TQM Quiz
Total QualityManagement
1 An acceptance control chart has limits that are based
on the specification limits for the product rather than
limits which differentiate between random and
assignable causes. Under which if the following
circumstance should a QC manager consider using an
acceptance control chart?
A- When the engineering tolerance on a dimension greatly
exceeds the natural dispersion of the manufacturing process
B- When the number of samples outside the current control
chart limits become too costly and cumbersome to investigate
C- When a process is subject to constant but stable tool wear
D- A and B
E- A and C
2 The practice of ceasing mass inspections and ending
awards based on price is credited to:
A- Edward Deming
B- Philip Crosby
C- Juran
D- Pareto
3 Quality management deals with all of the following
topics except:
A- Conformance to requirements / specifications
B- Satisfying the needs of the customer
C- Making products more desirable and luxurious
D- A and C
E- B and C
4 The OC curve provides a measure of the ______________
of the control chart
A- Sensitivity
B- Duality
5 Lots for acceptance sampling should be
______________ and ______________.
A- Homogeneous, Large
B- Heterogeneous, Small
C- Homogeneous, Small
D- Heterogeneous, Large
6 The four phases of the Shewart cycle are:
A- Plan, Do, Scan, Implement
B- Plan , Act , Do, Control
C- Plan, Do, Check, Act,
D- Implement, Design, Control, Plan
7 Process capability indices, Cp and Cpk, are:
A- Productivity measures
B- Financial measures
C- Quality measures
D- Time measures
8 The taste of burgers across all McDonald outlets should be
same. This is an example of ______________.
A- Sensory critical to quality Characteristic
B- Physical critical to Quality Characteristic
C- Time Orientation critical to Quality Characteristic
D- None of the above
9 Most quality problems------------
A- originate in the quality department where the ultimate responsibility for quality
rests
B- originate on the shop floor because of waste and product rework
C- are the result of management's lack of attention to potential quality
improvement ideas
D- could be eliminated if shop supervisors monitored their workers more closely
E- A and B
10 Quality assurance
A- refers to the prevention of product defects
B- is an auditing function that provides feedback to the project team and
client about the quality of output being produced
C- is the technical process that includes the construction of control charts
which specify acceptability limits for conforming output
D- A and B
E- B and C
11 A ______________ chart can be used to identify the
most frequently occurring defect.
A- Pareto
B- Ishikawa
C- Histogram
D- Scatter
12 Process capability ratio is expressed as:
A- USL+LSL/6s
B- USL-LSL/6s
C- USL-LSL/3s
D- USL-LSL/s
13 100% inspection for defects may be neither possible
nor desirable, When is sampling for defects likely to
be most useful?
A- When destructive testing is required
B- When the cost of 100% inspection is high
C- When we believe there are not many defects
D- A, B, and C
E- A and B
14 A main role of the project Champion is to:
A- Be a cheerleader for the team
B- Remove roadblocks
C- Perform statistical analysis
D- Develop the control plan
15 A histogram ordered by frequency of occurrence that
shows how many results were generated by each
identified cause is:
A- Statistical Histogram
B- Juran Histogram
C- Fishbone Diagram
D- Pareto Diagram
16 The key process input variables (KPIV) and key process output variables
are developed during the ______________ phase.
A- Define
B- Analyze
C- Measure
D- Improve
17 In 9001:2015, what does clause 7.2 relate to?
A- Leadership and commitment
B- Competence
C- Documented information
D- Planning of changes
18 When planning the quality management system ISO 9001,
organizations shall consider the issues and requirements referred to in
4.1 and 4.2 and determine the risks and opportunities that need to be
addressed to;
A- give assurance that the quality management system can
achieve its intended result(s)
B- enhance desirable effects
C- achieve improvement
D- all of the above
*For more Q&A click here to
visit our question bank
*Or Click here to take a free complete
quiz with online certification
19 Given L=3 and p=.03, estimate the sample size that
can be used for construction of a p chart.
A- 534
B- 321
C- 123
D- 291 ((1-p)*L2/p gives us an estimate of sample size)
20 Which of the following document(s) is (are)
included in the quality system?
A- A quality policy
B- Customer focus
C- Commitment
D- All of the given options
IRGST.org
Find more Tests, Quiz, Exams
Area Q&A
Free Quiz with
certification
IQ Click here Click here
English Click here Click here
Computer Driving Click here Click here
Project Management Click here Click here
Communication Skills Click here Click here
TQM Click here Click here
Food Safety Click here Click here
HSE Click here Click here
Basic Science Click here Click here
Irgst.org

More Related Content

What's hot

Quality Introduction Quiz - Series 1 By Maya.
Quality Introduction Quiz - Series 1 By Maya.Quality Introduction Quiz - Series 1 By Maya.
Quality Introduction Quiz - Series 1 By Maya.
johnsqms
 
Six sigma quiz
Six sigma quiz Six sigma quiz
Six sigma quiz
Saiprasad Shelke
 
Total quality-management-question-
Total quality-management-question-Total quality-management-question-
Total quality-management-question-
Manjunatha Eikila
 
Quality Quiz for operators 2014 12.11.2014
Quality Quiz for operators 2014   12.11.2014Quality Quiz for operators 2014   12.11.2014
Quality Quiz for operators 2014 12.11.2014
Venkateswara Steels & Springs (India) Pvt Ltd - Coimbatore
 
TOTAL QUALITY MANAGEMENT MCQ
TOTAL QUALITY MANAGEMENT MCQTOTAL QUALITY MANAGEMENT MCQ
TOTAL QUALITY MANAGEMENT MCQ
Nagarajan Kaliappan
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
PRASHANT KSHIRSAGAR
 
NCQC 2018 Knowledge Test _ Sample Paper 3
NCQC 2018 Knowledge Test _ Sample Paper 3NCQC 2018 Knowledge Test _ Sample Paper 3
NCQC 2018 Knowledge Test _ Sample Paper 3
Ek Pahla Kadam
 
Dmaic overview for slideshare
Dmaic overview for slideshareDmaic overview for slideshare
Dmaic overview for slideshare
Lean Strategies International LLC
 
FRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action SystemFRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action System
Ricky Smith CMRP, CMRT
 
QC question answer
QC question answerQC question answer
QC question answer
Prabhat Pandey
 
Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance Presentation
Andy_Watson_Sim
 
NCQC - Knowledge Test 05
NCQC - Knowledge Test 05NCQC - Knowledge Test 05
NCQC - Knowledge Test 05
Ek Pahla Kadam
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
Baibhav Agrawal
 
Quality Awareness Session.pptx
Quality Awareness Session.pptxQuality Awareness Session.pptx
Quality Awareness Session.pptx
ssuser7e363f
 
8 d problem solving rev01
8 d problem solving   rev018 d problem solving   rev01
8 d problem solving rev01
Jitesh Gaurav
 
Quality awareness
Quality awarenessQuality awareness
Quality awareness
smcci
 
Six sigma & levels of sigma processes
Six sigma & levels of sigma processesSix sigma & levels of sigma processes
Six sigma & levels of sigma processesMohit Singla
 
7 QC TOOLS PRESENTATION PPT
 7 QC TOOLS PRESENTATION PPT 7 QC TOOLS PRESENTATION PPT
7 QC TOOLS PRESENTATION PPT
Inter Alliance Werardt
 

What's hot (20)

Quality Introduction Quiz - Series 1 By Maya.
Quality Introduction Quiz - Series 1 By Maya.Quality Introduction Quiz - Series 1 By Maya.
Quality Introduction Quiz - Series 1 By Maya.
 
Quality quiz copy
Quality quiz   copyQuality quiz   copy
Quality quiz copy
 
Six sigma quiz
Six sigma quiz Six sigma quiz
Six sigma quiz
 
Total quality-management-question-
Total quality-management-question-Total quality-management-question-
Total quality-management-question-
 
Quality Quiz for operators 2014 12.11.2014
Quality Quiz for operators 2014   12.11.2014Quality Quiz for operators 2014   12.11.2014
Quality Quiz for operators 2014 12.11.2014
 
TOTAL QUALITY MANAGEMENT MCQ
TOTAL QUALITY MANAGEMENT MCQTOTAL QUALITY MANAGEMENT MCQ
TOTAL QUALITY MANAGEMENT MCQ
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
 
NCQC 2018 Knowledge Test _ Sample Paper 3
NCQC 2018 Knowledge Test _ Sample Paper 3NCQC 2018 Knowledge Test _ Sample Paper 3
NCQC 2018 Knowledge Test _ Sample Paper 3
 
Dmaic overview for slideshare
Dmaic overview for slideshareDmaic overview for slideshare
Dmaic overview for slideshare
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
FRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action SystemFRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action System
 
QC question answer
QC question answerQC question answer
QC question answer
 
Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance Presentation
 
NCQC - Knowledge Test 05
NCQC - Knowledge Test 05NCQC - Knowledge Test 05
NCQC - Knowledge Test 05
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Quality Awareness Session.pptx
Quality Awareness Session.pptxQuality Awareness Session.pptx
Quality Awareness Session.pptx
 
8 d problem solving rev01
8 d problem solving   rev018 d problem solving   rev01
8 d problem solving rev01
 
Quality awareness
Quality awarenessQuality awareness
Quality awareness
 
Six sigma & levels of sigma processes
Six sigma & levels of sigma processesSix sigma & levels of sigma processes
Six sigma & levels of sigma processes
 
7 QC TOOLS PRESENTATION PPT
 7 QC TOOLS PRESENTATION PPT 7 QC TOOLS PRESENTATION PPT
7 QC TOOLS PRESENTATION PPT
 

Similar to TQM quiz from IRGST.org

Iscom 471 final exam
Iscom 471 final examIscom 471 final exam
Iscom 471 final exam
pakoku123
 
Iscom 471 final exam
Iscom 471 final examIscom 471 final exam
Iscom 471 final examnbghjuyt654
 
Iscom 471 final exam
Iscom 471 final examIscom 471 final exam
Iscom 471 final exambhggg777
 
Iscom 471 final exam
Iscom 471 final examIscom 471 final exam
Iscom 471 final examnhyt6666789
 
Iscom 471 final exam
Iscom 471 final examIscom 471 final exam
Iscom 471 final examalkhdkh970970
 
Question 1 of 205.0 PointsGiven the size of the product, an ai.docx
Question 1 of 205.0 PointsGiven the size of the product, an ai.docxQuestion 1 of 205.0 PointsGiven the size of the product, an ai.docx
Question 1 of 205.0 PointsGiven the size of the product, an ai.docx
IRESH3
 
Process management - managing quality, time by applyingthe theory of constrai...
Process management - managing quality, time by applyingthe theory of constrai...Process management - managing quality, time by applyingthe theory of constrai...
Process management - managing quality, time by applyingthe theory of constrai...
InfoPerc/Te web
 
324335997 131-mcqs
324335997 131-mcqs324335997 131-mcqs
324335997 131-mcqs
RakeshNimhan
 
Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.ppt
ssuser09851b1
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505densongco
 
08 pmp quality management exam
08 pmp quality management exam08 pmp quality management exam
08 pmp quality management exam
Jamil Faraj , PMP
 
Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%sharing3444
 
(New) mkt 571 mkt571 final exam entire answers with questions correct 100%
(New) mkt 571 mkt571 final exam entire answers with questions correct  100%(New) mkt 571 mkt571 final exam entire answers with questions correct  100%
(New) mkt 571 mkt571 final exam entire answers with questions correct 100%twiter343r
 
1..mkt 571 mkt571 final exam correct 100%
1..mkt 571 mkt571 final exam correct 100%1..mkt 571 mkt571 final exam correct 100%
1..mkt 571 mkt571 final exam correct 100%Euroday
 
Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%singup22
 
Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%flyperhan
 
Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%largest433
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%sharing3444
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%largest433
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%singup22
 

Similar to TQM quiz from IRGST.org (20)

Iscom 471 final exam
Iscom 471 final examIscom 471 final exam
Iscom 471 final exam
 
Iscom 471 final exam
Iscom 471 final examIscom 471 final exam
Iscom 471 final exam
 
Iscom 471 final exam
Iscom 471 final examIscom 471 final exam
Iscom 471 final exam
 
Iscom 471 final exam
Iscom 471 final examIscom 471 final exam
Iscom 471 final exam
 
Iscom 471 final exam
Iscom 471 final examIscom 471 final exam
Iscom 471 final exam
 
Question 1 of 205.0 PointsGiven the size of the product, an ai.docx
Question 1 of 205.0 PointsGiven the size of the product, an ai.docxQuestion 1 of 205.0 PointsGiven the size of the product, an ai.docx
Question 1 of 205.0 PointsGiven the size of the product, an ai.docx
 
Process management - managing quality, time by applyingthe theory of constrai...
Process management - managing quality, time by applyingthe theory of constrai...Process management - managing quality, time by applyingthe theory of constrai...
Process management - managing quality, time by applyingthe theory of constrai...
 
324335997 131-mcqs
324335997 131-mcqs324335997 131-mcqs
324335997 131-mcqs
 
Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.ppt
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505
 
08 pmp quality management exam
08 pmp quality management exam08 pmp quality management exam
08 pmp quality management exam
 
Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%
 
(New) mkt 571 mkt571 final exam entire answers with questions correct 100%
(New) mkt 571 mkt571 final exam entire answers with questions correct  100%(New) mkt 571 mkt571 final exam entire answers with questions correct  100%
(New) mkt 571 mkt571 final exam entire answers with questions correct 100%
 
1..mkt 571 mkt571 final exam correct 100%
1..mkt 571 mkt571 final exam correct 100%1..mkt 571 mkt571 final exam correct 100%
1..mkt 571 mkt571 final exam correct 100%
 
Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%
 
Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%
 
Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%Mkt 571 mkt571 final exam correct 100%
Mkt 571 mkt571 final exam correct 100%
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%
 

Recently uploaded

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 

Recently uploaded (20)

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 

TQM quiz from IRGST.org

  • 2. 1 An acceptance control chart has limits that are based on the specification limits for the product rather than limits which differentiate between random and assignable causes. Under which if the following circumstance should a QC manager consider using an acceptance control chart? A- When the engineering tolerance on a dimension greatly exceeds the natural dispersion of the manufacturing process B- When the number of samples outside the current control chart limits become too costly and cumbersome to investigate C- When a process is subject to constant but stable tool wear D- A and B E- A and C
  • 3. 2 The practice of ceasing mass inspections and ending awards based on price is credited to: A- Edward Deming B- Philip Crosby C- Juran D- Pareto 3 Quality management deals with all of the following topics except: A- Conformance to requirements / specifications B- Satisfying the needs of the customer C- Making products more desirable and luxurious D- A and C E- B and C
  • 4. 4 The OC curve provides a measure of the ______________ of the control chart A- Sensitivity B- Duality 5 Lots for acceptance sampling should be ______________ and ______________. A- Homogeneous, Large B- Heterogeneous, Small C- Homogeneous, Small D- Heterogeneous, Large
  • 5. 6 The four phases of the Shewart cycle are: A- Plan, Do, Scan, Implement B- Plan , Act , Do, Control C- Plan, Do, Check, Act, D- Implement, Design, Control, Plan 7 Process capability indices, Cp and Cpk, are: A- Productivity measures B- Financial measures C- Quality measures D- Time measures
  • 6. 8 The taste of burgers across all McDonald outlets should be same. This is an example of ______________. A- Sensory critical to quality Characteristic B- Physical critical to Quality Characteristic C- Time Orientation critical to Quality Characteristic D- None of the above 9 Most quality problems------------ A- originate in the quality department where the ultimate responsibility for quality rests B- originate on the shop floor because of waste and product rework C- are the result of management's lack of attention to potential quality improvement ideas D- could be eliminated if shop supervisors monitored their workers more closely E- A and B
  • 7. 10 Quality assurance A- refers to the prevention of product defects B- is an auditing function that provides feedback to the project team and client about the quality of output being produced C- is the technical process that includes the construction of control charts which specify acceptability limits for conforming output D- A and B E- B and C 11 A ______________ chart can be used to identify the most frequently occurring defect. A- Pareto B- Ishikawa C- Histogram D- Scatter
  • 8. 12 Process capability ratio is expressed as: A- USL+LSL/6s B- USL-LSL/6s C- USL-LSL/3s D- USL-LSL/s 13 100% inspection for defects may be neither possible nor desirable, When is sampling for defects likely to be most useful? A- When destructive testing is required B- When the cost of 100% inspection is high C- When we believe there are not many defects D- A, B, and C E- A and B
  • 9. 14 A main role of the project Champion is to: A- Be a cheerleader for the team B- Remove roadblocks C- Perform statistical analysis D- Develop the control plan 15 A histogram ordered by frequency of occurrence that shows how many results were generated by each identified cause is: A- Statistical Histogram B- Juran Histogram C- Fishbone Diagram D- Pareto Diagram
  • 10. 16 The key process input variables (KPIV) and key process output variables are developed during the ______________ phase. A- Define B- Analyze C- Measure D- Improve 17 In 9001:2015, what does clause 7.2 relate to? A- Leadership and commitment B- Competence C- Documented information D- Planning of changes
  • 11. 18 When planning the quality management system ISO 9001, organizations shall consider the issues and requirements referred to in 4.1 and 4.2 and determine the risks and opportunities that need to be addressed to; A- give assurance that the quality management system can achieve its intended result(s) B- enhance desirable effects C- achieve improvement D- all of the above *For more Q&A click here to visit our question bank *Or Click here to take a free complete quiz with online certification 19 Given L=3 and p=.03, estimate the sample size that can be used for construction of a p chart. A- 534 B- 321 C- 123 D- 291 ((1-p)*L2/p gives us an estimate of sample size)
  • 12. 20 Which of the following document(s) is (are) included in the quality system? A- A quality policy B- Customer focus C- Commitment D- All of the given options IRGST.org
  • 13. Find more Tests, Quiz, Exams Area Q&A Free Quiz with certification IQ Click here Click here English Click here Click here Computer Driving Click here Click here Project Management Click here Click here Communication Skills Click here Click here TQM Click here Click here Food Safety Click here Click here HSE Click here Click here Basic Science Click here Click here Irgst.org