS9000 documentation and initiatives. Prepared
performance reviews and provided training, planning and career development as appropriate.
Executed all corporate policies, procedures, and programs in a professional and timely
manner.
3/1996 to 12/1999 AMERICANNTN BEARING, Schiller Park,Illinois
Project/Process Engineer
Responsible for all environmental reporting, including underground storage tank removal.
Analyzed and resolved customer complaints within a cross-functional team. Responsible for
the development and manufacture of International designed bearings for the domestic
automotive OEM and the industrial electric motor industry. Worked with US and
International manufacturing companies. Developed domestic suppliers of seals, retainers and
steel rings per ISO 9000. Responsible for the manufacture of all samples for customers using
the Production Part Approval Process. Process Engineer for five high volume bearing
production lines. Designed test fixtures using PRO ENGINEER CAD software. Lead auditor
for QS9000 third edition internal audits. Implemented ISO standards and best practices for
engineering design and development. Led Kaizen events using statistical data to identify and
reduce marginal manufacturing processes. Maintained business confidentiality relative to
personnel, pricing, promotion, customer lists, financial reports, and methods of distribution.
Consulted with executive management, corporate finance and other departments to provide
analysis of financial data. Conducted qualitative and quantitative analysis of metrics from
assigned business areas including product pricing.
5/1992 to 3/1996 GROSSINGER VOLVO, Lincolnwood, Illinois
ASE Certified Technician
Performed scheduled preventive maintenance and major tune-ups according to manufacturer
specifications. Diagnosed electrical and mechanical systems for faults. Analyzed and
resolved vehicle pickup and delivery issues as a Member of the Customer Service Index
Committee.
5/1991 to 5/1992 PHILLIPS PETROLEUM CO., Pasadena,Texas
Polyethylene Maintenance Engineer
Initiated mechanical design modifications on piping systems and pressure vessels using
Hazop procedures. Coordinated plant activities during shutdowns and turnovers.
5/1990 to 5/1991 FLORIDA PRODUCTION ENGINEERING, Daytona Beach,Florida
Process Engineer
Installed and debugged cellular manufacturing unit. Started up, trained and supervised 8
employees in JIT principles within the cellular environment.
5/1987 to 8/1988 PEPSI COLA, Orlando, Florida
Process Engineer
Supervised production line of 10 personnel. Initiated and managed parts inventory
computerization project.

More Related Content

What's hot

Gene Furr - Linked
Gene Furr - LinkedGene Furr - Linked
Gene Furr - LinkedGene Furr
 
Resume 11 27-12 (no address)
Resume 11 27-12 (no address)Resume 11 27-12 (no address)
Resume 11 27-12 (no address)Joebethke
 
Resume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaResume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaarvindblr
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal B
 
Draft lytle+resume1 6 28-2017.docx 2
Draft lytle+resume1 6 28-2017.docx  2Draft lytle+resume1 6 28-2017.docx  2
Draft lytle+resume1 6 28-2017.docx 2Rhonda Lytle
 
Herbst john resume product development 2016
Herbst john resume product development 2016Herbst john resume product development 2016
Herbst john resume product development 2016John Herbst
 
Herbst john resume manufacturing engineer 2016
Herbst john resume manufacturing engineer 2016Herbst john resume manufacturing engineer 2016
Herbst john resume manufacturing engineer 2016John Herbst
 
Industrial_Manufacturing Engineer Resume
Industrial_Manufacturing Engineer ResumeIndustrial_Manufacturing Engineer Resume
Industrial_Manufacturing Engineer ResumeBryan Davenport
 
Industrial_Manufacturing_Engineer_Resume
Industrial_Manufacturing_Engineer_ResumeIndustrial_Manufacturing_Engineer_Resume
Industrial_Manufacturing_Engineer_ResumeBryan Davenport
 
resume_Celeste_May2015
resume_Celeste_May2015resume_Celeste_May2015
resume_Celeste_May2015Celeste Lim
 
Terry Coopers Resume
Terry Coopers ResumeTerry Coopers Resume
Terry Coopers ResumeTerry Cooper
 

What's hot (20)

Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
Gene Furr - Linked
Gene Furr - LinkedGene Furr - Linked
Gene Furr - Linked
 
Resume 11 27-12 (no address)
Resume 11 27-12 (no address)Resume 11 27-12 (no address)
Resume 11 27-12 (no address)
 
Resume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaResume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-california
 
Marcus Wittmann
Marcus WittmannMarcus Wittmann
Marcus Wittmann
 
LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
 
Draft lytle+resume1 6 28-2017.docx 2
Draft lytle+resume1 6 28-2017.docx  2Draft lytle+resume1 6 28-2017.docx  2
Draft lytle+resume1 6 28-2017.docx 2
 
Rob VanBuren resume
Rob VanBuren resumeRob VanBuren resume
Rob VanBuren resume
 
Yajuvendra Bamrara CV
Yajuvendra Bamrara CVYajuvendra Bamrara CV
Yajuvendra Bamrara CV
 
Ashok bhandari
Ashok bhandariAshok bhandari
Ashok bhandari
 
MARTY_PATE
MARTY_PATEMARTY_PATE
MARTY_PATE
 
Herbst john resume product development 2016
Herbst john resume product development 2016Herbst john resume product development 2016
Herbst john resume product development 2016
 
Herbst john resume manufacturing engineer 2016
Herbst john resume manufacturing engineer 2016Herbst john resume manufacturing engineer 2016
Herbst john resume manufacturing engineer 2016
 
Industrial_Manufacturing Engineer Resume
Industrial_Manufacturing Engineer ResumeIndustrial_Manufacturing Engineer Resume
Industrial_Manufacturing Engineer Resume
 
KY Fung Resume_me
KY Fung Resume_meKY Fung Resume_me
KY Fung Resume_me
 
Chris Irgens
Chris IrgensChris Irgens
Chris Irgens
 
Industrial_Manufacturing_Engineer_Resume
Industrial_Manufacturing_Engineer_ResumeIndustrial_Manufacturing_Engineer_Resume
Industrial_Manufacturing_Engineer_Resume
 
resume_Celeste_May2015
resume_Celeste_May2015resume_Celeste_May2015
resume_Celeste_May2015
 
Terry Coopers Resume
Terry Coopers ResumeTerry Coopers Resume
Terry Coopers Resume
 

Similar to Erwin Flowers Resume Nov1 2015

Similar to Erwin Flowers Resume Nov1 2015 (20)

Scott Miller Resume
Scott Miller ResumeScott Miller Resume
Scott Miller Resume
 
Mark young resume_2016_may
Mark young resume_2016_mayMark young resume_2016_may
Mark young resume_2016_may
 
Dbresume28
Dbresume28Dbresume28
Dbresume28
 
DWADAMS RESUME2
DWADAMS RESUME2DWADAMS RESUME2
DWADAMS RESUME2
 
findley-steve BME professional
findley-steve BME professionalfindley-steve BME professional
findley-steve BME professional
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 
Rsume
RsumeRsume
Rsume
 
Suresh Babu G P Resume
Suresh Babu G P ResumeSuresh Babu G P Resume
Suresh Babu G P Resume
 
Amy Freeman Resume June2009
Amy Freeman Resume June2009Amy Freeman Resume June2009
Amy Freeman Resume June2009
 
Kipp Bottorff Update 2016 v2
Kipp Bottorff Update 2016 v2Kipp Bottorff Update 2016 v2
Kipp Bottorff Update 2016 v2
 
Robert Skidmore Resume 03212015
Robert Skidmore Resume 03212015Robert Skidmore Resume 03212015
Robert Skidmore Resume 03212015
 
141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017
 
Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01Pfeiffer Juergen 2015-04-28 REV01
Pfeiffer Juergen 2015-04-28 REV01
 
NPI operations eng
NPI operations eng NPI operations eng
NPI operations eng
 
Debahis CV
Debahis CVDebahis CV
Debahis CV
 
Resume
ResumeResume
Resume
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
 
Smiley Stephen Resume
Smiley Stephen ResumeSmiley Stephen Resume
Smiley Stephen Resume
 
JameyCranford_Manfac_Manager_Resume 2015
JameyCranford_Manfac_Manager_Resume 2015JameyCranford_Manfac_Manager_Resume 2015
JameyCranford_Manfac_Manager_Resume 2015
 

Erwin Flowers Resume Nov1 2015

  • 1. ERWIN B. FLOWERS 742 E. Oliviabrook Drive OakBrook Terrace, Illinois 60181 Telephone: (708) 271-2712 / Email: Flowerserwin@gmail.com ____________________________________________________________________________________ OBJECTIVE: Seeking leadership position in the areas of Chief Technical Reliability Engineer, Program Manager, Director of Cost Reductions Sr. Engineering Manager, Sr. Continuous Improvement Manager, Sr. Manager Quality/Reliability Engineering. My goal is to direct business leaders, maximize profits, reduce cost, waste, variation, defects, to improve productivity and Reliability, achieve customer Satisfaction, using Program Management, Sigma Methodologies for DMAIC, DFSS, CAPA, Lean and Kaizen, VSM, approaches for continuous improvement. Specialist in developing suppliers in PPAP, APQP, Engineering design review, DFMEA, Strategic MS project planning, root cause analysis, continuous improvement projects within cross functional TEAM environment. EDUCATION: FLORIDA A&M UNIVERSITY, Tallahassee,Florida B.S. Mechanical Engineering CERTIFICATION: Lean Six Sigma Master Black Belt,ASQ Certified Reliability Engineer, Champion Belt 2014 - Present: Navistar Inc,Lisle, Illinois Advanced Reliability Team Lead/ LewisB. Campbell Quality Award Chairman Responsible for providing professional input to a risk management plan that will anticipate reliability-related, and non-reliability-related risks that could adversely impact product development. Systematically initiate acceptance tests and inspection criteria to identify and manage reliability risks, growth, allocations, life expectancy, prediction, and demonstration testing methodology using ReliaSoft & MiniTab Software. Pinpoint and reduce risk related to FMEA - Failure Modes and Effects Analysis, by utilization of Data Analysis Techniques which include: Statistical Process Control; Reliability Modeling and Prediction; Fault Tree Analysis; Weibull Tree Analysis; Six Sigma (6σ) Methodology; Root-cause and Root-Cause Failure Analysis (RCA, RCFA); Failure Reporting, Analysis and Corrective Action System (FRACAS). Participate in building solid, professional relationships with cross functional teams. Implement strategies to eliminate or reduce any losses through root cause analysis, by managing risk related to essential objectives in the areas of environmental health and safety, quality and production. 06/2008 to 01/2014 Navistar Inc,Lisle, Illinois Medium Duty Engine Cost Reduction Manager Medium Duty Engine Cost Reduction Manager responsible for $20 mm cost reduction by championing innovative idea generation, and Supplier Resourcing. Concurrently Reducing 3 Month in service warranty by 50% by using Six Sigma Black Belt Problem Solving Methodologies within a cross functional team environment to obtain root cause. Promoted ASQ Certified Reliability Engineering methodology to ensure reliability. 04/2006 to 06/2008 EMERSON POWER TRANSMISSION, Valparaiso,Indiana Senior Product Engineer Senior engineer responsible for design and development of industrial bearings for the material handling, HVAC, aggregate and packaging industries. Utilize Microsoft Project and new product development methodology to track activities and milestones in a shared portal style environment. Managed cross functional teams including engineering, manufacturing, marketing, sales, quality, and international procurement address issues from original concepts to inventory management. Led current product optimizations through outsourcing of
  • 2. domestic products to Mexico, China and India. Designed tests to validate new products. Designed components and assemblies using Solid Edge software. Analyzed compliance and best practices in the areas of risk management and standards, as well as ensured that products meet all cost, quality and performance objectives. 9/2002 to 12/2005 FTI Corporation, Chicago, Illinois Product Engineering Manager Responsible for product development of manufacturers of domestic designed bearings for the industrial electric motor industry. Developed domestic suppliers with seals, retainers and steel rings per ISO 9000. Responsible for the manufacture of all samples for customers using the P.P.A.P. (Production Part Approval Process). Led Kaizen events using statistical data to identify and reduce marginal manufacturing processes. Designed test fixtures using AUTOCAD software. 12/1999 to 8/2002 Federal Mogul Visibility Group, Franklin Park,Illinois Mechanical Product Engineering Group Leader Overall responsibility of automotive OEM lighting programs from concept through production. Supervised the activities of product engineering personnel with project related purchases ranging from $200M to $2MM per project. Developed tool quotes from Asian and local machine shops. Designed test fixtures using PRO ENGINEER CAD software. Monitored performance of employees and equipment while providing management reports on transactions, including statistics on volume, productivity, new development and service impact to clients. Interacted with various operational areas to resolve problems or client inquiries. Ensured that products were developed on schedule, within budget, while meeting functional and unit cost specifications. Interfaced with manufacturers to determine feasibility, cost and development estimates for generating ROI analysis. Prepared monthly financial reporting package for management staff regarding profits and expense forecasts which were presented via quarterly interim review conference calls. Led design engineers in project designs. Maintained and supported QS9000 documentation and initiatives. Prepared performance reviews and provided training, planning and career development as appropriate. Executed all corporate policies, procedures, and programs in a professional and timely manner. 3/1996 to 12/1999 AMERICANNTN BEARING, Schiller Park,Illinois Project/Process Engineer Responsible for all environmental reporting, including underground storage tank removal. Analyzed and resolved customer complaints within a cross-functional team. Responsible for the development and manufacture of International designed bearings for the domestic automotive OEM and the industrial electric motor industry. Worked with US and International manufacturing companies. Developed domestic suppliers of seals, retainers and steel rings per ISO 9000. Responsible for the manufacture of all samples for customers using the Production Part Approval Process. Process Engineer for five high volume bearing production lines. Designed test fixtures using PRO ENGINEER CAD software. Lead auditor for QS9000 third edition internal audits. Implemented ISO standards and best practices for engineering design and development. Led Kaizen events using statistical data to identify and reduce marginal manufacturing processes. Maintained business confidentiality relative to personnel, pricing, promotion, customer lists, financial reports, and methods of distribution. Consulted with executive management, corporate finance and other departments to provide analysis of financial data. Conducted qualitative and quantitative analysis of metrics from assigned business areas including product pricing. 5/1992 to 3/1996 GROSSINGER VOLVO, Lincolnwood, Illinois ASE Certified Technician
  • 3. Performed scheduled preventive maintenance and major tune-ups according to manufacturer specifications. Diagnosed electrical and mechanical systems for faults. Analyzed and resolved vehicle pickup and delivery issues as a Member of the Customer Service Index Committee. 5/1991 to 5/1992 PHILLIPS PETROLEUM CO., Pasadena,Texas Polyethylene Maintenance Engineer Initiated mechanical design modifications on piping systems and pressure vessels using Hazop procedures. Coordinated plant activities during shutdowns and turnovers. 5/1990 to 5/1991 FLORIDA PRODUCTION ENGINEERING, Daytona Beach,Florida Process Engineer Installed and debugged cellular manufacturing unit. Started up, trained and supervised 8 employees in JIT principles within the cellular environment. 5/1987 to 8/1988 PEPSI COLA, Orlando, Florida Process Engineer Supervised production line of 10 personnel. Initiated and managed parts inventory computerization project.