SlideShare a Scribd company logo
VIC TEMPLANZA
4208 Chimay Way, San Jose, CA 95135 |408-239-9196 | templanza@sbcglobal.net
SUMMARY
Self-starting professional experienced in bringing new technology to market. Objectives
oriented individual with strong leadership capabilities and with proven ability to work in
cross-functional and cross-cultural groups. Organized, highly motivated, and detail-
directed problem solver. Ability to manage complex projects within schedule and
budget.
Specialties:• Project/Program Management • New Product Introduction (NPI) •
Production Launch and Transfer • Continuous Improvement Programs • Cost Reduction
EXPERIENCE
April, 2010 to
Present
QA/Tech Support Engineer, KLA-Tencor, Customer Operations
As a senior technical support engineer, helps manage product transition from
manufacturing to installation. Creates install and upgrade systems and procedures
showing specific roles and responsibilities of the install team, field office and the
customer. Conducts real-time upgrade/install progress evaluation against schedule and
provides technical assistance to ensure tasks completion as scheduled.
Constructs Gantt charts in collaboration with cross-functional teams to
promote synergized installation processes and cycle times, allowing for
effective management of customer expectation.
• Creates and uploads checklists in company-wide database to detail
out discrete activities and standard time to meet product install
schedule.
• Monitors daily install progress reports from the field and provides
technical assistance to 36 install/upgrade engineers resulting in 98%
on-time installations
Conducts post-install reviews to identify install out-of-box quality (OOBQ)
issues and collaborates with both Design Engineers (DE) and Manufacturing
Design Engineers (MDE) towards closure of these identified OOBQs resulting to
a 90% reduction in repeat problems.
Works with world-wide field offices towards return of Intellectual Property (IP)
parts and assemblies from customers who had their tool upgraded. This
accounts for 95% materials recovery in the last four years.
Manages over one million dollars of specialized and individual tooling. Was
instrumental in establishing a tooling program for the install team through
identification, procurement, issuance and calibration of individual and shared
installation tooling. This significantly contributed to the over-all on-time
project completion.
Page 2
November, 1999 to
March, 2010
Manufacturing Design Engineer, KLA-Tencor, WIN Division
Principal manufacturing engineer on User Interface (UI) assembly new product
introduction (NPI) activities. In collaboration with DE, created release schedules and
drove on time completion of all activities. Participated in design reviews and evaluated
assemblies for ease of manufacture, cost and serviceability. Built and released
assembly Bill of Materials (BOM) structures as well developed assembly Operations
Method Sheets (OMS). Provided technical guidance and troubleshooting assistance on
discrepant parts/processes for ongoing products.
Developed and managed KLA Specials program that provided a fast track process for
evaluation, approval, release and build of customer–specific options. Participated in
integrating the special process in the company-wide product ordering administration.
Evaluated and released 150 special requests resulting in additional $10 million
sales.
Lead engineer in transitioning the UI mechanical assembly from make to buy
resulting in 40% reduction in cost.
Lead engineer in transitioning the whole UI assembly from US KLA-Tencor
manufacturing to KLA-Tencor off-shore operations. Trained and qualified KLA-
Tencor-Singapore MDE and assembly staff.
COMPUTER SKILLS
Software
· Microsoft Project, MS Word, Excel, MS PowerPoint, Visio, SAP, eQuality and
Enovia data bases
EDUCATION
BS degree in Industrial Engineering, University of the Philippines
Certificate, Using FMEA to Design and Manufacture Medical Devices and
Instrumentation, College of Engineering, University of Wisconsin-Madison

More Related Content

What's hot

Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017
Daniel Thuraiappah
 
NPS_L
NPS_LNPS_L
Ian Patrick Resume
Ian Patrick ResumeIan Patrick Resume
Ian Patrick ResumeIan Patrick
 
Raul Enrico Bo-ot_CV
Raul Enrico Bo-ot_CVRaul Enrico Bo-ot_CV
Raul Enrico Bo-ot_CVRico Bo-ot
 
Darlene E Bigornia resume 2016
Darlene E Bigornia resume 2016Darlene E Bigornia resume 2016
Darlene E Bigornia resume 2016Darlene Bigornia
 
Huy Pham_Resume
Huy Pham_ResumeHuy Pham_Resume
Huy Pham_ResumeHuy Pham
 
Introducing Robert Driskell
Introducing Robert Driskell Introducing Robert Driskell
Introducing Robert Driskell
Robert Driskell
 
Engineering change management webinar april 2013
Engineering change management webinar april 2013Engineering change management webinar april 2013
Engineering change management webinar april 2013John Cachat
 
Nelson Perez Resume Nmp June 2011 Pm (3)
Nelson Perez Resume Nmp June 2011  Pm (3)Nelson Perez Resume Nmp June 2011  Pm (3)
Nelson Perez Resume Nmp June 2011 Pm (3)
Nelson Perez
 

What's hot (19)

Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017
 
Marcus Wittmann
Marcus WittmannMarcus Wittmann
Marcus Wittmann
 
Resume
ResumeResume
Resume
 
NPS_L
NPS_LNPS_L
NPS_L
 
GARRETTC_Resume M
GARRETTC_Resume MGARRETTC_Resume M
GARRETTC_Resume M
 
Ian Patrick Resume
Ian Patrick ResumeIan Patrick Resume
Ian Patrick Resume
 
Raul Enrico Bo-ot_CV
Raul Enrico Bo-ot_CVRaul Enrico Bo-ot_CV
Raul Enrico Bo-ot_CV
 
JD_CV_15
JD_CV_15JD_CV_15
JD_CV_15
 
Rob VanBuren resume
Rob VanBuren resumeRob VanBuren resume
Rob VanBuren resume
 
Darlene E Bigornia resume 2016
Darlene E Bigornia resume 2016Darlene E Bigornia resume 2016
Darlene E Bigornia resume 2016
 
Huy Pham_Resume
Huy Pham_ResumeHuy Pham_Resume
Huy Pham_Resume
 
Introducing Robert Driskell
Introducing Robert Driskell Introducing Robert Driskell
Introducing Robert Driskell
 
new sales eng
new sales engnew sales eng
new sales eng
 
Robert_Lima 01_14_16
Robert_Lima 01_14_16Robert_Lima 01_14_16
Robert_Lima 01_14_16
 
Engineering change management webinar april 2013
Engineering change management webinar april 2013Engineering change management webinar april 2013
Engineering change management webinar april 2013
 
GDRESUME2016
GDRESUME2016GDRESUME2016
GDRESUME2016
 
ProjectEngineer_Construction
ProjectEngineer_ConstructionProjectEngineer_Construction
ProjectEngineer_Construction
 
LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02LAK-2016_CV_-Rev-02
LAK-2016_CV_-Rev-02
 
Nelson Perez Resume Nmp June 2011 Pm (3)
Nelson Perez Resume Nmp June 2011  Pm (3)Nelson Perez Resume Nmp June 2011  Pm (3)
Nelson Perez Resume Nmp June 2011 Pm (3)
 

Viewers also liked

Eng. Arturo Pichardo Resume
Eng. Arturo Pichardo ResumeEng. Arturo Pichardo Resume
Eng. Arturo Pichardo ResumeArturo Pichardo
 
My Resume
My ResumeMy Resume
My Resume
speaktoandre
 
Amer malik resume
Amer malik resumeAmer malik resume
Amer malik resume
Amer Malik
 
Rick Gregory LinkedIn Resume 2016
Rick Gregory LinkedIn Resume 2016Rick Gregory LinkedIn Resume 2016
Rick Gregory LinkedIn Resume 2016Rick Gregory
 
Luis Navarro Resume
Luis Navarro ResumeLuis Navarro Resume
Luis Navarro ResumeLuis Navarro
 
Bapaiah Kolli Resume
Bapaiah Kolli  ResumeBapaiah Kolli  Resume
Bapaiah Kolli ResumeBapaiah Kolli
 
Swapna - CV -PMO Manager with 10 years exp in end to end Project Mngt -PMP Ce...
Swapna - CV -PMO Manager with 10 years exp in end to end Project Mngt -PMP Ce...Swapna - CV -PMO Manager with 10 years exp in end to end Project Mngt -PMP Ce...
Swapna - CV -PMO Manager with 10 years exp in end to end Project Mngt -PMP Ce...Swapna Srinivas
 
Tony Avakian's Resume 2016
Tony Avakian's Resume 2016Tony Avakian's Resume 2016
Tony Avakian's Resume 2016Tony Avakian
 
Edward new resume
Edward new resumeEdward new resume
Edward new resumeEdward Gao
 
Srings
SringsSrings
Jps16
Jps16Jps16

Viewers also liked (17)

BF CV - 18th Nov16
BF CV - 18th Nov16BF CV - 18th Nov16
BF CV - 18th Nov16
 
Eng. Arturo Pichardo Resume
Eng. Arturo Pichardo ResumeEng. Arturo Pichardo Resume
Eng. Arturo Pichardo Resume
 
My Resume
My ResumeMy Resume
My Resume
 
Harbinder Mahoon CV 2014
Harbinder Mahoon CV 2014Harbinder Mahoon CV 2014
Harbinder Mahoon CV 2014
 
Amer malik resume
Amer malik resumeAmer malik resume
Amer malik resume
 
Rick Gregory LinkedIn Resume 2016
Rick Gregory LinkedIn Resume 2016Rick Gregory LinkedIn Resume 2016
Rick Gregory LinkedIn Resume 2016
 
Luis Navarro Resume
Luis Navarro ResumeLuis Navarro Resume
Luis Navarro Resume
 
resume8-9
resume8-9resume8-9
resume8-9
 
Manufacturing Engineer
Manufacturing EngineerManufacturing Engineer
Manufacturing Engineer
 
Bapaiah Kolli Resume
Bapaiah Kolli  ResumeBapaiah Kolli  Resume
Bapaiah Kolli Resume
 
Bhushan Bhapkar-CV
Bhushan Bhapkar-CVBhushan Bhapkar-CV
Bhushan Bhapkar-CV
 
Swapna - CV -PMO Manager with 10 years exp in end to end Project Mngt -PMP Ce...
Swapna - CV -PMO Manager with 10 years exp in end to end Project Mngt -PMP Ce...Swapna - CV -PMO Manager with 10 years exp in end to end Project Mngt -PMP Ce...
Swapna - CV -PMO Manager with 10 years exp in end to end Project Mngt -PMP Ce...
 
Tony Avakian's Resume 2016
Tony Avakian's Resume 2016Tony Avakian's Resume 2016
Tony Avakian's Resume 2016
 
Edward new resume
Edward new resumeEdward new resume
Edward new resume
 
FINAL RESUME (1)
FINAL RESUME (1)FINAL RESUME (1)
FINAL RESUME (1)
 
Srings
SringsSrings
Srings
 
Jps16
Jps16Jps16
Jps16
 

Similar to VNT RESUME

ResumeSagli_Nov14
ResumeSagli_Nov14ResumeSagli_Nov14
ResumeSagli_Nov14Jerry Sagli
 
Kent Weeks - Resume - QC
Kent Weeks - Resume - QCKent Weeks - Resume - QC
Kent Weeks - Resume - QCKent Weeks
 
Resume pmp product lead
Resume pmp product leadResume pmp product lead
Resume pmp product lead
Nick Bavaro, MBA, PMP, PMI-ACP
 
Kelly Hysell (Director, HCM SAAS Product Management)
Kelly Hysell (Director, HCM SAAS Product Management)Kelly Hysell (Director, HCM SAAS Product Management)
Kelly Hysell (Director, HCM SAAS Product Management)Kelly Hysell
 
John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt
 
Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Angel Rios
 
Sunny Patel Resume 2016
Sunny Patel Resume 2016Sunny Patel Resume 2016
Sunny Patel Resume 2016Sunny Patel
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016Rich Bellino
 
Stephens Christina
Stephens ChristinaStephens Christina
Stephens Christina
Christina Stephens, CSPO
 
resume_Celeste_May2015
resume_Celeste_May2015resume_Celeste_May2015
resume_Celeste_May2015Celeste Lim
 
Ronnie Wade resume
Ronnie Wade resumeRonnie Wade resume
Ronnie Wade resumeRonnie Wade
 
Ken Eaton resume 160401
Ken Eaton resume 160401Ken Eaton resume 160401
Ken Eaton resume 160401Ken Eaton
 
Scott Pacich - 2016 Resume
Scott Pacich - 2016 ResumeScott Pacich - 2016 Resume
Scott Pacich - 2016 Resume
Scott Pacich
 

Similar to VNT RESUME (20)

ResumeSagli_Nov14
ResumeSagli_Nov14ResumeSagli_Nov14
ResumeSagli_Nov14
 
Kent Weeks - Resume - QC
Kent Weeks - Resume - QCKent Weeks - Resume - QC
Kent Weeks - Resume - QC
 
Resume pmp product lead
Resume pmp product leadResume pmp product lead
Resume pmp product lead
 
Nisha DeThomas CV
Nisha  DeThomas CVNisha  DeThomas CV
Nisha DeThomas CV
 
Kelly Hysell (Director, HCM SAAS Product Management)
Kelly Hysell (Director, HCM SAAS Product Management)Kelly Hysell (Director, HCM SAAS Product Management)
Kelly Hysell (Director, HCM SAAS Product Management)
 
John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt_ Resume 070615
John Blatt_ Resume 070615
 
SRN_11
SRN_11SRN_11
SRN_11
 
Cyndee_Blenkush_Resume
Cyndee_Blenkush_ResumeCyndee_Blenkush_Resume
Cyndee_Blenkush_Resume
 
Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1
 
Sunny Patel Resume 2016
Sunny Patel Resume 2016Sunny Patel Resume 2016
Sunny Patel Resume 2016
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016
 
Shannon Mays 2016
Shannon Mays 2016Shannon Mays 2016
Shannon Mays 2016
 
Stephens Christina
Stephens ChristinaStephens Christina
Stephens Christina
 
resume_Celeste_May2015
resume_Celeste_May2015resume_Celeste_May2015
resume_Celeste_May2015
 
Ronnie Wade resume
Ronnie Wade resumeRonnie Wade resume
Ronnie Wade resume
 
Bill White Resume
Bill White ResumeBill White Resume
Bill White Resume
 
Sumbula Safavi Resume
Sumbula Safavi ResumeSumbula Safavi Resume
Sumbula Safavi Resume
 
Andrew Chard
Andrew ChardAndrew Chard
Andrew Chard
 
Ken Eaton resume 160401
Ken Eaton resume 160401Ken Eaton resume 160401
Ken Eaton resume 160401
 
Scott Pacich - 2016 Resume
Scott Pacich - 2016 ResumeScott Pacich - 2016 Resume
Scott Pacich - 2016 Resume
 

VNT RESUME

  • 1. VIC TEMPLANZA 4208 Chimay Way, San Jose, CA 95135 |408-239-9196 | templanza@sbcglobal.net SUMMARY Self-starting professional experienced in bringing new technology to market. Objectives oriented individual with strong leadership capabilities and with proven ability to work in cross-functional and cross-cultural groups. Organized, highly motivated, and detail- directed problem solver. Ability to manage complex projects within schedule and budget. Specialties:• Project/Program Management • New Product Introduction (NPI) • Production Launch and Transfer • Continuous Improvement Programs • Cost Reduction EXPERIENCE April, 2010 to Present QA/Tech Support Engineer, KLA-Tencor, Customer Operations As a senior technical support engineer, helps manage product transition from manufacturing to installation. Creates install and upgrade systems and procedures showing specific roles and responsibilities of the install team, field office and the customer. Conducts real-time upgrade/install progress evaluation against schedule and provides technical assistance to ensure tasks completion as scheduled. Constructs Gantt charts in collaboration with cross-functional teams to promote synergized installation processes and cycle times, allowing for effective management of customer expectation. • Creates and uploads checklists in company-wide database to detail out discrete activities and standard time to meet product install schedule. • Monitors daily install progress reports from the field and provides technical assistance to 36 install/upgrade engineers resulting in 98% on-time installations Conducts post-install reviews to identify install out-of-box quality (OOBQ) issues and collaborates with both Design Engineers (DE) and Manufacturing Design Engineers (MDE) towards closure of these identified OOBQs resulting to a 90% reduction in repeat problems. Works with world-wide field offices towards return of Intellectual Property (IP) parts and assemblies from customers who had their tool upgraded. This accounts for 95% materials recovery in the last four years. Manages over one million dollars of specialized and individual tooling. Was instrumental in establishing a tooling program for the install team through identification, procurement, issuance and calibration of individual and shared installation tooling. This significantly contributed to the over-all on-time project completion.
  • 2. Page 2 November, 1999 to March, 2010 Manufacturing Design Engineer, KLA-Tencor, WIN Division Principal manufacturing engineer on User Interface (UI) assembly new product introduction (NPI) activities. In collaboration with DE, created release schedules and drove on time completion of all activities. Participated in design reviews and evaluated assemblies for ease of manufacture, cost and serviceability. Built and released assembly Bill of Materials (BOM) structures as well developed assembly Operations Method Sheets (OMS). Provided technical guidance and troubleshooting assistance on discrepant parts/processes for ongoing products. Developed and managed KLA Specials program that provided a fast track process for evaluation, approval, release and build of customer–specific options. Participated in integrating the special process in the company-wide product ordering administration. Evaluated and released 150 special requests resulting in additional $10 million sales. Lead engineer in transitioning the UI mechanical assembly from make to buy resulting in 40% reduction in cost. Lead engineer in transitioning the whole UI assembly from US KLA-Tencor manufacturing to KLA-Tencor off-shore operations. Trained and qualified KLA- Tencor-Singapore MDE and assembly staff. COMPUTER SKILLS Software · Microsoft Project, MS Word, Excel, MS PowerPoint, Visio, SAP, eQuality and Enovia data bases EDUCATION BS degree in Industrial Engineering, University of the Philippines Certificate, Using FMEA to Design and Manufacture Medical Devices and Instrumentation, College of Engineering, University of Wisconsin-Madison