076 S/S Circuit Breaker Install 1.0 Page 1 of 5
Trailblazers (Power) – Unit 076
Install Substation Circuit Breakers
This training specification has been developed from the Power Network
Trailblazer Standard. The specification details the required skills, knowledge and behaviours to
establish competence to carry out the installation of electricity circuit breakers.
The specification details the requirements for THREE separate categories. Candidates may be
assessed and receive registration for any ONE or a COMBINATION of the following -
1. Transmission Circuit Breakers
2. Primary Circuit Breakers
3. Distribution Circuit Breakers (up to 20 kV)
This specification details the minimum skills, knowledge and behaviours that would be required
by a candidate to be assessed as competent. This does not preclude employers adding to the
skills and knowledge detailed by the specification in their own training programmes.
What does competence look like?
CBI1 Being able to confidently use tools and equipment to carry out installation procedures on
circuit breakers in a substation environment in accordance with Company procedures.
CBI2 Demonstrating a safety conscious approach to the control of hazards associated with
the activity whilst working and communicating effectively with other team members to
achieve tasks.
Candidates to be assessed as competent in this skill area shall have completed the modules
shown below or have evidence demonstrating an equivalent level of competence.
1. SHEA Power (Revised Version) – providing basic HS&E awareness and an introduction to
specific HS&E factors relating to the power sector
2. BESC/AME Substations – establishing the competence to enter, move around and exit a
substation work area in a safe manner
076 S/S Circuit Breaker Install 1.0 Page 2 of 5
Performance Criteria
General Requirements. To be assessed as competent you must be able to -
1. Identify the substation and the plant / apparatus to be maintained using available
information in accordance with Company procedures
2. Select, inspect and wear the PPE required to carry out the work activity
3. Carry out a site specific risk assessment of the work area, identifying the hazards and the
control measures required (requirements included in SHEA Power and BESC/AME
Substations)
4. Apply and adhere to the control measures necessary to meet safety requirements for the
work activity e.g. safety documentation, work instructions and method statements
5. Identify and comply with demarcation arrangements for the work area in accordance with
Company procedures (where applicable)
6. Carry out a pre use inspection of the tools and equipment to be used, checking condition
and service information
7. Carry out the maintenance procedures on circuit breakers in accordance with
manufacturers specifications and Company procedures
8. Record / report results of the maintenance operation/s in accordance with Company
procedures
9. Ensure hazardous and non-hazardous waste materials are dealt with in accordance with
Company procedures and statutory regulations
10. Report and record incidents / defects in accordance with Company procedures
11. Store tools and equipment safely and securely and leave the substation work area in a safe
and secure condition in accordance with Company procedures
Task Specific – In addition, for EACH category to be taken you must be able to -
Category 1 Transmission Circuit Breakers
1. Carry out installation activities on ALL of the following circuit breaker types –
a) Air Blast b) Oil c) SF6
2. Carry out ALL of the following testing procedures –
a) Insulation medium tests Oil, SF6 and Air (to include dew point)
b) Insulation and continuity tests (secondary wiring)
c) Low resistance testing d) Timing and operational tests
076 S/S Circuit Breaker Install 1.0 Page 3 of 5
Category 2 Primary Circuit Breakers
1. Carry out installation procedures on a minimum of TWO of the following circuit breakers.
ONE of which MUST include an oil circuit breaker –
a) Oil b) SF6 c) Vacuum
2. Carry out installation procedures on ALL of the following circuit breaker components –
a) electro-mechanical components e.g. contacts, springs, braids
b) arc disruption devices c) phase barriers
3. Carry out ALL of the following testing procedures –
a) Insulation medium test b) Insulation resistance test
c) SF6 pressure check & leak detection d) Ductor testing e) timing test
Category 3 Distribution Circuit Breakers
1. Carry out maintenance procedures on a minimum of TWO of the following circuit breakers.
ONE of which MUST include an oil circuit breaker –
a) Oil b) SF6 c) Vacuum
2. Carry out maintenance procedures on ALL of the following circuit breaker components –
a) electro-mechanical components e.g. contacts, springs, braids
b) arc disruption devices c) phase barriers
3. Carry out ALL of the following testing procedures –
a) Insulation medium test b) Insulation resistance test
c) SF6 pressure check & leak detection d) Ductor testing e) timing test
076 S/S Circuit Breaker Install 1.0 Page 4 of 5
Knowledge and Understanding
To achieve any of the categories, you will need to know and understand:
General Requirements
K1. The principles of health, safety and environmental legislation in relation to work on
substation plant and apparatus e.g. Electricity at Work Regulations 1989
K2. The organisations safety rules, policies and procedures relating to work on or near
substation plant / apparatus e.g. safety documentation, demarcation
K3. How to identify the substation and the plant / apparatus to be worked on
K4. The hazards associated with work on or near substation apparatus and how to deal with
them e.g. exposed busbars, overhead conductors / structures
K5. The dangers of electricity and how an electric shock can be received including -
direct contact, infringing safety distances, induced voltage, arcing
K6. The electrical safety distances which must be maintained at differing voltages
K7. The appropriate PPE for work in substations and how to inspect, use and maintain it
K8. How to carry out a site specific risk assessment and identify workplace hazards
K9. How to enter, exit and move around a substation work area in a safe manner and (where
applicable) use and comply with demarcation arrangements
K10. The purpose and method of earthing substations and how to identify inadequate earthing
K11. The effect of adverse weather conditions on sub-station work activities
K12. How to update, report and record information in accordance with Company procedures
e.g. maintenance reports, test results, acts of vandalism / terrorism
K13. How to use, handle and dispose of hazardous and non-hazardous waste materials
K14. How to respond in the event of emergency situations in the work environment
K15. How to leave the work area and substation in a safe and secure condition. e.g. access
equipment secured, demarcation / screening removed, gates locked.
Task Specific – In addition, for EACH category to be taken you need to know and understand:
Category 1 - Transmission Circuit Breaker
K16. The function and operating principles of transmission circuit breakers
K17. The function and operating principles of transmission circuit breaker ancillary equipment
K18. How to carry out installation activities in accordance with Company procedures on
transmission circuit breaker plant and ancillary equipment
076 S/S Circuit Breaker Install 1.0 Page 5 of 5
K19. How to carry out testing procedures on transmission circuit breakers
K20. How to interpret the results of testing procedures carried out on transmission circuit
breakers
K21. How to interpret and comply with Company standards, specifications and manufacturer’s
instructions
K22. The hazards associated with work on transmission circuit breakers and its associated
plant and equipment
Category 2 - Primary Circuit Breakers
K23. The function and operating principles of primary circuit breakers
K24. The function and operating principles of primary circuit breakers ancillary equipment
K25. The function and operating principles of primary circuit breakers protection equipment
K26. How to carry out installation activities in accordance with Company procedures on
primary circuit breakers, plant and ancillary equipment
K27. How to carry out testing procedures on primary circuit breakers
K28. How to interpret the results of testing procedures carried out on primary circuit breakers
K29. How to interpret and comply with Company standards, specifications and manufacturer’s
instructions
K30. The hazards associated with work on primary circuit breakers and its associated plant and
equipment
Category 3 - Distribution Circuit Breakers (up to 20kV)
K31. The function and operating principles of distribution circuit breakers
K32. The function and operating principles of distribution circuit breakers ancillary equipment
K33. The function and operating principles of distribution circuit breakers protection equipment
K34. How to carry out installation activities on circuit breakers in accordance with Company
procedures
K35. The methods and purpose of carrying out maintenance testing procedures including -
Insulation medium, insulation resistance, SF6 pressure check & leak detection, Ductor
testing and timing tests
K36. The hazards associated with work on distribution circuit breakers and its associated plant
and equipment

More Related Content

What's hot

Lockout Tagout by FirstSource
Lockout Tagout by FirstSourceLockout Tagout by FirstSource
Lockout Tagout by FirstSource
Atlantic Training, LLC.
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYjasonmorgan
 
Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)
Panduit Safety
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
Mary Helen
 
Lockout Tagout Guidelines
Lockout Tagout GuidelinesLockout Tagout Guidelines
Lockout Tagout Guidelines
krm corporation
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
Panduit Safety
 
An OSHA Lock-Out & Tag-Out (LOTO) Presentation
An OSHA Lock-Out & Tag-Out (LOTO) PresentationAn OSHA Lock-Out & Tag-Out (LOTO) Presentation
An OSHA Lock-Out & Tag-Out (LOTO) Presentation
Jacqueline Chau
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
Bruce A. DelGrasso
 
The Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPIThe Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPI
Atlantic Training, LLC.
 
Lockout/Tagout
Lockout/TagoutLockout/Tagout
Lockout/Tagout
Arkansas STEPS Network
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
Atlantic Training, LLC.
 
Hazardous Energy Control by MSHA
Hazardous Energy Control by MSHAHazardous Energy Control by MSHA
Hazardous Energy Control by MSHA
Atlantic Training, LLC.
 
Functional safety standards_for_machinery
Functional safety standards_for_machineryFunctional safety standards_for_machinery
Functional safety standards_for_machinery
ie-net ingenieursvereniging vzw
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag Out
Hvacmach
 
MACHINE SAFEGUARDING TRAINING & PSHR requirements by JULIAN KALAC
MACHINE SAFEGUARDING TRAINING & PSHR requirements by JULIAN KALACMACHINE SAFEGUARDING TRAINING & PSHR requirements by JULIAN KALAC
MACHINE SAFEGUARDING TRAINING & PSHR requirements by JULIAN KALAC
Julian Kalac P.Eng
 

What's hot (19)

Lockout Tagout by FirstSource
Lockout Tagout by FirstSourceLockout Tagout by FirstSource
Lockout Tagout by FirstSource
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lockout Tagout Guidelines
Lockout Tagout GuidelinesLockout Tagout Guidelines
Lockout Tagout Guidelines
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
 
An OSHA Lock-Out & Tag-Out (LOTO) Presentation
An OSHA Lock-Out & Tag-Out (LOTO) PresentationAn OSHA Lock-Out & Tag-Out (LOTO) Presentation
An OSHA Lock-Out & Tag-Out (LOTO) Presentation
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
 
The Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPIThe Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPI
 
Lockout/Tagout
Lockout/TagoutLockout/Tagout
Lockout/Tagout
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Hazardous Energy Control by MSHA
Hazardous Energy Control by MSHAHazardous Energy Control by MSHA
Hazardous Energy Control by MSHA
 
Functional safety standards_for_machinery
Functional safety standards_for_machineryFunctional safety standards_for_machinery
Functional safety standards_for_machinery
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag Out
 
LOTO1
LOTO1LOTO1
LOTO1
 
LOTO 2
LOTO 2LOTO 2
LOTO 2
 
MACHINE SAFEGUARDING TRAINING & PSHR requirements by JULIAN KALAC
MACHINE SAFEGUARDING TRAINING & PSHR requirements by JULIAN KALACMACHINE SAFEGUARDING TRAINING & PSHR requirements by JULIAN KALAC
MACHINE SAFEGUARDING TRAINING & PSHR requirements by JULIAN KALAC
 

Similar to Trailblazers (Power) Install Substation Circuit Breakers

078 switchgear install 1.0
078 switchgear install 1.0078 switchgear install 1.0
078 switchgear install 1.0
Invest Northern Ireland
 
Key Elements of Australian Wiring Standards
Key Elements of Australian Wiring StandardsKey Elements of Australian Wiring Standards
Key Elements of Australian Wiring StandardsLiving Online
 
EHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
EHS Regulatory Compliance in 2018 and the Changes That Lie AheadEHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
EHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
Triumvirate Environmental
 
61131730 transmission-line-case-study
61131730 transmission-line-case-study61131730 transmission-line-case-study
61131730 transmission-line-case-study
homeworkping4
 
final CLM road roller.doc
final CLM road roller.docfinal CLM road roller.doc
final CLM road roller.doc
NeomiChloe1
 
Student Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docxStudent Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docx
florriezhamphrey3065
 
Daniel Hall - How to mitigate flash hazards in a main switchroom
Daniel Hall - How to mitigate flash hazards in a main switchroomDaniel Hall - How to mitigate flash hazards in a main switchroom
Daniel Hall - How to mitigate flash hazards in a main switchroom
NSW Environment and Planning
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)Vijayakumar Kumar
 
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
IRJET Journal
 
conf-type-test-2007-03.ppt
conf-type-test-2007-03.pptconf-type-test-2007-03.ppt
conf-type-test-2007-03.ppt
ssuser1f60f6
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
Personal Secret
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.SAJID MALLICK
 
loto.ppt
loto.pptloto.ppt
loto.ppt
murrtex
 
Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION
SAJJAD KHUDHUR ABBAS
 
City & guilds 2392
City & guilds 2392City & guilds 2392
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
SAJJAD KHUDHUR ABBAS
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
Khaled EL-Hag Ahmed
 
Manual tvoc 2
Manual tvoc 2Manual tvoc 2
Manual tvoc 2
Olian M. G.
 
Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020
minhaj uddin khan
 
MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2Benjamin Canaday
 

Similar to Trailblazers (Power) Install Substation Circuit Breakers (20)

078 switchgear install 1.0
078 switchgear install 1.0078 switchgear install 1.0
078 switchgear install 1.0
 
Key Elements of Australian Wiring Standards
Key Elements of Australian Wiring StandardsKey Elements of Australian Wiring Standards
Key Elements of Australian Wiring Standards
 
EHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
EHS Regulatory Compliance in 2018 and the Changes That Lie AheadEHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
EHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
 
61131730 transmission-line-case-study
61131730 transmission-line-case-study61131730 transmission-line-case-study
61131730 transmission-line-case-study
 
final CLM road roller.doc
final CLM road roller.docfinal CLM road roller.doc
final CLM road roller.doc
 
Student Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docxStudent Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docx
 
Daniel Hall - How to mitigate flash hazards in a main switchroom
Daniel Hall - How to mitigate flash hazards in a main switchroomDaniel Hall - How to mitigate flash hazards in a main switchroom
Daniel Hall - How to mitigate flash hazards in a main switchroom
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
 
conf-type-test-2007-03.ppt
conf-type-test-2007-03.pptconf-type-test-2007-03.ppt
conf-type-test-2007-03.ppt
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.
 
loto.ppt
loto.pptloto.ppt
loto.ppt
 
Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION
 
City & guilds 2392
City & guilds 2392City & guilds 2392
City & guilds 2392
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
Manual tvoc 2
Manual tvoc 2Manual tvoc 2
Manual tvoc 2
 
Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020Minhaj uddin khan cv 2020 1 6-2020
Minhaj uddin khan cv 2020 1 6-2020
 
MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2
 

More from Marty Stevenson

HV Skills Update - Ronnie Moore, EU Skills
HV Skills Update - Ronnie Moore, EU SkillsHV Skills Update - Ronnie Moore, EU Skills
HV Skills Update - Ronnie Moore, EU Skills
Marty Stevenson
 
Smart Energy Funding via Innovate UK - Richard Pelan, Invest NI
Smart Energy Funding via Innovate UK - Richard Pelan, Invest NISmart Energy Funding via Innovate UK - Richard Pelan, Invest NI
Smart Energy Funding via Innovate UK - Richard Pelan, Invest NI
Marty Stevenson
 
Availability of Energy Intellectual Property & Facilities at the University –...
Availability of Energy Intellectual Property & Facilities at the University –...Availability of Energy Intellectual Property & Facilities at the University –...
Availability of Energy Intellectual Property & Facilities at the University –...
Marty Stevenson
 
Explore Export 2017 | Go Canada presentation
Explore Export 2017 | Go Canada presentationExplore Export 2017 | Go Canada presentation
Explore Export 2017 | Go Canada presentation
Marty Stevenson
 
Explore Export 2017 | UK Export Finance
Explore Export 2017 | UK Export Finance Explore Export 2017 | UK Export Finance
Explore Export 2017 | UK Export Finance
Marty Stevenson
 
Explore Export 2017 | Sell it online
Explore Export 2017 | Sell it online Explore Export 2017 | Sell it online
Explore Export 2017 | Sell it online
Marty Stevenson
 
Explore Export 2017 | Energise your export activities
Explore Export 2017 | Energise your export activities Explore Export 2017 | Energise your export activities
Explore Export 2017 | Energise your export activities
Marty Stevenson
 

More from Marty Stevenson (7)

HV Skills Update - Ronnie Moore, EU Skills
HV Skills Update - Ronnie Moore, EU SkillsHV Skills Update - Ronnie Moore, EU Skills
HV Skills Update - Ronnie Moore, EU Skills
 
Smart Energy Funding via Innovate UK - Richard Pelan, Invest NI
Smart Energy Funding via Innovate UK - Richard Pelan, Invest NISmart Energy Funding via Innovate UK - Richard Pelan, Invest NI
Smart Energy Funding via Innovate UK - Richard Pelan, Invest NI
 
Availability of Energy Intellectual Property & Facilities at the University –...
Availability of Energy Intellectual Property & Facilities at the University –...Availability of Energy Intellectual Property & Facilities at the University –...
Availability of Energy Intellectual Property & Facilities at the University –...
 
Explore Export 2017 | Go Canada presentation
Explore Export 2017 | Go Canada presentationExplore Export 2017 | Go Canada presentation
Explore Export 2017 | Go Canada presentation
 
Explore Export 2017 | UK Export Finance
Explore Export 2017 | UK Export Finance Explore Export 2017 | UK Export Finance
Explore Export 2017 | UK Export Finance
 
Explore Export 2017 | Sell it online
Explore Export 2017 | Sell it online Explore Export 2017 | Sell it online
Explore Export 2017 | Sell it online
 
Explore Export 2017 | Energise your export activities
Explore Export 2017 | Energise your export activities Explore Export 2017 | Energise your export activities
Explore Export 2017 | Energise your export activities
 

Recently uploaded

Media as a Mind Controlling Strategy In Old and Modern Era
Media as a Mind Controlling Strategy In Old and Modern EraMedia as a Mind Controlling Strategy In Old and Modern Era
Media as a Mind Controlling Strategy In Old and Modern Era
faizulhassanfaiz1670
 
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptxsomanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
Howard Spence
 
Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...
Sebastiano Panichella
 
Acorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutesAcorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutes
IP ServerOne
 
0x01 - Newton's Third Law: Static vs. Dynamic Abusers
0x01 - Newton's Third Law:  Static vs. Dynamic Abusers0x01 - Newton's Third Law:  Static vs. Dynamic Abusers
0x01 - Newton's Third Law: Static vs. Dynamic Abusers
OWASP Beja
 
Getting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control TowerGetting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control Tower
Vladimir Samoylov
 
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdfBonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
khadija278284
 
María Carolina Martínez - eCommerce Day Colombia 2024
María Carolina Martínez - eCommerce Day Colombia 2024María Carolina Martínez - eCommerce Day Colombia 2024
María Carolina Martínez - eCommerce Day Colombia 2024
eCommerce Institute
 
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
OECD Directorate for Financial and Enterprise Affairs
 
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Orkestra
 
Obesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditionsObesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditions
Faculty of Medicine And Health Sciences
 
International Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software TestingInternational Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software Testing
Sebastiano Panichella
 
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Sebastiano Panichella
 
Eureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 PresentationEureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 Presentation
Access Innovations, Inc.
 
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdfSupercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
Access Innovations, Inc.
 
Bitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXOBitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXO
Matjaž Lipuš
 

Recently uploaded (16)

Media as a Mind Controlling Strategy In Old and Modern Era
Media as a Mind Controlling Strategy In Old and Modern EraMedia as a Mind Controlling Strategy In Old and Modern Era
Media as a Mind Controlling Strategy In Old and Modern Era
 
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptxsomanykidsbutsofewfathers-140705000023-phpapp02.pptx
somanykidsbutsofewfathers-140705000023-phpapp02.pptx
 
Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...Announcement of 18th IEEE International Conference on Software Testing, Verif...
Announcement of 18th IEEE International Conference on Software Testing, Verif...
 
Acorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutesAcorn Recovery: Restore IT infra within minutes
Acorn Recovery: Restore IT infra within minutes
 
0x01 - Newton's Third Law: Static vs. Dynamic Abusers
0x01 - Newton's Third Law:  Static vs. Dynamic Abusers0x01 - Newton's Third Law:  Static vs. Dynamic Abusers
0x01 - Newton's Third Law: Static vs. Dynamic Abusers
 
Getting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control TowerGetting started with Amazon Bedrock Studio and Control Tower
Getting started with Amazon Bedrock Studio and Control Tower
 
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdfBonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
Bonzo subscription_hjjjjjjjj5hhhhhhh_2024.pdf
 
María Carolina Martínez - eCommerce Day Colombia 2024
María Carolina Martínez - eCommerce Day Colombia 2024María Carolina Martínez - eCommerce Day Colombia 2024
María Carolina Martínez - eCommerce Day Colombia 2024
 
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
Competition and Regulation in Professional Services – KLEINER – June 2024 OEC...
 
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
Sharpen existing tools or get a new toolbox? Contemporary cluster initiatives...
 
Obesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditionsObesity causes and management and associated medical conditions
Obesity causes and management and associated medical conditions
 
International Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software TestingInternational Workshop on Artificial Intelligence in Software Testing
International Workshop on Artificial Intelligence in Software Testing
 
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...Doctoral Symposium at the 17th IEEE International Conference on Software Test...
Doctoral Symposium at the 17th IEEE International Conference on Software Test...
 
Eureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 PresentationEureka, I found it! - Special Libraries Association 2021 Presentation
Eureka, I found it! - Special Libraries Association 2021 Presentation
 
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdfSupercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
Supercharge your AI - SSP Industry Breakout Session 2024-v2_1.pdf
 
Bitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXOBitcoin Lightning wallet and tic-tac-toe game XOXO
Bitcoin Lightning wallet and tic-tac-toe game XOXO
 

Trailblazers (Power) Install Substation Circuit Breakers

  • 1. 076 S/S Circuit Breaker Install 1.0 Page 1 of 5 Trailblazers (Power) – Unit 076 Install Substation Circuit Breakers This training specification has been developed from the Power Network Trailblazer Standard. The specification details the required skills, knowledge and behaviours to establish competence to carry out the installation of electricity circuit breakers. The specification details the requirements for THREE separate categories. Candidates may be assessed and receive registration for any ONE or a COMBINATION of the following - 1. Transmission Circuit Breakers 2. Primary Circuit Breakers 3. Distribution Circuit Breakers (up to 20 kV) This specification details the minimum skills, knowledge and behaviours that would be required by a candidate to be assessed as competent. This does not preclude employers adding to the skills and knowledge detailed by the specification in their own training programmes. What does competence look like? CBI1 Being able to confidently use tools and equipment to carry out installation procedures on circuit breakers in a substation environment in accordance with Company procedures. CBI2 Demonstrating a safety conscious approach to the control of hazards associated with the activity whilst working and communicating effectively with other team members to achieve tasks. Candidates to be assessed as competent in this skill area shall have completed the modules shown below or have evidence demonstrating an equivalent level of competence. 1. SHEA Power (Revised Version) – providing basic HS&E awareness and an introduction to specific HS&E factors relating to the power sector 2. BESC/AME Substations – establishing the competence to enter, move around and exit a substation work area in a safe manner
  • 2. 076 S/S Circuit Breaker Install 1.0 Page 2 of 5 Performance Criteria General Requirements. To be assessed as competent you must be able to - 1. Identify the substation and the plant / apparatus to be maintained using available information in accordance with Company procedures 2. Select, inspect and wear the PPE required to carry out the work activity 3. Carry out a site specific risk assessment of the work area, identifying the hazards and the control measures required (requirements included in SHEA Power and BESC/AME Substations) 4. Apply and adhere to the control measures necessary to meet safety requirements for the work activity e.g. safety documentation, work instructions and method statements 5. Identify and comply with demarcation arrangements for the work area in accordance with Company procedures (where applicable) 6. Carry out a pre use inspection of the tools and equipment to be used, checking condition and service information 7. Carry out the maintenance procedures on circuit breakers in accordance with manufacturers specifications and Company procedures 8. Record / report results of the maintenance operation/s in accordance with Company procedures 9. Ensure hazardous and non-hazardous waste materials are dealt with in accordance with Company procedures and statutory regulations 10. Report and record incidents / defects in accordance with Company procedures 11. Store tools and equipment safely and securely and leave the substation work area in a safe and secure condition in accordance with Company procedures Task Specific – In addition, for EACH category to be taken you must be able to - Category 1 Transmission Circuit Breakers 1. Carry out installation activities on ALL of the following circuit breaker types – a) Air Blast b) Oil c) SF6 2. Carry out ALL of the following testing procedures – a) Insulation medium tests Oil, SF6 and Air (to include dew point) b) Insulation and continuity tests (secondary wiring) c) Low resistance testing d) Timing and operational tests
  • 3. 076 S/S Circuit Breaker Install 1.0 Page 3 of 5 Category 2 Primary Circuit Breakers 1. Carry out installation procedures on a minimum of TWO of the following circuit breakers. ONE of which MUST include an oil circuit breaker – a) Oil b) SF6 c) Vacuum 2. Carry out installation procedures on ALL of the following circuit breaker components – a) electro-mechanical components e.g. contacts, springs, braids b) arc disruption devices c) phase barriers 3. Carry out ALL of the following testing procedures – a) Insulation medium test b) Insulation resistance test c) SF6 pressure check & leak detection d) Ductor testing e) timing test Category 3 Distribution Circuit Breakers 1. Carry out maintenance procedures on a minimum of TWO of the following circuit breakers. ONE of which MUST include an oil circuit breaker – a) Oil b) SF6 c) Vacuum 2. Carry out maintenance procedures on ALL of the following circuit breaker components – a) electro-mechanical components e.g. contacts, springs, braids b) arc disruption devices c) phase barriers 3. Carry out ALL of the following testing procedures – a) Insulation medium test b) Insulation resistance test c) SF6 pressure check & leak detection d) Ductor testing e) timing test
  • 4. 076 S/S Circuit Breaker Install 1.0 Page 4 of 5 Knowledge and Understanding To achieve any of the categories, you will need to know and understand: General Requirements K1. The principles of health, safety and environmental legislation in relation to work on substation plant and apparatus e.g. Electricity at Work Regulations 1989 K2. The organisations safety rules, policies and procedures relating to work on or near substation plant / apparatus e.g. safety documentation, demarcation K3. How to identify the substation and the plant / apparatus to be worked on K4. The hazards associated with work on or near substation apparatus and how to deal with them e.g. exposed busbars, overhead conductors / structures K5. The dangers of electricity and how an electric shock can be received including - direct contact, infringing safety distances, induced voltage, arcing K6. The electrical safety distances which must be maintained at differing voltages K7. The appropriate PPE for work in substations and how to inspect, use and maintain it K8. How to carry out a site specific risk assessment and identify workplace hazards K9. How to enter, exit and move around a substation work area in a safe manner and (where applicable) use and comply with demarcation arrangements K10. The purpose and method of earthing substations and how to identify inadequate earthing K11. The effect of adverse weather conditions on sub-station work activities K12. How to update, report and record information in accordance with Company procedures e.g. maintenance reports, test results, acts of vandalism / terrorism K13. How to use, handle and dispose of hazardous and non-hazardous waste materials K14. How to respond in the event of emergency situations in the work environment K15. How to leave the work area and substation in a safe and secure condition. e.g. access equipment secured, demarcation / screening removed, gates locked. Task Specific – In addition, for EACH category to be taken you need to know and understand: Category 1 - Transmission Circuit Breaker K16. The function and operating principles of transmission circuit breakers K17. The function and operating principles of transmission circuit breaker ancillary equipment K18. How to carry out installation activities in accordance with Company procedures on transmission circuit breaker plant and ancillary equipment
  • 5. 076 S/S Circuit Breaker Install 1.0 Page 5 of 5 K19. How to carry out testing procedures on transmission circuit breakers K20. How to interpret the results of testing procedures carried out on transmission circuit breakers K21. How to interpret and comply with Company standards, specifications and manufacturer’s instructions K22. The hazards associated with work on transmission circuit breakers and its associated plant and equipment Category 2 - Primary Circuit Breakers K23. The function and operating principles of primary circuit breakers K24. The function and operating principles of primary circuit breakers ancillary equipment K25. The function and operating principles of primary circuit breakers protection equipment K26. How to carry out installation activities in accordance with Company procedures on primary circuit breakers, plant and ancillary equipment K27. How to carry out testing procedures on primary circuit breakers K28. How to interpret the results of testing procedures carried out on primary circuit breakers K29. How to interpret and comply with Company standards, specifications and manufacturer’s instructions K30. The hazards associated with work on primary circuit breakers and its associated plant and equipment Category 3 - Distribution Circuit Breakers (up to 20kV) K31. The function and operating principles of distribution circuit breakers K32. The function and operating principles of distribution circuit breakers ancillary equipment K33. The function and operating principles of distribution circuit breakers protection equipment K34. How to carry out installation activities on circuit breakers in accordance with Company procedures K35. The methods and purpose of carrying out maintenance testing procedures including - Insulation medium, insulation resistance, SF6 pressure check & leak detection, Ductor testing and timing tests K36. The hazards associated with work on distribution circuit breakers and its associated plant and equipment