Underground sulfur smelting technology
• Underground sulfur smelting is a method of extracting sulfur through
wells by melting it with superheated water in place of occurrence and
delivering it to the surface in liquid form.
Technology features
• The mining process is based on heat exchange between the coolant
(hot water) supplied through the wells from the surface and the ore
massif.
• This method is economically beneficial, as it excludes the extraction
of ore, its delivery to the surface and subsequent enrichment, and
therefore gives the cheapest sulfur.
• USS is based on a lower melting point of elemental sulfur (112.8–119
°C) compared to host rocks (limestones), a high density relative to
water (1.8 t/m3), low viscosity and insolubility in water.
Schematic diagram of a production well
• 1 - casing string;
• 2 - annular grouting;
• 3, 4 and 5 - water supply,
sulfur and air columns;
• 6 - separation packer;
• 7, 8 - water and sulfur
perforations;
• 9 - stuffing box compensators.
Air
Hot
water
Sulfu
r
• Wells with a diameter of 400 mm are drilled
from the surface with conventional drilling rigs,
they are cased with pipes to a sulfur-containing
deposit and cemented.
• Then the well is drilled to the full capacity of the
deposit. Three concentrically arranged columns
of pipes are lowered into it: water supply,
sulfuric, air.
• There is a perforation (holes) in the lower part
of the water supply column, which is divided
into the upper one - water and the lower one -
sulfur with the help of a separating packer.
• Hot water enters the sulfur deposit through the
upper perforation, heats it up and melts the
sulfur.
Basic operations of USS technology
Operational
exploration
Drilling and well
preparation
Arrangement
Production of
working reagents
Mining work:
a) coolant injection
b) drainage
a) pressure relief in
the sulfur column
d) pumping and
transportation of
liquid sulfur
Purification and
discharge of
formation waters or
creation of a closed
water circulation
Reclamation
• At temperatures above 160 °C, the viscosity of sulfur increases rapidly, so water is
supplied to the well at 120–159 °C.Water at a pressure of 1.0–1.2 MPa is injected
through the upper water perforation of the pipe and enters the formation.
• Passing through cracks, pores and caverns, it melts sulfur, which flows down to the
bottom of the well and enters back into the pipe string (below the packer) through
the lower sulfur perforation. Molten sulfur, due to the pressure of the injected
water, rises above the level of the air pipe and is released to the surface by an
airlift.
Schematic diagram of the technological complex for the extraction of sulfur by US
Thank you for your attention

More Related Content

Similar to USS presentation.pptx

Water Sources Final 1
Water Sources Final 1Water Sources Final 1
Water Sources Final 1
swelliot
 
Canal of design
Canal of designCanal of design
Canal of design
PREMKUMAR
 
120CR0393_Subrat Kumar Gaana_Seminar and Technical Writing.pptx
120CR0393_Subrat Kumar Gaana_Seminar and Technical Writing.pptx120CR0393_Subrat Kumar Gaana_Seminar and Technical Writing.pptx
120CR0393_Subrat Kumar Gaana_Seminar and Technical Writing.pptx
Subrat Kumar Gaana
 
Deep water drilling final
Deep water drilling finalDeep water drilling final
Deep water drilling finalTamer Bashandy
 
Babcock and Wilcox Boiler
Babcock and Wilcox BoilerBabcock and Wilcox Boiler
Babcock and Wilcox Boiler
rishironak
 
Petroleum Refinery Engineering
Petroleum Refinery EngineeringPetroleum Refinery Engineering
Petroleum Refinery Engineering
MuhammadAhmedSaleem3
 
Pretroleum Engineering
Pretroleum EngineeringPretroleum Engineering
Components of Water Supply.public health engineering and water management pdf
Components of Water Supply.public health engineering and water management pdfComponents of Water Supply.public health engineering and water management pdf
Components of Water Supply.public health engineering and water management pdf
MuhammadRamzan757427
 
study\source\ppt\Water control and diversion structures.ppt
study\source\ppt\Water control and diversion structures.pptstudy\source\ppt\Water control and diversion structures.ppt
study\source\ppt\Water control and diversion structures.ppt
pavik13
 
Wash boring
Wash boringWash boring
Wash boring
MachenLink
 
Environmental engineering I Mumbai University
Environmental engineering I Mumbai UniversityEnvironmental engineering I Mumbai University
Environmental engineering I Mumbai University
Shilpa Patil
 
Water Treatment process
Water Treatment processWater Treatment process
Water Treatment process
IRFANNALBAND1
 
Iron and steel INDUSTRY
Iron and steel INDUSTRYIron and steel INDUSTRY
Iron and steel INDUSTRY
Vishal Bhadauria
 
dokumen.tips_lecture-hydrogeology.pdf
dokumen.tips_lecture-hydrogeology.pdfdokumen.tips_lecture-hydrogeology.pdf
dokumen.tips_lecture-hydrogeology.pdf
DamilareDanielOlaniy
 
ENVIRONMENTAL ENGINEERING & POLLUTION CONTROL
ENVIRONMENTAL ENGINEERING & POLLUTION CONTROLENVIRONMENTAL ENGINEERING & POLLUTION CONTROL
ENVIRONMENTAL ENGINEERING & POLLUTION CONTROL
harshinirenuga
 
DRILLING METHODS
DRILLING METHODSDRILLING METHODS
DRILLING METHODS
Annamalai University
 

Similar to USS presentation.pptx (20)

Water Sources Final 1
Water Sources Final 1Water Sources Final 1
Water Sources Final 1
 
Canal of design
Canal of designCanal of design
Canal of design
 
120CR0393_Subrat Kumar Gaana_Seminar and Technical Writing.pptx
120CR0393_Subrat Kumar Gaana_Seminar and Technical Writing.pptx120CR0393_Subrat Kumar Gaana_Seminar and Technical Writing.pptx
120CR0393_Subrat Kumar Gaana_Seminar and Technical Writing.pptx
 
Deep water drilling final
Deep water drilling finalDeep water drilling final
Deep water drilling final
 
Babcock and Wilcox Boiler
Babcock and Wilcox BoilerBabcock and Wilcox Boiler
Babcock and Wilcox Boiler
 
Thermal power plant layout
Thermal power plant layoutThermal power plant layout
Thermal power plant layout
 
Petroleum Refinery Engineering
Petroleum Refinery EngineeringPetroleum Refinery Engineering
Petroleum Refinery Engineering
 
Pretroleum Engineering
Pretroleum EngineeringPretroleum Engineering
Pretroleum Engineering
 
Components of Water Supply.public health engineering and water management pdf
Components of Water Supply.public health engineering and water management pdfComponents of Water Supply.public health engineering and water management pdf
Components of Water Supply.public health engineering and water management pdf
 
study\source\ppt\Water control and diversion structures.ppt
study\source\ppt\Water control and diversion structures.pptstudy\source\ppt\Water control and diversion structures.ppt
study\source\ppt\Water control and diversion structures.ppt
 
Wash boring
Wash boringWash boring
Wash boring
 
Environmental engineering I Mumbai University
Environmental engineering I Mumbai UniversityEnvironmental engineering I Mumbai University
Environmental engineering I Mumbai University
 
RHowell_project summaries
RHowell_project summariesRHowell_project summaries
RHowell_project summaries
 
Water Treatment process
Water Treatment processWater Treatment process
Water Treatment process
 
Iron and steel INDUSTRY
Iron and steel INDUSTRYIron and steel INDUSTRY
Iron and steel INDUSTRY
 
Prsn
PrsnPrsn
Prsn
 
dokumen.tips_lecture-hydrogeology.pdf
dokumen.tips_lecture-hydrogeology.pdfdokumen.tips_lecture-hydrogeology.pdf
dokumen.tips_lecture-hydrogeology.pdf
 
Groundwater 1
Groundwater 1Groundwater 1
Groundwater 1
 
ENVIRONMENTAL ENGINEERING & POLLUTION CONTROL
ENVIRONMENTAL ENGINEERING & POLLUTION CONTROLENVIRONMENTAL ENGINEERING & POLLUTION CONTROL
ENVIRONMENTAL ENGINEERING & POLLUTION CONTROL
 
DRILLING METHODS
DRILLING METHODSDRILLING METHODS
DRILLING METHODS
 

Recently uploaded

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 

Recently uploaded (20)

ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 

USS presentation.pptx

  • 1. Underground sulfur smelting technology • Underground sulfur smelting is a method of extracting sulfur through wells by melting it with superheated water in place of occurrence and delivering it to the surface in liquid form.
  • 2. Technology features • The mining process is based on heat exchange between the coolant (hot water) supplied through the wells from the surface and the ore massif. • This method is economically beneficial, as it excludes the extraction of ore, its delivery to the surface and subsequent enrichment, and therefore gives the cheapest sulfur. • USS is based on a lower melting point of elemental sulfur (112.8–119 °C) compared to host rocks (limestones), a high density relative to water (1.8 t/m3), low viscosity and insolubility in water.
  • 3. Schematic diagram of a production well • 1 - casing string; • 2 - annular grouting; • 3, 4 and 5 - water supply, sulfur and air columns; • 6 - separation packer; • 7, 8 - water and sulfur perforations; • 9 - stuffing box compensators. Air Hot water Sulfu r
  • 4. • Wells with a diameter of 400 mm are drilled from the surface with conventional drilling rigs, they are cased with pipes to a sulfur-containing deposit and cemented. • Then the well is drilled to the full capacity of the deposit. Three concentrically arranged columns of pipes are lowered into it: water supply, sulfuric, air. • There is a perforation (holes) in the lower part of the water supply column, which is divided into the upper one - water and the lower one - sulfur with the help of a separating packer. • Hot water enters the sulfur deposit through the upper perforation, heats it up and melts the sulfur.
  • 5. Basic operations of USS technology Operational exploration Drilling and well preparation Arrangement Production of working reagents Mining work: a) coolant injection b) drainage a) pressure relief in the sulfur column d) pumping and transportation of liquid sulfur Purification and discharge of formation waters or creation of a closed water circulation Reclamation
  • 6. • At temperatures above 160 °C, the viscosity of sulfur increases rapidly, so water is supplied to the well at 120–159 °C.Water at a pressure of 1.0–1.2 MPa is injected through the upper water perforation of the pipe and enters the formation. • Passing through cracks, pores and caverns, it melts sulfur, which flows down to the bottom of the well and enters back into the pipe string (below the packer) through the lower sulfur perforation. Molten sulfur, due to the pressure of the injected water, rises above the level of the air pipe and is released to the surface by an airlift. Schematic diagram of the technological complex for the extraction of sulfur by US