CURRICULUM VITAE
Jaydeep K. Panchal
: +91 9998624523/ 0265 -2357500
: panchaljaydeep29@gmail.com
: 201 Karanhome Vadodara -390007
Project Engineer
Profile Summary
• Seasoned professional with +7.4 years of experience in:
Project Management Design Engineering Process Enhancement
Research & Development Resource Optimization Maintenance Operations
Estimation Technical Support QMS-Testing Team Management
• Proficient in spearheading R&D, design, testing and validation, process improvement and systems designing initiatives.
• Conversant with codes & standards API 6A , API 16C , ASME, ISO 15156, ISA S75-01 & 02, IEC 60534-8-3, ASME B31.1 ,
B31.3 & B31.8and ASME I, etc.
• Demonstrated excellence in streamlining the design, performance and efficiency of existing products (Design noise
level securing & pressure recover type pipe diffuser creation) resulting in 2014 (getting API 16C,API 6A QMA/QMC
license for delta doha Qatar.)
• Valve leakage check as per Pressure Equivalent Method and ASME Sec. VIII. Exposure to in drilling and completions
process, subsea tree design, gate valves, and subsea connectors quote estimation.
• A keen communicator with honed interpersonal, problem solving and analytical abilities.
Core Competencies (Static design & Flow serve equipments)
• Analyzing and producing the technical requirements and specifications & recommending design modifications based
on client requirement pipe arrangement stress critical line list preparation
• Providing technical inputs & engineering support to the team from conception to completion stage of the product
• Estimation & Proposals on Vessels, Heat exchangers, skid engineering, piping etc.
• Preparing the iso-piping schedules/ plans, engineering designs/ drawings and technical specifications for FRP/RFQ.
• Creating layouts, designs drawings and identifying weaknesses to make relevant modifications in plans/ structures in
line as per client’s specifications
• Analyzing engineering drawings, layouts, diagrams and various qualifications related to process
• Managing the conceptual design and accountable for detailed calculations, component & material selection
• Reviewing & monitoring the progress of project with stakeholders and end user clients for ensuring its completion
within the scheduled time & cost parameters
Employment Details
March’15-Dec’15: Valves Manufacturing Company – Reliable valves pvt ltd., India as Project Engineer
Aug’14-Fab’15: Wellhead Manufacturing Company – Delta Corporation, Qatar as R&D Project Engineer
MM’12 – MM’14: JVS Engineers Pvt. Ltd., Calgary as Design Engineer
MM’09 – MM’12: Tube Products Incorporate Pvt. Ltd.,Calgary as CAD/CAM Administration
Key Result Areas
• Accountable for providing technical advice and guidance to both external customers and internal engineering functions
• Facilitating product and process design of small components, large plant, machinery and vehicles
• Responsible for:
I. Researching and developing subsea piping power plant ideas for new products and production drilling systems
using computer-aided design for creating detailed designs and specifications
II. Visiting clients to conduct trial installations & offering technical expertise / solutions
• Involved in drilling and completions process, subsea tree design, gate valves, and subsea connectors
• Contributing in controlling & maintaining the design standard of the products; providing design support at all stages
of the design process
1 | P a g e
CURRICULUM VITAE
• Formulating project plans using MS Project for allocating tasks;
creating and planning new production processes
• Sales and estimating for enquiries
Contributing and tracking the regional preferences on estimations
Ensuring maximum serviceability on catering estimation requests
Experience on estimating projects from the controls perspective
Interacting with the relevant stakeholders for the scope resolution/
clarifications
Having an eye for detail and having an emphasis on the techno-
commercial understanding of the project
Contributing with continuous improvement ideas, process assets on estimations
Participate and contribute in the team meetings
Exceptional communicating skills
Assist in scope development with the customer, upselling additional scope where possible, to include estimate and
proposal support. Provides support to account managers, customer acquisition reps, and business consultants in the
coordination of sales process tasks for larger opportunities.
Provide technical insight and trends in support of sales pursuits. Use vast technical knowledge and experience to help
close high level sales.
Highlights:
• Played a stellar role in streamlining the design, performance and efficiency of existing products optimization existing
products using design methodology resulting in 2013 given freeze project design with control documents.
• Played a key role in taking 2012 (Inox ltd) measures to conclude projects on time & within budget
• Successfully organized 2013 (JVS engineer pvt ltd) training initiatives for design teams
• Recognized for providing 2013 (Saudi Aramco) unique / innovative ideas design projects.
• Efficiently managed to overcome 2013 (ONGC india) key challenges by taking 2013 (Design project cost-estimation &
less cost to more efficient, easy to assemble on site assembly) measures.
• Took several cost saving initiatives such as 2013 (by Solar project for dragon oil company)
Academic Details
• B.Tech. in Mechanical Engineering from JRN University (Rajasthan) in 2009
IT Skills
• Conversant with AutoCAD, Catia V5r19, Solid Works, Pro/E, 3D CAD, MS Office Suite and E.R.P. etc.
Personal Details
Date of Birth: 11th
October, 1986
Languages Known: English , Hindi & Gujarati
Projects Highlight
2 | P a g e
CURRICULUM VITAE
3"-128-10ksi Choke valve Choke manifold - 10ksi Fac-Wellhead -11”-10Ksi Gate Valve-FC-Stress test 1500Ltr-Pressure vessel
End of document
3 | P a g e

JD_CV_15

  • 1.
    CURRICULUM VITAE Jaydeep K.Panchal : +91 9998624523/ 0265 -2357500 : panchaljaydeep29@gmail.com : 201 Karanhome Vadodara -390007 Project Engineer Profile Summary • Seasoned professional with +7.4 years of experience in: Project Management Design Engineering Process Enhancement Research & Development Resource Optimization Maintenance Operations Estimation Technical Support QMS-Testing Team Management • Proficient in spearheading R&D, design, testing and validation, process improvement and systems designing initiatives. • Conversant with codes & standards API 6A , API 16C , ASME, ISO 15156, ISA S75-01 & 02, IEC 60534-8-3, ASME B31.1 , B31.3 & B31.8and ASME I, etc. • Demonstrated excellence in streamlining the design, performance and efficiency of existing products (Design noise level securing & pressure recover type pipe diffuser creation) resulting in 2014 (getting API 16C,API 6A QMA/QMC license for delta doha Qatar.) • Valve leakage check as per Pressure Equivalent Method and ASME Sec. VIII. Exposure to in drilling and completions process, subsea tree design, gate valves, and subsea connectors quote estimation. • A keen communicator with honed interpersonal, problem solving and analytical abilities. Core Competencies (Static design & Flow serve equipments) • Analyzing and producing the technical requirements and specifications & recommending design modifications based on client requirement pipe arrangement stress critical line list preparation • Providing technical inputs & engineering support to the team from conception to completion stage of the product • Estimation & Proposals on Vessels, Heat exchangers, skid engineering, piping etc. • Preparing the iso-piping schedules/ plans, engineering designs/ drawings and technical specifications for FRP/RFQ. • Creating layouts, designs drawings and identifying weaknesses to make relevant modifications in plans/ structures in line as per client’s specifications • Analyzing engineering drawings, layouts, diagrams and various qualifications related to process • Managing the conceptual design and accountable for detailed calculations, component & material selection • Reviewing & monitoring the progress of project with stakeholders and end user clients for ensuring its completion within the scheduled time & cost parameters Employment Details March’15-Dec’15: Valves Manufacturing Company – Reliable valves pvt ltd., India as Project Engineer Aug’14-Fab’15: Wellhead Manufacturing Company – Delta Corporation, Qatar as R&D Project Engineer MM’12 – MM’14: JVS Engineers Pvt. Ltd., Calgary as Design Engineer MM’09 – MM’12: Tube Products Incorporate Pvt. Ltd.,Calgary as CAD/CAM Administration Key Result Areas • Accountable for providing technical advice and guidance to both external customers and internal engineering functions • Facilitating product and process design of small components, large plant, machinery and vehicles • Responsible for: I. Researching and developing subsea piping power plant ideas for new products and production drilling systems using computer-aided design for creating detailed designs and specifications II. Visiting clients to conduct trial installations & offering technical expertise / solutions • Involved in drilling and completions process, subsea tree design, gate valves, and subsea connectors • Contributing in controlling & maintaining the design standard of the products; providing design support at all stages of the design process 1 | P a g e
  • 2.
    CURRICULUM VITAE • Formulatingproject plans using MS Project for allocating tasks; creating and planning new production processes • Sales and estimating for enquiries Contributing and tracking the regional preferences on estimations Ensuring maximum serviceability on catering estimation requests Experience on estimating projects from the controls perspective Interacting with the relevant stakeholders for the scope resolution/ clarifications Having an eye for detail and having an emphasis on the techno- commercial understanding of the project Contributing with continuous improvement ideas, process assets on estimations Participate and contribute in the team meetings Exceptional communicating skills Assist in scope development with the customer, upselling additional scope where possible, to include estimate and proposal support. Provides support to account managers, customer acquisition reps, and business consultants in the coordination of sales process tasks for larger opportunities. Provide technical insight and trends in support of sales pursuits. Use vast technical knowledge and experience to help close high level sales. Highlights: • Played a stellar role in streamlining the design, performance and efficiency of existing products optimization existing products using design methodology resulting in 2013 given freeze project design with control documents. • Played a key role in taking 2012 (Inox ltd) measures to conclude projects on time & within budget • Successfully organized 2013 (JVS engineer pvt ltd) training initiatives for design teams • Recognized for providing 2013 (Saudi Aramco) unique / innovative ideas design projects. • Efficiently managed to overcome 2013 (ONGC india) key challenges by taking 2013 (Design project cost-estimation & less cost to more efficient, easy to assemble on site assembly) measures. • Took several cost saving initiatives such as 2013 (by Solar project for dragon oil company) Academic Details • B.Tech. in Mechanical Engineering from JRN University (Rajasthan) in 2009 IT Skills • Conversant with AutoCAD, Catia V5r19, Solid Works, Pro/E, 3D CAD, MS Office Suite and E.R.P. etc. Personal Details Date of Birth: 11th October, 1986 Languages Known: English , Hindi & Gujarati Projects Highlight 2 | P a g e
  • 3.
    CURRICULUM VITAE 3"-128-10ksi Chokevalve Choke manifold - 10ksi Fac-Wellhead -11”-10Ksi Gate Valve-FC-Stress test 1500Ltr-Pressure vessel End of document 3 | P a g e