D1.2Operational demo cases
CS7 Tain
UCRAN, Aquabio
2
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: Tain
Lead partner:
Other partner:
With support of:
3
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: Situation before Ultimate
4
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: Objectives of the Ultimate solutions
5
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: Subtask 1.2.6 status/progress
Subtask: 1.2.6 RO treatment of distillery wastewater after AnMBR for internal water reuse
Baseline technology: no water reuse so far (discharge of AnMBR effluent to Dornoch Firth)
TRL: 5  7
Ultimate solution to foster circular economy: RO system for distillery wastewater (AnMBR effluent)
Capacity of demo plant: 1 m³/d
Quantifiable target: At full scale, potential for the production of 58,000 m³/a for internal water reuse; >40 % reduction of freshwater
through reuse of treated water
Status/progress:
• detailed design completed
• system available but needs adapting to fit latest configuration
6
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: Pictures of the new technologies
Subtask: 1.2.5 RO treatment of distillery wastewater after AnMBR for internal water reuse
The RO unit is designed to achieve
high quality water for reuse from
the distillery wastewater after
treatment through a pre-
precipitation stage and ammonia
stripping.
7
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: Task 1.2.6 - Timeline
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
YEAR 1 YEAR 2 YEAR 3 YEAR 4
 Pilot system expected to be operational in July 2022 (M26)
 Still enough time to complete the pilot experiments
Subtask: 1.2.5 RO treatment of distillery wastewater after AnMBR for internal water reuse
Legend
Task/Subtask
Activity as planned
Postponed activity
Delay of activity
Extension of activity
T1.2.6 - RO treatment of distillery wastewater after AnMBR for
internal water reuse in Tain
Baseline conditions assessed MS05 D1.1
Design of pilot system MS09
Laboratory scale experiments MS15 + 8M
Pilot system operational MS15 + 8M D1.2 + 2M
Start-up & results MS19 D1.9
Best practices for water recycling D1.3
8
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: Subtask 1.3.5 status/progress
Subtask: 1.3.5 Heat recovery from treated (AnMBR) distillery wastewater
Baseline technology: Biogas production via existing AnMBR; no heat recovery before Ultimate
TRL: 5  7
Ultimate solutions to foster circular economy: heat recovery from the AnMBR effluent via heat exchangers
Capacity of demo plant: heat utilization will be tested in all systems at 1 m3/d for the RO and 12 m³/d for the nutrients recovery
system and 14 kW of heat recovery can be expected
Quantifiable targets: At full scale, >15 % reduction of energy demand from biogas and 60 % heat recovery within stripping column unit
Status/progress:
• detailed design completed
• parts ordered
9
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: PID of the heat exchanging unit
Subtask: 1.3.5 Heat recovery from treated (AnMBR) distillery wastewater
P&ID of the heat exchange unit
The heat exchanger units are
designed to maximise heat
utilisation from the effluent
after the ammonia stripping
process.
10
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: First results of the new technologies
Subtask: 1.3.5 Heat recovery from treated (AnMBR) distillery wastewater
The biogas produced in the AnMBR first goes through a scrubber for H2S removal and is then converted to steam in a boiler.
The steam produced is reused to heat the stills in the distillery and contribute to reduce its dependence on fossil fuel by 15%.
https://www.forbesgroup.co.uk/envir
onmental-technologies/packed-
tower/
11
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: Task 1.3.5 - Timeline
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
YEAR 1 YEAR 2 YEAR 3 YEAR 4
 Heat recovery system expected to be operational in July 2022 (M26)
 Still enough time to complete the pilot experiments
Subtask: 1.3.5 Heat recovery from treated (AnMBR) distillery wastewater
Legend
Task/Subtask
Activity as planned
Postponed activity
Delay of activity
Extension of activity
T1.3.5 - Heat recovery from treated (AnMBR) distillery wastewater
in Tain
Baseline conditions assessed MS05 D1.1
Design of pilot system MS09
Pilot system operational MS15 +8M D1.2 + 2M
Start-up & results MS19 D1.9
Best practices for energy recovery D1.4
12
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: Subtask 1.4.6 status/progress
Subtask: 1.4.6 Recovery of ammonia from distillery wastewater via IEX/packed columns after AnMBR
Baseline technology: reuse of digestate on the barley fields
TRL: 5  7 (air stripping column & scrubber); 5  7 (struvite precipitation)
Ultimate solution to foster circular economy: air stripping column & scrubber; struvite precipitation
Capacity of demo plants:12-24 m³/d
Quantifiable target: At full scale, potential for the production of 122 t struvite/a from the pre-precipitation stage and 47 t nitrogen/a from
ammonia stripping, corresponding to about 80% P recovery and 80% N recovery in total
Status/progress:
• detailed design completed
• parts ordered
13
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
Subtask: 1.4.6 Recovery of ammonia from distillery wastewater via IEX/packed columns after AnMBR
CS7: Results of the preliminary evaluation
The evaluation of current knowledge and performance (see
figure on the right) of ion exchange, stripping and
precipitation based systems for ammonia recovery form
industrial wastewaters and the measured characteristics of
the anaerobically treated distillery wastewater led to the
selection of a two-stage system comprising pre-precipitation
(struvite) followed ammonia stripping to maximize the
recovery of nutrients.
14
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
Please insert pictures of the
progress of the construction
CS7: Pictures of the struvite precipitator
P&ID and drawing of the of the pre-precipitation reactor
The pre-precipitation stage will act as pre-treatment
to maximize ammonia recovery in the subsequent
stripping unit while also recovering P and N in the
form of struvite.
Subtask: 1.4.6 Recovery of ammonia from distillery wastewater after AnMBR
15
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
Subtask: 1.4.6 Recovery of ammonia from distillery wastewater after AnMBR
CS7: PID of the ammonia stripping unit
P&ID of the ammonia stripping unit
The stripping unit is designed to
maximize the recovery of ammonia
from the anaerobically treated
distillery wastewater in the form of
either an ammonia solution or
ammonium sulphate.
16
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS7: Task 1.4.6 - Timeline
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
YEAR 1 YEAR 2 YEAR 3 YEAR 4
 Nutrients recovery system expected to be operational in July 2022 (M26)
 Still enough time to complete the pilot experiments
Legend
Task/Subtask
Activity as planned
Postponed activity
Delay of activity
Extension of activity
Subtask: 1.4.6 Recovery of ammonia from distillery wastewater after AnMBR
T1.4.6 - Recovery of ammonia from distillery wastewater by
IEX/packed columns after AnMBR in Tain
Baseline conditions assessed MS05 D1.1
Design of pilot system MS09
Laboratory scale experiments MS15 +8M
Pilot system operational MS15 +8M D1.2 + 2M
Start-up & results MS19 D1.9
Best practices for material recovery D1.5
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
m.pidou@cranfield.ac.uk
CS7 Contacts
M.M.Gritti@cranfield.ac.uk

More Related Content

Similar to D1.2-Demonstrator Case Study Tain

D1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilD1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilDrKristineJung
 
D1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study KalundborgD1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study KalundborgDrKristineJung
 
D1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study KalundborgD1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study KalundborgDrKristineJung
 
D1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaD1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaDrKristineJung
 
ULTIMATE project - Case Study 7 in Tain, UK
ULTIMATE project - Case Study 7 in Tain, UKULTIMATE project - Case Study 7 in Tain, UK
ULTIMATE project - Case Study 7 in Tain, UKDrKristineJung
 
D1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study NafplioD1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study NafplioDrKristineJung
 
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilD1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilDrKristineJung
 
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilD1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilDrKristineJung
 
D1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaD1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaDrKristineJung
 
D1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study NafplioD1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study NafplioDrKristineJung
 
D1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study NafplioD1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study NafplioDrKristineJung
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandDrKristineJung
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandDrKristineJung
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaDrKristineJung
 
D1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoD1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoDrKristineJung
 
D1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoD1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoDrKristineJung
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaDrKristineJung
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaDrKristineJung
 
D1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaD1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaDrKristineJung
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandDrKristineJung
 

Similar to D1.2-Demonstrator Case Study Tain (20)

D1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilD1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
 
D1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study KalundborgD1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study Kalundborg
 
D1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study KalundborgD1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study Kalundborg
 
D1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaD1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study Lleida
 
ULTIMATE project - Case Study 7 in Tain, UK
ULTIMATE project - Case Study 7 in Tain, UKULTIMATE project - Case Study 7 in Tain, UK
ULTIMATE project - Case Study 7 in Tain, UK
 
D1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study NafplioD1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study Nafplio
 
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilD1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
 
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilD1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
 
D1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaD1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study Lleida
 
D1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study NafplioD1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study Nafplio
 
D1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study NafplioD1.2-Demonstrator Case Study Nafplio
D1.2-Demonstrator Case Study Nafplio
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw Prinsenland
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw Prinsenland
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study Tarragona
 
D1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoD1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study Rosignano
 
D1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoD1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study Rosignano
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study Tarragona
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study Tarragona
 
D1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaD1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study Lleida
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw Prinsenland
 

Recently uploaded

analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxKarpagam Institute of Teechnology
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxMustafa Ahmed
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniR. Sosa
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalSwarnaSLcse
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligencemahaffeycheryld
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxMustafa Ahmed
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...IJECEIAES
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxCHAIRMAN M
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationEmaan Sharma
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New HorizonMorshed Ahmed Rahath
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024EMMANUELLEFRANCEHELI
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..MaherOthman7
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsMathias Magdowski
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdfKamal Acharya
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUankushspencer015
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 

Recently uploaded (20)

analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 

D1.2-Demonstrator Case Study Tain

  • 1. D1.2Operational demo cases CS7 Tain UCRAN, Aquabio
  • 2. 2 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: Tain Lead partner: Other partner: With support of:
  • 3. 3 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: Situation before Ultimate
  • 4. 4 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: Objectives of the Ultimate solutions
  • 5. 5 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: Subtask 1.2.6 status/progress Subtask: 1.2.6 RO treatment of distillery wastewater after AnMBR for internal water reuse Baseline technology: no water reuse so far (discharge of AnMBR effluent to Dornoch Firth) TRL: 5  7 Ultimate solution to foster circular economy: RO system for distillery wastewater (AnMBR effluent) Capacity of demo plant: 1 m³/d Quantifiable target: At full scale, potential for the production of 58,000 m³/a for internal water reuse; >40 % reduction of freshwater through reuse of treated water Status/progress: • detailed design completed • system available but needs adapting to fit latest configuration
  • 6. 6 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: Pictures of the new technologies Subtask: 1.2.5 RO treatment of distillery wastewater after AnMBR for internal water reuse The RO unit is designed to achieve high quality water for reuse from the distillery wastewater after treatment through a pre- precipitation stage and ammonia stripping.
  • 7. 7 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: Task 1.2.6 - Timeline M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 YEAR 1 YEAR 2 YEAR 3 YEAR 4  Pilot system expected to be operational in July 2022 (M26)  Still enough time to complete the pilot experiments Subtask: 1.2.5 RO treatment of distillery wastewater after AnMBR for internal water reuse Legend Task/Subtask Activity as planned Postponed activity Delay of activity Extension of activity T1.2.6 - RO treatment of distillery wastewater after AnMBR for internal water reuse in Tain Baseline conditions assessed MS05 D1.1 Design of pilot system MS09 Laboratory scale experiments MS15 + 8M Pilot system operational MS15 + 8M D1.2 + 2M Start-up & results MS19 D1.9 Best practices for water recycling D1.3
  • 8. 8 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: Subtask 1.3.5 status/progress Subtask: 1.3.5 Heat recovery from treated (AnMBR) distillery wastewater Baseline technology: Biogas production via existing AnMBR; no heat recovery before Ultimate TRL: 5  7 Ultimate solutions to foster circular economy: heat recovery from the AnMBR effluent via heat exchangers Capacity of demo plant: heat utilization will be tested in all systems at 1 m3/d for the RO and 12 m³/d for the nutrients recovery system and 14 kW of heat recovery can be expected Quantifiable targets: At full scale, >15 % reduction of energy demand from biogas and 60 % heat recovery within stripping column unit Status/progress: • detailed design completed • parts ordered
  • 9. 9 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: PID of the heat exchanging unit Subtask: 1.3.5 Heat recovery from treated (AnMBR) distillery wastewater P&ID of the heat exchange unit The heat exchanger units are designed to maximise heat utilisation from the effluent after the ammonia stripping process.
  • 10. 10 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: First results of the new technologies Subtask: 1.3.5 Heat recovery from treated (AnMBR) distillery wastewater The biogas produced in the AnMBR first goes through a scrubber for H2S removal and is then converted to steam in a boiler. The steam produced is reused to heat the stills in the distillery and contribute to reduce its dependence on fossil fuel by 15%. https://www.forbesgroup.co.uk/envir onmental-technologies/packed- tower/
  • 11. 11 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: Task 1.3.5 - Timeline M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 YEAR 1 YEAR 2 YEAR 3 YEAR 4  Heat recovery system expected to be operational in July 2022 (M26)  Still enough time to complete the pilot experiments Subtask: 1.3.5 Heat recovery from treated (AnMBR) distillery wastewater Legend Task/Subtask Activity as planned Postponed activity Delay of activity Extension of activity T1.3.5 - Heat recovery from treated (AnMBR) distillery wastewater in Tain Baseline conditions assessed MS05 D1.1 Design of pilot system MS09 Pilot system operational MS15 +8M D1.2 + 2M Start-up & results MS19 D1.9 Best practices for energy recovery D1.4
  • 12. 12 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: Subtask 1.4.6 status/progress Subtask: 1.4.6 Recovery of ammonia from distillery wastewater via IEX/packed columns after AnMBR Baseline technology: reuse of digestate on the barley fields TRL: 5  7 (air stripping column & scrubber); 5  7 (struvite precipitation) Ultimate solution to foster circular economy: air stripping column & scrubber; struvite precipitation Capacity of demo plants:12-24 m³/d Quantifiable target: At full scale, potential for the production of 122 t struvite/a from the pre-precipitation stage and 47 t nitrogen/a from ammonia stripping, corresponding to about 80% P recovery and 80% N recovery in total Status/progress: • detailed design completed • parts ordered
  • 13. 13 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 Subtask: 1.4.6 Recovery of ammonia from distillery wastewater via IEX/packed columns after AnMBR CS7: Results of the preliminary evaluation The evaluation of current knowledge and performance (see figure on the right) of ion exchange, stripping and precipitation based systems for ammonia recovery form industrial wastewaters and the measured characteristics of the anaerobically treated distillery wastewater led to the selection of a two-stage system comprising pre-precipitation (struvite) followed ammonia stripping to maximize the recovery of nutrients.
  • 14. 14 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 Please insert pictures of the progress of the construction CS7: Pictures of the struvite precipitator P&ID and drawing of the of the pre-precipitation reactor The pre-precipitation stage will act as pre-treatment to maximize ammonia recovery in the subsequent stripping unit while also recovering P and N in the form of struvite. Subtask: 1.4.6 Recovery of ammonia from distillery wastewater after AnMBR
  • 15. 15 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 Subtask: 1.4.6 Recovery of ammonia from distillery wastewater after AnMBR CS7: PID of the ammonia stripping unit P&ID of the ammonia stripping unit The stripping unit is designed to maximize the recovery of ammonia from the anaerobically treated distillery wastewater in the form of either an ammonia solution or ammonium sulphate.
  • 16. 16 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS7: Task 1.4.6 - Timeline M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 YEAR 1 YEAR 2 YEAR 3 YEAR 4  Nutrients recovery system expected to be operational in July 2022 (M26)  Still enough time to complete the pilot experiments Legend Task/Subtask Activity as planned Postponed activity Delay of activity Extension of activity Subtask: 1.4.6 Recovery of ammonia from distillery wastewater after AnMBR T1.4.6 - Recovery of ammonia from distillery wastewater by IEX/packed columns after AnMBR in Tain Baseline conditions assessed MS05 D1.1 Design of pilot system MS09 Laboratory scale experiments MS15 +8M Pilot system operational MS15 +8M D1.2 + 2M Start-up & results MS19 D1.9 Best practices for material recovery D1.5
  • 17. The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 m.pidou@cranfield.ac.uk CS7 Contacts M.M.Gritti@cranfield.ac.uk