Sajid Mallick is seeking a position as a QA/QC Inspector or Engineer with experience in electrical and instrumentation. He has over 8 years of experience in various roles in India and the Gulf. He holds a diploma in instrumentation and is proficient in inspection, testing, calibration and ensuring work is completed according to specifications, standards and quality plans. He has worked on projects in Kuwait, Iraq, Qatar and India for oil, gas and industrial facilities.
Responsibilities: E&I QA/QC
Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I)
Jobs.QA/QC with the help of specification, drawings.
Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery
Note.
Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional
drawings.
Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing.
Responsible for all Red Marks/As Built drawing as per site modification.
Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer
installation.
Inspection for Heating Tracing cables and Testing.
Having Good Knowledge of (NEC) National Electrical Code.
American Petroleum Institute (API ) Standards
IEC- international ELECTROTECHNICAL Commission Standards.
Inspection for the Installation of MCT’s.
Inspection for Lightning Protection (Lightning Arresters).
Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints,
Earth Bus Bar, EARTHING Test.
Inspection for Motor Installation, Resistance/IR test & Motor torque test.
Inspection for Cable Continuity/IR, Cable termination, EARTHING test.
Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S.
Complete QA/QC Documentation as per Project specification.
Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT.
Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT.
Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing)
Inspection for Impulse Line Leak test.
Inspection for JB’S Installation, Panels, Cabinets Installation.
Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre-
Commissioning with the attachments of Instrument loop package index, Functional loop test CR,
Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop
Diagram & P& ID’S.
Responsible for clear the Punch Points.
Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion
Department (MC)
Final Walk Down of Hand over System (HOS) with Client.
Responsibilities: E&I QA/QC
Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I)
Jobs.QA/QC with the help of specification, drawings.
Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery
Note.
Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional
drawings.
Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing.
Responsible for all Red Marks/As Built drawing as per site modification.
Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer
installation.
Inspection for Heating Tracing cables and Testing.
Having Good Knowledge of (NEC) National Electrical Code.
American Petroleum Institute (API ) Standards
IEC- international ELECTROTECHNICAL Commission Standards.
Inspection for the Installation of MCT’s.
Inspection for Lightning Protection (Lightning Arresters).
Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints,
Earth Bus Bar, EARTHING Test.
Inspection for Motor Installation, Resistance/IR test & Motor torque test.
Inspection for Cable Continuity/IR, Cable termination, EARTHING test.
Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S.
Complete QA/QC Documentation as per Project specification.
Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT.
Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT.
Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing)
Inspection for Impulse Line Leak test.
Inspection for JB’S Installation, Panels, Cabinets Installation.
Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre-
Commissioning with the attachments of Instrument loop package index, Functional loop test CR,
Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop
Diagram & P& ID’S.
Responsible for clear the Punch Points.
Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion
Department (MC)
Final Walk Down of Hand over System (HOS) with Client.
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONMaypray Guimbarda
I ‘am Certified Coating Inspector for SSPC Level 2 of PCI - Protective Coating Inspector American Standards Equivalent of NACE 2, CSWIP-BGAS 2 and FROSIO 3, and have Experience for all Insulation Works Likes: Cryogenic Insulation Cold Box Equipment, Tank for Polyurethane Foam Insulation of Double Walls, Tank Insulation External Wall and Thermal Insulation for Piping and Mechanical Equipment"
E&I QC INSPECTOR RESUM AND documents.pdfIrfan786pak
I have good working experience more then 17 years in Oil and Gas ,Fertilizer, Chemical, Petrochemical, in Saudi Arabia & Pakistan , Having a good Experience in Maintenance, Pre Commissioning ,& Commissioning, Start-up and erection Activities, Good knowledge & working skills in plant Control Automation and different control systems such as DCS & ESD systems, Burner Management System, Condition Monitoring System, Turbine & Compressor Integrated Control Systems, F&G System, Production Wellheads, Water & Gas Injection Wellheads Hydraulic Control Panels etc. Ability to work alone as a shifter and fault finding & rectify. i am a Safety conscious & sound knowledge about work permits like cold, hot and entry work permits.in Maintenance and Commissioning 4 LTE2.48 % C4G + During my job I'm Responsible for the PM , CM & breakdown maintenance of various field Instrumentation like flow , pressure , temperature level transmitters , vibration probes , control / on - off valves which installed on Process piping , Skids . Self motivated Maintenance Professional with a demonstrated history of working in the Oil & Gas and Petrochemicals industry in instrument & Control system department securing16 years of Practical experience I am expertly capable in fault diagnosis , troubleshooting and process controls systems in process plant to ensure safety guidelines . I am experienced in modern process control instrumentation in chemicals , petrochemical , fertilizer , oil & gas and cryogenic plants in field of instrumentation . Highly skilled in electrical operations & maintenance . Has working proficiency in SAP system utilization and MS office My skills include but are not limited to : PLC , DCS & Vibration Monitoring System | Control Valve Operation & Maintenance | Loop Checking & SAT / FAT Activities | P & ID & Instruments Calibration | Transducers , SIS / SIL Concept , Positioners | Single Loop Controllers , I / P , ESD System | Turbine & Compressor Control Systems | Workshop / Field Test Equipment | Control Valves , Online Gas Analyzers | Burner Management System | Custody Transfer Metering | Commissioning Activities | Interpersonal Skills | Presentation Skills
I am available on
Email: irfanpak181@gmail.com
Mobile 📱: 00966533012366
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONMaypray Guimbarda
I ‘am Certified Coating Inspector for SSPC Level 2 of PCI - Protective Coating Inspector American Standards Equivalent of NACE 2, CSWIP-BGAS 2 and FROSIO 3, and have Experience for all Insulation Works Likes: Cryogenic Insulation Cold Box Equipment, Tank for Polyurethane Foam Insulation of Double Walls, Tank Insulation External Wall and Thermal Insulation for Piping and Mechanical Equipment"
E&I QC INSPECTOR RESUM AND documents.pdfIrfan786pak
I have good working experience more then 17 years in Oil and Gas ,Fertilizer, Chemical, Petrochemical, in Saudi Arabia & Pakistan , Having a good Experience in Maintenance, Pre Commissioning ,& Commissioning, Start-up and erection Activities, Good knowledge & working skills in plant Control Automation and different control systems such as DCS & ESD systems, Burner Management System, Condition Monitoring System, Turbine & Compressor Integrated Control Systems, F&G System, Production Wellheads, Water & Gas Injection Wellheads Hydraulic Control Panels etc. Ability to work alone as a shifter and fault finding & rectify. i am a Safety conscious & sound knowledge about work permits like cold, hot and entry work permits.in Maintenance and Commissioning 4 LTE2.48 % C4G + During my job I'm Responsible for the PM , CM & breakdown maintenance of various field Instrumentation like flow , pressure , temperature level transmitters , vibration probes , control / on - off valves which installed on Process piping , Skids . Self motivated Maintenance Professional with a demonstrated history of working in the Oil & Gas and Petrochemicals industry in instrument & Control system department securing16 years of Practical experience I am expertly capable in fault diagnosis , troubleshooting and process controls systems in process plant to ensure safety guidelines . I am experienced in modern process control instrumentation in chemicals , petrochemical , fertilizer , oil & gas and cryogenic plants in field of instrumentation . Highly skilled in electrical operations & maintenance . Has working proficiency in SAP system utilization and MS office My skills include but are not limited to : PLC , DCS & Vibration Monitoring System | Control Valve Operation & Maintenance | Loop Checking & SAT / FAT Activities | P & ID & Instruments Calibration | Transducers , SIS / SIL Concept , Positioners | Single Loop Controllers , I / P , ESD System | Turbine & Compressor Control Systems | Workshop / Field Test Equipment | Control Valves , Online Gas Analyzers | Burner Management System | Custody Transfer Metering | Commissioning Activities | Interpersonal Skills | Presentation Skills
I am available on
Email: irfanpak181@gmail.com
Mobile 📱: 00966533012366
Planning, Scheduling & monitoring of activities on daily, weekly and monthly basis and preparation of the reports.
Developed and implemented Quality Plan (QP), Inspection Test Plan (ITP) |
|and Checklist to ensure work flow compliance is met accordingly.
Familiar with ISO-9001/14001,Quality management systems,quality management tools,quality objective and mission.
Planning & coordinating with the contractor, consultants and client for timely completion of all activities.
Monitored and conducted in-process and final inspection, examination, testing procedure to the product inspected and demonstrate capabilities in the following function like planning inspection, evaluating the validity and acceptance, reporting and documentations.
1. SAJID MALLICK
Cell No.: +91 9324074321
008898605185 (India)
E-Mail : sajid1679@gmail.com
QA/QC Inspector/Engineer (Electrical & Instrumentation)
TO,
Whomsoever Concerned.
I undersigned having the qualification of Diploma in Instrumentation with the precious gulf
and India experience (8½ years) in various instrument fields. As well contribute to best of
my ability, skills, knowledge, and performance. I strongly believe that providing an
Opportunity. I will be able to manage entrusted responsibilities benefiting your
organization. I wish to join in your esteemed concern for that I hereby enclose my resume
for your kind consideration so that I may get rid of all anticipatory measures in my life. I
entrusted with a dependable opportunity to perform technically and professionally would
be grateful forever and will be revealing my full effort without failure.
Expecting your kind consideration as early as possible. Thanking you,
Yours truly,
SAJID MALLICK (Resume with attachment)
Resume Sajid Mallick QA/QC Inspector Page 1
(Electrical & Instrumentation)
2. RESUME SUMMERY
Diploma in Instrumentation with (8½ years) overseas & Indian experienced as a QA/QC
inspector/Engineer (E&I). Carrying the responsibilities & performing all activities of
instrumentation regarding construction job, calibration etc as per project ITP, QCP,
Method statement, Project specification & project/vendor documents for oil & gas plant,
refineries, petrochemical and Industrial Plant etc.
PERSONAL DETAILS
Father’s Name : Abdul Samim
Date of birth : 01/01/1990
Marital status : Single
Nationality : Indian
Language known : English, Hindi & Urdu
Academic Qualification : SSC Passed
Technical Qualification : Diploma in Instrumentation
Computer Awareness : MS-Office, (DCA), Internet
3D Smart plan review, CDMS and WINPCS.
Driving license : Yes
PASSPORT DETAILS
Passport No : L 2388862 Place of Issue : Patna
Date of Issue : 04/06/2013 Date of Expiry : 03/06/2023
EMPLOYEMENT HISTORY
01-JULY-2014 To 28-DEC-2014
Company :EQUATE PETROCHEMICAL(KUWAIT)
Position : Instrument QA/QC Engineer
Project : P-25 Project Equate, Kuwait
Job Responsibilities.
Responsibilities for inspection of all types of activities for electrical and Instrument & Electrical and
Telecom& F&G in field lab & Control Room Inspection for installation of Cables, Installation of
transformer, testing of transformer. Installation & Testing, installation of tray works (electrical &
instruments), inspection for control room as panel installation, Cable Lying, Termination. Also
inspection for installation of lighting system in Instrument inspection for installation of transmitters,
tubing, stanchion works, inspection for lab calibration, loop check & Commissioning. Witnessed
Calibration of instrument like pressure, level, temperature, pressure switch, temperature switch
control valves I/P converters, limit switch solenoid valves, Inspection of cable tray installation and
conduit, Fabricated support of instrument devices and electrical equipments alignment of panel,
marshalling box, mounting of instrument devices such as pressure, level, temperature transmitter,
RTD and thermocouple pressure switch and temperature switch. Cable pulling from control room to
J.B then from J.B to Field .
Resume Sajid Mallick QA/QC Inspector Page 2
(Electrical & Instrumentation)
3. 02-Jul-2013 To 02-Jun-2014
Company :KUMYANG(IRAQ)
Position : E&I QA/QC Engineer
Project : West Qurna Phase II Basra, Iraq
Job Responsibilities.
Witnessed Calibration of instrument like pressure, level, temperature, pressure switch,
temperature switch control valves I/P converters, limit switch solenoid valves, Inspection of
cable tray installation and conduit, Fabricated support of instrument devices and electrical
equipments alignment of panel, marshalling box, mounting of instrument devices such as
pressure, level, temperature transmitter, RTD and thermocouple pressure switch and
temperature switch. Cable pulling from control room to J.B then from J.B to Field Instruments
Supervise termination of instrument Cable in junction box, marshalling panel Impulse line test
pressure Assist in plant commissioning works, loop checking, Interlock check, P & ID, ILD, and
punch list works .Preparation of Loop folders
04-April-2011 To 03-April-2013
Company : JGC (QATAR)
Position : Instrument QA/QC Inspector
Project : Shell Pearl GTL Project(Qatar)
Job Responsibilities.
Plan,organize,control and execute all works in accordance with Quality plans and documented
procedures, Review and approval of QA/QC documents ITP’s, each ITP’s shall include contractor and
company required witnesses and hold points for all construction activities. Deals with reviewing of
ITP/QCP/method statement/approval prior for project preparation. Study and implementation of
international code such as NEC, ANSI, NFPA & Fully conversant with relevant international (ASTM,
API, BSI, IP, ISO, IEC, SPs/ERDs and DEPs) etc standards. Carry out Inspections and surveillances, Non
Conformance Reports and assist in implement Corrective Action Reports. Analyzed every area to be
survey and witness prior for RFI to be offered to the main client for inspection. Inspection and
witnessing of all instrumentation activities – Stub-up, instrument cable trenches, cable trays and it’s
supports, cables laying dressing tagging in trenches and trays, installation of instrument control
panel /JB’S/Console and it’s frames, Glanding and termination/meggering and continuity of
instrument cables. Installation of all instruments and its stanchions, installation of impulse
tubing/air piping and its pressure /leak test. Calibration of all instruments such as pressure, flow,
level, temperature and its valves & switches etc as per project specifications and project/vendor
documents.
Resume Sajid Mallick QA/QC Inspector Page 3
(Electrical & Instrumentation)
4. 10-Aug-2009 To 08-Jan-2011
Company : ANI INSTRUMENT SERVICES
Position : Instrument QA/QC Inspector
Project : Indian Oil Refinery Kanpur
Job Responsibilities
Responsible to perform the instrument inspection Review plans and drawings in accordance
with specifications, codes and standards. Familiar with the International industry codes
and standards related to intrinsically safe systems and electrical systems for
Instrumentation such as; NFPA 70/NEC, NEMA 250, NEMA VE 1, NEMA VE 2, IEC
60529,IEEE518, IEEE1100, ANSI , ISA Conduct activities and inspection in accordance to
Project Quality Assurance Manual and Quality Control Inspection Plan. · Monitor daily
discipline activities and verifies compliance to project procedures, specifications and
standards. Identify quality problems, reject non-conforming items and initiate, recommend
or provide solutions to the problems with customer sanction / approvals through
designated channels.
As Per International & Standards, Specifications, Instrument Calibration Method of
Statement & As Per Approved Project Drawings Supervised, Inspected & Witnessed
calibration work shop, DCS Cabinets frame inside RIB’S, Instrument Cable Duct Bank, Cable
Pulling from RIB to J.B & Control Room and , Stanchion of instrument devices, Marshalling
Panel, Junction Boxes installation, Mounting of instrument devices. Anything not as per
Standards or Specification then Making Surveillance or Non Conformance Reports Carried
out daily job activities after receiving RFI (Request for inspection) from contractor.
05-Mar-2007 To 20-Jun-2009
Company : MIRAJ INSTRUMENTS SERVICES
Position : E&I QA/QC Inspector
Project : Haldiya Rerfinery Ltd. Kolkata (W.B.)
Job Responsibilities
Preparing QCP’s and ITP’s and Inspection Checklist for Procurement and Construction
According to Project Quality Plan (PQP).Preparing and Answering Project Technical Query
(PTQ).Overseas the Documents Control Management and ensure the Availability or Current
Client Engineering Standards, Procedures and industrial Codes and Standard. Familiar with
International Standard NACE, ASTM, DIN, BSI, IEC, ANSI, API, NEC, NEMA. Familiar with
latest Calibration Certificates, all test and Measuring Instrument are in Operational and
Calibrated Condition which will be utilized. Responsible for Checking Verifying and
Reviewing the Construction Drawings Covering Specification IFC, P&ID, ILD, and other
Attachments Prior to Installation. Aware of Safety rules and regulations, Conducted weekly
safety Auditing and Reporting, Participated weekly Safety Meeting and Familiar with the
Relevant Safety Induction like 100% Fall Protection, Confined Space Entry and Pre-
Commissioning Priority etc.
Resume Sajid Mallick QA/QC Inspector Page 4
(Electrical & Instrumentation)
5. Safety Training Course Attended
1-Permit to Work Course 2- Medic First Aid course
3- Confined Space 4- PMC Safety Induction
5- Red Escape Mask Training Entry 6- Work at height
7- Electric Safety (Restricted Area) 8- Safety Induction course
9- IIF Course (Incident & Injury Free. 10- Basic Fire Fighting course
11- Sea Survival course From GTSC 12- General Safety Offshor&Basic
SAFETY RESPONSIBILITIES
Conduct TBT meeting periodically about using of proper PPE and quality talks regarding E&I
activities at site daily/weekly with sub-contractor’s personnel. Keep all safety records and
assures work permits were in restricted areas before any work start and make sure
precautions were implemented, follow ensuring that for fine Prevention effective and
lawful, Realization of fine prevention defects, Implements job hazard analysis safety
precaution. Carrying the hot and cold permits in various areas as required. Attending the
weekly safety huddle and housekeeping. Establish and maintain a professional relationship
with company and sub- contractor’s HSE Dept.
I declared that all the above statements are true & correct to the best of my
Knowledge and belief all my required documents will be forwarded whenever required.
DATE ……………………
TIME SAJID MALLICK
Resume Sajid Mallick QA/QC Inspector Page 5
(Electrical & Instrumentation)
6. Safety Training Course Attended
1-Permit to Work Course 2- Medic First Aid course
3- Confined Space 4- PMC Safety Induction
5- Red Escape Mask Training Entry 6- Work at height
7- Electric Safety (Restricted Area) 8- Safety Induction course
9- IIF Course (Incident & Injury Free. 10- Basic Fire Fighting course
11- Sea Survival course From GTSC 12- General Safety Offshor&Basic
SAFETY RESPONSIBILITIES
Conduct TBT meeting periodically about using of proper PPE and quality talks regarding E&I
activities at site daily/weekly with sub-contractor’s personnel. Keep all safety records and
assures work permits were in restricted areas before any work start and make sure
precautions were implemented, follow ensuring that for fine Prevention effective and
lawful, Realization of fine prevention defects, Implements job hazard analysis safety
precaution. Carrying the hot and cold permits in various areas as required. Attending the
weekly safety huddle and housekeeping. Establish and maintain a professional relationship
with company and sub- contractor’s HSE Dept.
I declared that all the above statements are true & correct to the best of my
Knowledge and belief all my required documents will be forwarded whenever required.
DATE ……………………
TIME SAJID MALLICK
Resume Sajid Mallick QA/QC Inspector Page 5
(Electrical & Instrumentation)