SlideShare a Scribd company logo
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 864
To Study Effective Implementation of ERP System and Its Applicability
to Multi-storeyed Residential Building
Mr. Ajinkya Balkrushana Nigade1 Prof. J. A. Dhivare2 Dr. Navnath V. Khadake3
PG Student, M.E. CM, Dept of Civil Engineering, JSPM’s Imperial College Of Engineering & Research Wagholi,
Pune.1
Assistant Professor, M.E. CM, Dept of Civil Engineering , JSPM’s Imperial College Of Engineering & Research
Wagholi, Pune2 , 3
-------------------------------------------------------------------***-----------------------------------------------------------------------
Abstract— Speaking of global trade, India has finally
found a step forward. Therefore, large and medium-sized
domestic businesses adopt standards and processes that
meet international norms. Given the needs of the Indian
market, it has become a major reason why IT solutions
vendors are happy. Statistically, IT spending for Indian
companies has increased dramatically in recent years. ERP
was one of the first IT ideas to enter the Indian market, but
it had mixed results. ERP is a company-run software
management system that integrates all aspects of an
organization, including planning, production, marketing,
and marketing. The business environment has grown
increasingly difficult, and the market has shifted from
domestic to global. Managers are constantly under pressure
to improve competition by reducing operational costs and
improving resources. Organizations should therefore be
more accountable to customers and competitors. And ERP,
as a business solution, seeks to assist managers in
establishing better business processes and providing them
with the information they need to make timely decisions
Keyword: ERP System , management Software , Rework ,
PO , Material Quantity
1. INTRODUCTION
ERP is a computer-based program that seeks to
integrate all departmental programs into a single
integrated software system that uses a single website,
allowing different departments to easily share information
and communicate. ERP software is a business solution that
provides powerful analytics based on data from a variety
of building processes, including accounting / financial
management, contract management, machinery /
innovation management, human finance management,
project management, vendor management, bid
management, Customer Relationship Management (CRM) ,
planning, shipping, asset management, and more. ERP
programs can help a construction company in a variety of
ways. Because ERP systems effectively connect all aspects
of the business, more accurate control is possible. ERP
systems can eliminate data sales, control data generated
by multiple departments, and reduce data registration
errors. ERP systems are software compilation of integrated
application modules with integrated structures used by
businesses to integrate data and process real-time
information throughout their supply chain. The benefits of
installing an ERP system have made it an integral part of
today's organization. The construction business has
problems that are different from those faced by the
industry and the utility industry. This requires efficient
resource allocation, project planning, staff tracking, and,
most importantly, information exchange. Organizations in
developing countries are often reluctant to use ERP
systems because of their specific needs and limited
availability of software for the construction industry.
1.1. What Is ERP?
ERP is a computer-based program that seeks to integrate
all departmental programs into a single integrated
software system that uses a single website, allowing
different departments to easily share information and
communicate. ERP software is a business solution that
provides powerful analytics based on data from a variety
of building processes, including accounting / financial
management, contract management, machinery /
innovation management, human finance management,
project management, vendor management, bid
management, Customer Relationship Management (CRM) ,
planning, shipping, asset management, and more. ERP
programs can help a construction company in a variety of
ways. Because ERP systems effectively connect all aspects
of the business, more accurate control is possible. ERP
systems can eliminate data sales, control data generated
by multiple departments, and reduce data registration
errors. ERP systems are software compilation of integrated
application modules with integrated structures used by
businesses to integrate data and process real-time
information throughout their supply chain. The benefits of
installing an ERP system have made it an integral part of
today's organization. The construction business has
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 865
problems that are different from those faced by the
industry and the utility industry. This requires efficient
resource allocation, project planning, staff tracking, and,
most importantly, information exchange. Organizations in
developing countries are often reluctant to use ERP
systems because of their specific needs and limited
availability of software for the construction industry.
1.2 Benefits of ERP
Following are some of the benefits they achieved by
implementing the ERP packages:
 Gives Accounts Payable workers more control
over invoicing and payment processing, increasing
productivity and reducing reliance on computer
personnel for these processe
 Reduce the need of paper documents by offering
online forms for easily inputting and retrieving
data.
 Improves information timeliness by allowing
publication daily rather than monthly.
 Greater accuracy of information with extensive
content, better presentation, and auditor
satisfaction
 Better cost control.
 Improved customer response and follow-up.
 More efficient cash collection, for example, a
significant reduction in client payment delays.
2. PROBLEM STATEMENT
Majestique Towers is a residential development by
Majestique Landmarks in Kharadi, Pune. The project
provides Apartments with a great blend of modern
architecture and amenities to give a comfortable living
environment. The Apartment is available in the following
configurations: 2 and 3 bedroom apartments. This is an
RERA-approved project. The project takes up a total of
13.1 acres of land. Majestique Towers consists of 19
towers in total. The building has 16 storeys. There are 984
units of lodging available. The project takes up a total of
13.1 acres of land. Majestique Towers consists of 19
towers in total.
Fig 1 3D view of Majestique Towers.
3. DATA COLLECTION
3.1 Items List
This is a list of building materials. Many types of building
materials are used in the construction industry to build
buildings and structures. These categories of materials and
products are used by architects and construction project
managers to determine the materials and methods used
for construction projects. Other building materials such as
cold rolled steel frame are considered modern
construction methods, in addition to less expensive
methods such as blocks and planks. Many building
materials have a variety of uses; therefore it is always a
good idea to contact the manufacturer to check that the
product is best suited to your needs.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 866
3.2 Material List
3.3 Supplier list
71 A B SALES 9326870818
191 Aakash Bricks 8796959595
257 ACC Limited 9763398253
68 Accurate Powertech India 9822602449
Pvt Ltd
80 ADARSH STEELS 9890811888
201 Aditya Transport 9689601113
170 Agarwal Agencies 7066028108
189 Agrawal Traders 9922588622
151
AHLADA ENGINEERS PVT.
LTD
9177327799
197 Ajinkyatara Enterprises 9881860640
91 ALOK DISTRIBUTORS 9028177554
206 AlokInframatePvt.LTd. 9850982020
162 AMAFHH TRADERS 9422033320
177 Amar Enterprises 9028535311
4. ANALYSIS IN ERP
Create Project with name of MAJESTIQUE TOWERS in ERP.
Fig 2 Create project in ERP
4.1 BOQ
BoQ means a bill of quantity is a document prepared by a
cost estimator to calculate the exact costing of project
work by multiplying item work by their rate.
Fig 3 BoQ in ERP
ID Item Class Name Item Description
552 BRICK MASONARY
Burnt bricks, red bricks,
siporex bricks, fly ash
bricks.
740 floor cleaning work -
744 RCC Chamber -
616 “BBM”&“Concrete work” -
829
) flush tank slim ( dual
flush) l420w380h110
-
799 1.5 2 CORE CABLE
801 10 SQ.MM COPPER LUGS
787 100 mm PVC bend
790 100 mm pvc bend -
793 100 watt led full set
827 2) 32/8screw SCREW
797 200 AMP BUS BAR
ID Material Class Name
665 Expantion Sheet
583 10 hp pump with 100rft pipe
592 100 amp bus bar
591 100 Amp main switch
659 100 mm pvc bend
656 100 mm pvc elbow
657 100 mm pvc elbow.
661 100 mm pvc socket
654 100 mm pvc tee
663 100 mm shoe bend
652 100 pvc pipe
640 100mm clips for flexible pipe
ID Supplier Name Contact No
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 867
4.2 Sub Project Work Category Budget
A job without a budget is like a car without fuel. Funding is
essential to start the project and stop all resources.
Fig 4 Sub Project Work Category Budge
4.3 Work Orders
Work order authorizes product development — providing
a production team with a way to create a product to meet
specific needs. Properly covered, it will withstand a great
deal of adverse conditions and run times (BOM).
Fig 5 Work Orders
4.4 Material In Stock
Companies in the materials industry are involved in the
discovery, production, and processing of raw materials,
which are utilised in a variety of sectors and industries.
Fig 6 Material In Stock
4.5 Purchase Order And Its Status
A purchase order (PO) is a business document and the
buyer's first official offer to the seller that specifies the
types, quantities, and agreed-upon pricing for items or
services. It is used to manage the purchase of goods and
services from third-party vendors.
Fig 7 Purchase Order And Its Status
5. REWORK ON PROJECT
The potential of rework in most every building project has
an impact on the demand and schedule of project
operations. Based on the fact that rework has a similar
impact on costs and timeline.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 868
Fig 8 Problem- Plinth Beam passing through Septic Tank
5.1 Rework cost calculation
Throughout the course of this study, Calculate the amount
of rework and its cost; provide an example to show how to
calculate the amount of rework and its cost. Activities A, B,
C, D, E, and F are depicted in this example, along with their
duration and usual cost. A project charter outlining all of
these actions is also given.
Table 1 Normal Activity cost calculation
Activity Activity Duration Normal
(days) cost (Rs)
A Excavation and filing for
Septic tank plinth beam
12 12,000/-
B Septic tank concreting 2 1,800/-
C Septic tank brickwork 3 1,400/-
D Septic tank Plaster 4 3,600/-
E Septic tank pounding 6 13,500/-
Total 27 32300
Table 2 Rework cost calculation
Activity Activity Duration Normal
(days) cost (Rs)
A Excavation and filing for
Septic tank plinth beam
12 12,000/-
B Septic tank concreting 2 1,800/-
C Plinth Beam casting 4 14500/-
G Plinth Beam Demolition 3 5000
D Septic tank brickwork 3 1,400/-
E Septic tank Plaster 4 3,600/-
F Septic tank pounding 6 13,500/-
Total 34 51800
4. CONCLUSION
 Manufacturers may use a recognised ERP system
to accurately plan production, increase capacity
utilisation, decrease inventory, and meet
guaranteed delivery dates.
 The advantages of implementing an ERP system
have made them an essential component of
today's companies.
 Extra appropriate administration is feasible since
ERP systems successfully link all parts of an
organisation.
 ERP systems were designed to automate back-
office functions that had no direct influence on
customers or the wider public.
 Developers are now working hard to integrate
mobile phones with both ERP applications.
 The difficulties might be due to the system,
business approach, infrastructure, training, or a
lack of ambition. Despite the fact that older ERP
systems were designed for huge corporations,
smaller firms are increasingly utilising ERP
systems.
 The ERP framework integrates diverse structural
systems and allows for incorrect transaction and
production, boosting an organization's
performance. Prior to installing an ERP software
package, businesses must conduct a detailed
examination of their business operations.
 It also allows for a comparison of existing
procedures to those provided by ERP software.
.
5. REFRENCES
[1] Abhijit N. Bhirud “Effective Implementation of
ERP in Infrastructure Construction
Industry”Volume 4, Issue 2 (March-April, 2016)
PP 1-4
[2] BooYoung Chung et. al. “Developing ERP Systems
Success Model for the Construction Industry”ASCE
/ MARCH 2009PP 1-11
[3] C. S. Dudgikar “Development of ERP Module for
Quality Management in Construction Industry”
(IJEC), Volume – 1, Issue – 1, August 2012 PP 1-12
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 869
[4] Hans Voordijket. al. “Enterprise Resource
Planning in a large construction firm:
implementation analysis “Construction
Management and Economics (July 2003) PP 1-12
[5] Jonathan Jingsheng Shi “Enterprise Resource
Planning for Construction Business Management”
ASCE / MARCH/APRIL 2003 PP 1-8
[6] Mahmood Ali “Developing in-House ERP System
for the Construction Industry in a Developing
Country: A Case Study” Engineering Management
Research; Vol. 6, No. 1; 2017 PP1-12
[7] PiyushDeole “Research Analysis for successful
functioning of ERP system in Construction
Industry” (IJERT) Vol. 2 Issue 11, November –
2013 PP 1-6
[8] Parvathy Mohandas et.al. “Research Analysis for
successful functioning of ERP system in
Construction Industry”(IJERT) Vol. 2 Issue 11,
November – 2013 PP 1-6
[9] RohitChaudhariet. al.“Implementation Based ERP
Module for Construction Site Management”(IRJET)
Volume: 06 Issue: 06 | June 2019 PP 1-12
[10] SudhanvaKadoli “An Enterprise Resource
Planning (ERP) For A Construction Enterprise
Along with Business Intelligence (BI)” Vol. 3, Issue
2, February 2014 PP 1-7
[11] Syed M. Ahmed “Implementation of Enterprise
Resource Planning (ERP) Systems In The
Construction Industry” PP 1-9
[12] Sergey V. Zykov “Enterprise Resource Planning
Systems: the Integrated Approach”ITERA
International Group of Companies PP 1-12
[13] ThakareAmol K. “Cost Analysis and Project
Planning using ERP in Construction Industry”
ISSN: 2278-621X Vol. 2 Issue 4 July 2013 PP 1-15
[14] Yu-Cheng LIN “Construction Enterprise Resource
Planning Implementation: Critical Success Factors
– Lesson Learning in Taiwan” PP 1-6
IS CODES:
i. IS 7272 : 1974 - Recommendation for Labour Output.
Constants for Building Work.

More Related Content

Similar to To Study Effective Implementation of ERP System and Its Applicability to Multi-storeyed Residential Building

Web Development Using Cloud Computing and Payment Gateway
Web Development Using Cloud Computing and Payment GatewayWeb Development Using Cloud Computing and Payment Gateway
Web Development Using Cloud Computing and Payment Gateway
IRJET Journal
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
IRJET Journal
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
IRJET Journal
 
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...
IRJET Journal
 
Analyzing Optimal Practises for Web Frameworks
Analyzing Optimal Practises for Web FrameworksAnalyzing Optimal Practises for Web Frameworks
Analyzing Optimal Practises for Web Frameworks
IRJET Journal
 
Cloud computing customer relationship management for online rental system
Cloud computing customer relationship management for online rental systemCloud computing customer relationship management for online rental system
Cloud computing customer relationship management for online rental system
IRJET Journal
 
IRJET- Logistics Network Superintendence Based on Knowledge Engineering
IRJET- Logistics Network Superintendence Based on Knowledge EngineeringIRJET- Logistics Network Superintendence Based on Knowledge Engineering
IRJET- Logistics Network Superintendence Based on Knowledge Engineering
IRJET Journal
 
IRJET- Implementation of Business Ease Android Application for Akhil Bhar...
IRJET-  	  Implementation of Business Ease Android Application for Akhil Bhar...IRJET-  	  Implementation of Business Ease Android Application for Akhil Bhar...
IRJET- Implementation of Business Ease Android Application for Akhil Bhar...
IRJET Journal
 
Automated Placement System
Automated Placement SystemAutomated Placement System
Automated Placement System
IRJET Journal
 
IRJET- A Repository Application Developed using .Net MVC and Angularjs for In...
IRJET- A Repository Application Developed using .Net MVC and Angularjs for In...IRJET- A Repository Application Developed using .Net MVC and Angularjs for In...
IRJET- A Repository Application Developed using .Net MVC and Angularjs for In...
IRJET Journal
 
IRJET-Towards a Methodology for the Development of Plug-In
IRJET-Towards a Methodology for the Development of Plug-InIRJET-Towards a Methodology for the Development of Plug-In
IRJET-Towards a Methodology for the Development of Plug-In
IRJET Journal
 
Integrating Essential Components of Digital Twin for Energy Industry
Integrating Essential Components of Digital Twin for Energy IndustryIntegrating Essential Components of Digital Twin for Energy Industry
Integrating Essential Components of Digital Twin for Energy Industry
IRJET Journal
 
RICE INDUSTRY AUTOMATION TECHNIQUE USING IoT WITH RASPBERRY PI AND PHYTON LAN...
RICE INDUSTRY AUTOMATION TECHNIQUE USING IoT WITH RASPBERRY PI AND PHYTON LAN...RICE INDUSTRY AUTOMATION TECHNIQUE USING IoT WITH RASPBERRY PI AND PHYTON LAN...
RICE INDUSTRY AUTOMATION TECHNIQUE USING IoT WITH RASPBERRY PI AND PHYTON LAN...
IRJET Journal
 
EPC Case study - RAY International
EPC Case study - RAY International EPC Case study - RAY International
EPC Case study - RAY International
RheinBrücke IT Consulting
 
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRANComputer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
IRJET Journal
 
Landing Page and Case Management
Landing Page and Case ManagementLanding Page and Case Management
Landing Page and Case Management
IRJET Journal
 
Backend for Frontend in Microservices
Backend for Frontend in MicroservicesBackend for Frontend in Microservices
Backend for Frontend in Microservices
IRJET Journal
 
'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' 'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management'
Alan Martin Redmond, PhD
 
IRJET- In-House File Tracking System
IRJET-  	  In-House File Tracking SystemIRJET-  	  In-House File Tracking System
IRJET- In-House File Tracking System
IRJET Journal
 
IRJET- E-Payment and Transactions using QR Codes
IRJET- E-Payment and Transactions using QR CodesIRJET- E-Payment and Transactions using QR Codes
IRJET- E-Payment and Transactions using QR Codes
IRJET Journal
 

Similar to To Study Effective Implementation of ERP System and Its Applicability to Multi-storeyed Residential Building (20)

Web Development Using Cloud Computing and Payment Gateway
Web Development Using Cloud Computing and Payment GatewayWeb Development Using Cloud Computing and Payment Gateway
Web Development Using Cloud Computing and Payment Gateway
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
 
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...
Secure Storage Auditing with Efficient Key Update for Cognitive Industrial IO...
 
Analyzing Optimal Practises for Web Frameworks
Analyzing Optimal Practises for Web FrameworksAnalyzing Optimal Practises for Web Frameworks
Analyzing Optimal Practises for Web Frameworks
 
Cloud computing customer relationship management for online rental system
Cloud computing customer relationship management for online rental systemCloud computing customer relationship management for online rental system
Cloud computing customer relationship management for online rental system
 
IRJET- Logistics Network Superintendence Based on Knowledge Engineering
IRJET- Logistics Network Superintendence Based on Knowledge EngineeringIRJET- Logistics Network Superintendence Based on Knowledge Engineering
IRJET- Logistics Network Superintendence Based on Knowledge Engineering
 
IRJET- Implementation of Business Ease Android Application for Akhil Bhar...
IRJET-  	  Implementation of Business Ease Android Application for Akhil Bhar...IRJET-  	  Implementation of Business Ease Android Application for Akhil Bhar...
IRJET- Implementation of Business Ease Android Application for Akhil Bhar...
 
Automated Placement System
Automated Placement SystemAutomated Placement System
Automated Placement System
 
IRJET- A Repository Application Developed using .Net MVC and Angularjs for In...
IRJET- A Repository Application Developed using .Net MVC and Angularjs for In...IRJET- A Repository Application Developed using .Net MVC and Angularjs for In...
IRJET- A Repository Application Developed using .Net MVC and Angularjs for In...
 
IRJET-Towards a Methodology for the Development of Plug-In
IRJET-Towards a Methodology for the Development of Plug-InIRJET-Towards a Methodology for the Development of Plug-In
IRJET-Towards a Methodology for the Development of Plug-In
 
Integrating Essential Components of Digital Twin for Energy Industry
Integrating Essential Components of Digital Twin for Energy IndustryIntegrating Essential Components of Digital Twin for Energy Industry
Integrating Essential Components of Digital Twin for Energy Industry
 
RICE INDUSTRY AUTOMATION TECHNIQUE USING IoT WITH RASPBERRY PI AND PHYTON LAN...
RICE INDUSTRY AUTOMATION TECHNIQUE USING IoT WITH RASPBERRY PI AND PHYTON LAN...RICE INDUSTRY AUTOMATION TECHNIQUE USING IoT WITH RASPBERRY PI AND PHYTON LAN...
RICE INDUSTRY AUTOMATION TECHNIQUE USING IoT WITH RASPBERRY PI AND PHYTON LAN...
 
EPC Case study - RAY International
EPC Case study - RAY International EPC Case study - RAY International
EPC Case study - RAY International
 
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRANComputer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
 
Landing Page and Case Management
Landing Page and Case ManagementLanding Page and Case Management
Landing Page and Case Management
 
Backend for Frontend in Microservices
Backend for Frontend in MicroservicesBackend for Frontend in Microservices
Backend for Frontend in Microservices
 
'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' 'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management'
 
IRJET- In-House File Tracking System
IRJET-  	  In-House File Tracking SystemIRJET-  	  In-House File Tracking System
IRJET- In-House File Tracking System
 
IRJET- E-Payment and Transactions using QR Codes
IRJET- E-Payment and Transactions using QR CodesIRJET- E-Payment and Transactions using QR Codes
IRJET- E-Payment and Transactions using QR Codes
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 

Recently uploaded (20)

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 

To Study Effective Implementation of ERP System and Its Applicability to Multi-storeyed Residential Building

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 864 To Study Effective Implementation of ERP System and Its Applicability to Multi-storeyed Residential Building Mr. Ajinkya Balkrushana Nigade1 Prof. J. A. Dhivare2 Dr. Navnath V. Khadake3 PG Student, M.E. CM, Dept of Civil Engineering, JSPM’s Imperial College Of Engineering & Research Wagholi, Pune.1 Assistant Professor, M.E. CM, Dept of Civil Engineering , JSPM’s Imperial College Of Engineering & Research Wagholi, Pune2 , 3 -------------------------------------------------------------------***----------------------------------------------------------------------- Abstract— Speaking of global trade, India has finally found a step forward. Therefore, large and medium-sized domestic businesses adopt standards and processes that meet international norms. Given the needs of the Indian market, it has become a major reason why IT solutions vendors are happy. Statistically, IT spending for Indian companies has increased dramatically in recent years. ERP was one of the first IT ideas to enter the Indian market, but it had mixed results. ERP is a company-run software management system that integrates all aspects of an organization, including planning, production, marketing, and marketing. The business environment has grown increasingly difficult, and the market has shifted from domestic to global. Managers are constantly under pressure to improve competition by reducing operational costs and improving resources. Organizations should therefore be more accountable to customers and competitors. And ERP, as a business solution, seeks to assist managers in establishing better business processes and providing them with the information they need to make timely decisions Keyword: ERP System , management Software , Rework , PO , Material Quantity 1. INTRODUCTION ERP is a computer-based program that seeks to integrate all departmental programs into a single integrated software system that uses a single website, allowing different departments to easily share information and communicate. ERP software is a business solution that provides powerful analytics based on data from a variety of building processes, including accounting / financial management, contract management, machinery / innovation management, human finance management, project management, vendor management, bid management, Customer Relationship Management (CRM) , planning, shipping, asset management, and more. ERP programs can help a construction company in a variety of ways. Because ERP systems effectively connect all aspects of the business, more accurate control is possible. ERP systems can eliminate data sales, control data generated by multiple departments, and reduce data registration errors. ERP systems are software compilation of integrated application modules with integrated structures used by businesses to integrate data and process real-time information throughout their supply chain. The benefits of installing an ERP system have made it an integral part of today's organization. The construction business has problems that are different from those faced by the industry and the utility industry. This requires efficient resource allocation, project planning, staff tracking, and, most importantly, information exchange. Organizations in developing countries are often reluctant to use ERP systems because of their specific needs and limited availability of software for the construction industry. 1.1. What Is ERP? ERP is a computer-based program that seeks to integrate all departmental programs into a single integrated software system that uses a single website, allowing different departments to easily share information and communicate. ERP software is a business solution that provides powerful analytics based on data from a variety of building processes, including accounting / financial management, contract management, machinery / innovation management, human finance management, project management, vendor management, bid management, Customer Relationship Management (CRM) , planning, shipping, asset management, and more. ERP programs can help a construction company in a variety of ways. Because ERP systems effectively connect all aspects of the business, more accurate control is possible. ERP systems can eliminate data sales, control data generated by multiple departments, and reduce data registration errors. ERP systems are software compilation of integrated application modules with integrated structures used by businesses to integrate data and process real-time information throughout their supply chain. The benefits of installing an ERP system have made it an integral part of today's organization. The construction business has
  • 2. © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 865 problems that are different from those faced by the industry and the utility industry. This requires efficient resource allocation, project planning, staff tracking, and, most importantly, information exchange. Organizations in developing countries are often reluctant to use ERP systems because of their specific needs and limited availability of software for the construction industry. 1.2 Benefits of ERP Following are some of the benefits they achieved by implementing the ERP packages:  Gives Accounts Payable workers more control over invoicing and payment processing, increasing productivity and reducing reliance on computer personnel for these processe  Reduce the need of paper documents by offering online forms for easily inputting and retrieving data.  Improves information timeliness by allowing publication daily rather than monthly.  Greater accuracy of information with extensive content, better presentation, and auditor satisfaction  Better cost control.  Improved customer response and follow-up.  More efficient cash collection, for example, a significant reduction in client payment delays. 2. PROBLEM STATEMENT Majestique Towers is a residential development by Majestique Landmarks in Kharadi, Pune. The project provides Apartments with a great blend of modern architecture and amenities to give a comfortable living environment. The Apartment is available in the following configurations: 2 and 3 bedroom apartments. This is an RERA-approved project. The project takes up a total of 13.1 acres of land. Majestique Towers consists of 19 towers in total. The building has 16 storeys. There are 984 units of lodging available. The project takes up a total of 13.1 acres of land. Majestique Towers consists of 19 towers in total. Fig 1 3D view of Majestique Towers. 3. DATA COLLECTION 3.1 Items List This is a list of building materials. Many types of building materials are used in the construction industry to build buildings and structures. These categories of materials and products are used by architects and construction project managers to determine the materials and methods used for construction projects. Other building materials such as cold rolled steel frame are considered modern construction methods, in addition to less expensive methods such as blocks and planks. Many building materials have a variety of uses; therefore it is always a good idea to contact the manufacturer to check that the product is best suited to your needs. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 866 3.2 Material List 3.3 Supplier list 71 A B SALES 9326870818 191 Aakash Bricks 8796959595 257 ACC Limited 9763398253 68 Accurate Powertech India 9822602449 Pvt Ltd 80 ADARSH STEELS 9890811888 201 Aditya Transport 9689601113 170 Agarwal Agencies 7066028108 189 Agrawal Traders 9922588622 151 AHLADA ENGINEERS PVT. LTD 9177327799 197 Ajinkyatara Enterprises 9881860640 91 ALOK DISTRIBUTORS 9028177554 206 AlokInframatePvt.LTd. 9850982020 162 AMAFHH TRADERS 9422033320 177 Amar Enterprises 9028535311 4. ANALYSIS IN ERP Create Project with name of MAJESTIQUE TOWERS in ERP. Fig 2 Create project in ERP 4.1 BOQ BoQ means a bill of quantity is a document prepared by a cost estimator to calculate the exact costing of project work by multiplying item work by their rate. Fig 3 BoQ in ERP ID Item Class Name Item Description 552 BRICK MASONARY Burnt bricks, red bricks, siporex bricks, fly ash bricks. 740 floor cleaning work - 744 RCC Chamber - 616 “BBM”&“Concrete work” - 829 ) flush tank slim ( dual flush) l420w380h110 - 799 1.5 2 CORE CABLE 801 10 SQ.MM COPPER LUGS 787 100 mm PVC bend 790 100 mm pvc bend - 793 100 watt led full set 827 2) 32/8screw SCREW 797 200 AMP BUS BAR ID Material Class Name 665 Expantion Sheet 583 10 hp pump with 100rft pipe 592 100 amp bus bar 591 100 Amp main switch 659 100 mm pvc bend 656 100 mm pvc elbow 657 100 mm pvc elbow. 661 100 mm pvc socket 654 100 mm pvc tee 663 100 mm shoe bend 652 100 pvc pipe 640 100mm clips for flexible pipe ID Supplier Name Contact No
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 867 4.2 Sub Project Work Category Budget A job without a budget is like a car without fuel. Funding is essential to start the project and stop all resources. Fig 4 Sub Project Work Category Budge 4.3 Work Orders Work order authorizes product development — providing a production team with a way to create a product to meet specific needs. Properly covered, it will withstand a great deal of adverse conditions and run times (BOM). Fig 5 Work Orders 4.4 Material In Stock Companies in the materials industry are involved in the discovery, production, and processing of raw materials, which are utilised in a variety of sectors and industries. Fig 6 Material In Stock 4.5 Purchase Order And Its Status A purchase order (PO) is a business document and the buyer's first official offer to the seller that specifies the types, quantities, and agreed-upon pricing for items or services. It is used to manage the purchase of goods and services from third-party vendors. Fig 7 Purchase Order And Its Status 5. REWORK ON PROJECT The potential of rework in most every building project has an impact on the demand and schedule of project operations. Based on the fact that rework has a similar impact on costs and timeline.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 868 Fig 8 Problem- Plinth Beam passing through Septic Tank 5.1 Rework cost calculation Throughout the course of this study, Calculate the amount of rework and its cost; provide an example to show how to calculate the amount of rework and its cost. Activities A, B, C, D, E, and F are depicted in this example, along with their duration and usual cost. A project charter outlining all of these actions is also given. Table 1 Normal Activity cost calculation Activity Activity Duration Normal (days) cost (Rs) A Excavation and filing for Septic tank plinth beam 12 12,000/- B Septic tank concreting 2 1,800/- C Septic tank brickwork 3 1,400/- D Septic tank Plaster 4 3,600/- E Septic tank pounding 6 13,500/- Total 27 32300 Table 2 Rework cost calculation Activity Activity Duration Normal (days) cost (Rs) A Excavation and filing for Septic tank plinth beam 12 12,000/- B Septic tank concreting 2 1,800/- C Plinth Beam casting 4 14500/- G Plinth Beam Demolition 3 5000 D Septic tank brickwork 3 1,400/- E Septic tank Plaster 4 3,600/- F Septic tank pounding 6 13,500/- Total 34 51800 4. CONCLUSION  Manufacturers may use a recognised ERP system to accurately plan production, increase capacity utilisation, decrease inventory, and meet guaranteed delivery dates.  The advantages of implementing an ERP system have made them an essential component of today's companies.  Extra appropriate administration is feasible since ERP systems successfully link all parts of an organisation.  ERP systems were designed to automate back- office functions that had no direct influence on customers or the wider public.  Developers are now working hard to integrate mobile phones with both ERP applications.  The difficulties might be due to the system, business approach, infrastructure, training, or a lack of ambition. Despite the fact that older ERP systems were designed for huge corporations, smaller firms are increasingly utilising ERP systems.  The ERP framework integrates diverse structural systems and allows for incorrect transaction and production, boosting an organization's performance. Prior to installing an ERP software package, businesses must conduct a detailed examination of their business operations.  It also allows for a comparison of existing procedures to those provided by ERP software. . 5. REFRENCES [1] Abhijit N. Bhirud “Effective Implementation of ERP in Infrastructure Construction Industry”Volume 4, Issue 2 (March-April, 2016) PP 1-4 [2] BooYoung Chung et. al. “Developing ERP Systems Success Model for the Construction Industry”ASCE / MARCH 2009PP 1-11 [3] C. S. Dudgikar “Development of ERP Module for Quality Management in Construction Industry” (IJEC), Volume – 1, Issue – 1, August 2012 PP 1-12
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 05 | May 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 869 [4] Hans Voordijket. al. “Enterprise Resource Planning in a large construction firm: implementation analysis “Construction Management and Economics (July 2003) PP 1-12 [5] Jonathan Jingsheng Shi “Enterprise Resource Planning for Construction Business Management” ASCE / MARCH/APRIL 2003 PP 1-8 [6] Mahmood Ali “Developing in-House ERP System for the Construction Industry in a Developing Country: A Case Study” Engineering Management Research; Vol. 6, No. 1; 2017 PP1-12 [7] PiyushDeole “Research Analysis for successful functioning of ERP system in Construction Industry” (IJERT) Vol. 2 Issue 11, November – 2013 PP 1-6 [8] Parvathy Mohandas et.al. “Research Analysis for successful functioning of ERP system in Construction Industry”(IJERT) Vol. 2 Issue 11, November – 2013 PP 1-6 [9] RohitChaudhariet. al.“Implementation Based ERP Module for Construction Site Management”(IRJET) Volume: 06 Issue: 06 | June 2019 PP 1-12 [10] SudhanvaKadoli “An Enterprise Resource Planning (ERP) For A Construction Enterprise Along with Business Intelligence (BI)” Vol. 3, Issue 2, February 2014 PP 1-7 [11] Syed M. Ahmed “Implementation of Enterprise Resource Planning (ERP) Systems In The Construction Industry” PP 1-9 [12] Sergey V. Zykov “Enterprise Resource Planning Systems: the Integrated Approach”ITERA International Group of Companies PP 1-12 [13] ThakareAmol K. “Cost Analysis and Project Planning using ERP in Construction Industry” ISSN: 2278-621X Vol. 2 Issue 4 July 2013 PP 1-15 [14] Yu-Cheng LIN “Construction Enterprise Resource Planning Implementation: Critical Success Factors – Lesson Learning in Taiwan” PP 1-6 IS CODES: i. IS 7272 : 1974 - Recommendation for Labour Output. Constants for Building Work.