SlideShare a Scribd company logo
1 of 18
D1.2Operational demo cases
CS4 Nafplio
Greener than Green, Alberta, NTUA
2
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Nafplio
Lead partner:
Other partners:
3
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Situation before Ultimate
Argolida area:
- increasing water demand for irrigation
- high-water consumption of the fruit processing industry
 great pressure on regional aquifer
Alberta S.A has a primary treatment unit of about 20 m3/h capacity:
- high production periods (Nov.-Mar. & Aug.-Oct.): 3500 m3 WW/d
- other months: 500 m3 WW/d
- treatment unit consists of a series of tank:
Raw wastewater tank → Rotostrainer →Less solids tank → equalization/ homogeneous
tank → Neutralization tank → Pre Sedimentation tank → Aeration tank → Flocculation tank
→ Final sedimentation tank → Final tank of treated water → Central treatment unit of local
water authority (DEYARM)
Aim of the Ultimate solutions (after the implementation of the additional pilot wastewater
treatment process):
to achieve lower organic burden in the final effluent,
compliant to limits specified by the local water management authority
either for disposal to the local final treatment unit,
either for irrigation
or for reuse in the production procedure of Alberta S.A.
4
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Objectives of the Ultimate solutions
5
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Objectives of the Ultimate solutions
Ultimate aims to address the various issues involved in fresh-water management and reduce
wastewater disposal cost. Thus, different techniques are to be implemented to guarantee a
sustainable management of the end-of-the-pipe wastewater effluents derived from the food
industry, and also to prevent the losses of inorganic and organic pollutants to the
environment, making it easier to recycle/reuse the purified water.
The activities in ULTIMATE target both the recovery of various inorganic and organic
contaminants from the processing water and the reuse of the purified water. In Alberta’s fruit
processing plant, a mobile pilot plant will demonstrate a hybrid adsorption / SubCritical Water
Extraction (SCWE) process to extract high value-added compounds, such as antioxidants from
the wastewater. Residual wastewater will be treated in pilot-scale by an AOP before polishing in
an on-site Small Bioreactor Platform (SBP) for reuse in irrigation or discharge into the municipal
WWTP to reduce operational costs. The extracted compounds will be assessed for their use by
Alberta making “fortified juice” with antioxidant properties, increasing the value of their product,
but also by selling the extract to the food-supplement sector.
6
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Subtask 1.2.4 Status/progress
Baseline technology: no water reuse so far
TRL: 57
Ultimate solution to foster circular economy:
Capacity: 10 m³/d
Status/progress:
• detailed design completed
• The unit has been installed in Nafplio / several parts to be integrated
Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio
Quantifiable target: Ambition beyond the project: 100% water reuse for irrigation; >90% reduction of freshwater
through water reuse
7
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Pictures/videos of the new technologies
Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio
CS4 video
The unit installed in Nafplio AOP
AOP operating with
Alberta’s wastewater
Coagulation tests Sensors
SBP capsules
This video is accessible via
the indicated link below this
presentation on the
ULTIMATE webpage.
8
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Pictures/videos of the new technologies
Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio
Unit installation video
The unit installed in Nafplio
Sensors
SBP capsules
TOC analyzer
Dossing pumps
9
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Operational procedures and methodologies
Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio
10
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
0
0.2
0.4
0.6
0.8
1
1.2
0 1000 2000 3000 4000 5000
Remaining
content
of
model
compound
Irrandiance(W/m^2)
sun light
artificial light
CS4: Results of laboratory experiments
Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio
Results of the individual technologies
• Coagulant effectively removes TSS
• The adsorption of VAC is more efficient if it goes prior to any
chemical process  Minor change in our initial design
• The AOP effectively degrades organic matter when used both
under solar or artificial light
• More results will be available the upcoming weeks
11
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Subtask 1.2.4 – Timeline
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
YEAR 1 YEAR 2 YEAR 3 YEAR 4
 Pilot system (filtration, AOP and SBP) is operational
 Enough time to complete the pilot experiments
Legend
Task/Subtask
Activity as planned
Postponed activity
Delay of activity
Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio
T1.2.4 - Reuse of fruit processing wastewater in Nafplio
Baseline conditions assessed MS05 D1.1
Design of pilot system MS09
Laboratory experiments MS15
Pilot system operational (Filtration, AOP, SBP) MS15 +6M D1.2 + 0M
Start-up & results MS19 D1.9
Best practices for water recycling D1.3
12
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Subtask 1.4.3 Status/progress
Baseline technology: No recovery
TRL: 5  7
Ultimate solution to foster circular economy:
Capacity: 10 m³/d
Status/progress:
• Lab scale experiments completed
• Pilot unit under construction
Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio
Quantifiable target: Recovery of polyphenols: 50-70%
13
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio
CS4: Pictures/videos of the new technologies
Static adsorption
Lab scale – Dynamic adsorption
14
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio
CS4: Operational procedures and methodologies
15
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio
CS4: Results of the laboratory experiments
0.
3.5
7.
10.5
14.
0 15 30 45 60 75
adsorption
capacity
Q
(mg/g)
t (min)
0.1g
0.2g
0.5g
1.0g
y = -0,0195x + 2,9041
R² = 0,9964
y = -0,0208x + 2,6424
R² = 0,9802
y = -0,0197x + 2,3111
R² = 0,9701
0.
0.75
1.5
2.25
3.
3.75
0 15 30 45 60 75
lnQe
t (min)
0.1 g
0.2 g
0.5 g
maximum adsorptive
capacity (Q): 23 g of
polyphenols per kg of
resin for the FPX 66
resin
Static
Adsorption
Dynamic
Adsorption
0
35
70
105
140
0. 125. 250. 375. 500.
C
phenols
(mg/L)
Bed Volums (BV)
2.5 ml/min
5ml/min
The breakthrough
curves showed that
1.7 m3 of wastewater
can be treated per kg
of resin per 10 cycles
16
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Results of the laboratory experiments
Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio
•Static extraction experiments were
performed employing hot water and
organic solvents
•Water-methanol mixture (50:50 b.v.)
yielded 69% polyphenols recovery
•Currently working on dynamic
extraction experiments,
•Aiming to optimise:
• experimental conditions and
• solvent recovery and reuse
strategy
17
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
CS4: Subtask 1.4.3 – Timeline
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
YEAR 1 YEAR 2 YEAR 3 YEAR 4
 Pilot system expected to be operational in November 2022 (M30)
 Extension of lab-scale experiments to accelerate pilot start-up
and optimisation phases
 Still enough time to complete the pilot experiments
Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio
T1.4.3 - Recovery of high added-value compounds (antioxidants) in
Nafplio
Baseline conditions assessed MS05 D1.1
Design of pilot system MS09
Laboratory experiments MS15
Pilot system operational MS15 +12M D1.2 + 6M
Start-up & results MS19 +2MD1.9 + 0M
Best practices for material recovery D1.5
Legend
Task/Subtask
Activity as planned
Postponed activity
Delay of activity
Extension of activity
The project leading to this application has received funding from the European Union’s
Horizon 2020 research and innovation programme under grant agreement No 869318
d.iossifidis@greenerthangreen.co
CS4 Contacts
m.touloupi@greenerthangreen.co

More Related Content

Similar to D1.2-Demonstrator Case Study Nafplio

D1.2-Demonstrator Case Study Tain
D1.2-Demonstrator Case Study TainD1.2-Demonstrator Case Study Tain
D1.2-Demonstrator Case Study TainDrKristineJung
 
D1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoD1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoDrKristineJung
 
D1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study KalundborgD1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study KalundborgDrKristineJung
 
D1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoD1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoDrKristineJung
 
D1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaD1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaDrKristineJung
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandDrKristineJung
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandDrKristineJung
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandDrKristineJung
 
D1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanD1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanDrKristineJung
 
D1.2-Demonstrator Case Study Tain
D1.2-Demonstrator Case Study TainD1.2-Demonstrator Case Study Tain
D1.2-Demonstrator Case Study TainDrKristineJung
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaDrKristineJung
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaDrKristineJung
 
D1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanD1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanDrKristineJung
 
D1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanD1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanDrKristineJung
 
SaltGae Project: results achieved and demo sites.
SaltGae Project: results achieved and demo sites.SaltGae Project: results achieved and demo sites.
SaltGae Project: results achieved and demo sites.SALTGAEProject
 
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilD1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilDrKristineJung
 
SMART Plant Project - EUBCE2019
SMART Plant Project - EUBCE2019SMART Plant Project - EUBCE2019
SMART Plant Project - EUBCE2019SALTGAEProject
 
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilD1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilDrKristineJung
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaDrKristineJung
 
D1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanD1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanDrKristineJung
 

Similar to D1.2-Demonstrator Case Study Nafplio (20)

D1.2-Demonstrator Case Study Tain
D1.2-Demonstrator Case Study TainD1.2-Demonstrator Case Study Tain
D1.2-Demonstrator Case Study Tain
 
D1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoD1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study Rosignano
 
D1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study KalundborgD1.2-Demonstrator Case Study Kalundborg
D1.2-Demonstrator Case Study Kalundborg
 
D1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study RosignanoD1.2-Demonstrator Case Study Rosignano
D1.2-Demonstrator Case Study Rosignano
 
D1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study LleidaD1.2-Demonstrator Case Study Lleida
D1.2-Demonstrator Case Study Lleida
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw Prinsenland
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw Prinsenland
 
D1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw PrinsenlandD1.2-Demonstrator Case Study Nieuw Prinsenland
D1.2-Demonstrator Case Study Nieuw Prinsenland
 
D1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanD1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/Shafdan
 
D1.2-Demonstrator Case Study Tain
D1.2-Demonstrator Case Study TainD1.2-Demonstrator Case Study Tain
D1.2-Demonstrator Case Study Tain
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study Tarragona
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study Tarragona
 
D1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanD1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/Shafdan
 
D1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanD1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/Shafdan
 
SaltGae Project: results achieved and demo sites.
SaltGae Project: results achieved and demo sites.SaltGae Project: results achieved and demo sites.
SaltGae Project: results achieved and demo sites.
 
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilD1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
 
SMART Plant Project - EUBCE2019
SMART Plant Project - EUBCE2019SMART Plant Project - EUBCE2019
SMART Plant Project - EUBCE2019
 
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´ExilD1.2-Demonstrator Case Study Saint-Maurice l´Exil
D1.2-Demonstrator Case Study Saint-Maurice l´Exil
 
D1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study TarragonaD1.2-Demonstrator Case Study Tarragona
D1.2-Demonstrator Case Study Tarragona
 
D1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/ShafdanD1.2-Demonstrator Case Study Karmiel/Shafdan
D1.2-Demonstrator Case Study Karmiel/Shafdan
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

D1.2-Demonstrator Case Study Nafplio

  • 1. D1.2Operational demo cases CS4 Nafplio Greener than Green, Alberta, NTUA
  • 2. 2 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Nafplio Lead partner: Other partners:
  • 3. 3 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Situation before Ultimate Argolida area: - increasing water demand for irrigation - high-water consumption of the fruit processing industry  great pressure on regional aquifer Alberta S.A has a primary treatment unit of about 20 m3/h capacity: - high production periods (Nov.-Mar. & Aug.-Oct.): 3500 m3 WW/d - other months: 500 m3 WW/d - treatment unit consists of a series of tank: Raw wastewater tank → Rotostrainer →Less solids tank → equalization/ homogeneous tank → Neutralization tank → Pre Sedimentation tank → Aeration tank → Flocculation tank → Final sedimentation tank → Final tank of treated water → Central treatment unit of local water authority (DEYARM) Aim of the Ultimate solutions (after the implementation of the additional pilot wastewater treatment process): to achieve lower organic burden in the final effluent, compliant to limits specified by the local water management authority either for disposal to the local final treatment unit, either for irrigation or for reuse in the production procedure of Alberta S.A.
  • 4. 4 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Objectives of the Ultimate solutions
  • 5. 5 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Objectives of the Ultimate solutions Ultimate aims to address the various issues involved in fresh-water management and reduce wastewater disposal cost. Thus, different techniques are to be implemented to guarantee a sustainable management of the end-of-the-pipe wastewater effluents derived from the food industry, and also to prevent the losses of inorganic and organic pollutants to the environment, making it easier to recycle/reuse the purified water. The activities in ULTIMATE target both the recovery of various inorganic and organic contaminants from the processing water and the reuse of the purified water. In Alberta’s fruit processing plant, a mobile pilot plant will demonstrate a hybrid adsorption / SubCritical Water Extraction (SCWE) process to extract high value-added compounds, such as antioxidants from the wastewater. Residual wastewater will be treated in pilot-scale by an AOP before polishing in an on-site Small Bioreactor Platform (SBP) for reuse in irrigation or discharge into the municipal WWTP to reduce operational costs. The extracted compounds will be assessed for their use by Alberta making “fortified juice” with antioxidant properties, increasing the value of their product, but also by selling the extract to the food-supplement sector.
  • 6. 6 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Subtask 1.2.4 Status/progress Baseline technology: no water reuse so far TRL: 57 Ultimate solution to foster circular economy: Capacity: 10 m³/d Status/progress: • detailed design completed • The unit has been installed in Nafplio / several parts to be integrated Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio Quantifiable target: Ambition beyond the project: 100% water reuse for irrigation; >90% reduction of freshwater through water reuse
  • 7. 7 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Pictures/videos of the new technologies Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio CS4 video The unit installed in Nafplio AOP AOP operating with Alberta’s wastewater Coagulation tests Sensors SBP capsules This video is accessible via the indicated link below this presentation on the ULTIMATE webpage.
  • 8. 8 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Pictures/videos of the new technologies Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio Unit installation video The unit installed in Nafplio Sensors SBP capsules TOC analyzer Dossing pumps
  • 9. 9 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Operational procedures and methodologies Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio
  • 10. 10 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 0 0.2 0.4 0.6 0.8 1 1.2 0 1000 2000 3000 4000 5000 Remaining content of model compound Irrandiance(W/m^2) sun light artificial light CS4: Results of laboratory experiments Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio Results of the individual technologies • Coagulant effectively removes TSS • The adsorption of VAC is more efficient if it goes prior to any chemical process  Minor change in our initial design • The AOP effectively degrades organic matter when used both under solar or artificial light • More results will be available the upcoming weeks
  • 11. 11 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Subtask 1.2.4 – Timeline M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 YEAR 1 YEAR 2 YEAR 3 YEAR 4  Pilot system (filtration, AOP and SBP) is operational  Enough time to complete the pilot experiments Legend Task/Subtask Activity as planned Postponed activity Delay of activity Subtask: 1.2.4 Reuse of fruit processing wastewater in Nafplio T1.2.4 - Reuse of fruit processing wastewater in Nafplio Baseline conditions assessed MS05 D1.1 Design of pilot system MS09 Laboratory experiments MS15 Pilot system operational (Filtration, AOP, SBP) MS15 +6M D1.2 + 0M Start-up & results MS19 D1.9 Best practices for water recycling D1.3
  • 12. 12 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Subtask 1.4.3 Status/progress Baseline technology: No recovery TRL: 5  7 Ultimate solution to foster circular economy: Capacity: 10 m³/d Status/progress: • Lab scale experiments completed • Pilot unit under construction Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio Quantifiable target: Recovery of polyphenols: 50-70%
  • 13. 13 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio CS4: Pictures/videos of the new technologies Static adsorption Lab scale – Dynamic adsorption
  • 14. 14 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio CS4: Operational procedures and methodologies
  • 15. 15 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio CS4: Results of the laboratory experiments 0. 3.5 7. 10.5 14. 0 15 30 45 60 75 adsorption capacity Q (mg/g) t (min) 0.1g 0.2g 0.5g 1.0g y = -0,0195x + 2,9041 R² = 0,9964 y = -0,0208x + 2,6424 R² = 0,9802 y = -0,0197x + 2,3111 R² = 0,9701 0. 0.75 1.5 2.25 3. 3.75 0 15 30 45 60 75 lnQe t (min) 0.1 g 0.2 g 0.5 g maximum adsorptive capacity (Q): 23 g of polyphenols per kg of resin for the FPX 66 resin Static Adsorption Dynamic Adsorption 0 35 70 105 140 0. 125. 250. 375. 500. C phenols (mg/L) Bed Volums (BV) 2.5 ml/min 5ml/min The breakthrough curves showed that 1.7 m3 of wastewater can be treated per kg of resin per 10 cycles
  • 16. 16 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Results of the laboratory experiments Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio •Static extraction experiments were performed employing hot water and organic solvents •Water-methanol mixture (50:50 b.v.) yielded 69% polyphenols recovery •Currently working on dynamic extraction experiments, •Aiming to optimise: • experimental conditions and • solvent recovery and reuse strategy
  • 17. 17 The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 CS4: Subtask 1.4.3 – Timeline M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 YEAR 1 YEAR 2 YEAR 3 YEAR 4  Pilot system expected to be operational in November 2022 (M30)  Extension of lab-scale experiments to accelerate pilot start-up and optimisation phases  Still enough time to complete the pilot experiments Subtask: 1.4.3 Recovery of high-added-value compounds (antioxidants) in Nafplio T1.4.3 - Recovery of high added-value compounds (antioxidants) in Nafplio Baseline conditions assessed MS05 D1.1 Design of pilot system MS09 Laboratory experiments MS15 Pilot system operational MS15 +12M D1.2 + 6M Start-up & results MS19 +2MD1.9 + 0M Best practices for material recovery D1.5 Legend Task/Subtask Activity as planned Postponed activity Delay of activity Extension of activity
  • 18. The project leading to this application has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 869318 d.iossifidis@greenerthangreen.co CS4 Contacts m.touloupi@greenerthangreen.co