The document describes the multi-step process for preparing a Town Planning Scheme (TPS) in Ahmedabad, India. It involves detailed surveying, establishing land ownership details, reconciling maps and records, publicizing the plan, allocating land for roads and amenities, determining plot sizes and values, consulting landowners, and obtaining governmental approvals. The long process aims to systematically plan infrastructure, compensate landowners, and capture increases in land value to fund development.
Sensory Garden: Lessons learned from the UK and SingaporeHazreena Hussein
The on-going research collaboration between the University of Malaya and Kuala Lumpur City Hall learn further from the successes and failures of the sensory gardens studied in the UK and Singapore, whilst sharing its own experiences and efforts done in providing such gardens, so as to improve the well-being and health in Malaysia.
1. Menara MIDF : The Menara MIDF is located in Kuala Lumpur, Malaysia. Menara MIDF is a 23-storey building with a 2 storey below ground basement. Located in the middle of the city centre with the increasing density of Kuala Lumpur city centre, without support of mechanical ventilation, the building is exposed to poor indoor air quality. Due to security, privacy and noise level problem, windows and openings are not optimal solutions to ventilating the indoor space of the building. 2. Malaysia International Trade and Exhibition Centre : MITEC is primarily an exhibition center located close to the heart of Kuala Lumpur, in Mont Kiara, hosting multiple large exhibitions and events and has represented the Southeast Asian region for it's scale and ability to host events such as the SEA Games. The height of the building totals to approximately, 63 meters in height, spanning over 3 main superstructure floors, 2 mezzanine levels and 2 basement substructure levels.
Sensory Garden: Lessons learned from the UK and SingaporeHazreena Hussein
The on-going research collaboration between the University of Malaya and Kuala Lumpur City Hall learn further from the successes and failures of the sensory gardens studied in the UK and Singapore, whilst sharing its own experiences and efforts done in providing such gardens, so as to improve the well-being and health in Malaysia.
1. Menara MIDF : The Menara MIDF is located in Kuala Lumpur, Malaysia. Menara MIDF is a 23-storey building with a 2 storey below ground basement. Located in the middle of the city centre with the increasing density of Kuala Lumpur city centre, without support of mechanical ventilation, the building is exposed to poor indoor air quality. Due to security, privacy and noise level problem, windows and openings are not optimal solutions to ventilating the indoor space of the building. 2. Malaysia International Trade and Exhibition Centre : MITEC is primarily an exhibition center located close to the heart of Kuala Lumpur, in Mont Kiara, hosting multiple large exhibitions and events and has represented the Southeast Asian region for it's scale and ability to host events such as the SEA Games. The height of the building totals to approximately, 63 meters in height, spanning over 3 main superstructure floors, 2 mezzanine levels and 2 basement substructure levels.
Writing indicates the role and importance of Development Controls particularly in the context of Chandigarh to make city development more rational and realistic leveraged by urban desigh
Life and Career with works of Constantinos Apostolou Doxiadis. Theory of Urban Design presentation - CA Doxiadis : Ekistics theory, Islamabad master plan, Aspra Spitia introduction, Name of books and journals with bibliography
Valuation - professional prractice and valuationKavin Raval
VALUATION IS USED TO DECIDE THE VALUE OF A STRUCTURE OR A RENT OF A HOUSE OR OFFICE . THE TYPES OF RENT ARE DESCRIBED. THE METHOD OF FIXING RENT IS ILLUSTRATED.
Community Participation should be indispensible element in human settlements,especially in planning strategies and in formulation, implementation and management. It should influence all levels of Government in the decision making process to further the political, social and economic growth of Human settlements. This relates especially to low income and Cost Effective Housing projects denoting squatter settlement upgrading with site and service schemes.
In squatter settlement upgrading projects, the authorities regularize the illegal land tenure of squatters and provide basic infrastructure in the settlements. These interventions are expected to be sufficient incentives for the residents to start improving their houses. In sites-and-services schemes, the authorities provide serviced plots to the urban poor and expect them to produce their own houses, through individual or mutual self-help or the employment of small contractors. Participation assumes an activity in which the community takes part and the involvement of at least one other party, usually a government agency or a nongovernmental organization (NGO). Community participation is sometimes used to indicate community self reliance or self-help, i.e. an activity which is usually undertaken by a government agency, is undertaken by the community on its own (e.g. spontaneous housing).
The United Nations defined community development as "the processes by which the efforts of the people themselves are united with those of governmental authorities to improve the economic, social and cultural conditions of communities, to integrate these communities into the life of the nation and to enable them to contribute fully to national progress."
Development controls and Chandigarh Architectural controlsJIT KUMAR GUPTA
Presentation tries to focus on role and importance of Development controls in the urban context and explains this in the context of Chandigarh experiment with such controls
professional practice and valuation topic of ppt:-valuationtirath prajapati
Valuation is the technique of estimation or determining the fair price or value of property such as building, a factory, other engineering structures of various types, land etc.
History of Town Planning_Building and Town PlanningA Makwana
The term town planning is used to indicate the arrangement of various components of a town in such a way that the town as such attains the significance of a living organism.
Writing indicates the role and importance of Development Controls particularly in the context of Chandigarh to make city development more rational and realistic leveraged by urban desigh
Life and Career with works of Constantinos Apostolou Doxiadis. Theory of Urban Design presentation - CA Doxiadis : Ekistics theory, Islamabad master plan, Aspra Spitia introduction, Name of books and journals with bibliography
Valuation - professional prractice and valuationKavin Raval
VALUATION IS USED TO DECIDE THE VALUE OF A STRUCTURE OR A RENT OF A HOUSE OR OFFICE . THE TYPES OF RENT ARE DESCRIBED. THE METHOD OF FIXING RENT IS ILLUSTRATED.
Community Participation should be indispensible element in human settlements,especially in planning strategies and in formulation, implementation and management. It should influence all levels of Government in the decision making process to further the political, social and economic growth of Human settlements. This relates especially to low income and Cost Effective Housing projects denoting squatter settlement upgrading with site and service schemes.
In squatter settlement upgrading projects, the authorities regularize the illegal land tenure of squatters and provide basic infrastructure in the settlements. These interventions are expected to be sufficient incentives for the residents to start improving their houses. In sites-and-services schemes, the authorities provide serviced plots to the urban poor and expect them to produce their own houses, through individual or mutual self-help or the employment of small contractors. Participation assumes an activity in which the community takes part and the involvement of at least one other party, usually a government agency or a nongovernmental organization (NGO). Community participation is sometimes used to indicate community self reliance or self-help, i.e. an activity which is usually undertaken by a government agency, is undertaken by the community on its own (e.g. spontaneous housing).
The United Nations defined community development as "the processes by which the efforts of the people themselves are united with those of governmental authorities to improve the economic, social and cultural conditions of communities, to integrate these communities into the life of the nation and to enable them to contribute fully to national progress."
Development controls and Chandigarh Architectural controlsJIT KUMAR GUPTA
Presentation tries to focus on role and importance of Development controls in the urban context and explains this in the context of Chandigarh experiment with such controls
professional practice and valuation topic of ppt:-valuationtirath prajapati
Valuation is the technique of estimation or determining the fair price or value of property such as building, a factory, other engineering structures of various types, land etc.
History of Town Planning_Building and Town PlanningA Makwana
The term town planning is used to indicate the arrangement of various components of a town in such a way that the town as such attains the significance of a living organism.
presentation based on Land Acquisition act and Land pooling in India. PPT is helpful for Urban Planning Students. discussed various land pooling models in India.
I need someone to paraphrase these words just change it to dif.docxwilcockiris
I need someone to paraphrase these words " just change it to diffrent word with the same meaning"
Compare the Preliminary Site Plan to the Final Site Plan The Washtenaw Community College Health &Fitness Center-Preliminary Site plan, consists of Architectural sheets including: title sheet, site plan, master plan, site analysis plan, first floor plan, second floor plan, and elevation sheet. It also consists of civil sheets, including: topographical survey, preliminary areawide stormwater drainage map, preliminary grading plan, pond calculation and outlet structure detail, and two preliminary utility plans; based on the sheet index on the cover page of preliminary site plan. Among these sheets, the second floor map, and elevation sheets are missing from architectural sheets. And the preliminary areawide stormwater drainage map, and one of the preliminary utility plans from civil sheets are missing as well."
And The Washtenaw Community College Health &Fitness Center-Final Site plan, consists of architectural sheets, including: title sheet, site plan, master plan, site details, landscape plan, landscape details, first floor plan, second floor plan, elevation, and, photometric sheet. It also consists of Civil sheets, including: Parcel la topographical survey, removal plan, grading and soil erosion control plan, areawide stormwater drainage map, drainage area plan, two utility plans, pond calculations and outlet structure details, three storm sewer plan and profile sheets, two water main plan and profile sheets, two sanitary force main plan and profile sheets, and, two detail sheets. From architectural sheets, the first and second floor plans, elevation, and photometric sheets are missing. In addition, all the civil sheets except the parcel 1a topographical survey, are missing. By comparing the two preliminary and final site plans, we can consider the preliminary site plan as a plan that is more general which provides less detailed information regarding the proposed development than the final site plan does. It seems that the applicant (Washtenaw Community College) combined the two preliminary and final site plan in one application since the issue date of both plans is October 10, 2005.
"What has changed “
“The shape and number of proposed parking lot has changed in the final plan. the parking spaces has decreased from 356 space in Preliminary site plan into 348 space in the final site plan. but it did not limit the impervious area of the site plan which is 22.80% of the total gross area in both preliminary and final site plans. The shape of the proposed building has changed in the final plan. The shape of traffic intersection between entrance drive and East Hiron River Drive has changed. The final site plan proposed setbacks in right of way. The shape, width and length of drive ways and trails has changed in some places. Recommendations I would recommend having a comprehensive and more detailed site analysis plan within the preliminary site p.
The public sector has for many years suffered a financial burden in acquiring the land for
public facilities in Taiwan. The Regulation of Transferable Floor Area for Urban Planningis adopted to acquire
land. Of priority concern is the influence on environmental quality when the lot receives floor area. The“Farm
Land Release” policy will release 160,000 hectares of farm landsin the future. The policy’s influences on space
structure resulting from surplus floor areas need to be analyzed. The research areais located in a newly
developing district that was changed due to the farm-land release policy from agricultural to urban development
use. The aim of this studyis to determine the developer’s profits under various scenarios based on game theory
by the discounted cash flow method. The role of the public sector in this game is to maximizethe development
intensity, and to offer a suitable environment for future floor area to transfer. The developer and the owner of
the land reservation for public facilities make decisions during the game when the floor area amount for
transferred is announced. Finally, this study employs the strategic form of matrix to convertthe result of
financial analysis into payoffs in order to identify the Nash Equilibrium solution.
Expert Accessory Dwelling Unit (ADU) Drafting ServicesResDraft
Whether you’re looking to create a guest house, a rental unit, or a private retreat, our experienced team will design a space that complements your existing home and maximizes your investment. We provide personalized, comprehensive expert accessory dwelling unit (ADU)drafting solutions tailored to your needs, ensuring a seamless process from concept to completion.
White wonder, Work developed by Eva TschoppMansi Shah
White Wonder by Eva Tschopp
A tale about our culture around the use of fertilizers and pesticides visiting small farms around Ahmedabad in Matar and Shilaj.
Dive into the innovative world of smart garages with our insightful presentation, "Exploring the Future of Smart Garages." This comprehensive guide covers the latest advancements in garage technology, including automated systems, smart security features, energy efficiency solutions, and seamless integration with smart home ecosystems. Learn how these technologies are transforming traditional garages into high-tech, efficient spaces that enhance convenience, safety, and sustainability.
Ideal for homeowners, tech enthusiasts, and industry professionals, this presentation provides valuable insights into the trends, benefits, and future developments in smart garage technology. Stay ahead of the curve with our expert analysis and practical tips on implementing smart garage solutions.
7 Alternatives to Bullet Points in PowerPointAlvis Oh
So you tried all the ways to beautify your bullet points on your pitch deck but it just got way uglier. These points are supposed to be memorable and leave a lasting impression on your audience. With these tips, you'll no longer have to spend so much time thinking how you should present your pointers.
Transforming Brand Perception and Boosting Profitabilityaaryangarg12
In today's digital era, the dynamics of brand perception, consumer behavior, and profitability have been profoundly reshaped by the synergy of branding, social media, and website design. This research paper investigates the transformative power of these elements in influencing how individuals perceive brands and products and how this transformation can be harnessed to drive sales and profitability for businesses.
Through an exploration of brand psychology and consumer behavior, this study sheds light on the intricate ways in which effective branding strategies, strategic social media engagement, and user-centric website design contribute to altering consumers' perceptions. We delve into the principles that underlie successful brand transformations, examining how visual identity, messaging, and storytelling can captivate and resonate with target audiences.
Methodologically, this research employs a comprehensive approach, combining qualitative and quantitative analyses. Real-world case studies illustrate the impact of branding, social media campaigns, and website redesigns on consumer perception, sales figures, and profitability. We assess the various metrics, including brand awareness, customer engagement, conversion rates, and revenue growth, to measure the effectiveness of these strategies.
The results underscore the pivotal role of cohesive branding, social media influence, and website usability in shaping positive brand perceptions, influencing consumer decisions, and ultimately bolstering sales and profitability. This paper provides actionable insights and strategic recommendations for businesses seeking to leverage branding, social media, and website design as potent tools to enhance their market position and financial success.
You could be a professional graphic designer and still make mistakes. There is always the possibility of human error. On the other hand if you’re not a designer, the chances of making some common graphic design mistakes are even higher. Because you don’t know what you don’t know. That’s where this blog comes in. To make your job easier and help you create better designs, we have put together a list of common graphic design mistakes that you need to avoid.
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Mansi Shah
This study examines cattle rearing in urban and rural settings, focusing on milk production and consumption. By exploring a case in Ahmedabad, it highlights the challenges and processes in dairy farming across different environments, emphasising the need for sustainable practices and the essential role of milk in daily consumption.
1. INTRODUCTION:
The TPS area is located in the southern portion of the city of Ahmedabad
very close to the junction of Ahmedabad Mehmedabad Highway and the
60-meter-wide Sardar Patel Ring Road. This is one of the most rapidly
developing corridors and is predominantly an industrial area. It falls in the
village of Vinzol.
The TPS falls within the jurisdiction of Ahmedabad Municipal Corporation.
River Khari abuts the entire northern portion and passes through the TPS.
To the west is the Mumbai Ahmedabad Railway line. To the east is the TPS
No. 91 Vinzol 3. To the south are TPS Nos. 71 Vinzol Hathijan and 72
Vinzol 1. Most the area is vacant and includes the village settlement of
Vinzol. The total area of the TPS is approximately 82 hectares and it has 80
land parcels.
The study is interesting because in this TPS, there is a village settlement
that needed to be integrated, a large water body that needed to be
responded to, and a non-perennial river that passes through the area.
2. THE TPS PREPARATION PROCESS:
The process for preparing a TPS is prescribed in GTPUDA, 1976, and its
Rules. It is quite a complex and long process involving over 50 steps that
can take a maximum of four years and one month as provided by the act,
but in practice takes much longer. It is described in a much simplified and
concise manner, drawing from experience in preparing over 20 such TPSs
for various planning authorities. Each stage is illustrated by relevant
drawings and documents.
SURVEY OF THE AREA:
A very detailed and accurate topographical survey of the entire area for
which the TPS is being prepared is undertaken using high-accuracy
equipment called the Total Station Survey, which records all physical
features on the ground— structures, trees, fences, compound walls, electric
poles, water bodies, drains, etc.
ESTABLISHING THE OWNERSHIP DETAILS OF EVERY LAND PARCEL:
3. All cadastral records are collected to reflect the ownership details, extent
(area), tenures, and encumbrances for every land parcel and are compiled
in a prescribed format. The type of tenure for each land parcel is noted;
this is crucial as it has a direct implication on the change of use and
transfer of ownership, and usually the same tenure is retained while giving
back the newly shaped land parcel.
RECONCILING THE SURVEY AND LANDOWNERSHIP RECORDS TO PREPARE
A BASE MAP:
Along with the cadastral records, all types of spatial records (maps) are
also collected. As in the case of cadastral (area) records, these are of
several types, spread across agencies, and non-computerized, using not-to-
scale drawings and in different formats. The spatial records are vectorized
and reconciled with the physical survey of the area. At this point, the area
from the maps and records are compared and finalized. This is called the
“melavni” in the local language and literally translated means “to match.”
This process is a major bottleneck, as it must be certified by the Land
Records Department. This department has limited staff and is unable to
cope with the pace. The base map of the area is now ready for
undertaking planning.
DEFINING THE BOUNDARY OF THE AREA:
On the final base map of the area that shows the survey, the boundary of
the TPS area is clearly marked. At this stage, the intention to prepare a TPS
for the area is publicized in a clear fashion in local newspapers. Figure 13
shows the area with the TPS boundary.
At this point, the information pertaining to the land prices is collected
from the register of land transactions. Based on the information on
relevant sales of land, a sales map is prepared. Obviously, sales are not
available for all parcels and hence, based on the available transactions and
valuation principles, land values are attributed to each plot. This is called
the original plot (OP) value; it is the value of the land parcel before any
4. kind of planning intervention.
MARKING ORIGINAL PLOTS ON THE BASE MAP:
All the OPs are marked on the base map. If more than one land parcel or
plot be- longs to one owner or group of owners with exactly the same
tenure status, then such land parcels or plots are consolidated and given
one OP number. The land parcels need to be contiguous. Thus, at this
stage landholdings within a TPS are also consolidated as far as possible.
TABULATING OWNERSHIP DETAILS AND PLOT SIZE:
The task of tabulating the information is commenced in a format
prescribed in the GTPUDA Rules called the F Form. The first few columns
are filled—name of the owners, land tenure, revenue survey numbers, OP
number, OP area, and OP value.
LAYING OUT THE ROADS IN THE AREA:
The planning of the TPS area begins and at this stage the TPS is called a
draft TPS. The first major step is laying out the roads. If a road that is
shown in the DP passes through the TPS area, it is usually respected. It
may be slightly modified, keeping in view the findings of the survey. While
5. designing the road network, the transportation planning principles are
followed, a planning pattern (e.g., a grid or a radial pattern) is devised, and
appropriate connectivity with the arterial road network identified in the DP,
and the DP roads passing through the TPS is established, if a natural
feature such as a water body is present, it is ad- dressed and, most
importantly, care is taken to ensure that each OP gets access to it. The
GTPUDA indicates a tentative percentage of areas under roads to the total
scheme area of about 15 to 17 percent.
CARVING OUT PLOTS FOR AMENITIES IN THE AREA:
Plots providing adequate social infrastructure such as schools, hospitals,
dispensaries, clinics, open spaces, housing for the poor, etc., are marked on
the base map along with the roads. The areas to be allocated for such
uses are indicated in the GTPUDA as tentative percentage to the total area
of the TPS is about 20 percent.
TABULATING DEDUCTION AND FINAL PLOT SIZE:
The total percentage of area that goes under roads and amenities is about
6. 35 to 40 percent. The GTPUDA allows this to go up to 50 percent. The F
Form is continued to be filled further. From each OP this percentage is
deducted and a final plot (FP) size is arrived.
At this stage, the process of valuation is continued further. A semi final (SF)
value to the OP is also assigned. Usually, this is the same as the OP value.
In some instances, however, there can be a change in the value of the OP
before the provision of infrastructure—it may increase or decrease owing
to the planning proposals such as zone changes, changes in plot shape,
changes in the plot size that are impacted certain development control
regulation, a substantial shift in plots, and proximity to features that may
negatively impact development, such as a high tension lines, eroded lands,
etc.
DELINEATION OF FINAL PLOTS:
After the roads and amenity plots are worked out, each OP is reconstituted
or redrawn. At this stage, the irregular shapes of the OPs give way to
regularly shaped FPs with the new areas. Figure 19 shows the proposed
road network, amenity plots, and FPs.
TABULATING INFRASTRUCTURE AND BETTERMENT CHARGES:
At this stage, costs for a TPS are worked out. These include the following:
• Costs of key infrastructure roads, water supply, drainage, and street-
lights are calculated
• Compensation to be paid to each landowner for the land is appropriated
based on the SF value
• Administrative costs of implementing the TPS are accounted for the final
value for each plot is systematically assessed
• A portion of this increase in land value is taken as betterment charges
• A “G Form” summing up the inflows and outflows for a TPS is prepared
summarizing the overall financial strategy of the TPS
7. • The “F Form” is completed—each landowner is given compensation for
the land taken and a portion of the land value is taken as
betterment; based on the two, the net demand is computed for
each owner.
OWNER’S MEETING:
Landowners are consulted and heard at this stage for the first time when
the work on the draft schemes is completed. A well-publicized landowner’s
meeting is prescribed in the GTPUDA.
MODIFICATION OF THE DRAFT TPS AND ITS APPROVAL:
Based on the suggestions and objections received from each landowner,
the draft TPS is modified and published. It is again thrown open for
objections and suggestions from the landowners. Based on the second
round of objections and suggestions, it is modified and then submitted to
the State Government for approval. Once approved, the draft TPS is now
called the sanctioned draft TPS. The proposals for roads can be
implemented.
APPOINTMENT OF THE TOWN PLANNING OFFICER (TPO):
After approval of the draft TPS, a quasi-judicial of officer called the town-
planning officer (TPO) is appointed. The TPO’s task is to deal with each
landowner both on the physical planning proposal—the shape and
location of the FP and the financial proposal—the compensation and
betterment issues, and eventually demarcate the FP on ground and hand it
over to the owner. The TPO divides the sanctioned draft TPS in two parts
to facilitate his or her functioning: a preliminary TPS to deal with the
physical planning proposal and a final TPS to deal with the financial
proposal.
INDIVIDUAL HEARINGS TO EACH LANDOWNER ON THE PRELIMINARY TPS:
8. The TPO gives individual hearings to each landowner and revises the
preliminary TPS if required. Inputs from the State Government and local
authority and development authority are sought. The preliminary TPS may
be modified if required, and the TPO gives a second round of hearings.
FINALIZATION OF THE PRELIMINARY TPS AND ITS APPROVAL:
The preliminary TPS is again modified based on the second hearing. At this
stage, demarcation of FPs commences. The TPO finalizes the preliminary
TPS by writing his or her decisions with regard to every plot. This is
referred to as the award of the preliminary TPS and is published in the
local newspapers. At this stage, the preliminary TPS is sent to the State
Government for approval. It must be approved within two months. The
preliminary TPS comes into effect from the date of sanction and all plots
appropriated for public purpose vest with the local authority or
development authority.
INDIVIDUAL HEARINGS TO EACH LANDOWNER ON THE FINAL TPS:
At this stage, the financial proposals are taken up with each owner. These
pertain to the compensation and betterment charges. The TPS at this stage
is called the final TPS.
FINALIZATION OF THE FINAL TPS, ITS APPROVAL, AND IMPLEMENTATION:
Once the hearings are done, the financial proposals may be modified and
sent to the State Government for opinion. There may be some
modifications. The TPO then finalizes the TPS and publishes it in the local
newspapers. This is referred to as the “Award of the Final TPS”. A Board of
Appeals for further issues on financials is constituted. Once all appeals are
resolved and the final TPS is modified, it is sent to the State Government
for approval. The State Government is required to sanction it within three
months, but it usually takes longer. Once approved, the drawings and
documents are sent to the State’s Revenue Department to update the
records.