Qualifications Oil & Gas Experience : 4 years’ experience
Power Plant Experience : 2 years’ experience
Documentation : 11 years’ experience
Quality Inspection : 5 years experience
Banking : 3 years experience
Data Entry : Excellent
Experience
TUFANBEYLI, TURKEY
Mechanical Commissioning Engineer
February 6, 2015 - Present
Client : Enerjisa Enerji Uretum A.S.
Value : $953M
THERMAL POWER PLANT (3 X 150 MW Coal Fired Boiler with Re-
heater)
Duties and Responsibilities
 Line inspection of each system to ensure standard materials is properly
installed before start-up.
 Conduct pre-commissioning activities such as L.O flushing, valve line-
up, inspection & punch report for each system
 Perform motor solo, no-load and load test run that includes rotation
check, vibration check, and temperature check to ensure good
condition of each mechanical equipment.
 Conducts commissioning activities for Limestone Handling System
such as operation and maintenance of vibrating feeders, chain/belt
conveyors, bucket elevators, hammer/mill crushers, screeners, dust
collectors, dense transport system, two-stage air compressors, air
dryers.
 System operation of limestone handling system.
 Train operators and ensure to ensure their competency for the required
job.
RABIGH, SAUDI ARABIA
Mechanical Commissioning Engineer
Operation & Maintenance
July 24, 2013 – July 25,2014
Client : Saudi Electricity Company
Value : $3.39bn
RABIGH POWER PLANT 2 (4 X 700 MW Combined Cycle Gas-Fired
Boiler with Re-heater)
Duties and Responsibilities
 Supervises and coordinates activities of technical staff engaged in
maintaining and repairing static and rotating equipment used in the
construction site.
 Reviewing and reporting of project status.
 Carrying out quality inspections in job site.
 Performs the work of employees and other duties as required.
 Supervises and assigns the work of maintenance employees.
 Thorough knowledge of the occupation hazards and corresponding
safety precautions necessary for the safe performance of assigned
duties. Manage Permit-To-Work documents.
 Planning and undertaking scheduled maintenance and assign jobs to
the subordinates to ensure early preparation for all job requirements.
 Support the project team by give all the mechanical requirements and
request for possible changes which will lead to safe and accessible job
areas.
 Lead the mechanical maintenance crew during the commissioning and
start up
 Train subordinates and ensure their competency for the required job.
 Pre-inspection prior to start of work whether defined precautions are in
place.
RUWAIS, UNITED ARAB EMIRATES
QA/QC Coordinator
2012 - 2013
Client : TAKREER
Value : $9.6Bn
RRE IP3/IP4 EXPANSION
TAKREER – GS ENGINEERING & CONSTRUCTION PROJECT
GREEN DIESEL PROJECT (IRP II) PLANT SHUTDOWN
Duties and Responsibilities
 Preparing QA/QC method statement for hydrostatic testing for
underground and above ground piping for an oil and gas project
 Contribute ideas in preparing and making Project Quality Plan
 Distributes test packages to inspectors and line checkers for site
confirmation and verification
 Conduct actual site line checks and verification as per approved
isometric drawings
 Monitors, records and clearing of QC related punch items
 Review and coordination of NDE and outstanding inspection
 Final release and signing-off of test packages
 Witness air blowing, hydro testing, service test, pneumatic test and
flushing
 Ascertains that safety for welding, testing and related activities are
being implemented
 Visual inspection of Glass Reinforced Fiber Plastic Pipes (GRP)
Cement / Bond Joints
 Painting / coating inspection of steel structural works and piping
support.
 Undertake QC painting / coating activities in the work place for daily
basis.
 Monitor weather condition for surface preparation and painting /
coating application.
 Hot dip galvanizing coating inspection.
 Execute Painting / coating inspection work as per company / project
inspection test plan.
 Perform site check and monitor all painting / coating related works
and ensure all final products meet in accordance with company
procedure, client requirement and international codes.
 Responsible for incoming coating / painting material inspection and
has to ensure whether these materials suits to meets the requirements of
project specifications.
 Prepare all necessary QA / QC painting / coating documents and
handed over to clients review.
 Conducted surveillance of Welding, NDT, PMI and PWHT activities
on subcontractors designated area of responsibility
 Ensures that all welds meets the project requirements and in
accordance to the WPS
 Ensures that repairs are done correctly and accurately to comply with
the project specification
MANILA, PHILIPPINES
Financial Analyst
2009-2012
BANKING AND FINANCIAL SERVICES
31st
Street, Global City Fort Bonifacio, Taguig
Duties and Responsibilities
 Knowledgeable in MSP application
 Perform reporting, remitting, and reconciling activities related to
funding a delivery of whole loans and securitization of mortgage
backed securities (MBS) and monthly servicing activities
 Analyze data, research issues and exceptions, and resolve
discrepancies.
 Ensure adherence to internal controls and regulatory standards.
 Provide assistance to customers regarding operations performance in
areas such as monthly servicing, delivery accuracy, custodial account
management, cash management, reporting, remitting, and lender
compliance.
 Report results and concerns to management. Collect and analyze data
regarding customer performance.
 Conduct root cause analysis of customer problems and issues. Propose
solutions. Support implementation.
 Build internal and external customer relationships. Respond to
inquiries.
 Update workflow processes. Ensure processes respond to operational
risk and control objectives, process improvement goals, and
achievement of business goals.
 Support the technology group by testing system enhancements prior to
release.
 May perform moderate to complex projects or participate as a team
member on more complex products.
SHUAIBA, KUWAIT
2008-2009
KUWAIT PARAXYLENE PRODUCTION COMPANY (KPPC)
AROMATICS COMPLEX – PETROCHEMICAL
Shuaiba Industrial Park, Mangaf, Kuwait
QA/QC DEPARTMENT
QC Inspector
Duties and Responsibilities
 Responsible for inspection of pipe line and mechanical equipments to
ensure that quality and other related codes are met.
 Inspection of instruments, valves and fittings for defects.
 Conducted surveillance of Welding, NDT, PMI and PWHT activities
on subcontractors designated area of responsibility
 Ensures that all welds meets the project requirements and in
accordance to the WPS
 Conducted visual inspection on production welds and witness WQT
 Ensures that repairs are done correctly and accurately to comply with
the project specification
 Review of DWR, NDT, PMI and PWHT reports
 Receives test packages for line checking, document reviews and punch
listings
 Performs actual site inspection and verification as per approved
isometric drawings
 Monitors, records and releases of test packages for testing
 Witness Air Blowing, Hydro Test, Service Test, Pneumatic Test and
Flushing
 Ascertains that safety for welding, testing and related activities are
being implemented
Mailiao, TAIWAN
YUNLIN COUNTY, TAIWAN
2005-2007
FORMOSA PETROCHEMICAL CORPORATION
QUALITY CONTROL DEPARTMENT
DOCUMENT CONTROLLER
Duties and Responsibilities
 Coordinate all activities related to the document control procedure,
including technical documents, drawings, and commercial
correspondence.
 Input document data into the standard registers ensuring that the
information is accurate and up to date.
 Generate the various document control reports as required.
 Data entry of site documents, and follow up of all the site needs
 Makes sure that controlled copies of latest approved documents and
drawings are given to the appropriate staff, subcontractors and
suppliers as applicable
 Maintain updated records of all approved documents and drawings and
their distribution clearly
 Maintain the documents and drawings in the document control office
under safe custody without any damage or deterioration with easy
traceability
 Maintain the files and control logs as required by the project.
Skills and Competency
 Knowledge in use of spreadsheet, database, word processing and
selected job specific software.
 Ability to keep clear and accurate records and reports
 Ability to use computer and rapidly input data and retrieve records and
information
 Ability to organize work load and to manage a filing methods and
management techniques
 Good Communication skills.
2004–2005 Pasig City, PHILIPPINES
BANCO DE ORO HEAD OFFICE
One San Miguel Avenue, Ortigas Center, Pasig City
ITEMS PROCESSING UNIT
Data Encoder / Comptroller
 Supervised my members with regards to the effective, efficient and
accurateness of data entered in the system.
 Trained new recruits regarding the systems and the standard operating
procedures in inputting data.
 Scanning and verifying data.
 Implemented training course for new recruits — speeding profitability.
 Empowers technical breadth and depth of the job core to enable the
encoders to be proficient in all aspects of expertise.
BANKARD PHILIPPINES, INC Pasig City, PHILIPPINES
Robinsons-Equitable tower, Ortigas Center, Pasig City
Data Encoder / Comptroller
 Supervised my members with regards to the effective, efficient and
accurateness of data entered in the system.
 Trained new recruits regarding the systems and the standard operating
procedures in inputting data.
 Scanning and verifying data.
 Implemented training course for new recruits — speeding profitability.
 Empowers technical breadth and depth of the job core to enable the
encoders to be proficient in all aspects of expertise.
INNOVE COMMUNICATIONS, INC. Makati City, PHILIPPINES
Valero Street, Legaspi Village, Makati City
Cashier
Duties and Responsibilities
 Accepting currency and other forms of payment
 Recording purchased items, giving change, and producing receipts
 Handles cash payments from clients.
 Making daily transmittal reports and cash deposits
 Ensure that each customer receives outstanding service by providing a
friendly environment, which includes greeting and acknowledging
every customer, maintaining outstanding standards, solid product
knowledge and all other aspects of customer service.
 Maintain an awareness of all promotions and advertisements
 Communicate customer requests to management.
Skills and Competency
 Ability to process information/merchandise through register system
 Ability to communicate with associates and customers
 Ability to read, count, and write to accurately complete all
documentation
 Ability to operate all equipment necessary to perform the job
MEGADATA CORPORATION Mandaluyong City, PHILIPPINES
667 Sgt. Bumatay St., Mandaluyong City
Data Encoder
 Encoding and verifying datas.
 Encoding U.S. directories
 Encoding credit card applications.
2003 RIZAL, PHILIPPINES
Alcan Starpack Philippines Corporation
Km.22 East Ortigas extension avenue, Cainta
QUALITY SYSTEMS DEPARTMENT
Quality Systems Assistant
 Responsible for the inspection of incoming materials / products from
principals and ensuring that the good stocks as wells as returned bad
orders are free from contamination and infestation.
 Conduct inspection and verification work according to company
standard, procedures and client requirements
 Conduct inspection and verification work according to company
standard, procedures and client requirements
 Coordinate with receiving and returns section on the inspection of
incoming goods.
 Prevent contamination & infestation of good stocks.
 Inform the concern supervisors when a deviation is found.
 Prepare and submit complete and accurate inspection report.
Trainings OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
(OSHA)
November 29, 2013
Yanbu, Kingdom of Saudi Arabia
Education 1997-2002 ADAMSON UNIVERSITY MANILA,
PHILIPPINES
B.S. Mechanical Engineering
Personal Background Name : Frederic Manuel Fuentes
Birthdate : March 22, 1981
Civil Status : Married
Contact person : Angeliza B. Fuentes
Mobile number : +639288062129
Skills
• Typing skills of at least 60-75 wpm with 99% typing accuracy.
• Knowledgeable in Computer Applications (MS Word, Excel,
PowerPoint & etc.), Internet, Operating Systems (Win 98™,Win XP™,
Win 2000™), Programming Languages (VB,C+,
HTML,AUTOCadd),Networking and PC Troubleshooting
• Driving with Professional License
• Quality Control. Documentation
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014

FREDERIC FUENTES_ 2014

  • 1.
    Block 5 Lot22 Durian Street Centennial II, Pinalad Road Nagpayong, Pinagbuhatan Pasig City ☎ (63) 09288062129 ☎ (63) 09182286328 email : engr.fuentes@yahoo.com Frederic Manuel Fuentes Qualifications Oil & Gas Experience : 4 years’ experience Power Plant Experience : 2 years’ experience Documentation : 11 years’ experience Quality Inspection : 5 years experience Banking : 3 years experience Data Entry : Excellent Experience TUFANBEYLI, TURKEY Mechanical Commissioning Engineer February 6, 2015 - Present Client : Enerjisa Enerji Uretum A.S. Value : $953M THERMAL POWER PLANT (3 X 150 MW Coal Fired Boiler with Re- heater) Duties and Responsibilities  Line inspection of each system to ensure standard materials is properly installed before start-up.  Conduct pre-commissioning activities such as L.O flushing, valve line- up, inspection & punch report for each system  Perform motor solo, no-load and load test run that includes rotation check, vibration check, and temperature check to ensure good condition of each mechanical equipment.  Conducts commissioning activities for Limestone Handling System such as operation and maintenance of vibrating feeders, chain/belt conveyors, bucket elevators, hammer/mill crushers, screeners, dust collectors, dense transport system, two-stage air compressors, air dryers.  System operation of limestone handling system.  Train operators and ensure to ensure their competency for the required job.
  • 2.
    RABIGH, SAUDI ARABIA MechanicalCommissioning Engineer Operation & Maintenance July 24, 2013 – July 25,2014 Client : Saudi Electricity Company Value : $3.39bn RABIGH POWER PLANT 2 (4 X 700 MW Combined Cycle Gas-Fired Boiler with Re-heater) Duties and Responsibilities  Supervises and coordinates activities of technical staff engaged in maintaining and repairing static and rotating equipment used in the construction site.  Reviewing and reporting of project status.  Carrying out quality inspections in job site.  Performs the work of employees and other duties as required.  Supervises and assigns the work of maintenance employees.  Thorough knowledge of the occupation hazards and corresponding safety precautions necessary for the safe performance of assigned duties. Manage Permit-To-Work documents.  Planning and undertaking scheduled maintenance and assign jobs to the subordinates to ensure early preparation for all job requirements.  Support the project team by give all the mechanical requirements and request for possible changes which will lead to safe and accessible job areas.  Lead the mechanical maintenance crew during the commissioning and start up  Train subordinates and ensure their competency for the required job.  Pre-inspection prior to start of work whether defined precautions are in place.
  • 3.
    RUWAIS, UNITED ARABEMIRATES QA/QC Coordinator 2012 - 2013 Client : TAKREER Value : $9.6Bn RRE IP3/IP4 EXPANSION TAKREER – GS ENGINEERING & CONSTRUCTION PROJECT GREEN DIESEL PROJECT (IRP II) PLANT SHUTDOWN Duties and Responsibilities  Preparing QA/QC method statement for hydrostatic testing for underground and above ground piping for an oil and gas project  Contribute ideas in preparing and making Project Quality Plan  Distributes test packages to inspectors and line checkers for site confirmation and verification  Conduct actual site line checks and verification as per approved isometric drawings  Monitors, records and clearing of QC related punch items  Review and coordination of NDE and outstanding inspection  Final release and signing-off of test packages  Witness air blowing, hydro testing, service test, pneumatic test and flushing  Ascertains that safety for welding, testing and related activities are being implemented  Visual inspection of Glass Reinforced Fiber Plastic Pipes (GRP) Cement / Bond Joints  Painting / coating inspection of steel structural works and piping support.  Undertake QC painting / coating activities in the work place for daily basis.  Monitor weather condition for surface preparation and painting / coating application.  Hot dip galvanizing coating inspection.  Execute Painting / coating inspection work as per company / project inspection test plan.  Perform site check and monitor all painting / coating related works and ensure all final products meet in accordance with company procedure, client requirement and international codes.
  • 4.
     Responsible forincoming coating / painting material inspection and has to ensure whether these materials suits to meets the requirements of project specifications.  Prepare all necessary QA / QC painting / coating documents and handed over to clients review.  Conducted surveillance of Welding, NDT, PMI and PWHT activities on subcontractors designated area of responsibility  Ensures that all welds meets the project requirements and in accordance to the WPS  Ensures that repairs are done correctly and accurately to comply with the project specification MANILA, PHILIPPINES Financial Analyst 2009-2012 BANKING AND FINANCIAL SERVICES 31st Street, Global City Fort Bonifacio, Taguig Duties and Responsibilities  Knowledgeable in MSP application  Perform reporting, remitting, and reconciling activities related to funding a delivery of whole loans and securitization of mortgage backed securities (MBS) and monthly servicing activities  Analyze data, research issues and exceptions, and resolve discrepancies.  Ensure adherence to internal controls and regulatory standards.  Provide assistance to customers regarding operations performance in areas such as monthly servicing, delivery accuracy, custodial account management, cash management, reporting, remitting, and lender compliance.  Report results and concerns to management. Collect and analyze data regarding customer performance.  Conduct root cause analysis of customer problems and issues. Propose solutions. Support implementation.  Build internal and external customer relationships. Respond to inquiries.  Update workflow processes. Ensure processes respond to operational risk and control objectives, process improvement goals, and achievement of business goals.  Support the technology group by testing system enhancements prior to release.  May perform moderate to complex projects or participate as a team member on more complex products.
  • 5.
    SHUAIBA, KUWAIT 2008-2009 KUWAIT PARAXYLENEPRODUCTION COMPANY (KPPC) AROMATICS COMPLEX – PETROCHEMICAL Shuaiba Industrial Park, Mangaf, Kuwait QA/QC DEPARTMENT QC Inspector Duties and Responsibilities  Responsible for inspection of pipe line and mechanical equipments to ensure that quality and other related codes are met.  Inspection of instruments, valves and fittings for defects.  Conducted surveillance of Welding, NDT, PMI and PWHT activities on subcontractors designated area of responsibility  Ensures that all welds meets the project requirements and in accordance to the WPS  Conducted visual inspection on production welds and witness WQT  Ensures that repairs are done correctly and accurately to comply with the project specification  Review of DWR, NDT, PMI and PWHT reports  Receives test packages for line checking, document reviews and punch listings  Performs actual site inspection and verification as per approved isometric drawings  Monitors, records and releases of test packages for testing  Witness Air Blowing, Hydro Test, Service Test, Pneumatic Test and Flushing  Ascertains that safety for welding, testing and related activities are being implemented Mailiao, TAIWAN YUNLIN COUNTY, TAIWAN 2005-2007 FORMOSA PETROCHEMICAL CORPORATION QUALITY CONTROL DEPARTMENT DOCUMENT CONTROLLER
  • 6.
    Duties and Responsibilities Coordinate all activities related to the document control procedure, including technical documents, drawings, and commercial correspondence.  Input document data into the standard registers ensuring that the information is accurate and up to date.  Generate the various document control reports as required.  Data entry of site documents, and follow up of all the site needs  Makes sure that controlled copies of latest approved documents and drawings are given to the appropriate staff, subcontractors and suppliers as applicable  Maintain updated records of all approved documents and drawings and their distribution clearly  Maintain the documents and drawings in the document control office under safe custody without any damage or deterioration with easy traceability  Maintain the files and control logs as required by the project. Skills and Competency  Knowledge in use of spreadsheet, database, word processing and selected job specific software.  Ability to keep clear and accurate records and reports  Ability to use computer and rapidly input data and retrieve records and information  Ability to organize work load and to manage a filing methods and management techniques  Good Communication skills. 2004–2005 Pasig City, PHILIPPINES BANCO DE ORO HEAD OFFICE One San Miguel Avenue, Ortigas Center, Pasig City ITEMS PROCESSING UNIT Data Encoder / Comptroller  Supervised my members with regards to the effective, efficient and accurateness of data entered in the system.  Trained new recruits regarding the systems and the standard operating procedures in inputting data.  Scanning and verifying data.  Implemented training course for new recruits — speeding profitability.  Empowers technical breadth and depth of the job core to enable the
  • 7.
    encoders to beproficient in all aspects of expertise. BANKARD PHILIPPINES, INC Pasig City, PHILIPPINES Robinsons-Equitable tower, Ortigas Center, Pasig City Data Encoder / Comptroller  Supervised my members with regards to the effective, efficient and accurateness of data entered in the system.  Trained new recruits regarding the systems and the standard operating procedures in inputting data.  Scanning and verifying data.  Implemented training course for new recruits — speeding profitability.  Empowers technical breadth and depth of the job core to enable the encoders to be proficient in all aspects of expertise. INNOVE COMMUNICATIONS, INC. Makati City, PHILIPPINES Valero Street, Legaspi Village, Makati City Cashier Duties and Responsibilities  Accepting currency and other forms of payment  Recording purchased items, giving change, and producing receipts  Handles cash payments from clients.  Making daily transmittal reports and cash deposits  Ensure that each customer receives outstanding service by providing a friendly environment, which includes greeting and acknowledging every customer, maintaining outstanding standards, solid product knowledge and all other aspects of customer service.  Maintain an awareness of all promotions and advertisements  Communicate customer requests to management. Skills and Competency  Ability to process information/merchandise through register system
  • 8.
     Ability tocommunicate with associates and customers  Ability to read, count, and write to accurately complete all documentation  Ability to operate all equipment necessary to perform the job MEGADATA CORPORATION Mandaluyong City, PHILIPPINES 667 Sgt. Bumatay St., Mandaluyong City Data Encoder  Encoding and verifying datas.  Encoding U.S. directories  Encoding credit card applications. 2003 RIZAL, PHILIPPINES Alcan Starpack Philippines Corporation Km.22 East Ortigas extension avenue, Cainta QUALITY SYSTEMS DEPARTMENT Quality Systems Assistant  Responsible for the inspection of incoming materials / products from principals and ensuring that the good stocks as wells as returned bad orders are free from contamination and infestation.  Conduct inspection and verification work according to company standard, procedures and client requirements  Conduct inspection and verification work according to company standard, procedures and client requirements  Coordinate with receiving and returns section on the inspection of incoming goods.  Prevent contamination & infestation of good stocks.  Inform the concern supervisors when a deviation is found.  Prepare and submit complete and accurate inspection report.
  • 9.
    Trainings OCCUPATIONAL SAFETYAND HEALTH ADMINISTRATION (OSHA) November 29, 2013 Yanbu, Kingdom of Saudi Arabia Education 1997-2002 ADAMSON UNIVERSITY MANILA, PHILIPPINES B.S. Mechanical Engineering Personal Background Name : Frederic Manuel Fuentes Birthdate : March 22, 1981 Civil Status : Married Contact person : Angeliza B. Fuentes Mobile number : +639288062129 Skills • Typing skills of at least 60-75 wpm with 99% typing accuracy. • Knowledgeable in Computer Applications (MS Word, Excel, PowerPoint & etc.), Internet, Operating Systems (Win 98™,Win XP™, Win 2000™), Programming Languages (VB,C+, HTML,AUTOCadd),Networking and PC Troubleshooting • Driving with Professional License • Quality Control. Documentation