SlideShare a Scribd company logo
1 of 27
Download to read offline
Subject: DISASTER MANAGEMENT
TOPIC: APPLICATION OF SCIENCE AND
TECHNOLOGY FOR DISASTER MANAGEMENT &
MITIGATION
Prepared By:
NAME ENROLLMENT NO. NAME ENROLLMENT NO.
151103106007 KANSARA ABHISHEK 151103106014 PATEL ROHAN
151103106008 KOTILA JAYVEER 151103106015 PATEL AASHISH
151103106009 MISTRY ADITYA 151103106016 RATNANI MANISHA
151103106010 PANDYA DHRUMIL 151103106017 SHARMA DIPEN
151103106011 PATEL KAJAL 151103106018 TANK PRATIK
151103106012 PATEL NIRMAL 151103106019 VAGHELA ROHIT
151103106013 PATEL RAKSHIT
CONTENT
 Geo- informatics in disaster management
 Disaster communication system
 Land use planning and Development regulations
 Disaster safe designs and constructions
 Structural and non structural mitigation of disaster
 Science & technology institutions for disaster management in India
 Remote Sensing (RS)
 Geographical Information System (GIS)
 Global Positioning System (GPS)
 Remote sensing is an investigative technique
that uses a recording instrument or device to
measure or acquire information on a distant
object or phenomenon with which it is not in
physical or close contact.
 The technique is used foe accumulating
important information of the environment.
 Remote sensing can collect data much faster
than ground based observation, covering a
large spatial area at one time to give a
comprehensive view.
 It has the capability of capturing images of
distant targets and in all weather conditions.
 Using remote sensing data such as satellite imageries and aerial photos, to map the
variations in terrain properties such as vegetation, water and geology both in space and
time.
 Helping to locate the area of a natural disaster and monitor its growing proportions
providing information on the disaster rapidly and reliably and thereby ensuring that extent
of damage is evaluated precisely.
 Monitoring the disaster event which provides in turn a quantitative base for relief
operations.
 Geographical information system can be defined as a system of hardware and software for
measuring, storing, retrieving, mapping, monitoring, modeling, and analyzing a variety of
data types related to geographic and natural phenomena.
Disaster preparedness  Disaster early warning
 Hazard monitoring
 Database construction
 Logistics preparation for disaster relief
Disaster mitigation  Vulnerability assessment
 Hazard assessment
 Risk investigation and assessment
 Disaster characteristic factor monitoring
Reconstruction and recovery  Disaster loss assessment
 Requirement assessment for disaster
recovery and reconstruction
 Recovery and reconstruction monitoring
disaster  Disaster information quick processing and
analysis
 Disaster mapping
 Scenario simulation
 Disaster trend forecasting
Disaster relief  Information integration and analysis
 Disaster monitoring
 Dynamic disaster loss assessment
 Drought
 Earthquake
 Floods
 Landslide
 A critical component of any successful
rescue operation is time.
 Prior knowledge of the precise location of
landmarks, streets, buildings, emergency
service resources, and disaster relief sites
saves time and lives.
 The global positioning system serves as a
facilitating technology in addressing these
needs by helping the users at any point on or
near the earth’s surface to obtain
instantaneous three dimensional coordinates
of the their location.
 Pinpointing the location of damage sites and floodplains.
 Playing a significant role in helping scientists to predict earthquake in earthquake prone
areas.
 Using the precise position information provided by GPS scientists can study how pressure
slowly builds up over time in an attempt to characterize and in the future perhaps predict
earthquakes.
 Meteorologists responsible for storm tracking and flood predication also rely on GPS.
 GPS give quick information in the efficient operation of their emergency response teams.
 Early warning is the provision of timely and effective information through identified
institutions that allows individuals exposed to hazard to take action to avoid or reduce their
risk and prepare for effective response.
 Early warning information suggest people to take action when disasters close to happening.
 Risk knowledge
 Monitoring and predicating
 Disseminating information
 Response
 Land Use Planning is described as the process undertaken by public authorities to identify,
evaluate and describe different options for the use of land, including consideration of long
term economic, and enviournment objectives.
 The main are as under:-
 Selecting the safe site for the building structures.
 Relocating a community outside the hazardous and disaster prone areas.
 Formulation of land use policies for the long term sustainable development.
 Measures to promote land use should include legal implementation of property insurance
against the damage of disaster evens and creation of public awareness for the proper land
use practices.
 Appropriate land use in the disaster prone areas , by adjusting the land stability with
agricultural development strategies.
 Long term land use planning by incorporating all geological related data available and
identifying for allocation of hazard free areas for industrial and urban development.
 High investment industries, other important infrastructure should not be located in the
areas that are susceptible to damages.
 Adoption of the culture of safety in construction to follow bye laws and codes and usage of
good quality material.
 The government shall support these initiatives by providing technical guidance to rebuild
houses that can sustain against shaking of the earthquake.
 Manuals need to be developed outlining methodologies for new constructions
 identification of the vulnerable buildings in the state
 Construction of emergency shelters, identification of the buildings that could act as a
shelters and strengthening existing one, also of the infrastructure, which are useful during
emergencies.
 Building structures on the firmer ground or stiff soil because stiff soil loss their strength
with strong vibrations.
 Help in purchasing of the safe sites for the construction.
 Priority of buildings according to their importance.
Earthquake Safe Design
and Construction
 The building should have a simple rectangular
plan.
 Long walls should be supported by reinforced
concrete columns.
 Door and window openings in walls should
preferably be small and more centrally located.
 The location of the openings should not be too
close to the edge of the wall.
 Vertical reinforcements should be provided at
corners and junctions of walls. It shall be
passing through the lintel bands and floor slabs.
 Landslide Safe Design and
Construction
 The potential for the landslides and development
erosion can be greatly reduced or prevented with
proper development, proper construction techniques,
seasonal inspections and regular maintenance of
drainage facilities.
 Keep the surface drainage water away from vulnerable
areas, such as steep slopes, loose soils and non-
vegetated surfaces.
 Collect and direct water from driveways, non-
vegetated surfaces, into catch basins, and confine water
flow in drainage pipe such as ditch, drywell, gutter,
natural drainage or holding pond.
 Improve soil`s ability to resist erosion by stabilizing
slopes by increasing vegetation and tress.
 Floods Safe Design and
Construction
 Avoid residing on river banks and slopes on river
side`s.
 Build at least 250meters away from the
seacoast/river banks.
 Build proper drainage system in all flood prone
areas, so that the water can be drained off quickly
to prevent accumulation.
 Construct the building with a plinth level higher
than the known high flood level.
 Construct the whole village or settlement on a
raised platform higher than the high flood level.
 Construct buildings on columns with wall-free
space at ground level permitting the free flow of
water, provided that columns are circular and
strong.
 In dry weather condition the ground area could be
fenced.
 Cyclones Safe Design and
Construction
 In cyclonic regions, close to the coast, a site above the
likely inundation(more) level should be given preference.
 For individual buildings, a circular or polygonal plan
shape is preferred over rectangular or square plans.
 Where building is constructed on columns, it is necessary
that columns are properly braced on both the directions.
 Doors and windows should have strong closing/locking
arrangements and glass/wooden panels be securely fixed.
 Reduce the size of the panel and provide a metallic fabric
outside the panels.
 Provide proper locking arrangements of shutters. Securely
fix the frames to walls.
 The roof projections should be kept minimum (not
exceeding 500mm), or else, are tied down adequately.
STRUCTURAL MITIGATION
Structural mitigation is defined as a risk reduction effort performed through the
construction or altering of the physical environment through the application of engineered
solutions.
 Building codes
 Relocation
 Structural modification
 Earthquakes
 Floods
 Cyclone
 Construction of community shelters
 Construction of barrier and retention systems
 Non-structural mitigation is defined as a measure that reduces risk through modification in
human behavior or natural processes without requiring the use of engineered structures.
 Legal framework
 Land use planning
 Incentives and financial framework
 Training and education
 Public awareness
 India meteorological department (IMD)
 Central water commission (CWC)
 Indian national center for oceanic information system (INCOIS)
 Geological survey if India (GSI)
 Defense research & development organization (DRDO)
 Indian space research organization (ISRO)
 Department od atomic energy (DAE)
Disaster management and mitigation of disaster

More Related Content

Similar to Disaster management and mitigation of disaster

Design of G+3 considing earthquake with Etab .pdf
Design of G+3 considing earthquake with Etab .pdfDesign of G+3 considing earthquake with Etab .pdf
Design of G+3 considing earthquake with Etab .pdfPrince Ahirwar
 
Introduction to civil engineering
Introduction to civil engineeringIntroduction to civil engineering
Introduction to civil engineeringJaydevVadachhak
 
Vietnam disaster risk prevention aid system for urban flooding
Vietnam disaster risk prevention aid system for urban floodingVietnam disaster risk prevention aid system for urban flooding
Vietnam disaster risk prevention aid system for urban floodingByoungjaeBJLee
 
Roles of Technology, Engineering and Academe in Climate Change
Roles of Technology, Engineering and Academe in Climate ChangeRoles of Technology, Engineering and Academe in Climate Change
Roles of Technology, Engineering and Academe in Climate ChangeChristopher Marzan
 
The Importance of Geotechnical Services Building on a Solid Foundation.pdf
The Importance of Geotechnical Services Building on a Solid Foundation.pdfThe Importance of Geotechnical Services Building on a Solid Foundation.pdf
The Importance of Geotechnical Services Building on a Solid Foundation.pdfFalcon Laboratory
 
Earthquake design
Earthquake designEarthquake design
Earthquake designFArzand Gul
 
SITE_ANALYSIS.pptx
SITE_ANALYSIS.pptxSITE_ANALYSIS.pptx
SITE_ANALYSIS.pptxAnjuWanti1
 
Concept of flood risk (1)
Concept of flood risk (1)Concept of flood risk (1)
Concept of flood risk (1)irfan ashraf
 
DISASTER MITIGATION AND MANAGEMENT INTRODUCTION
DISASTER MITIGATION AND MANAGEMENT INTRODUCTIONDISASTER MITIGATION AND MANAGEMENT INTRODUCTION
DISASTER MITIGATION AND MANAGEMENT INTRODUCTIONKavya Kusam
 
Highlighting the Value of Geotechnical Testing Services and Investigation
Highlighting the Value of Geotechnical Testing Services and InvestigationHighlighting the Value of Geotechnical Testing Services and Investigation
Highlighting the Value of Geotechnical Testing Services and InvestigationAussie Hydro-Vac Services
 
Just Water Management | NILEX
Just Water Management | NILEXJust Water Management | NILEX
Just Water Management | NILEXNilex Inc
 
disaster management...........................
disaster management...........................disaster management...........................
disaster management...........................MeruvaLokeshwar
 
Highlighting the Value of Geotechnical Testing Services and Investigation
Highlighting the Value of Geotechnical Testing Services and InvestigationHighlighting the Value of Geotechnical Testing Services and Investigation
Highlighting the Value of Geotechnical Testing Services and InvestigationAussie Hydro-Vac Services
 
IRJET- Risk Assessment and Management Techniques to Avoid Landslide Hazard
IRJET- Risk Assessment and Management Techniques to Avoid Landslide HazardIRJET- Risk Assessment and Management Techniques to Avoid Landslide Hazard
IRJET- Risk Assessment and Management Techniques to Avoid Landslide HazardIRJET Journal
 
New techniques of erosion controls on hill roads[ a v shinde]
New techniques of erosion controls on hill roads[ a v shinde]New techniques of erosion controls on hill roads[ a v shinde]
New techniques of erosion controls on hill roads[ a v shinde]santosh212121
 
Application of Remote Sensing & GIS in Disaster Management
Application of Remote Sensing & GIS in Disaster ManagementApplication of Remote Sensing & GIS in Disaster Management
Application of Remote Sensing & GIS in Disaster ManagementAjayPatro
 
1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdfahsansaeed78
 
Site layout cpm module4
Site layout cpm module4Site layout cpm module4
Site layout cpm module4ahsanrabbani
 

Similar to Disaster management and mitigation of disaster (20)

Design of G+3 considing earthquake with Etab .pdf
Design of G+3 considing earthquake with Etab .pdfDesign of G+3 considing earthquake with Etab .pdf
Design of G+3 considing earthquake with Etab .pdf
 
Introduction to civil engineering
Introduction to civil engineeringIntroduction to civil engineering
Introduction to civil engineering
 
Vietnam disaster risk prevention aid system for urban flooding
Vietnam disaster risk prevention aid system for urban floodingVietnam disaster risk prevention aid system for urban flooding
Vietnam disaster risk prevention aid system for urban flooding
 
Roles of Technology, Engineering and Academe in Climate Change
Roles of Technology, Engineering and Academe in Climate ChangeRoles of Technology, Engineering and Academe in Climate Change
Roles of Technology, Engineering and Academe in Climate Change
 
The Importance of Geotechnical Services Building on a Solid Foundation.pdf
The Importance of Geotechnical Services Building on a Solid Foundation.pdfThe Importance of Geotechnical Services Building on a Solid Foundation.pdf
The Importance of Geotechnical Services Building on a Solid Foundation.pdf
 
Earthquake design
Earthquake designEarthquake design
Earthquake design
 
SITE_ANALYSIS.pptx
SITE_ANALYSIS.pptxSITE_ANALYSIS.pptx
SITE_ANALYSIS.pptx
 
Concept of flood risk (1)
Concept of flood risk (1)Concept of flood risk (1)
Concept of flood risk (1)
 
DISASTER MITIGATION AND MANAGEMENT INTRODUCTION
DISASTER MITIGATION AND MANAGEMENT INTRODUCTIONDISASTER MITIGATION AND MANAGEMENT INTRODUCTION
DISASTER MITIGATION AND MANAGEMENT INTRODUCTION
 
Highlighting the Value of Geotechnical Testing Services and Investigation
Highlighting the Value of Geotechnical Testing Services and InvestigationHighlighting the Value of Geotechnical Testing Services and Investigation
Highlighting the Value of Geotechnical Testing Services and Investigation
 
Just Water Management | NILEX
Just Water Management | NILEXJust Water Management | NILEX
Just Water Management | NILEX
 
disaster management...........................
disaster management...........................disaster management...........................
disaster management...........................
 
Building Risk
Building RiskBuilding Risk
Building Risk
 
Highlighting the Value of Geotechnical Testing Services and Investigation
Highlighting the Value of Geotechnical Testing Services and InvestigationHighlighting the Value of Geotechnical Testing Services and Investigation
Highlighting the Value of Geotechnical Testing Services and Investigation
 
IRJET- Risk Assessment and Management Techniques to Avoid Landslide Hazard
IRJET- Risk Assessment and Management Techniques to Avoid Landslide HazardIRJET- Risk Assessment and Management Techniques to Avoid Landslide Hazard
IRJET- Risk Assessment and Management Techniques to Avoid Landslide Hazard
 
Theory of Design
Theory of Design Theory of Design
Theory of Design
 
New techniques of erosion controls on hill roads[ a v shinde]
New techniques of erosion controls on hill roads[ a v shinde]New techniques of erosion controls on hill roads[ a v shinde]
New techniques of erosion controls on hill roads[ a v shinde]
 
Application of Remote Sensing & GIS in Disaster Management
Application of Remote Sensing & GIS in Disaster ManagementApplication of Remote Sensing & GIS in Disaster Management
Application of Remote Sensing & GIS in Disaster Management
 
1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf
 
Site layout cpm module4
Site layout cpm module4Site layout cpm module4
Site layout cpm module4
 

More from ARUNKUMARC39

18CYM101T ENVIRONMENTAL SCIENCEpdf
18CYM101T       ENVIRONMENTAL SCIENCEpdf18CYM101T       ENVIRONMENTAL SCIENCEpdf
18CYM101T ENVIRONMENTAL SCIENCEpdfARUNKUMARC39
 
vacuumconcrete- 190731131507.pdf
vacuumconcrete-         190731131507.pdfvacuumconcrete-         190731131507.pdf
vacuumconcrete- 190731131507.pdfARUNKUMARC39
 
tremieconcreting-copy -161012060215.pdf
tremieconcreting-copy  -161012060215.pdftremieconcreting-copy  -161012060215.pdf
tremieconcreting-copy -161012060215.pdfARUNKUMARC39
 
rrs-1-171217063912.pdf ferro cement and its application
rrs-1-171217063912.pdf ferro cement and its applicationrrs-1-171217063912.pdf ferro cement and its application
rrs-1-171217063912.pdf ferro cement and its applicationARUNKUMARC39
 
frc-141021075144---conversion-gate01.pdf
frc-141021075144---conversion-gate01.pdffrc-141021075144---conversion-gate01.pdf
frc-141021075144---conversion-gate01.pdfARUNKUMARC39
 
selfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxselfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxARUNKUMARC39
 
seminar topic on high density concrete-
seminar  topic on high density concrete-seminar  topic on high density concrete-
seminar topic on high density concrete-ARUNKUMARC39
 
oil palm shell concrete oil palm shell concrete
oil palm shell concrete oil palm shell concreteoil palm shell concrete oil palm shell concrete
oil palm shell concrete oil palm shell concreteARUNKUMARC39
 
Agricultural-Waste-and-Industrial-Waste-in-construction.pptx
Agricultural-Waste-and-Industrial-Waste-in-construction.pptxAgricultural-Waste-and-Industrial-Waste-in-construction.pptx
Agricultural-Waste-and-Industrial-Waste-in-construction.pptxARUNKUMARC39
 
Industrial hazards and plant safety in disaster
Industrial hazards and plant safety in disasterIndustrial hazards and plant safety in disaster
Industrial hazards and plant safety in disasterARUNKUMARC39
 
Disaster management in India and its challenges
Disaster management in India and its challengesDisaster management in India and its challenges
Disaster management in India and its challengesARUNKUMARC39
 
Treatment of industrial waste water and its management
Treatment of industrial waste water and its managementTreatment of industrial waste water and its management
Treatment of industrial waste water and its managementARUNKUMARC39
 
Unit 2 of water pollution and its management
Unit 2 of water pollution and its managementUnit 2 of water pollution and its management
Unit 2 of water pollution and its managementARUNKUMARC39
 
Industrial waster water management and its application
Industrial waster water management and its applicationIndustrial waster water management and its application
Industrial waster water management and its applicationARUNKUMARC39
 
Water pollution and its management - a open elective
Water pollution and its management - a open electiveWater pollution and its management - a open elective
Water pollution and its management - a open electiveARUNKUMARC39
 
Heat analysis finite element method two Dimensional
Heat analysis finite element method two DimensionalHeat analysis finite element method two Dimensional
Heat analysis finite element method two DimensionalARUNKUMARC39
 
FEM-APPLICATION-BIOMECHANICS FE ANALYSIS (1).ppt
FEM-APPLICATION-BIOMECHANICS    FE ANALYSIS                      (1).pptFEM-APPLICATION-BIOMECHANICS    FE ANALYSIS                      (1).ppt
FEM-APPLICATION-BIOMECHANICS FE ANALYSIS (1).pptARUNKUMARC39
 
Quality control of concrete and its importance
Quality control of concrete and its importanceQuality control of concrete and its importance
Quality control of concrete and its importanceARUNKUMARC39
 
CONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concreteCONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concreteARUNKUMARC39
 
Admixture of concrete power point presentation
Admixture of concrete power point presentationAdmixture of concrete power point presentation
Admixture of concrete power point presentationARUNKUMARC39
 

More from ARUNKUMARC39 (20)

18CYM101T ENVIRONMENTAL SCIENCEpdf
18CYM101T       ENVIRONMENTAL SCIENCEpdf18CYM101T       ENVIRONMENTAL SCIENCEpdf
18CYM101T ENVIRONMENTAL SCIENCEpdf
 
vacuumconcrete- 190731131507.pdf
vacuumconcrete-         190731131507.pdfvacuumconcrete-         190731131507.pdf
vacuumconcrete- 190731131507.pdf
 
tremieconcreting-copy -161012060215.pdf
tremieconcreting-copy  -161012060215.pdftremieconcreting-copy  -161012060215.pdf
tremieconcreting-copy -161012060215.pdf
 
rrs-1-171217063912.pdf ferro cement and its application
rrs-1-171217063912.pdf ferro cement and its applicationrrs-1-171217063912.pdf ferro cement and its application
rrs-1-171217063912.pdf ferro cement and its application
 
frc-141021075144---conversion-gate01.pdf
frc-141021075144---conversion-gate01.pdffrc-141021075144---conversion-gate01.pdf
frc-141021075144---conversion-gate01.pdf
 
selfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxselfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptx
 
seminar topic on high density concrete-
seminar  topic on high density concrete-seminar  topic on high density concrete-
seminar topic on high density concrete-
 
oil palm shell concrete oil palm shell concrete
oil palm shell concrete oil palm shell concreteoil palm shell concrete oil palm shell concrete
oil palm shell concrete oil palm shell concrete
 
Agricultural-Waste-and-Industrial-Waste-in-construction.pptx
Agricultural-Waste-and-Industrial-Waste-in-construction.pptxAgricultural-Waste-and-Industrial-Waste-in-construction.pptx
Agricultural-Waste-and-Industrial-Waste-in-construction.pptx
 
Industrial hazards and plant safety in disaster
Industrial hazards and plant safety in disasterIndustrial hazards and plant safety in disaster
Industrial hazards and plant safety in disaster
 
Disaster management in India and its challenges
Disaster management in India and its challengesDisaster management in India and its challenges
Disaster management in India and its challenges
 
Treatment of industrial waste water and its management
Treatment of industrial waste water and its managementTreatment of industrial waste water and its management
Treatment of industrial waste water and its management
 
Unit 2 of water pollution and its management
Unit 2 of water pollution and its managementUnit 2 of water pollution and its management
Unit 2 of water pollution and its management
 
Industrial waster water management and its application
Industrial waster water management and its applicationIndustrial waster water management and its application
Industrial waster water management and its application
 
Water pollution and its management - a open elective
Water pollution and its management - a open electiveWater pollution and its management - a open elective
Water pollution and its management - a open elective
 
Heat analysis finite element method two Dimensional
Heat analysis finite element method two DimensionalHeat analysis finite element method two Dimensional
Heat analysis finite element method two Dimensional
 
FEM-APPLICATION-BIOMECHANICS FE ANALYSIS (1).ppt
FEM-APPLICATION-BIOMECHANICS    FE ANALYSIS                      (1).pptFEM-APPLICATION-BIOMECHANICS    FE ANALYSIS                      (1).ppt
FEM-APPLICATION-BIOMECHANICS FE ANALYSIS (1).ppt
 
Quality control of concrete and its importance
Quality control of concrete and its importanceQuality control of concrete and its importance
Quality control of concrete and its importance
 
CONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concreteCONCRETE TECHNOLOGY an introduction to concrete
CONCRETE TECHNOLOGY an introduction to concrete
 
Admixture of concrete power point presentation
Admixture of concrete power point presentationAdmixture of concrete power point presentation
Admixture of concrete power point presentation
 

Recently uploaded

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 

Recently uploaded (20)

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 

Disaster management and mitigation of disaster

  • 1. Subject: DISASTER MANAGEMENT TOPIC: APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
  • 2. Prepared By: NAME ENROLLMENT NO. NAME ENROLLMENT NO. 151103106007 KANSARA ABHISHEK 151103106014 PATEL ROHAN 151103106008 KOTILA JAYVEER 151103106015 PATEL AASHISH 151103106009 MISTRY ADITYA 151103106016 RATNANI MANISHA 151103106010 PANDYA DHRUMIL 151103106017 SHARMA DIPEN 151103106011 PATEL KAJAL 151103106018 TANK PRATIK 151103106012 PATEL NIRMAL 151103106019 VAGHELA ROHIT 151103106013 PATEL RAKSHIT
  • 3. CONTENT  Geo- informatics in disaster management  Disaster communication system  Land use planning and Development regulations  Disaster safe designs and constructions  Structural and non structural mitigation of disaster  Science & technology institutions for disaster management in India
  • 4.  Remote Sensing (RS)  Geographical Information System (GIS)  Global Positioning System (GPS)
  • 5.  Remote sensing is an investigative technique that uses a recording instrument or device to measure or acquire information on a distant object or phenomenon with which it is not in physical or close contact.  The technique is used foe accumulating important information of the environment.  Remote sensing can collect data much faster than ground based observation, covering a large spatial area at one time to give a comprehensive view.  It has the capability of capturing images of distant targets and in all weather conditions.
  • 6.  Using remote sensing data such as satellite imageries and aerial photos, to map the variations in terrain properties such as vegetation, water and geology both in space and time.  Helping to locate the area of a natural disaster and monitor its growing proportions providing information on the disaster rapidly and reliably and thereby ensuring that extent of damage is evaluated precisely.  Monitoring the disaster event which provides in turn a quantitative base for relief operations.
  • 7.  Geographical information system can be defined as a system of hardware and software for measuring, storing, retrieving, mapping, monitoring, modeling, and analyzing a variety of data types related to geographic and natural phenomena.
  • 8.
  • 9. Disaster preparedness  Disaster early warning  Hazard monitoring  Database construction  Logistics preparation for disaster relief Disaster mitigation  Vulnerability assessment  Hazard assessment  Risk investigation and assessment  Disaster characteristic factor monitoring Reconstruction and recovery  Disaster loss assessment  Requirement assessment for disaster recovery and reconstruction  Recovery and reconstruction monitoring disaster  Disaster information quick processing and analysis  Disaster mapping  Scenario simulation  Disaster trend forecasting Disaster relief  Information integration and analysis  Disaster monitoring  Dynamic disaster loss assessment
  • 10.  Drought  Earthquake  Floods  Landslide
  • 11.  A critical component of any successful rescue operation is time.  Prior knowledge of the precise location of landmarks, streets, buildings, emergency service resources, and disaster relief sites saves time and lives.  The global positioning system serves as a facilitating technology in addressing these needs by helping the users at any point on or near the earth’s surface to obtain instantaneous three dimensional coordinates of the their location.
  • 12.  Pinpointing the location of damage sites and floodplains.  Playing a significant role in helping scientists to predict earthquake in earthquake prone areas.  Using the precise position information provided by GPS scientists can study how pressure slowly builds up over time in an attempt to characterize and in the future perhaps predict earthquakes.  Meteorologists responsible for storm tracking and flood predication also rely on GPS.  GPS give quick information in the efficient operation of their emergency response teams.
  • 13.  Early warning is the provision of timely and effective information through identified institutions that allows individuals exposed to hazard to take action to avoid or reduce their risk and prepare for effective response.  Early warning information suggest people to take action when disasters close to happening.
  • 14.  Risk knowledge  Monitoring and predicating  Disseminating information  Response
  • 15.  Land Use Planning is described as the process undertaken by public authorities to identify, evaluate and describe different options for the use of land, including consideration of long term economic, and enviournment objectives.
  • 16.  The main are as under:-  Selecting the safe site for the building structures.  Relocating a community outside the hazardous and disaster prone areas.  Formulation of land use policies for the long term sustainable development.  Measures to promote land use should include legal implementation of property insurance against the damage of disaster evens and creation of public awareness for the proper land use practices.  Appropriate land use in the disaster prone areas , by adjusting the land stability with agricultural development strategies.  Long term land use planning by incorporating all geological related data available and identifying for allocation of hazard free areas for industrial and urban development.  High investment industries, other important infrastructure should not be located in the areas that are susceptible to damages.
  • 17.  Adoption of the culture of safety in construction to follow bye laws and codes and usage of good quality material.  The government shall support these initiatives by providing technical guidance to rebuild houses that can sustain against shaking of the earthquake.  Manuals need to be developed outlining methodologies for new constructions  identification of the vulnerable buildings in the state  Construction of emergency shelters, identification of the buildings that could act as a shelters and strengthening existing one, also of the infrastructure, which are useful during emergencies.  Building structures on the firmer ground or stiff soil because stiff soil loss their strength with strong vibrations.  Help in purchasing of the safe sites for the construction.  Priority of buildings according to their importance.
  • 18. Earthquake Safe Design and Construction  The building should have a simple rectangular plan.  Long walls should be supported by reinforced concrete columns.  Door and window openings in walls should preferably be small and more centrally located.  The location of the openings should not be too close to the edge of the wall.  Vertical reinforcements should be provided at corners and junctions of walls. It shall be passing through the lintel bands and floor slabs.
  • 19.  Landslide Safe Design and Construction  The potential for the landslides and development erosion can be greatly reduced or prevented with proper development, proper construction techniques, seasonal inspections and regular maintenance of drainage facilities.  Keep the surface drainage water away from vulnerable areas, such as steep slopes, loose soils and non- vegetated surfaces.  Collect and direct water from driveways, non- vegetated surfaces, into catch basins, and confine water flow in drainage pipe such as ditch, drywell, gutter, natural drainage or holding pond.  Improve soil`s ability to resist erosion by stabilizing slopes by increasing vegetation and tress.
  • 20.  Floods Safe Design and Construction  Avoid residing on river banks and slopes on river side`s.  Build at least 250meters away from the seacoast/river banks.  Build proper drainage system in all flood prone areas, so that the water can be drained off quickly to prevent accumulation.  Construct the building with a plinth level higher than the known high flood level.  Construct the whole village or settlement on a raised platform higher than the high flood level.  Construct buildings on columns with wall-free space at ground level permitting the free flow of water, provided that columns are circular and strong.  In dry weather condition the ground area could be fenced.
  • 21.  Cyclones Safe Design and Construction  In cyclonic regions, close to the coast, a site above the likely inundation(more) level should be given preference.  For individual buildings, a circular or polygonal plan shape is preferred over rectangular or square plans.  Where building is constructed on columns, it is necessary that columns are properly braced on both the directions.  Doors and windows should have strong closing/locking arrangements and glass/wooden panels be securely fixed.  Reduce the size of the panel and provide a metallic fabric outside the panels.  Provide proper locking arrangements of shutters. Securely fix the frames to walls.  The roof projections should be kept minimum (not exceeding 500mm), or else, are tied down adequately.
  • 22. STRUCTURAL MITIGATION Structural mitigation is defined as a risk reduction effort performed through the construction or altering of the physical environment through the application of engineered solutions.
  • 23.  Building codes  Relocation  Structural modification  Earthquakes  Floods  Cyclone  Construction of community shelters  Construction of barrier and retention systems
  • 24.  Non-structural mitigation is defined as a measure that reduces risk through modification in human behavior or natural processes without requiring the use of engineered structures.
  • 25.  Legal framework  Land use planning  Incentives and financial framework  Training and education  Public awareness
  • 26.  India meteorological department (IMD)  Central water commission (CWC)  Indian national center for oceanic information system (INCOIS)  Geological survey if India (GSI)  Defense research & development organization (DRDO)  Indian space research organization (ISRO)  Department od atomic energy (DAE)