1. CS 9 Kalundborg
Kick-off meeting: September, 7th 2020
A. Fjordside, S. Bendix Larsen, P. Nobel, L. Vredenbregt, J. Jährig,
U. Miehe, A. Kleyböcker
2. 2
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
Energy
Water
Material
Kalundborg Symbiosis since 1972:
Biotech industry
&
Municipal utility
industrial owned
multi-utility
3. 3
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
WATER - Task 1.2.7
Novel membrane treatment for biotech or
biotech & municipal WWTP effluent for water
reuse
Partners:
OBJECTIVE:
Production of fit-for-purpose water via:
à novel (ultra tight) ultra-filtration membrane
combined with
à pre-treatment for wastewater with high-non-
degradable organic matter
Scenario III
Scenario I
Scenario II
4. 4
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
Kalund
mun.
Novo
WWTP
Kalund
WWTP
Other
Ind.?
Joint control system
ENERGY - Task 1.3.7
Increase energy efficiency via digitalization and
symbiotic joint operation of two WWTPs as well
as heat recovery
Partners:
OBJECTIVES:
Increase in energy efficiency via:
à Joint control system for a synergistic operation
of a biotech WWTP and municipal WWTP
Heat recovery from WW
à Concept study & modelling
5. 5
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
MATERIAL - Task 1.4.8
Concept study for nutrient and/or high-value product recovery
Partners:
OBJECTIVES:
Recovery of acetic acid, sulfur or tbd
Content of study:
- Technological treatment train
- Economic value of the recovered product
- Internal usage or usage by other industries?
- Impacts on the operation of the municipal WWTP
Material recovery