8 Discipline Problem Solving
Corporate Quality - 8D problem
solving
8 Discipline Problem Solving
Key Concept :
Resolve problems permanently so that they
never recur. This will allow you to work on
more “futuristic projects” such as process
/product improvement and other “forward
thinking” initiatives.
Corporate Quality - 8D problem
solving
Why Follow an 8-D Approach
• Problems need to be resolved “for good”.
• Problems usually re-surface with “Band Aid”
solutions.
• When problems are effectively resolved,
company can channel resources to more
strategic efforts such as innovation and other
“forward thinking” initiatives.
Corporate Quality - 8D problem
solving
Three Key Points of 8-D Problem Solving
• Determination of Root Cause
• Implementation of Permanent Corrective
Actions
• Systemic Actions to correct(improve) the
system as a whole. These actions could
involve the performance of FMEAs, Training,
Changing Standard Operating
Procedures……….
Corporate Quality - 8D problem
solving
Steps of 8-D Problem Solving Process
• D-0: The planning stage.
• D-1: Establishing the team.
• D-2: Describing the problem.
• D-3: Developing an Interim Containment
Action(ICA)
• D-4: Defining Root Cause and Identifying the Escape
Points ( 5 Why’s)
• D-5: Permanent Corrective Actions(PCA) for Root
Causes and Escape Point.
• D-6: Implementing the PCA
• D-7: Preventing Recurrence(Addressing the System)
• D-8: Recognizing the Efforts of the Team.
Corporate Quality - 8D problem
solving
D-0 : The Planning Stage
An 8-D is needed if:
Something has changed ( past performance exceeds
present performance) and there is a deviation from an
expected performance level.
Questions to Ask:
1. What has changed or what is the symptom?
2. Can the symptom be clearly described and
quantified?
3. Is any Emergency Response Action (ERA) required
to safeguard the customer?
Corporate Quality - 8D problem
solving
D-1 : Establish the Team
The team must have the required knowledge about the
process or system to be able to understand the problem
and have the potential to solve it in an allocated time
period.
Team Roles:
1. Champion (who owns the problem)
2. Leader
3. Members
4. Writer
5. Recorder
6.Time Manager/ Facilitator
Corporate Quality - 8D problem
solving
Obstacles that may arise
Obstacles that may be experienced by team:
1. Too many leaders
2. Roles not correctly defined
3. Time constraints
4. Lack of adequate communication
5. Lack of management support
6.Poorly defined objective
7.Lack of leadreship
Corporate Quality - 8D problem
solving
Team Objectives
• What needs to be accomplished( the end goal )
• How to get to the end goal
Corporate Quality - 8D problem
solving
D-2 : Description of the Problem
Step 1: What is Wrong with What ?
Step2: Develop a problem description
a. What is the problem ?
b. When did it happen ?
c. Where did it happen ?
d. How large is the problem ?
Step 3: Identify areas where more information is
needed
Step 4: Establish a set of boundaries around the
problem by asking the questions “What is” and
“What is not”
Corporate Quality - 8D problem
solving
D-3 : Develop an Interim Containment Action
Purpose of D-3:
To define, verify and implement an interim containment
action in order to isolate the effects of the problem from
affecting the customer (internal or external). The ICA
will remain in effect until a permanent corrective
actions has been implemented. D-3 must also validate
the effectiveness of the containment action.
Corporate Quality - 8D problem
solving
D-3 : Develop an Interim Containment Action
Rationale for D-3:
• To buy time until a permanent corrective action is
implemented.
• Protect the customer from the effect of the problem.
• Contain the problem from a cost, quality and
reputation perspective .
Corporate Quality - 8D problem
solving
D-4 : Define and Verify Root Cause
Purpose of D-4:
1. To isolate and verify root cause
2. To isolate and verify the location in the process
where the effect of the root cause could have been
detected but was not.
Corporate Quality - 8D problem
solving
D-5 : Choose and Verify PCA for Root cause
and Escape Point
Purpose of D-5 :
a. To select best PCA to remove root cause
b. to select the best PCA to address the escape point
c. Verify that both actions will be successful when
implemented
d. Verify that no other problems are created as a result
of the PCA selected
e. A time line for the PCA is defined.
Corporate Quality - 8D problem
solving
D-6 : Implement and Validate Permanent
Corrective Actions
Purpose of D-6 :
a. Plan and implement the PCA selected
b. Validate the PCA i.e. make sure it works
c. Remove the ICA(interim containment actions)
d. Monitor long term results
Note: You must have a method to validate the PCA
that has been implemented.
Corporate Quality - 8D problem
solving
D-7 : Prevent Recurrence
Purpose of D -7 :
a. Modify the existing systems (policies,
practices and procedures) in place so as to
prevent a recurrence of such a problem or
similar problems.
b. Make recommendations for systemic
improvements, if necessary.
Corporate Quality - 8D problem
solving
D- 8 : Recognition
Purpose of D - 8 :
To recognize and celebrate the success of the
team in resolving the problem by implementing
permanent corrective actions ( preventive in
nature) .
Corporate Quality - 8D problem
solving
Conclusions
• The 8 - D procedure involves a structured
thought process and emphasizes the
importance of a well documented report.
• 8- D Problem Solving encourages team work
in resolving problems.
• 8-D document is generated as the direct
consequence of a problem and therefore, it is
essential that the 8-D process be completed in
a structured and well thought out manner and
be meticulously documented .
• It has high internal and external visibility and
impact.
Corporate Quality - 8D problem
solving
Questions?

More Related Content

What's hot

Root Cause And Corrective Action Workshop Cinci Asq 2009
Root Cause And Corrective Action Workshop  Cinci Asq 2009Root Cause And Corrective Action Workshop  Cinci Asq 2009
Root Cause And Corrective Action Workshop Cinci Asq 2009
roycohen
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training Module
Frank-G. Adler
 
8D : Problem Solving Methodology
8D : Problem Solving Methodology8D : Problem Solving Methodology
8D : Problem Solving Methodology
Gestion Projet Automobile
 
8 Disciplines (8D) Training
8 Disciplines (8D) Training8 Disciplines (8D) Training
8 Disciplines (8D) Training
J. García - Verdugo
 
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root CauseRoot Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
Craig Thornton
 
8D Problem Solving
8D Problem Solving8D Problem Solving
8D Problem Solving
Ajay Garg
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
gatelyw396
 
Presentation On G8D
Presentation On G8DPresentation On G8D
Presentation On G8D
RRChandran
 
7 QC Tools Training
7 QC Tools Training7 QC Tools Training
7 QC Tools Training
PRASHANT KSHIRSAGAR
 
Basic 8D Problem Solving Tools & Methods - Part 1
Basic 8D Problem Solving Tools & Methods - Part 1Basic 8D Problem Solving Tools & Methods - Part 1
Basic 8D Problem Solving Tools & Methods - Part 1
Tony Alvarez
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach
J. García - Verdugo
 
Quality Circle Presentation Template
Quality Circle Presentation TemplateQuality Circle Presentation Template
Quality Circle Presentation Template
Ek Pahla Kadam
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
Operational Excellence Consulting
 
Dmaic overview for slideshare
Dmaic overview for slideshareDmaic overview for slideshare
Dmaic overview for slideshare
Lean Strategies International LLC
 
#8 Root Cause Analysis
#8 Root Cause Analysis#8 Root Cause Analysis
#8 Root Cause Analysis
suman_purumandla
 
FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)
Ankit Gupta
 
5-Why Training
5-Why Training5-Why Training
5-Why Training
Ranita Kaur
 
Dmaic
DmaicDmaic
Dmaic
jagan339
 

What's hot (20)

Root Cause And Corrective Action Workshop Cinci Asq 2009
Root Cause And Corrective Action Workshop  Cinci Asq 2009Root Cause And Corrective Action Workshop  Cinci Asq 2009
Root Cause And Corrective Action Workshop Cinci Asq 2009
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training Module
 
8D : Problem Solving Methodology
8D : Problem Solving Methodology8D : Problem Solving Methodology
8D : Problem Solving Methodology
 
8 Disciplines (8D) Training
8 Disciplines (8D) Training8 Disciplines (8D) Training
8 Disciplines (8D) Training
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root CauseRoot Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
 
8D Problem Solving
8D Problem Solving8D Problem Solving
8D Problem Solving
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
Presentation On G8D
Presentation On G8DPresentation On G8D
Presentation On G8D
 
7 QC Tools Training
7 QC Tools Training7 QC Tools Training
7 QC Tools Training
 
Basic 8D Problem Solving Tools & Methods - Part 1
Basic 8D Problem Solving Tools & Methods - Part 1Basic 8D Problem Solving Tools & Methods - Part 1
Basic 8D Problem Solving Tools & Methods - Part 1
 
8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach8 Disciplines (8D) Problem Solving Approach
8 Disciplines (8D) Problem Solving Approach
 
Root Cause Analysis Presentation
Root Cause Analysis PresentationRoot Cause Analysis Presentation
Root Cause Analysis Presentation
 
Quality Circle Presentation Template
Quality Circle Presentation TemplateQuality Circle Presentation Template
Quality Circle Presentation Template
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
 
Dmaic overview for slideshare
Dmaic overview for slideshareDmaic overview for slideshare
Dmaic overview for slideshare
 
#8 Root Cause Analysis
#8 Root Cause Analysis#8 Root Cause Analysis
#8 Root Cause Analysis
 
FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)
 
5-Why Training
5-Why Training5-Why Training
5-Why Training
 
Dmaic
DmaicDmaic
Dmaic
 

Similar to 8 d problem solving rev01

SSCG 8D Problem Solving
SSCG 8D Problem SolvingSSCG 8D Problem Solving
SSCG 8D Problem Solving
SSCG Consulting
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniques
Ahsan Saleem
 
Yellow belt process improvement training and certification module
Yellow belt process improvement training and certification moduleYellow belt process improvement training and certification module
Yellow belt process improvement training and certification module
Vishy Chandra
 
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
VDiversify
 
Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507
larrypenni
 
8D Problem Solving Concepts with Lean Six Sigma.pptx
8D Problem Solving Concepts with Lean Six Sigma.pptx8D Problem Solving Concepts with Lean Six Sigma.pptx
8D Problem Solving Concepts with Lean Six Sigma.pptx
MindCypress .
 
Deming’s PDCA and Constant Learning
Deming’s PDCA and Constant LearningDeming’s PDCA and Constant Learning
Deming’s PDCA and Constant Learning
Jeanie Arnoco
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptx
RoopaDNDandally
 
6.1 Continuous Performance Improvement
6.1 Continuous Performance Improvement6.1 Continuous Performance Improvement
6.1 Continuous Performance Improvement
passuby
 
8D Problem Solving Approach
8D Problem Solving Approach8D Problem Solving Approach
8D Problem Solving Approach
Timothy Wooi
 
8d_en.pdf
8d_en.pdf8d_en.pdf
8d_en.pdf
DeepakMore54
 
Understand dmaic
Understand dmaicUnderstand dmaic
Understand dmaic
Ajit Kumar
 
QM-021-PDCA
QM-021-PDCAQM-021-PDCA
QM-021-PDCAhandbook
 
Lean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptxLean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptx
DebashishDolon
 
6 sigma basic best ppt
6 sigma basic best ppt6 sigma basic best ppt
6 sigma basic best ppt
Jayesh Sarode
 
Qm0011 principles & philosophies of quality management
Qm0011   principles & philosophies of quality managementQm0011   principles & philosophies of quality management
Qm0011 principles & philosophies of quality managementsmumbahelp
 
5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdf5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdf
JenniferElizarraras1
 
Quality Engineering material
Quality Engineering materialQuality Engineering material
Quality Engineering material
TeluguSudhakar3
 
Chapter 8 group assignment
Chapter 8 group assignmentChapter 8 group assignment
Chapter 8 group assignmentjandrewsxu
 

Similar to 8 d problem solving rev01 (20)

SSCG 8D Problem Solving
SSCG 8D Problem SolvingSSCG 8D Problem Solving
SSCG 8D Problem Solving
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniques
 
Yellow belt process improvement training and certification module
Yellow belt process improvement training and certification moduleYellow belt process improvement training and certification module
Yellow belt process improvement training and certification module
 
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
 
Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507
 
8D Problem Solving Concepts with Lean Six Sigma.pptx
8D Problem Solving Concepts with Lean Six Sigma.pptx8D Problem Solving Concepts with Lean Six Sigma.pptx
8D Problem Solving Concepts with Lean Six Sigma.pptx
 
Deming’s PDCA and Constant Learning
Deming’s PDCA and Constant LearningDeming’s PDCA and Constant Learning
Deming’s PDCA and Constant Learning
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptx
 
6.1 Continuous Performance Improvement
6.1 Continuous Performance Improvement6.1 Continuous Performance Improvement
6.1 Continuous Performance Improvement
 
8D Problem Solving Approach
8D Problem Solving Approach8D Problem Solving Approach
8D Problem Solving Approach
 
8d_en.pdf
8d_en.pdf8d_en.pdf
8d_en.pdf
 
Understand dmaic
Understand dmaicUnderstand dmaic
Understand dmaic
 
PDCA
PDCAPDCA
PDCA
 
QM-021-PDCA
QM-021-PDCAQM-021-PDCA
QM-021-PDCA
 
Lean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptxLean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptx
 
6 sigma basic best ppt
6 sigma basic best ppt6 sigma basic best ppt
6 sigma basic best ppt
 
Qm0011 principles & philosophies of quality management
Qm0011   principles & philosophies of quality managementQm0011   principles & philosophies of quality management
Qm0011 principles & philosophies of quality management
 
5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdf5_Why_Root_Cause_Corrective_Actions.pdf
5_Why_Root_Cause_Corrective_Actions.pdf
 
Quality Engineering material
Quality Engineering materialQuality Engineering material
Quality Engineering material
 
Chapter 8 group assignment
Chapter 8 group assignmentChapter 8 group assignment
Chapter 8 group assignment
 

More from Jitesh Gaurav

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
Jitesh Gaurav
 
Weld material
Weld materialWeld material
Weld material
Jitesh Gaurav
 
Six sigma
Six sigmaSix sigma
Six sigma
Jitesh Gaurav
 
Spi link
Spi linkSpi link
Spi link
Jitesh Gaurav
 
6 Sigma - Chapter3
6 Sigma - Chapter36 Sigma - Chapter3
6 Sigma - Chapter3
Jitesh Gaurav
 
6 Sigma - Chapter2
6 Sigma - Chapter26 Sigma - Chapter2
6 Sigma - Chapter2
Jitesh Gaurav
 
6 Sigma - Chapter1
6 Sigma - Chapter16 Sigma - Chapter1
6 Sigma - Chapter1
Jitesh Gaurav
 
6 Sigma - Chapter8
6 Sigma - Chapter86 Sigma - Chapter8
6 Sigma - Chapter8
Jitesh Gaurav
 
6 Sigma - Chapter7
6 Sigma - Chapter76 Sigma - Chapter7
6 Sigma - Chapter7
Jitesh Gaurav
 
6 Sigma - Chapter6
6 Sigma - Chapter66 Sigma - Chapter6
6 Sigma - Chapter6
Jitesh Gaurav
 
6 Sigma - Chapter5
6 Sigma - Chapter56 Sigma - Chapter5
6 Sigma - Chapter5
Jitesh Gaurav
 
6 Sigma - Chapter4
6 Sigma - Chapter46 Sigma - Chapter4
6 Sigma - Chapter4
Jitesh Gaurav
 
Pattern production
Pattern productionPattern production
Pattern production
Jitesh Gaurav
 
Methods of kaizen
Methods of kaizenMethods of kaizen
Methods of kaizen
Jitesh Gaurav
 
Dfmea rating
Dfmea ratingDfmea rating
Dfmea rating
Jitesh Gaurav
 
Qip
QipQip
Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]
Jitesh Gaurav
 

More from Jitesh Gaurav (20)

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 
Weld material
Weld materialWeld material
Weld material
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Spi link
Spi linkSpi link
Spi link
 
6 Sigma - Chapter3
6 Sigma - Chapter36 Sigma - Chapter3
6 Sigma - Chapter3
 
6 Sigma - Chapter2
6 Sigma - Chapter26 Sigma - Chapter2
6 Sigma - Chapter2
 
6 Sigma - Chapter1
6 Sigma - Chapter16 Sigma - Chapter1
6 Sigma - Chapter1
 
6 Sigma - Chapter8
6 Sigma - Chapter86 Sigma - Chapter8
6 Sigma - Chapter8
 
6 Sigma - Chapter7
6 Sigma - Chapter76 Sigma - Chapter7
6 Sigma - Chapter7
 
6 Sigma - Chapter6
6 Sigma - Chapter66 Sigma - Chapter6
6 Sigma - Chapter6
 
6 Sigma - Chapter5
6 Sigma - Chapter56 Sigma - Chapter5
6 Sigma - Chapter5
 
6 Sigma - Chapter4
6 Sigma - Chapter46 Sigma - Chapter4
6 Sigma - Chapter4
 
Pattern production
Pattern productionPattern production
Pattern production
 
smed
smedsmed
smed
 
Methods of kaizen
Methods of kaizenMethods of kaizen
Methods of kaizen
 
Dfmea rating
Dfmea ratingDfmea rating
Dfmea rating
 
Qip
QipQip
Qip
 
Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]
 
Tqm
TqmTqm
Tqm
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 

Recently uploaded

Maximizing Your Streaming Experience with XCIPTV- Tips for 2024.pdf
Maximizing Your Streaming Experience with XCIPTV- Tips for 2024.pdfMaximizing Your Streaming Experience with XCIPTV- Tips for 2024.pdf
Maximizing Your Streaming Experience with XCIPTV- Tips for 2024.pdf
Xtreame HDTV
 
This Is The First All Category Quiz That I Made
This Is The First All Category Quiz That I MadeThis Is The First All Category Quiz That I Made
This Is The First All Category Quiz That I Made
Aarush Ghate
 
Reimagining Classics - What Makes a Remake a Success
Reimagining Classics - What Makes a Remake a SuccessReimagining Classics - What Makes a Remake a Success
Reimagining Classics - What Makes a Remake a Success
Mark Murphy Director
 
Meet Crazyjamjam - A TikTok Sensation | Blog Eternal
Meet Crazyjamjam - A TikTok Sensation | Blog EternalMeet Crazyjamjam - A TikTok Sensation | Blog Eternal
Meet Crazyjamjam - A TikTok Sensation | Blog Eternal
Blog Eternal
 
Skeem Saam in June 2024 available on Forum
Skeem Saam in June 2024 available on ForumSkeem Saam in June 2024 available on Forum
Skeem Saam in June 2024 available on Forum
Isaac More
 
Are the X-Men Marvel or DC An In-Depth Exploration.pdf
Are the X-Men Marvel or DC An In-Depth Exploration.pdfAre the X-Men Marvel or DC An In-Depth Exploration.pdf
Are the X-Men Marvel or DC An In-Depth Exploration.pdf
Xtreame HDTV
 
Panchayat Season 3 - Official Trailer.pdf
Panchayat Season 3 - Official Trailer.pdfPanchayat Season 3 - Official Trailer.pdf
Panchayat Season 3 - Official Trailer.pdf
Suleman Rana
 
A TO Z INDIA Monthly Magazine - JUNE 2024
A TO Z INDIA Monthly Magazine - JUNE 2024A TO Z INDIA Monthly Magazine - JUNE 2024
A TO Z INDIA Monthly Magazine - JUNE 2024
Indira Srivatsa
 
Tom Selleck Net Worth: A Comprehensive Analysis
Tom Selleck Net Worth: A Comprehensive AnalysisTom Selleck Net Worth: A Comprehensive Analysis
Tom Selleck Net Worth: A Comprehensive Analysis
greendigital
 
Scandal! Teasers June 2024 on etv Forum.co.za
Scandal! Teasers June 2024 on etv Forum.co.zaScandal! Teasers June 2024 on etv Forum.co.za
Scandal! Teasers June 2024 on etv Forum.co.za
Isaac More
 
The Evolution of Animation in Film - Mark Murphy Director
The Evolution of Animation in Film - Mark Murphy DirectorThe Evolution of Animation in Film - Mark Murphy Director
The Evolution of Animation in Film - Mark Murphy Director
Mark Murphy Director
 
From Slave to Scourge: The Existential Choice of Django Unchained. The Philos...
From Slave to Scourge: The Existential Choice of Django Unchained. The Philos...From Slave to Scourge: The Existential Choice of Django Unchained. The Philos...
From Slave to Scourge: The Existential Choice of Django Unchained. The Philos...
Rodney Thomas Jr
 
Christina's Baby Shower Game June 2024.pptx
Christina's Baby Shower Game June 2024.pptxChristina's Baby Shower Game June 2024.pptx
Christina's Baby Shower Game June 2024.pptx
madeline604788
 
Hollywood Actress - The 250 hottest gallery
Hollywood Actress - The 250 hottest galleryHollywood Actress - The 250 hottest gallery
Hollywood Actress - The 250 hottest gallery
Zsolt Nemeth
 

Recently uploaded (14)

Maximizing Your Streaming Experience with XCIPTV- Tips for 2024.pdf
Maximizing Your Streaming Experience with XCIPTV- Tips for 2024.pdfMaximizing Your Streaming Experience with XCIPTV- Tips for 2024.pdf
Maximizing Your Streaming Experience with XCIPTV- Tips for 2024.pdf
 
This Is The First All Category Quiz That I Made
This Is The First All Category Quiz That I MadeThis Is The First All Category Quiz That I Made
This Is The First All Category Quiz That I Made
 
Reimagining Classics - What Makes a Remake a Success
Reimagining Classics - What Makes a Remake a SuccessReimagining Classics - What Makes a Remake a Success
Reimagining Classics - What Makes a Remake a Success
 
Meet Crazyjamjam - A TikTok Sensation | Blog Eternal
Meet Crazyjamjam - A TikTok Sensation | Blog EternalMeet Crazyjamjam - A TikTok Sensation | Blog Eternal
Meet Crazyjamjam - A TikTok Sensation | Blog Eternal
 
Skeem Saam in June 2024 available on Forum
Skeem Saam in June 2024 available on ForumSkeem Saam in June 2024 available on Forum
Skeem Saam in June 2024 available on Forum
 
Are the X-Men Marvel or DC An In-Depth Exploration.pdf
Are the X-Men Marvel or DC An In-Depth Exploration.pdfAre the X-Men Marvel or DC An In-Depth Exploration.pdf
Are the X-Men Marvel or DC An In-Depth Exploration.pdf
 
Panchayat Season 3 - Official Trailer.pdf
Panchayat Season 3 - Official Trailer.pdfPanchayat Season 3 - Official Trailer.pdf
Panchayat Season 3 - Official Trailer.pdf
 
A TO Z INDIA Monthly Magazine - JUNE 2024
A TO Z INDIA Monthly Magazine - JUNE 2024A TO Z INDIA Monthly Magazine - JUNE 2024
A TO Z INDIA Monthly Magazine - JUNE 2024
 
Tom Selleck Net Worth: A Comprehensive Analysis
Tom Selleck Net Worth: A Comprehensive AnalysisTom Selleck Net Worth: A Comprehensive Analysis
Tom Selleck Net Worth: A Comprehensive Analysis
 
Scandal! Teasers June 2024 on etv Forum.co.za
Scandal! Teasers June 2024 on etv Forum.co.zaScandal! Teasers June 2024 on etv Forum.co.za
Scandal! Teasers June 2024 on etv Forum.co.za
 
The Evolution of Animation in Film - Mark Murphy Director
The Evolution of Animation in Film - Mark Murphy DirectorThe Evolution of Animation in Film - Mark Murphy Director
The Evolution of Animation in Film - Mark Murphy Director
 
From Slave to Scourge: The Existential Choice of Django Unchained. The Philos...
From Slave to Scourge: The Existential Choice of Django Unchained. The Philos...From Slave to Scourge: The Existential Choice of Django Unchained. The Philos...
From Slave to Scourge: The Existential Choice of Django Unchained. The Philos...
 
Christina's Baby Shower Game June 2024.pptx
Christina's Baby Shower Game June 2024.pptxChristina's Baby Shower Game June 2024.pptx
Christina's Baby Shower Game June 2024.pptx
 
Hollywood Actress - The 250 hottest gallery
Hollywood Actress - The 250 hottest galleryHollywood Actress - The 250 hottest gallery
Hollywood Actress - The 250 hottest gallery
 

8 d problem solving rev01

  • 1. Corporate Quality - 8D problem solving TRAINING MODULE CORPORATE QUALITY SANDEN VIKAS INDIA LTD, FBD. 8 D PROBLEM SOLVING
  • 2. Corporate Quality - 8D problem solving 8 Discipline Problem Solving
  • 3. Corporate Quality - 8D problem solving 8 Discipline Problem Solving Key Concept : Resolve problems permanently so that they never recur. This will allow you to work on more “futuristic projects” such as process /product improvement and other “forward thinking” initiatives.
  • 4. Corporate Quality - 8D problem solving Why Follow an 8-D Approach • Problems need to be resolved “for good”. • Problems usually re-surface with “Band Aid” solutions. • When problems are effectively resolved, company can channel resources to more strategic efforts such as innovation and other “forward thinking” initiatives.
  • 5. Corporate Quality - 8D problem solving Three Key Points of 8-D Problem Solving • Determination of Root Cause • Implementation of Permanent Corrective Actions • Systemic Actions to correct(improve) the system as a whole. These actions could involve the performance of FMEAs, Training, Changing Standard Operating Procedures……….
  • 6. Corporate Quality - 8D problem solving Steps of 8-D Problem Solving Process • D-0: The planning stage. • D-1: Establishing the team. • D-2: Describing the problem. • D-3: Developing an Interim Containment Action(ICA) • D-4: Defining Root Cause and Identifying the Escape Points ( 5 Why’s) • D-5: Permanent Corrective Actions(PCA) for Root Causes and Escape Point. • D-6: Implementing the PCA • D-7: Preventing Recurrence(Addressing the System) • D-8: Recognizing the Efforts of the Team.
  • 7. Corporate Quality - 8D problem solving D-0 : The Planning Stage An 8-D is needed if: Something has changed ( past performance exceeds present performance) and there is a deviation from an expected performance level. Questions to Ask: 1. What has changed or what is the symptom? 2. Can the symptom be clearly described and quantified? 3. Is any Emergency Response Action (ERA) required to safeguard the customer?
  • 8. Corporate Quality - 8D problem solving D-1 : Establish the Team The team must have the required knowledge about the process or system to be able to understand the problem and have the potential to solve it in an allocated time period. Team Roles: 1. Champion (who owns the problem) 2. Leader 3. Members 4. Writer 5. Recorder 6.Time Manager/ Facilitator
  • 9. Corporate Quality - 8D problem solving Obstacles that may arise Obstacles that may be experienced by team: 1. Too many leaders 2. Roles not correctly defined 3. Time constraints 4. Lack of adequate communication 5. Lack of management support 6.Poorly defined objective 7.Lack of leadreship
  • 10. Corporate Quality - 8D problem solving Team Objectives • What needs to be accomplished( the end goal ) • How to get to the end goal
  • 11. Corporate Quality - 8D problem solving D-2 : Description of the Problem Step 1: What is Wrong with What ? Step2: Develop a problem description a. What is the problem ? b. When did it happen ? c. Where did it happen ? d. How large is the problem ? Step 3: Identify areas where more information is needed Step 4: Establish a set of boundaries around the problem by asking the questions “What is” and “What is not”
  • 12. Corporate Quality - 8D problem solving D-3 : Develop an Interim Containment Action Purpose of D-3: To define, verify and implement an interim containment action in order to isolate the effects of the problem from affecting the customer (internal or external). The ICA will remain in effect until a permanent corrective actions has been implemented. D-3 must also validate the effectiveness of the containment action.
  • 13. Corporate Quality - 8D problem solving D-3 : Develop an Interim Containment Action Rationale for D-3: • To buy time until a permanent corrective action is implemented. • Protect the customer from the effect of the problem. • Contain the problem from a cost, quality and reputation perspective .
  • 14. Corporate Quality - 8D problem solving D-4 : Define and Verify Root Cause Purpose of D-4: 1. To isolate and verify root cause 2. To isolate and verify the location in the process where the effect of the root cause could have been detected but was not.
  • 15. Corporate Quality - 8D problem solving D-5 : Choose and Verify PCA for Root cause and Escape Point Purpose of D-5 : a. To select best PCA to remove root cause b. to select the best PCA to address the escape point c. Verify that both actions will be successful when implemented d. Verify that no other problems are created as a result of the PCA selected e. A time line for the PCA is defined.
  • 16. Corporate Quality - 8D problem solving D-6 : Implement and Validate Permanent Corrective Actions Purpose of D-6 : a. Plan and implement the PCA selected b. Validate the PCA i.e. make sure it works c. Remove the ICA(interim containment actions) d. Monitor long term results Note: You must have a method to validate the PCA that has been implemented.
  • 17. Corporate Quality - 8D problem solving D-7 : Prevent Recurrence Purpose of D -7 : a. Modify the existing systems (policies, practices and procedures) in place so as to prevent a recurrence of such a problem or similar problems. b. Make recommendations for systemic improvements, if necessary.
  • 18. Corporate Quality - 8D problem solving D- 8 : Recognition Purpose of D - 8 : To recognize and celebrate the success of the team in resolving the problem by implementing permanent corrective actions ( preventive in nature) .
  • 19. Corporate Quality - 8D problem solving Conclusions • The 8 - D procedure involves a structured thought process and emphasizes the importance of a well documented report. • 8- D Problem Solving encourages team work in resolving problems. • 8-D document is generated as the direct consequence of a problem and therefore, it is essential that the 8-D process be completed in a structured and well thought out manner and be meticulously documented . • It has high internal and external visibility and impact.
  • 20. Corporate Quality - 8D problem solving Questions?