Tremie concreting
 The most satisfactory method of placing
concret under water is by the use of tremie
pipe.
 The word tremie is derived from the French
word hopper.
Tremie method
 A tremie is a watertight pipe.
 Generally 250mm in dia.
 Funnel shaped hopper at its upper
end and a loose plug at the bottom.
 It is supported on a working
platform above water level.
Method of tremie concreting
 A tremie pipe of 200mm to 250mm diameter is used. The length of pipe
can be easily increased or deceased by using coupling. A funnel is provide
at the top end of pipe to facilitate pouring of concrete. The bottom end is
closed with a plug or thick polyethylene sheet to prevent entry of water
into the pipe.
 The pipe is lowered and made to rest at the point where the concrete is
going to be placed. The concrete having a very high slump of about 15 to
20 cm is poured into the funnel. When the whole length of pipe is filled up
with the concrete. The tremie pipe is lifted up and a slight jerk the plug is
forced out and the concrete gets discharged.
 After concreting has started the lower end of the tremie should be kept as
deeply submerged in the previously placed concrete to prevent entry of water
into the pipe from bottom end.
 The tremie should be lifted slowly to prermit the concrete to flow out, care
being taken not to loose the seal at the bottom. In this way, concrete work is
progressed without stopping till the concrete level comes above the water
level.
Precautions to be taken during
concreting by tremie method
 Cofferdams or forms should be sufficiently tight to reduce the flow of
water to less than 3m per minute through the space to be concreted.
 All the time, the lower end of the tremie pipe should be kept well
embedded in the wet concrete.
 Once concreting has started the tremie should not be moved laterally
through the deposited concrete as this will again disturb the concrete. If it
is necessary to shift the tremie. It should be lifted out and moved to the
new position.
 Pumping of water should not be allowed whilst concrete is being placed, nor
24hr thereafter. If simultaneous pumping is done it may suck the cement
particles.
 Under water concreting need not be compacted. As concrete gets
automatically compacted by the hydrostatic pressure of water.
 High water ratio is required for high consistency which reduces the strength
of concrete. But at present with the use of super plasticizers it is possible to
place a concrete with as low a water ratio as 0.3.
 When large quantities of concrete are required to be placed over an extensive
area it is advisable to use a number of tremies.
Thank you

More Related Content

Similar to tremieconcreting-copy -161012060215.pdf

02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptxPAVITRA GOYAL
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsKHUSHBU SHAH
 
Underwater concreting and soil reinforcement techniques,
Underwater concreting and soil reinforcement techniques,Underwater concreting and soil reinforcement techniques,
Underwater concreting and soil reinforcement techniques,Anmol Sahu
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewersathyan s
 
Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) laxman singh
 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary CementingHtet Naing Htoo
 
Water proofing in islamabad
Water proofing in islamabadWater proofing in islamabad
Water proofing in islamabadtayyab94
 
Interior services unit 2
Interior services unit 2Interior services unit 2
Interior services unit 2ctlachu
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptxssuser480182
 
Concrete pumps_Advanced Construction Technology (Semester-6), Civil Engineering
Concrete pumps_Advanced Construction Technology (Semester-6), Civil EngineeringConcrete pumps_Advanced Construction Technology (Semester-6), Civil Engineering
Concrete pumps_Advanced Construction Technology (Semester-6), Civil EngineeringA Makwana
 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksKumarS250747
 

Similar to tremieconcreting-copy -161012060215.pdf (20)

Concrete checking test
Concrete checking testConcrete checking test
Concrete checking test
 
02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx
 
GUNITING
GUNITINGGUNITING
GUNITING
 
Water proofing in buildings
Water proofing in buildingsWater proofing in buildings
Water proofing in buildings
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavations
 
Underwater concreting and soil reinforcement techniques,
Underwater concreting and soil reinforcement techniques,Underwater concreting and soil reinforcement techniques,
Underwater concreting and soil reinforcement techniques,
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewer
 
Traps
TrapsTraps
Traps
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
Waterproofing and insulaton
Waterproofing and insulatonWaterproofing and insulaton
Waterproofing and insulaton
 
Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering)
 
Dmc pile
Dmc pileDmc pile
Dmc pile
 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary Cementing
 
Water proofing in islamabad
Water proofing in islamabadWater proofing in islamabad
Water proofing in islamabad
 
Rebuild
RebuildRebuild
Rebuild
 
Interior services unit 2
Interior services unit 2Interior services unit 2
Interior services unit 2
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
 
Pumping of concrete
Pumping of concretePumping of concrete
Pumping of concrete
 
Concrete pumps_Advanced Construction Technology (Semester-6), Civil Engineering
Concrete pumps_Advanced Construction Technology (Semester-6), Civil EngineeringConcrete pumps_Advanced Construction Technology (Semester-6), Civil Engineering
Concrete pumps_Advanced Construction Technology (Semester-6), Civil Engineering
 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil works
 

More from ARUNKUMARC39

18CYM101T ENVIRONMENTAL SCIENCEpdf
18CYM101T       ENVIRONMENTAL SCIENCEpdf18CYM101T       ENVIRONMENTAL SCIENCEpdf
18CYM101T ENVIRONMENTAL SCIENCEpdfARUNKUMARC39
 
vacuumconcrete- 190731131507.pdf
vacuumconcrete-         190731131507.pdfvacuumconcrete-         190731131507.pdf
vacuumconcrete- 190731131507.pdfARUNKUMARC39
 
rrs-1-171217063912.pdf ferro cement and its application
rrs-1-171217063912.pdf ferro cement and its applicationrrs-1-171217063912.pdf ferro cement and its application
rrs-1-171217063912.pdf ferro cement and its applicationARUNKUMARC39
 
frc-141021075144---conversion-gate01.pdf
frc-141021075144---conversion-gate01.pdffrc-141021075144---conversion-gate01.pdf
frc-141021075144---conversion-gate01.pdfARUNKUMARC39
 
selfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxselfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxARUNKUMARC39
 
seminar topic on high density concrete-
seminar  topic on high density concrete-seminar  topic on high density concrete-
seminar topic on high density concrete-ARUNKUMARC39
 
oil palm shell concrete oil palm shell concrete
oil palm shell concrete oil palm shell concreteoil palm shell concrete oil palm shell concrete
oil palm shell concrete oil palm shell concreteARUNKUMARC39
 
Agricultural-Waste-and-Industrial-Waste-in-construction.pptx
Agricultural-Waste-and-Industrial-Waste-in-construction.pptxAgricultural-Waste-and-Industrial-Waste-in-construction.pptx
Agricultural-Waste-and-Industrial-Waste-in-construction.pptxARUNKUMARC39
 
Industrial hazards and plant safety in disaster
Industrial hazards and plant safety in disasterIndustrial hazards and plant safety in disaster
Industrial hazards and plant safety in disasterARUNKUMARC39
 
Disaster management in India and its challenges
Disaster management in India and its challengesDisaster management in India and its challenges
Disaster management in India and its challengesARUNKUMARC39
 
Disaster management and mitigation of disaster
Disaster management and mitigation of disasterDisaster management and mitigation of disaster
Disaster management and mitigation of disasterARUNKUMARC39
 
Treatment of industrial waste water and its management
Treatment of industrial waste water and its managementTreatment of industrial waste water and its management
Treatment of industrial waste water and its managementARUNKUMARC39
 
Unit 2 of water pollution and its management
Unit 2 of water pollution and its managementUnit 2 of water pollution and its management
Unit 2 of water pollution and its managementARUNKUMARC39
 
Industrial waster water management and its application
Industrial waster water management and its applicationIndustrial waster water management and its application
Industrial waster water management and its applicationARUNKUMARC39
 
Water pollution and its management - a open elective
Water pollution and its management - a open electiveWater pollution and its management - a open elective
Water pollution and its management - a open electiveARUNKUMARC39
 
Heat analysis finite element method two Dimensional
Heat analysis finite element method two DimensionalHeat analysis finite element method two Dimensional
Heat analysis finite element method two DimensionalARUNKUMARC39
 
FEM-APPLICATION-BIOMECHANICS FE ANALYSIS (1).ppt
FEM-APPLICATION-BIOMECHANICS    FE ANALYSIS                      (1).pptFEM-APPLICATION-BIOMECHANICS    FE ANALYSIS                      (1).ppt
FEM-APPLICATION-BIOMECHANICS FE ANALYSIS (1).pptARUNKUMARC39
 
Quality control of concrete and its importance
Quality control of concrete and its importanceQuality control of concrete and its importance
Quality control of concrete and its importanceARUNKUMARC39
 
CONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concreteCONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concreteARUNKUMARC39
 
Admixture of concrete power point presentation
Admixture of concrete power point presentationAdmixture of concrete power point presentation
Admixture of concrete power point presentationARUNKUMARC39
 

More from ARUNKUMARC39 (20)

18CYM101T ENVIRONMENTAL SCIENCEpdf
18CYM101T       ENVIRONMENTAL SCIENCEpdf18CYM101T       ENVIRONMENTAL SCIENCEpdf
18CYM101T ENVIRONMENTAL SCIENCEpdf
 
vacuumconcrete- 190731131507.pdf
vacuumconcrete-         190731131507.pdfvacuumconcrete-         190731131507.pdf
vacuumconcrete- 190731131507.pdf
 
rrs-1-171217063912.pdf ferro cement and its application
rrs-1-171217063912.pdf ferro cement and its applicationrrs-1-171217063912.pdf ferro cement and its application
rrs-1-171217063912.pdf ferro cement and its application
 
frc-141021075144---conversion-gate01.pdf
frc-141021075144---conversion-gate01.pdffrc-141021075144---conversion-gate01.pdf
frc-141021075144---conversion-gate01.pdf
 
selfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxselfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptx
 
seminar topic on high density concrete-
seminar  topic on high density concrete-seminar  topic on high density concrete-
seminar topic on high density concrete-
 
oil palm shell concrete oil palm shell concrete
oil palm shell concrete oil palm shell concreteoil palm shell concrete oil palm shell concrete
oil palm shell concrete oil palm shell concrete
 
Agricultural-Waste-and-Industrial-Waste-in-construction.pptx
Agricultural-Waste-and-Industrial-Waste-in-construction.pptxAgricultural-Waste-and-Industrial-Waste-in-construction.pptx
Agricultural-Waste-and-Industrial-Waste-in-construction.pptx
 
Industrial hazards and plant safety in disaster
Industrial hazards and plant safety in disasterIndustrial hazards and plant safety in disaster
Industrial hazards and plant safety in disaster
 
Disaster management in India and its challenges
Disaster management in India and its challengesDisaster management in India and its challenges
Disaster management in India and its challenges
 
Disaster management and mitigation of disaster
Disaster management and mitigation of disasterDisaster management and mitigation of disaster
Disaster management and mitigation of disaster
 
Treatment of industrial waste water and its management
Treatment of industrial waste water and its managementTreatment of industrial waste water and its management
Treatment of industrial waste water and its management
 
Unit 2 of water pollution and its management
Unit 2 of water pollution and its managementUnit 2 of water pollution and its management
Unit 2 of water pollution and its management
 
Industrial waster water management and its application
Industrial waster water management and its applicationIndustrial waster water management and its application
Industrial waster water management and its application
 
Water pollution and its management - a open elective
Water pollution and its management - a open electiveWater pollution and its management - a open elective
Water pollution and its management - a open elective
 
Heat analysis finite element method two Dimensional
Heat analysis finite element method two DimensionalHeat analysis finite element method two Dimensional
Heat analysis finite element method two Dimensional
 
FEM-APPLICATION-BIOMECHANICS FE ANALYSIS (1).ppt
FEM-APPLICATION-BIOMECHANICS    FE ANALYSIS                      (1).pptFEM-APPLICATION-BIOMECHANICS    FE ANALYSIS                      (1).ppt
FEM-APPLICATION-BIOMECHANICS FE ANALYSIS (1).ppt
 
Quality control of concrete and its importance
Quality control of concrete and its importanceQuality control of concrete and its importance
Quality control of concrete and its importance
 
CONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concreteCONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concrete
 
Admixture of concrete power point presentation
Admixture of concrete power point presentationAdmixture of concrete power point presentation
Admixture of concrete power point presentation
 

Recently uploaded

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfEr. Suman Jyoti
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 

Recently uploaded (20)

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 

tremieconcreting-copy -161012060215.pdf

  • 2.  The most satisfactory method of placing concret under water is by the use of tremie pipe.  The word tremie is derived from the French word hopper.
  • 3. Tremie method  A tremie is a watertight pipe.  Generally 250mm in dia.  Funnel shaped hopper at its upper end and a loose plug at the bottom.  It is supported on a working platform above water level.
  • 4. Method of tremie concreting  A tremie pipe of 200mm to 250mm diameter is used. The length of pipe can be easily increased or deceased by using coupling. A funnel is provide at the top end of pipe to facilitate pouring of concrete. The bottom end is closed with a plug or thick polyethylene sheet to prevent entry of water into the pipe.  The pipe is lowered and made to rest at the point where the concrete is going to be placed. The concrete having a very high slump of about 15 to 20 cm is poured into the funnel. When the whole length of pipe is filled up with the concrete. The tremie pipe is lifted up and a slight jerk the plug is forced out and the concrete gets discharged.
  • 5.  After concreting has started the lower end of the tremie should be kept as deeply submerged in the previously placed concrete to prevent entry of water into the pipe from bottom end.  The tremie should be lifted slowly to prermit the concrete to flow out, care being taken not to loose the seal at the bottom. In this way, concrete work is progressed without stopping till the concrete level comes above the water level.
  • 6.
  • 7.
  • 8. Precautions to be taken during concreting by tremie method  Cofferdams or forms should be sufficiently tight to reduce the flow of water to less than 3m per minute through the space to be concreted.  All the time, the lower end of the tremie pipe should be kept well embedded in the wet concrete.  Once concreting has started the tremie should not be moved laterally through the deposited concrete as this will again disturb the concrete. If it is necessary to shift the tremie. It should be lifted out and moved to the new position.
  • 9.  Pumping of water should not be allowed whilst concrete is being placed, nor 24hr thereafter. If simultaneous pumping is done it may suck the cement particles.  Under water concreting need not be compacted. As concrete gets automatically compacted by the hydrostatic pressure of water.  High water ratio is required for high consistency which reduces the strength of concrete. But at present with the use of super plasticizers it is possible to place a concrete with as low a water ratio as 0.3.  When large quantities of concrete are required to be placed over an extensive area it is advisable to use a number of tremies.