Thin Client vs. Fat Client Network Design
Thin Client vs. Fat Client & Network Design Considerations
Introduction Network computing was created in an effort to allow users of a computer application to
share data more easily than using stand alone computers. Clients on a client/server network store
their application data on a central server. There are two categories of clients on a network. They
were originally categorized by their hardware design, but today clients are categorized by the
software application design and where the bulk of the processing is done and where the bulk of the
application software is stored.
A thin client, sometimes called a lean client, is a low–cost, centrally–managed computer. The term
derives from the fact that small computers in networks tend ... Show more content on
Helpwriting.net ...
A product made by Citrix Systems actually simulates a Microsoft Windows desktop from a thin
400KB client. The Citrix product does have server capacity problems when sending multimedia
over a network, but basic word processing and accounting programs are practical over a Citrix
network.
This transition has made it once again easier to operate in a centralized processing computing
environment. Today further enhancements to HTML are allowing more graphic intensive
applications to be created. Macromedia Flash, Shockwave, and ActiveX Controls are enhancements
to HTML which are allowing for a thin client application to have dynamic graphical interfaces.
Load balancing systems such as Coyote Point Systems Equalizers are allowing reliable networks
with redundant servers and application load spread over multiple servers. Lower telecommunication
and standard routing protocols such as BGP have allowed remote offices relying on network access
to have redundant routes to the internet or central servers.
Part B
#1
Selecting computer hardware and software for a company is an important management decision.
This decision will have a direct impact on operational efficiency and competitive advantage. The
most important management and organizational issue to consider is total cost of ownership. In
considering a fat client or thin client network application design, managers must know what their
total cost of ownership is. In many cases a thin client design has a higher up
... Get more on HelpWriting.net ...
It 315 Unit 3 Assignment
Portfolio Assignment ITS 315: Introduction to Networks Mazen Alkhatib December 23, 2012
Network Implementation Over four months, a very short period of time, a small accounting firm
grew from five employees to fifty. The existing network architecture could no longer support the
exponential growth. Peer–to–Peer networks work very well in a small office environment. Once the
ratio of employees exceeds around five employees resources, file storage and a plethora of other
network disasters begin. The obvious solution was to recommend a change. As explained in the
proposal the proposed upgrade from a peer–to–peer network architecture to client/server was an
imminent necessity. Cable Recommendation The accounting firm ... Show more content on
Helpwriting.net ...
Our intention is to do the aforementioned in a manner that will allow us to manage all of the files
and resources from a central location by implementing a server to our current network architecture.
Reasons to Change. In the past our peer–to–peer network architecture served us well by providing
us with a way to share our files and resources in a manner that did not require much planning.
Unfortunately, as a peer–to–peer network grows it becomes more difficult to maintain due to its lack
of centralized control which makes it un–scalable. With the addition of fifty individual workstations,
security access and file storage control remains in the hands of the user. For example, should
someone decide to delete a company file, there would be no way of knowing. Once there are more
than five or six workstations attached peer–to–peer networks begin to pose as a security threat that
may cause loss of sensitive company data due to virus and spyware attacks. Fortunately
advancements in technology have provided a viable solution for rapidly growing small businesses
such as our own called servers. Our Viable Solution. Adding a server to our current network will
allow our employees to manage, store, send and process data from a centralized location 24 hours a
day. In
... Get more on HelpWriting.net ...
Essay about Will Linux replace Windows NT as the server OS...
Linux VS NT /
Will Linux replace Windows NT as the server OS of choice?
"Linux is ready, or at least poised, to take on Windows NT for market dominance of server operating
systems", said T. W. Burger Owner, Thomas Wolfgang Burger Consulting June 2000.
It is the competitive choice for the user wanting a cheap, versatile, scalable, and reliable server
solution. This article examines how Linux is ready to meet or exceed all user requirements that NT
provides and why Linux should be the preferred alternative to NT. Included are the steps,
requirements, options, and costs involved. Linux will soon surpass NT in most if not all network
service applications. It is an open source, multi–vendor, and multi–platform server operating system
... Show more content on Helpwriting.net ...
A small business server handles under 50 users and an enterprise server 50 or more. Novell Netware,
Windows NT, and other scalable server solutions will handle various numbers of small business user
loads. At a certain point a business will require an enterprise server product. This OS will be capable
of handling massive user traffic and provide a total solution: a comprehensive set of software tools
that will allow a business to be run using computers. An enterprise OS will be run on a
minicomputer such as the HP9000 or a super–microcomputer with large data processing capacity
like a multi–processor Alpha Chip–based machine. Enterprise computing is a term describing a set
of software tools with a network OS at its core. Enterprise computing provides not only a place to
store and share files but everything required for a business to gather and manipulate information
throughout the business as well as Internet access for customer support and business–to–business
data flow. An enterprise computing product is generally made up of the network OS and components
that provide one or more of the following: file service, print service, Web page hosting, Internet
access/firewall, mail service, backup, and database, and/or SQL database services. A server is, as the
name implies, a provider of computing resources. It is part of a client–server network configuration
that generally
... Get more on HelpWriting.net ...
Operating Systems Analysis Paper
Operating Systems Analysis Paper
There are many operating systems that are common on the Internet today. Back when computers
could only handle one command at a time, in the 1950 's, was very time consuming. Now, about
sixty years later, a computer 's operating system can handle many applications at one time while
delivering speed and is user friendly. Although there are many Operating Systems that are available,
there are onle a few of them that are well knon and is commonly used. Some of the most common
Operating Systems that are used on the Internet are the Windows platforms such as Windows XP,
Sun Solaris, UNIX, Apple, and Linux Apache. A DNS (Domain Name System) system is what
powers the Internet that we use to browse. It is ... Show more content on Helpwriting.net ...
The current version is 2.6 that was released nearly seven years ago in 2003. The operating system
itself can be used in the home or small office and is continuing to rise to popularity (What is Linux,
2008). Windows began in 1985, version 1.0 and was the very first Windows operating system. Back
then, computers were slow and were not able to multitask like we do now. in the 1990 's, Windows
bagan to be used in the office environment even though there were still no Internet services. Nearly
ten years later, Windows were used in almost all businesses and not so much in the homes. With the
Windows 95 version, the home user was able to dail–up to the Internet. That set forth the business
use of computers and the business environment. By the time that the Windows Windows XP became
available, computers were widely used all over the world. This version took care of the basic needs
of all home and office use by being fast, reliable, and secure (The History of Microsoft Window 's
Early Operating Systems, 2010).
References
Linux Online Inc. 2008. Linux Online. What is Linux. Retrieved July 31, 2010 from
http://www.linux.org/info/
Miller, R. 2010. ArticleBase.com. The History of Microsoft Window 's Early Operating Systems.
Recieved July 31, 2010 from http://www.articlesbase.com/operating–systems–articles/the–history–
of–microsoft–windows–early–operating–systems–1740192.html
The Open Group. 2010. UNIX. What is UNIX. Retrieved July 30, 2010
... Get more on HelpWriting.net ...
Quickbooks Accounting Software Essay
I. INTRODUCTION
Information Technology (IT) is a foundation for conducting business today. It plays a critical role in
increasing productivity of firms and entire nation. It is proven that firms who invested in IT have
experienced continued growth in productivity and efficiency. Many companies' survival and even
existence without use of IT is unimaginable. IT has become the largest component of capital
investment for companies in the United States and many other countries. Accounting/Finance
application systems like Peachtree, Net Suite and QuickBooks let you manage your business with a
little or no experience. All three application systems allow the users to manage the companies'
capital including bookkeeping, inventory, ... Show more content on Helpwriting.net ...
It provides the most comprehensive tools for small business financial management. It is used to
track expenses, prepare and send invoices, prepare financial statements, track inventory levels, and
many other jobs that small businesses must perform to stay successful. New versions like Simple
Start for new businesses and Enterprise version for larger businesses is currently out on the market
available to purchase. Besides the desktop software, QuickBooks is offering an online version which
is hosted though the online edition. Simple Start is the so called most simple version. It is designed
for users that do not want or need full–fledged accounting software but still want an efficient way to
keep track of sales, expenses, and customers. It is designed to help the user see how much money
was made in a given month, which invoices have or have not been paid, who are the best customers
etc. The "Tax Detail" report which is also available is designed to help the user save time during the
tax time. It creates a report that can be handed to the accountant or the figures could be transferred
to the return. Typical price for the Simple Start software package is $99.95.
QuickBooks Enterprise Solutions software is the most powerful QuickBooks solution for larger,
growing businesses that QuickBooks is currently offering. With the Enterprise Solutions software,
one could save thousands in up–front and on–going system costs.
... Get more on HelpWriting.net ...
Table Of Contents. I.Executive Summary2. Ii.Introduction2.
Table of Contents
I. Executive Summary 2
II. Introduction 2
III. Assumptions 2
IV. Network Design & Justification 4
Components
Levels & Layouts
Training
Security
Data Management (servers)
V. Recommendations 9
Cost effectiveness vs Efficiency
Expansion
VI. Conclusion 9
VII. Appendix 10
Appendix A:
Appendix B:
VIII. References 11
Executive Summary
Introduction
The network for which the Public Relations Company (PRC) requires is one which uses the variety
of technologies which will facilitate the company's employees. The use of the network will increase
workflow and efficiency when dealing with clients allowing more feasibility in sharing data and
using devices such as printers, projectors and OLED TVs. This is a project network design ... Show
more content on Helpwriting.net ...
As another resort the BYODs on the first level are able to connect to the network via a powerline
adapter if they feel the need to have a physical connection to the network via a Cat cable from the
powerline adapter.
2. Assuming that they don't use telephone communications rather they use the network internet as
communication through their own or companies' mobile devices to communicate within the
company or externally within protocol.
3. Assuming they don't need security cameras or Bio security in the server room which would be an
added cost which would depend on how much expenditure the company is willing to invest into
physical security. Thus I have left out these components in my diagram.
4. Wireless modems today mostly come with firewalls pre–installed, I have assumed for simplicity
that the modem does not have a firewall and have placed one in the diagram in between the internet
and the modem to show to Rebecca that there is protection for the network from malicious sources
on the internet.
5. Since the senior staff have structural constraints I have assumed that can ascertain Wi–Fi
connection via a Wi–Fi booster which will have 5Ghz speed enabled for their large data transfers
across the
... Get more on HelpWriting.net ...
Software Licensing Research Paper
Software Licensing Microsoft Windows Server 2016 Microsoft Windows Storage Server 2016
(Standard Edition and Workgroup Edition) Microsoft Windows 10 Enterprise Windows Office 365:
Office on PCs, tablets, and phones and Android, each user can install Office on 5 PCs or Macs, 5
tablets (Windows, iPad, and Android), and 5 phones ). (Cisco Small Business RV345 – Router –
rack–mountable) Features Items and Capabilities The Cisco RV345 Dual WAN Gigabit VPN Router
is the perfect choice for any small business network that requires performance, security, and
reliability. An intuitive user interface helps you get up and running with Internet access in minutes.
You'll enjoy reliable, highly secure connectivity that is so transparent you will ... Show more content
on Helpwriting.net ...
Prepare to meet tomorrow's business needs with native support for IPv6, which lets you take
advantage of the latest networking applications and operating systems without having to upgrade
your network. Reduce power consumption with "green" switches that employ power–efficient
microprocessors and quiet, fan less operation in many models. Protect Your Business Investment
Cisco 200 Series Switches offer the reliable performance, investment protection, and peace of mind
you expect from a Cisco switch. Safeguard your investment with a limited lifetime warranty and a
solution that has been tested to deliver the performance your business demands. Solve technical
problems right away with expert phone support through the Cisco Small Business Support Center
and extensive online tools. (PowerEdge R430 Server) Features and Capabilities Delivering peak 2–
socket performance to space–constrained data centers, the PowerEdge R430 is a short–depth (24")
entry rack server. It is an excellent fit for a wide range of workloads, including: High–performance
computing (HPC) Web serving Infrastructure scale–out Surveillance and site security Performance
Drive powerful performance across a wide range of workloads with the latest Intel® Xeon®
processor E5–2600 v4 product family, with up to 22 cores per processor. Boost memory and I/O
performance with: 12 DIMM slots that allow you to grow memory capacity over
... Get more on HelpWriting.net ...
Riordan Windows Operating System Upgrade
Riordan Windows Operating System Upgrade
SR–rm–006
Learning Team A
Kevan Burton, Elizabeth Oshiro, Adam Steward, Jens Walker
University of Phoenix
POS/421 – Windows Server Networking
Lydia Bell
January 11, 2009
Riordan Windows Operating System Upgrade Riordan Manufacturing is a global manufacturing
company of custom plastic products. Riordan has headquarters located in San Jose, California and
additional plant locations in Albany, Georgia; Pontiac, Michigan and Hangzhou, China. Each of the
company locations consist of aging and disparate computer system infrastructure. The company's
Chief Information Officer, Maria Trinh, has submitted Service Request SR–rm–006 in an effort to
recommend a potential upgrade of the Windows ... Show more content on Helpwriting.net ...
System Requirements
The system requirements recommended by Microsoft (2001) for Windows XP Professional include
a personal computer (PC) with an Intel Pentium/Celeron family, AMD K6/Athlon/Duron family or a
similar compatible processor with at least 300 MHz, or 233 MHz as the minimum requirement. The
PC is also recommended to have 128 MB of RAM, or 64 MB at the minimum memory requirement.
However, if only the minimum 64 MB is used, the performance of the operating system may suffer
or have limited features. Additionally, a hard drive with at least 1.5 GB of available space is
required. Riordan's San Jose office consists of Dell OptiPlex systems with 2.6 GHz Pentium 4
processors, 512 MB RAM and 60 GB hard drives, all comfortably above Microsoft's recommended
hardware configuration levels.
Costs
The cost to upgrade to Windows XP Professional is priced at $189.99 per upgrade license
(VioSoftware.com, 2009). While this cost is similar to the upgrade license cost of Vista, all PC's
throughout all Riordan locations will only require upgrade licenses for Windows XP Professional,
while upgrading the older Windows 98 PC's in Albany and Pontiac to Windows Vista will require
full version licenses. For the 35 PCs in San Jose, the total software upgrade cost is $6649.65, plus
installation time. Since these installations follow an upgrade path from existing older versions of
Windows, installation
... Get more on HelpWriting.net ...
Key Requirements Set By Strata Engineering Ltd
Introduction
This report highlights key requirements set by Strata Engineering Ltd, in the briefing it was
discussed that there are numerous changes that needs to be made in order for the company to
maintain a firm contact with its clients all over the world and make the ICT network infrastructure
efficient within the newly established ICT department in order to achieve that task.
During the briefing the Managing Director put forward some suggestions regarding as to how to
improve the ICT department network infrastructure, in the briefing the following points were
discussed:
(1) All IP addresses and Names dynamically managed
(2) A redesigned logical structure to suit the organisational structure i.e. a centralised management
of the office floor
(3) Write permissions should be allocated to related jobs
(4) Server based share strategy
(5) A VPN server configuration so staff (consultants) only can connect to the network remotely
(6) New laser printer to be installed, implementing a server printing strategy allowing all staff access
to the printers, TD and Consultants printing jobs be processed quicker
(7) Range of settings that would uniform the user environment
(8) May extend operations into new European location, how IT could be managed from UK
(9) A Budget of maximum £8000 is available and any purchasing or upgrade must be sourced from
their preferred suppliers such as Dell UK
(10) Keen to implement Windows server 2008 and wants to know the differences between an
... Get more on HelpWriting.net ...
Nt1330 Unit 3 Assignment 1
Question 1 – Goal/Introduction The goal of this lab was to set up a windows DNS server on the
same network as the other Linux servers. This lab focused on using the windows DNS server to be
the master DNS server with the Linux DNS server that was built in the last lab to be the slave. This
means that the Linux had to be configured to be the slave and when the master (windows) was set
up it would need the IP address or the hostname of the slave server (Linux). In order to configure the
Linux to be the slave server, an edit to the dhcp.conf file in etc (/etc/dhcp/dchp.conf). Once in the
file you need to add a zone with the name of the slave DNS server. In the options for it (anything
inside the curly brackets) a type is needed. The type should ... Show more content on
Helpwriting.net ...
Windows Active Directory is a central hub where a system administrator can change anything about
a users role in the organization and access on the network in a very short time unlike Linux. Because
SELinux is host based that means each change to a user or group means going in and configuring
them one at a time by hand while Active Directory GUI is much simpler to use when configuring.
Another benefit to active directory is the ability to authenticate. Authenticating prevents a user
without the proper rights to access something that they don't nee to edit or view. Once authenticated
a user has access to all internal Microsoft services and features that the policy allows for. I feel that
SELinux and OpenLdap if better for network management in the sense that it is very flexible and
can better manage the network. The only downside to this is it is much harder to set up and
configure. OpenLdap also has issues working with and connecting to windows devices on the
network. It is very rare in an organization to only see Linux with no Microsoft servers or clients.
Even though OpenLdap has the potential to be better at managing because of its flexibility a system
administrator would be more inclined to use active directory because of its ease and compatibility
with
... Get more on HelpWriting.net ...
Pros And Cons Of The Internet
Scenario 1 Introduction Internet is the major requirement of today's world. Without internet, it
becomes very difficult to manage many things which are majorly distributed not only terms of
geography but in terms of resources, system etc. Trident company is focused of this principal only,
and hence managing network system in order to manage all the resources efficiently. This is
accomplished by implementing different internet technology in order to provide efficient system so
as to manage process of information exchange more secure and private. This may include wireless
internet technology, intranet, email etc. But this strategy also has some pros and cons which may
results in security breech for information that need to be exchanged. In the case of distributed
system where all the process whole business depends upon the web, based information exchange
process requires better network and security system in order to escape from serious security breech.
Networking becomes primary requirement for every organization in order to run business smoothly
with maximized profit. This is due to the increase in the demand of using network in the business in
order to reduce the cost and to improve the efficiency and performance of the business. For
example, the extend intranet enables the organization to establish communication between different
departments as well branches in order to exchange the required data in real time. Following are the
strategic competitive benefits that could be achieved by a company's use of extranets: Share
Resources Real Time communication Data exchange Reduced Cost denial Every business support
different type network requirement depending upon amount of data, size of business etc. Following
are some different network which can be used for information exchange within or outside
organization. Client/Server Networking: The benefit in this case can be the sharing of resources in
order to minimize the cost in terms of individual service and in terms of management. The challenge
can be the management of client/server network which needs a greater effort. Network computing:
The benefit in this case can be the reduced work load which tremendously increases the efficiency
of the
... Get more on HelpWriting.net ...
Proposal for SBS 2011 Essay examples
Here at Knight Lite, commitment to long term operations is of great importance. Taking pride in a
growing customer database and knowing how well business has flourished are two key factors in
determining how current operations are beginning to show age and are no longer fit for the
company. Technically, the current in–house systems are running Windows 2000 Pro and are
centrally connected to server, with a Small Business Server 2003 configuration. A migration to
newer operating systems highly recommended in order to achieve optimal work performance, with
all terminals upgrading to Windows 7 Enterprise and the server over hauled to Small Business
Server Standard Edition 2011.
Knight Lite provides first class, 24 hour concierge service. As ... Show more content on
Helpwriting.net ...
Attached is a sample list of requirements for Small Business Server 2011 and comparison to the
current existing setup (Microsoft Technet):
Hardware Knight Lite SBS 2011 Requirements
Processor Pentium IV 1.6 GHz x86 Quad core 2 GHz 64–bit (x64) or faster
Physical Memory 1 GB of RAM 8 GB of RAM
Storage Capacity 80 GB 120
Optical Disc Drive CD–ROM DVD–ROM
As far as hardware requirement, the real world cost is not too much. A decent home–based server
would range in cost from roughly $400 to $500. The Small Business Server 2011 operating system,
however, currently sells for about $1,000. The software cost can rise, depending on the amount of
CALs (Client Access Licenses) that are purchased. Customers can acquire additional 5–packs of
CALs for the number of users or devices they wish to connect to Windows Small Business Server
2011 through Microsoft at about $360 (Microsoft Online Store). With that in mind, Knight Lite as a
company would need to pay around $2,000 to cover all the users and their devices. Despite the
initial cost to migrate to Small Business Server 2011, there are quite a few benefits that greatly
outweigh the negatives, one of these being the configuration of the server and the user access.
Attached is a screen shot of the standard task list that is automatically displayed when the
installation of the server operating system is completed, but not configured (Stevens):
The standard console
... Get more on HelpWriting.net ...
Administering Desktop Clients: IT Consultation for Mr. Green
I.T Consultation For Mr. Green
CIS 329 – Administering Desktop Clients
August 11, 2013 Mr. Green has decided to implement a network within his small business. This is a
good choice in moving forward with his growing operations and size. He has several questions, and
already has a few opinions about how he will go about this implementation, including both the
software and hardware involved. My job as a private computer consultant will be to clarify some of
the common misconceptions made by Mr. Green, and ensure that his network implementation will
allow him to reach the goals he has as a small business owner. Mr. Green does not seem to have any
interest in a Windows–based server up–front, ... Show more content on Helpwriting.net ...
Usually this service would run from a server as opposed to a workstation running Windows 7
Ultimate. The closest Mr. Green could get to GPOs would be putting restrictions on the workgroup
functionality, but there are very few settings that would mimic the functionality of a server.
Several years pass, and Mr. Green is now running a network with Windows Server 2008, as well as
Windows 7 Enterprise. The migration of the other machines on the network is now simpler, as there
are machines on the network that are designed to simplify network infrastructure. One technique he
could use to manage his other workstations and install Windows 7 Enterprise correctly on each one
is a function called AppLocker, which "Specifies what software is allowed to run on the users PCs
through centrally managed but flexible Group Policies" ("Windows 7 enterprise," 2013). He also has
the option to put the installation media on his Windows Server 2008, within a folder that is shared
across all computers. This is different from Windows 7 Ultimate because he can set group policies
and permissions on each group of programs and files his workers need access to. Group Policies are
yet another way that Mr. Green can implement software installations across a few dozen computers,
and is probably the most effective way.
... Get more on HelpWriting.net ...
Building a Small Business: American One Car Essay
This study, since I have been tasked as a network consultant for American One Car will cover the
most reliable and efficient approach to building a small business network so American One Car and
its staff can perform its duties without worry from the network side. First before we begin to cover
hardware and internet speeds it is important first to cover a few questions to get a better feel as to
what we are going to need. Since this is a small business we will be covering things not typically
seen in a home network so the first thing we will ask is whether American One Car will be housing
any servers? The second thing to consider is whether the network will need a wired, wireless or both
connections. The third topic to cover is how many ... Show more content on Helpwriting.net ...
Since we have determined that there could be roughly anywhere from 10 – 18 people on I believe a
wired LAN is your most logical step. Based upon previous installations in the building we are given
a few options to consider including cable, DSL and fiber. Fiber is going to give you the fastest
speeds while something like DSL is going to save you the most money. If money is not a concern
and based on that fiber is already installed a lot of the upfront cost of the installation is already
covered, fiber would be the most recommended route especially if you plan to expand your business
to more employees as fiber will handle the extra load more efficiently than DSL or cable. Typically
DSL is going to give only up to 40Mbps while Fiber can offer anywhere from 150 to 500Mbps.
Since we have determined our best approach for internet connectivity it is time to determine the type
of hardware that will be needed to support this network. If we do decide to go with FIOS as our plan
it is important to make sure we have the hardware to support fiber to include switches and routers.
First off we are going to need a reliable router as it will be the main way in which we secure and
manage our traffic. For this size business I would recommend a Cisco 2900 series router because it
offers and supports a fiber connection as well as wired or wireless connectivity, which is also
important because of the companies need
... Get more on HelpWriting.net ...
3 Platform Research Essay
Presented By: Mohiuddin Rana Windows Server: Windows Server is a server operating system from
Microsoft Corporation. Windows Server offers ease of management through its interface. The
Windows Sever web hosting environment supports major Web programming languages and
databases such as PHP, MySQL, ASP.NET and MS SQL. Unix (Linux) Server: Unix is a registered
trademark of The Open Group that refers to a family of computer operating systems. Officially
licensed Unix operating systems include OS X (Apple), Solaris (Oracle), AIX (IBM), IRIX (SGI),
and HP–UX (Hewlett–Packard). Mac OS X Server: OS X Server, formerly Mac OS X Server, was a
separately sold Unix server operating system from Apple Inc. architecturally ... Show more content
on Helpwriting.net ...
Linux Server: Linux can choose the most suitable Linux–based server system. Those operating
system have adequate compatibility with the common hardware. For the example, Ubuntu is listing
the suitable hardware for the software they've developed. Mac OS X Server Mac OS X Server
includes additional services, applications, and administration tools for managing and deploying
servers. It's commonly found in small business, education, and large organizations. Findings:
Windows Server: Windows is in commercial buildings, industrial facilities; Advantage: 1.
Compatibility: Almost every application, driver will work on Windows. 2. Technical support:
Having so many users, you can always find someone (either online or offline) who can help you
with Windows. 3. Huge quantity of function: When you get to know Windows well, you'll find out
that there are so many functions that you can do almost anything quite easily. Disadvantage: 1.
Viruses: You may need to buy an antivirus program, although free ones exist. 2. Slow: Windows
requires a lot of computer resources (memory, processor, disk space), and thus, runs slower. 3. Price:
It easily costs over a hundred dollars. Mac OS X Server: Mac OS X is graphical–based operating
system, being released one year before it's Microsoft counterpart. Advantage: 1. Viruses: Apple
Macs get almost no viruses. 2. Reliability: Macs only run on Apple computers, and are thus less
prone to hardware and software crashing. 3. Looks: Let's face
... Get more on HelpWriting.net ...
Web Based Information System
Web–Based Application Development implications for project management and development
processes The unique nature of many web–based applications broadens the role of traditional project
management and adds a new dimension to the software development process.In addition to the
participation and contribution of analysts, designers, programmers, architects, managers, domain
experts and so on, web–based applications often contain significant multimedia content (images,
movie clips, sound clips and text) requiring specialist resources for their development. Multimedia
development Groups separate from the software engineers usually produce multimedia web content
in parallel, in a similar way that on–line help is typically produced by a ... Show more content on
Helpwriting.net ...
Specific cross–border e–commerce platforms and business partnering networks now make
globalization accessible also for small and medium sized companies. Face–to–face business
networking Professionals who wish to leverage their presentation skills with the urgency of
physically being present, attend general and exclusive events. Many professionals tend to prefer
face–to–face networking over online based networking because the potential for higher quality
relationships are possible. Many individuals also prefer face–to–face because people tend to prefer
actually knowing and meeting who they intend to do business with. General business networking
Before online networking, there was and has always been, networking face–to–face. "Schmoozing"
or "rubbing elbows" are expressions used among business professionals for introducing and meeting
one another, and establishing rapport. Business networking in the ICT domain Companies /
organizations –– and related value chains / value networks –– need some sort of IT support.
Traditionally, it is provided by software applications, software packages /suites, ERPs and/or
workflows; presently, also by different types of web–based innovations. A truly "ICT" business
networking approach rethinks –– and rebuilds –– the operating support from scratch, around two
key business features: information contributions, to be provided by the
... Get more on HelpWriting.net ...
Quality And Characteristics Of Different Platforms
Aim of this report is to identify nature, quality and characteristics of different platforms available
such as Peer–to–Peer, Client Server, and virtualization architecture to establish a communication
network between computers in relation with administration, security and usability. Communication
is the need for all businesses, with the growing number of population the demand to use better ways
to communicate and share resources are increasing, and thanks to the fast emerging new
technologies now organizations are able to share their resources efficiently. Today organizations can
easily established a network of the computers and devices to fulfill their need to share information,
files and resources over network. To do so, there are mainly three platforms available, each has its
own pros and cons. Even after establishment of the network there is also a need of care so that
network keep running smoothly without any problems. To optimize the working of the network, we
need to administrate the network with best practice in place. There are many roles and
responsibilities associated to in maintaining a network such as building, configuring, managing
user's permissions to performing regular test and optimizing network, but with the rise in the shift
the organization do their business also increases the threats associated to them. That is where the
need for security arises to protect with the increasing threats of malicious attack such as viruses,
hacking and botnets etc. So
... Get more on HelpWriting.net ...
Capstone Review Essays
Topic 1 – INPUT/OUTPUT Level 1 – Definition 1. A person wishes to purchase a personal
computer for home usage. Identify the internal hardware components this computer should contain.
a. Student should identify the following: Power Supply, Motherboard, CPU, RAM, HDD, USB ports
for I/O's such as mouse and keyboard. You also can add in DVD drives, I/O's for speakers, monitor,
and microphone. Level 2 – Application 2. Explain in simple terms the I/O process. a.
"Input/Output"... Data is entered into the computer through an input device such as a mouse or
keyboard; given the application used the CPU will process the data into output. Level 3 –
Troubleshooting 3. You typed "abcd" but the locally attached printer prints garbled text. How do you
go ... Show more content on Helpwriting.net ...
Can the PC connect to a different website? Topic 3 – SOHO Broadband Level 1 – Definition 1.
Describe popular broadband solutions available to consumers in today's market. a. Brief definitions
of broadband technologies such as ADSL, Cable, Satellite. A comparison and contrast of these
technologies will be a plus. Level 2 – Application 2. Design a broadband solution for a home
network that will accommodate access from multiple servers, computers, printers, TVs, phones, and
mobile devices for the home entertainment and data storage/sharing as well as telephone services. a.
The plan will incorporate the selection of the type of broadband technology and service provider,
and render a wiring design based on the flow plan of a typical home and the location of each
specific device determining the type of media and interconnection devices, including wired and
wireless, and the type of sharing solutions for entertainment and data services with necessary
security controls. Level 3 – Troubleshooting 3. A small law office is equipped with a broadband
service. The office network has recently encountered various symptoms of degraded services. Some
individuals are not able to access data from the file server hosted in house from time to time, while
some others are not able to access the email and database through the internet occasionally. How do
you propose to determine the cause and correct it? a. The answer should incorporate a logical
analysis to identify
... Get more on HelpWriting.net ...
An Introduction of a Network Consulting Business
1. Prepare an opening statement that specifies your organization's capacities to handle a deployment
of this size. The company being discussed in this paper is a small–sized network consulting business
that concentrates on LAN setup, Inter–LAN routing framework, topology structures, and VLAN
setups. Our quality group of specialists is all CCIE certified in the wide–ranging yet specific
services that our company offers for the 2 networks when they are combined. Numerous of our
experts are extremely renowned ranked high in the sector. The subsequent aspects are a fractional
list of a few of the preceding ventures that our company has actually carried out for a selection of
companies and projects. References can also be set forth upon request. We have actually made a
hierarchical LAN topology structure. For an exclusive network we created their address system. We
offered added network safety by setting up port protection on switches. We have actually offered the
creating and setups for VLAN in numerous companies. We have actually offered appointments for
businesses on the kinds and named brand names to be utilized for switches, Ethernet, routers, and
numerous other networking gadgets. Established the appliances, software and tools for LAN Search
for a significant market player As shown in the info offered above, our business has actually dealt
with the majority of elements of offering an efficient network design for a selection of modern
businesses. Our group of
... Get more on HelpWriting.net ...
The Availabilty of the Internet of Everything Essay examples
Introduction The internet of everything (IoE) can be briefly described as the connection that could
exist and relate people with people (P2P), machine with machine(M2M) and people with machines
(P2M), this can be summarized as connection between people, processes, machines or things and
data, what this also means for P2P connection is that in terms of distances, cultures it will bring
people from different parts of the world together and thus making them understand each other's
difference which somehow bring the citizens of the world closer together, in terms of M2M it will
allow for artificial intelligent machines to be able to maintain themselves which could result in the
saving of funds and in terms of M2P it will allow for better ... Show more content on
Helpwriting.net ...
f the time for backup generators to come online as this will allow for a continual power supply if the
generators have a problem coming online also the generators have to be able to power the
infrastructure for more than 48 hours , the other thing that will be needed is the a cooling component
it is known that since the data center will contain many components it will over heat and when they
do they behave abnormally or stop operating so a reliable cooling fan will be needed to keep them
cool, a network connection with in the data center to allow for data to be transmitted in and out of
the data center and this thus will require more bandwidth transmition as huge ammounts of data will
be dealt with, a Halon fire suspension which is a liquefied compressed gas that stops the spread of
fire by chemically disrupting combustion this means unlike water it won't soak the components
which will somehow allow for insurance to pay so this thus make it an ideal fire suppressor for the
data center, also the use of real time monitoring software to keep an eye on the every component of
the data center so that any abnormalities can be noticed and taken care off as soon as they occur, and
also one important component or action that will be needed is a backup of the data that is in the data
center as it has to be established that something can happen to the data center the information that
was in it can still be accessed and the backups need to be tested after a while to ensure that they
... Get more on HelpWriting.net ...
Windows NT 40 vs. Lynix Essay
Windows NT 40 vs. Lynix Founded in 1975, Microsoft (Nasdaq "MSFT") is the worldwide leader in
software for personal computers. The company offers a wide range of products and services for
business and personal use; each designed with the mission of making it easier and more enjoyable
for people to take advantage of the full power of personal computing every day. The Linux operating
system is not suitable for mainstream usage by business or home users. Today with Windows NT
4.0, customers can be confident in delivering applications that are scalable, secure, and
reliableyet cost effective to deploy and manage. Linux clearly has a long way to
go to be competitive with Windows NT 4.0. With the release of the Windows ... Show more content
on Helpwriting.net ...
Myth: Linux performs better than Windows NT
Reality: Windows NT 4.0 Outperforms Linux On Common Customer Workloads
The Linux community claims to have improved performance and scalability in the latest versions of
the Linux Kernel (2.2), however it's clear that Linux remains inferior to the Windows NT 4.0
operating system. For file and print services, according to independent tests conducted by PC Week
Labs, the Windows NT 4.0 operating system delivers 52 percent better performance on a single
processor system, and 110 percent better performance on a 4way system than similarly
configured single processor and 4way Linux/SAMBA systems. For Web servers, the same
PC Week tests showed Windows NT 4.0 with Internet Information Server 4.0 delivers 41 percent
better performance on a single processor system and 125 percent better performance on a
4way system than Linux and Apache.
For ecommerce workloads using secure sockets (SSL), recent PC Magazine Windows 4
tests showed Windows NT 4.0 with Internet Information Server 4.0 delivers approximately five
times the performance provided by Linux and Stronghold.
For transactionorientated Line of Business applications, Windows NT 4.0 has achieved a
result of 40,368 tpmC at a cost of $18.46 per transaction on a Compaq 8Way Pentium III
XEON
... Get more on HelpWriting.net ...
Understanding The Technologies Required For E Commerce
Assignment 1: Understanding the technologies required for e–commerce
Shops are capable of being placed into three categories to separate and even differentiate them by
how they trade, the first being 'Bricks'. These shops/businesses have no other way of trading other
than customer facing outlets requiring physical transaction of products. Businesses that would be
categorized as 'Bricks' would usually be small retailers such as local grocery stores and small local
restaurant's.
The second category is 'Clicks' which is exactly as it sounds, it simply means that the business is
only able to trade using the internet. Amazon is a well–known online business selling solely through
online distribution using nothing but warehouses to store and then dispatch their products. This type
of business would be categorized as 'Click' as customers are only able to purchase from Amazon
through the use of the Internet. Other examples would include Ebay and also Steam.
The third and final category is labelled 'Bricks and Clicks' as they utilize both trading methods to
trade. They will have customer facing shops for consumers to enter and physically purchase while
also having a website that enables customers to also shop online and have their item delivered
directly to them. Shops using this method would include most major supermarkets such as Tesco,
Sainsbury's and ASDA.
Before continuing to decide whether continuing your business online through e–commerce, first we
need to fully understand
... Get more on HelpWriting.net ...
Creating A Website For An Effective Website
Having a website allows your network to benefit from an online presence and educate customers to
its business. But what does it take to create such a website? What are the steps needed to create and
operate an effective website, a site that encourages customers to do business with you? Technically,
the creation of a single site is not something difficult: thousands of new sites are appearing on the
web on a daily basis. But this "apparition" proves to be a handicap in terms of appearance and
operation. Here are 6 steps to create a site likely to leave a favorable impression in the minds of
customers, actual and potential. 1. Think about the goal, to the look and feel of your site Begin this
discussion by assessing other similar sites in your industry or other network sites. Determine what
you think is useful or not useful at these sites. Ask yourself the following questions: What
connection is there between fashion design, use of illustrations and colors or tone of the text and the
activity itself? Does the site offers easy access to the information that most customers have an
immediate need? Will they want to visit it again, and why? Is it clear that the information will be
updated on a regular basis? The fact to consider other sites allow you to better understand what you
expect from yours. 3. Remove a domain name Your domain name is the Internet address that users
type into their browser to find your site. For example, www.votreentrepise.com. You must file all
domain
... Get more on HelpWriting.net ...
Cis 175 Assignment 1
Strayer University
Week 10 Assignment 3: Business Intelligence and Data Warehouses
CIS175008VA016–1154–001 Intro to Networking
Professor Obi Ndubuisi
June 14, 2015
For the company DesignIT, I would use a LAN type of network (for local–area network). This
networks several computers, a mail (exchange) server, a database server and a file share server in
one building and interconnects with each switch or backbone. I chose this for this small space
because it is less than 100 square feet and is all within a single dwelling. This way the employees
can all share their resources with one another, an intranet, database and printers.
This network only needs a single modem with wireless capabilities and an optional access point ...
Show more content on Helpwriting.net ...
DesignIT would only need a basic television package with a single receiver in their conference room
and a 10–15 line telephone service.
Point–to–point topology would not be useful because each computer is connected directly. Mesh
topology requires many cables and can handle a high–volume traffic. If the wireless access point or
router fails it would only affect the computers and devices in the particular area, same with switches
but not connected by a cable directly from the wall. In DesignIT's case, hopefully the failure is just
in the access point so that at least the employees would have a medium–weak to weak wifi
connection. I would suggest a central backbone installed in ceiling above the reception area. CAT5
or CAT6 cables can support up to 100 meters before signal degradation. These connections can be
routed form the reception area ceiling coming out like a star and then down the walls or separations
and out to a port jack. Each workstation's PC would connect to their corresponding wall Ethernet
jack. In many workstation cases, the cable goes form the wall jack to their phone on their desk and
back down to their CPU which usually sits on the florr or a lower–sitting platform.
For a small company, like the last company I worked for (121 computers, 14 servers) or DeignIT,
client–server networking would be the best to implement. All the computers are set up like desk
workstations and connected to the same network with hubs.
A server or several
... Get more on HelpWriting.net ...
Summary: Administering Windows Server Operating System
Designed to help prepare for the Administering Windows Server exam, part of MCSE Server
Infrastructure Certification. Prerequisite: CMIT 369. An overview of the management and
administration of Windows Server operating systems. The goal is to manage and troubleshoot
features of Windows Server operating systems, including Active Directory, DNS, Group Policy,
Desktop Security, Remote Access, Windows Deployment, and User Accounts.
Course Outcomes
1. Deploy, manage, and maintain Windows server to provide critical network services.
2. Configure and manage Windows services to secure the network infrastructure.
3. Implement secure remote access based on organizational IT policies
Outcome 1: Deploy, manage, and maintain Windows server to provide ... Show more content on
Helpwriting.net ...
I created generic containers, OUs, and Group Policy objects. I have performed backup and recovery
of Active Directory and after learning and performing these skills in the lab, I continued using many
of them in the production environment as a member of the Windows Server engineering and
deployment teams. Active Directory, users, and systems within Active Directory utilize DNS as a
mechanism to locate domain controllers. Additionally, the namespace of the Active Directory
domain structure is built on top of DNS naming structures (Microsoft, 2014). As a result, a
functioning DNS is required in order to install and configure Active Directory. In support of the
Active Directory installation for the Windows Server lab, I installed and managed DNS with Active
Directory integrated zones. I configured forwarding with the corporate production DNS
infrastructure. I created, edited and deleted static host [A], alias [CNAME] and reverse [PTR]
records for Non–Windows hosts. I installed and managed DHCP in the Windows Server lab, and
managed scopes and IP reservations for servers. I also implemented Distributed File System [DFS]
services to create software installation shares that were available in each of the lab's local
environments. DFS provides a mechanism to share files that are distributed in multiple locations
across a network in a manner that
... Get more on HelpWriting.net ...
A Research Study On Network Administration Essay
ACTIVE DIRECTORY JULIUS MC NEIL In this independent study, I will be gathering unique
data; I will exercise my analytic skills to produce a paper on the subject of Network Administration.
Practice in research methods and quantitative analysis will be of great benefit and relevance to my
future work. The independent study will allow me to explore my interest in the areas of nutritional
anthropology not covered in existing courses. The purpose of the study: The study is focused on my
goal for the future, to become a network administrator. Network administration is a profession
where an administrator is in charge of the maintenance of the computer hardware and software
systems that make up a computer network. The major role of the network administrator varies from
company to company, I look forward to this career because of my passion for networking and
computers and also due to the fact that computers are used internationally and also this would lead
to a promising career in a field that is growing bigger every day. Objectives: Upon completion of the
independent study, I will have acquired knowledge of network administration and cover a wide
range of technologies used in a network or telecommunications network. Gain confidence in
methods of field research gather and analyzed personally collected data, and finally, produce a
professional paper in the field of network administration. Also, I would have established a more
professional work and research habit.
... Get more on HelpWriting.net ...
Network Security: Analysis of Windows Server 2008
Solution 1: With Windows Server 2008 Applications, you can make OU's, Groups and User's, and
can set GPO's for the OU's, Groups and / or Users requirements or restrictions.
Below are some reasons for upgrading to Windows Server 2008 R2 with service Pack 1(SP1). As we
go through each one of the issues stated above, we address the concerns and exploit Windows
Server 2008. With the new technology of today and the improvements with Windows Server 2008,
not only is Windows Server 2008 an OSI, but it is much more. So let us take a look at some of the
good reasons for upgrading.
Windows Server provides new virtualization technology that enables you to deliver more advanced
capabilities to your business for increased IT efficiency and agility. Whether you want to consolidate
servers, build a private cloud, or offer Virtual Desktop Infrastructure, the addition of these powerful
virtualization features enables you to take your datacenter and desktop virtualization strategy to a
new level. Windows Server is the newest Windows Server operating system from Microsoft. It is
designed to help organizations reduce operating costs and increase efficiencies and agility.
Windows Server expands the Microsoft virtualization strategy for both server and desktop
workloads by adding dynamic memory management for virtualized workloads with Dynamic
Memory and Microsoft RemoteFX for a rich end user experience with a Virtual Desktop
Infrastructure (VDI) and session virtualization (formerly known as
... Get more on HelpWriting.net ...
Hrm/531 Week 3
To meet the requirements desired by the President and Vice President of the Acme Corporation, I
believe that they will only need four servers, considering it is such a small business of less than 20
people. All of the servers will be running Windows Server 2008 R2. The following servers will be: a
file and printer server, an email and web server, and an SQL server. The file and printing services
will be put on the same server because they will more than likely be used together. "A file server
allows you to centrally locate files to be accessed by multiple people. Because the files are centrally
located, it is easier for multiple users to access and find files (assuming they are organized well) and
it is easier to back up these files. When using Microsoft Windows to provide file sharing, you will
usually be using Server Message Block (SMB) to access Microsoft Shares or shared folders"
(MOAC,2011). As for the printing side of the server, "multiple users can access a centrally located
printer using print services, ... Show more content on Helpwriting.net ...
"The mail server is a server that stores and manages electronic messages (email) among users. If you
are using Microsoft email products, you will be using Microsoft Exchange to act as your mail
server, and you would most likely access the email using Microsoft Outlook or a web browser"
(MOAC, 2011) . Having web services is ideal, as well. "Using a web server to provide web services
means that users can access web pages using their browsers. These web services may be used to do
research, provide leads for sales, allow customers to purchase goods and services, and provide
customer support over the Internet. Web services may also be used to provide an easy method to
access databases, run reports, track sales leads, provide customer support, and even help you with
payroll and human resources" (MOAC,
... Get more on HelpWriting.net ...
Pos 355 Week 5 Operating Systems Analysis Team Paper...
POS 355
Week 5
Operating Systems Analysis
Team Paper
Introduction When considering which operating system for a home or business office computer or
network of computers, it is important to evaluate all areas of the different operating systems options.
When evaluating Microsoft Windows XP, Microsoft Windows Server 2008, and Linux operating
systems it is important to consider the system requirements, the different editions available, security
features, system features, updates and support, user interface, and cost effectiveness. Depending on
what a person's or organization's needs are will determine which operating system is best fit.
Operating System Requirements
Windows XP The system requirements for Windows XP Home Edition ... Show more content on
Helpwriting.net ...
It is similar to Windows XP Home, but is limited to low–end hardware, can only run 3 programs at a
time, and has some other features either removed or disabled by default.
Windows XP was based on Windows NT4 and Windows 2000 technology. Microsoft was
positioning the Windows XP Professional Edition to replace Windows NT4 and Windows 2000
Professional. In addition, the Windows XP Home edition replaced Windows 95/98/ME (TechGenix
Ltd., 2002). The gap between the Home and Professional Editions begins to widen when it comes to
larger computer networks. Some of the features that are limited to the Professional Edition are
Remote Desktop, Offline Files and Folders, Scalable Processor Support, Encrypting File System,
Access Control, Designed to manage Microsoft Windows Servers, Centralized Administration,
Group Control, Software Installation and Maintenance, Roaming User Profiles, and Remote
Installation Service.
Windows Server 2008
Windows Server 2008 R2 has seven different versions. Each edition provides key functionality to
support any sized business and IT challenges. These editions will be described in this section.
Windows server 2008 Foundation is the least expensive. It is an entry–level foundation that is
targeted for small businesses. It has a reliable technology that provides organizations with the
foundation to run the most prevalent business applications.
Windows server 2008
... Get more on HelpWriting.net ...
Quickbooks
Running Head: QUICKBOOKS QuickBooks BA Project Paper Penn State Harrisburg University I.
INTRODUCTION Information Technology (IT) is a foundation for conducting business today. It
plays a critical role in increasing productivity of firms and entire nation. It is proven that firms who
invested in IT have experienced continued growth in productivity and efficiency. Many companies'
survival and even existence without use of IT is unimaginable. IT has become the largest component
of capital investment for companies in the United States and many other countries.
Accounting/Finance application systems like Peachtree, Net Suite and QuickBooks let you manage
your business with a little or no experience. All three application systems allow ... Show more
content on Helpwriting.net ...
For example, a screen used to record a check resembles a paper check or a customer invoice
resembles a paper invoice form. After the information is entered, QuickBooks automatically records
the appropriate accounting transaction using the information entered. Another feature that is offered
with QuickBooks is the customization for individual needs. Using the professionally designed
templates or build your own templates and customized forms with the QuickBooks Layout
Designer, users can create professional looking estimates, invoices, sales receipts etc. to meet the
individuals needs. In addition to customizing the look, QuickBooks allows users to turn features on
and off, change the color of the interface to make it easier to distinguish between companies, and
customize the reports to focus on specific information. QuickBooks Merchant Service is another
feature that is offered, which allows the users to process credit cards with a click of a button. It is the
only credit card processing solution that's completely integrated into QuickBooks. It is sold
separately and there is no need for additional hardware or software. It saves the user money and
makes the job easier by keeping more accurate records. Besides that it also tells the user when
payments have been deposited to the bank account and it also allows the user to download merchant
fees into QuickBooks. Being able to access any important
... Get more on HelpWriting.net ...
NT 2580 Project Part 2
Issue one. Based on the premise that Richman has 5,000 employees throughout the main office and
several branch offices, you must research solutions and detail the appropriate access controls
including policies, standards, and procedures that define who users are, what they can do, which
resources they can access, and which operations they can perform on a system.
Issue two. Based on the premise that most of the managers have BlackBerry devices for instant
communications and all employees are provided cell phones, you must research and detail the
cryptography methods to protect organizational information using techniques that ensure its
integrity, confidentiality, authenticity, and non–repudiation, and the recovery of encrypted
information ... Show more content on Helpwriting.net ...
Windows Server also provides enhanced management control over resources across the enterprise. It
is designed to provide better energy efficiency and performance by reducing power consumption
and lowering overhead costs. It also helps provide improved branch office capabilities, exciting new
remote access experiences and streamlined server management.
Overview of Top 10 Reasons to Upgrade:
Powerful Hardware and Scaling Feature; PHSF Reduced Power Consumption; RPC Hyper–V in
Windows Server 2008 R2 with SP1; HV Expand Desktop Deployment Options with VDI; EDDO
with VDI Easier and More Efficient Server Management; EMESM Managing Data Not just
Managing Storage; MDNMS Ubiquitous Remote Access; URA Improved Branch Office
Performance and Management; IBOPM Simplified Management for SMBs; SMSMBs The
Strongest web and Application Server to Date; SWA
Top IT Pro Tasks Made Easier by Windows Server 2008 R2 with SP1
Do more with less. This has been the server manager's mantra for several years but never more than
now. Fortunately, Windows Server 2008 R2 with SP1 has got your back with numerous and varied
features designed specifically to address
... Get more on HelpWriting.net ...
Difference Between Peer Server Vs Client Server Network
Client–Server network Vs. Peer–Peer network.
Key differences between Client Server network and Peer–Peer network:
1. Data path: The prominent difference between client to server network and peer to peer network is
that in a client to server network, the designated clients request for services and the servers provide
them (data flows from server to client), but in peer to peer network, peers act as service providers
and service consumers and service providers at the same time (data flows within peers).
2. Configuration: The Client–server network requires a central security database which stores blocks
of shared data as a backup, but the peer–peer network does not contain the central security database
as each peer contains its own data.
3. Purpose: The purpose of Client–server network is to share ... Show more content on
Helpwriting.net ...
If any user crashes a computer and if some shared residue file is deleted, it poses serious threat to
the stability of the entire network.
9. Hardware and software requirements:
Client–Server network: Let us consider a client–server network, with up to 25 users as an example.
Hardware requirements:
 Dual processor: Each processor must be a Quad core with 2.6GhHz or more.
 16GB RAM.
 RAID–5 (Redundant array of independent drives) configuration with 3 disks of 250GB storage.
 Ethernet cables.
 This network has a dedicated server which has more computing speed, more memory and more
storage space. Software requirements:
 Microsoft Windows server 2008 R2 64 bit with SQL server 2008 R2 64 bit.
 CALs*, as much needed. *CAL– It is not a software product but it is a license that gives user the
rights to access the services of the server. In a Client–server network, the software needs to be
installed only in the server and not in the client
... Get more on HelpWriting.net ...
Sample Security Plan X
Sample Security Plan: Adventure Works
The following sample security plan was put together by a fictitious company named Adventure
Works. Because of the increasing focus on security in the computing world, the company has
decided to review security practices and put together a plan to improve those practices. Adventure
Works' needs may differ from your company's needs, but reading through their plan should give you
a good idea of the steps involved in creating a good security plan.
This plan was developed by Matthew, Managing Director of Adventure Works, in cooperation with
other key members of the Adventure Works staff.
About Adventure Works
We are a 20–person firm specializing in high–adventure travel packages. Our staff ... Show more
content on Helpwriting.net ...
The remainder are linked by an 802.11g wireless network with an access port. All computers run
Windows XP Professional except for the two print servers and two administrative computers, which
run Windows 98.
Security
We compared each computer against the checklist in the Security Guide for Small Business. We also
ran the MBSA. These actions produced the following results:
Virus protection: Not present on six computers; not up–to–date on four computers; generally, most
users were aware of viruses but were a bit unsure about what they could do to prevent them.
Spam–filtering software: Many users have begun to complain about spam, but no protection is in
place.
Firewall: We thought the ISP's router included a firewall, but it doesn't; so, we don't have one.
Updates: All the Windows XP Professional systems are up–to–date because they were automatically
checking and downloading updates. However, several installations of Microsoft Office need
updating, and the Windows 98 computers are not updated at all.
Passwords: A random sampling
... Get more on HelpWriting.net ...
Microsoft Word : Operating Systems Essay
Operating systems:
It is very common that businesses use older versions of Microsoft Word, as it is reliable and not
costly at all, especially in smaller businesses such as dentists, etc. However, using old operating
systems might require the employers to give new employees training as most employees might not
be familiar with older versions of windows. Although windows 10 has been released, making its
predecessors cheaper, smaller firms cannot afford to upgrade to windows 7 to XP due to it being
costly and the entire system would be down for a while, it'll be difficult to manage information.
However a larger company will be able to afford it, businesses likes to use Windows OS due to the
fact being that it has better support than other OS, and it offers better hardware support e.g. printers,
scanners, etc.
Small businesses does not need a server for their business as they do not have a need of one, hence
they only requires in their workstations, which is commonly Windows OS, Windows 7 is the most
reliable out of windows 7/8.1/10, it is also an OS that has a user–friendly making the interface easy
to use. However larger businesses will require more work stations, larger businesses will also
require a server, or a computer that's more powerful than the work stations in order to store
resources and manage accounts, etc. The server will run a different operating system than the work
stations, e.g. Microsoft Windows Sever 2012, these are only beneficial to larger companies as
... Get more on HelpWriting.net ...
Report On Configuration Of An Intranet Based Client Server...
Second progress report
Progress of my report on configuration of an intranet based client–server system for the data
collection and data processing system with strong immunity against cyber intrusion
Introduction
The previous progress report was aimed at configuring the intranet client–server based network that
can be implemented to different organizations and institutions. I used CISCO packet tracer to
network the client–server system in order to make sure that all computers are in a position to share
and exchange data and information with each other effectively.
In this progress report, a lot has been done on installations of simple java codes in order to create a
program that will enable communication over the network. Using this ... Show more content on
Helpwriting.net ...
A good example of a client server java program is chat application in java which employs the
sockets which I specify 2017. I ran the code in my laptop, as local host because I did not have other
computers to initiate the IP address for them, I used only one device, my own one.
Whenever a person has already completed installation Microsoft Windows Server 2008 R2
(Microsoft, 2016) on their server, the window entitled Initial Configuration Tasks might come up:
The initial arrangement tasks framework is utilized to fulfill the most essential or, program functions
of Microsoft Windows Server 2008 R2. This particular window shows whenever the computer
performs. If you don 't want to come up like that, just click the bottom check box. If associative
error messages do not appear when the system of equipment operates than users must restart
Windows, click Start –> Run, type be, and press Enter.
Immediately after setting up the operating system, a few things you should do before continuing;
you must make sure that the computers connected to the Internet If this is the first computer, you
must make it a domain controller setup, this is not a requirement if the computer will not be a
domain controller.
The Server Name
Dedicated servers (Microsoft, 2016) in the network must have a specific name. The configuration
gives a default name that you can accept or change, accommodate windows installments, such as
Small Business Server and
... Get more on HelpWriting.net ...
Project Questions On Cloud Computing Essay
Contents Chapter 1 2 Introduction and Concept Formulation 2 1.1 Case Study and Problem
Statement 2 1.2 Objectives 3 1.3 Feasibility Aspects of the Project 3 1.3.1 Technical Feasibility 3
1.3.2 Legal Feasibility 3 1.3.3 Operational Feasibility 4 1.3.4 Economic Feasibility 4 1.3.5 Schedule
Feasibility 4 1.4 Resources Required 5 1.4.1 Windows Server 5 1.4.2 Windows Server 2012 R2 5
1.4.3 Set–up 5 1.4.4 Virtual Machine 6 1.5 Introduction of Cloud Computing 6 1.5.1 Introduction 6
1.5.2 Example 7 1.5.3 Why to use Cloud Computing 7 1.5.4 Benefits of Cloud Computing 9 1.5.5
Types of Clouds 10 1.5.6 Cloud Computing Services 11 1.5.7 Cloud Computing Architecture 12
1.5.8 Security concern 13 1.5.9 Privacy Concern 14 1.5.10 Virtualization 14 1.6 Summary 16
Chapter 1 Introduction and Concept Formulation 1.1 Case Study and Problem Statement Dhaval
Desai Group, IT Company in Auckland, who serve over 1000 customer through its 20 offices and 5
different global sites. The company provides logistic software and their support. The company
develops customized logistic system for parcel service. Logistic system has to handle around 400
million parcels a year. They need effective solution to handle all structure. They have identified the
benefits of Cloud Computing and start putting into effects. It works for them in various reasons and
shown excellent performance. Hardware and software demand reduced for employees. The
employees have to run Cloud Computing System to perform their IT
... Get more on HelpWriting.net ...
Ms Windows vs. Unix/Linux
MS Windows vs. Unix/Linux
University of Phoenix
POS/420 Introduction to Unix
October 20, 2008
Scott Stewart
MS Windows vs. Unix/Linux
The Microsoft and Linux operating systems have been long considered to be in a competition to be
the best operating systems on the market. This paper will compare and contrast these operating
systems to help the consumer decide which is right for his or her environment. Such subjects as;
cost, market share, hardware requirements, file processing, programming capabilities, availability if
application software, networking, and user interface will be examined.
Cost
The cost difference between running a Linux desktop / server compared to a Microsoft desktop /
server is overwhelming. ... Show more content on Helpwriting.net ...
Finally, marketing is a big "reason" why Microsoft still holds a large place in the desktop market
share. Microsoft is constantly keeping their products in the public eye view, where Linux does not,
causing people to know of Microsoft desktops but not so much about Linux desktops. With that said,
while Microsoft does hold a dominate place in the desktop world, the same is not so true in the
server world.
In the server marketplace, Microsoft is losing ground quickly to the Linux Server. Linux has been
gaining ground in the server world for several reasons including; cost, ease of use, and
dependability. The cost of the Linux server is much lower than that of the Microsoft server as we
examined earlier. This cost difference is opening up IT departments to the ideal of using Linux over
Microsoft, which in return is helping Linux gain server market share. Next, because Linux is
becoming easier to administrate, that too is moving IT departments to convert. In the past, Linux
was all "command prompt" oriented, today GUIs and such have been developed to help the novice
user with system administration. Finally, dependability is probably the biggest reason Linux is
gaining server market share. Perhaps the best way to explain Linux dependability is to explain that
Linux does not need to be rebooted once a week. But in
... Get more on HelpWriting.net ...
Riordan Manufacturing Upgrade
Riordan Manufacturing is a privately held company with plant operations in Albany, Georgia;
Pontiac, Michigan; Hangzhou, China. The Corporate Headquarters are located in San Jose,
California. Riordan Manufacturing is a subsidiary of Riordan Industries. The Chief Operating
Officer (COO) is Hugh McCauley and the Chief Financial Officer (CFO) is Dale Edgel. The
Company employs a work force of 550 people throughout the four locations. Corporate
Headquarters in San Jose, California has recognized a growing need to upgrade the network
operating system. Riordan 's current operating system is Windows NT 4.0. The Chief Information
Officer (CIO) Maria Trinh has asked the Manager of IT Services, Patricia Miller to assemble a team
of IT ... Show more content on Helpwriting.net ...
The company would also have the ability to grant access to the Internet to users that need this
resource while keeping others off the web. While most of the information that has been reviewed so
far has some impact from a security point of view their still is the ability to grow the system.
Windows 2003 is a network operating system that can grow with the company. Since the request to
upgrade only the San Jose, CA location this will not limit the company to this location. Over time
the company has the ability to integrate or update other locations to Windows 2003. This meaning
that network administration can be centrally located to one or two locations, the first location would
be used for the administration and the second location for back up and recovery.
Consideration of other Operating System
We decided to look at another Operation System (OS) besides Windows 2003. The Linux OS is an
open sourced system and can be adapted to work with–in a multi–platform environment. First we
looked at the fact that company wide we would have UNIX, Microsoft, and Linux if we went in this
direction. Linux and UNIX work well together since Linux is based on Unix. They will be able to
communicate with minimal intervention. Then the fact that the rest of the company would
... Get more on HelpWriting.net ...

Thin Client Vs. Fat Client Network Design

  • 1.
    Thin Client vs.Fat Client Network Design Thin Client vs. Fat Client & Network Design Considerations Introduction Network computing was created in an effort to allow users of a computer application to share data more easily than using stand alone computers. Clients on a client/server network store their application data on a central server. There are two categories of clients on a network. They were originally categorized by their hardware design, but today clients are categorized by the software application design and where the bulk of the processing is done and where the bulk of the application software is stored. A thin client, sometimes called a lean client, is a low–cost, centrally–managed computer. The term derives from the fact that small computers in networks tend ... Show more content on Helpwriting.net ... A product made by Citrix Systems actually simulates a Microsoft Windows desktop from a thin 400KB client. The Citrix product does have server capacity problems when sending multimedia over a network, but basic word processing and accounting programs are practical over a Citrix network. This transition has made it once again easier to operate in a centralized processing computing environment. Today further enhancements to HTML are allowing more graphic intensive applications to be created. Macromedia Flash, Shockwave, and ActiveX Controls are enhancements to HTML which are allowing for a thin client application to have dynamic graphical interfaces. Load balancing systems such as Coyote Point Systems Equalizers are allowing reliable networks with redundant servers and application load spread over multiple servers. Lower telecommunication and standard routing protocols such as BGP have allowed remote offices relying on network access to have redundant routes to the internet or central servers. Part B #1 Selecting computer hardware and software for a company is an important management decision. This decision will have a direct impact on operational efficiency and competitive advantage. The most important management and organizational issue to consider is total cost of ownership. In considering a fat client or thin client network application design, managers must know what their total cost of ownership is. In many cases a thin client design has a higher up ... Get more on HelpWriting.net ...
  • 3.
    It 315 Unit3 Assignment Portfolio Assignment ITS 315: Introduction to Networks Mazen Alkhatib December 23, 2012 Network Implementation Over four months, a very short period of time, a small accounting firm grew from five employees to fifty. The existing network architecture could no longer support the exponential growth. Peer–to–Peer networks work very well in a small office environment. Once the ratio of employees exceeds around five employees resources, file storage and a plethora of other network disasters begin. The obvious solution was to recommend a change. As explained in the proposal the proposed upgrade from a peer–to–peer network architecture to client/server was an imminent necessity. Cable Recommendation The accounting firm ... Show more content on Helpwriting.net ... Our intention is to do the aforementioned in a manner that will allow us to manage all of the files and resources from a central location by implementing a server to our current network architecture. Reasons to Change. In the past our peer–to–peer network architecture served us well by providing us with a way to share our files and resources in a manner that did not require much planning. Unfortunately, as a peer–to–peer network grows it becomes more difficult to maintain due to its lack of centralized control which makes it un–scalable. With the addition of fifty individual workstations, security access and file storage control remains in the hands of the user. For example, should someone decide to delete a company file, there would be no way of knowing. Once there are more than five or six workstations attached peer–to–peer networks begin to pose as a security threat that may cause loss of sensitive company data due to virus and spyware attacks. Fortunately advancements in technology have provided a viable solution for rapidly growing small businesses such as our own called servers. Our Viable Solution. Adding a server to our current network will allow our employees to manage, store, send and process data from a centralized location 24 hours a day. In ... Get more on HelpWriting.net ...
  • 5.
    Essay about WillLinux replace Windows NT as the server OS... Linux VS NT / Will Linux replace Windows NT as the server OS of choice? "Linux is ready, or at least poised, to take on Windows NT for market dominance of server operating systems", said T. W. Burger Owner, Thomas Wolfgang Burger Consulting June 2000. It is the competitive choice for the user wanting a cheap, versatile, scalable, and reliable server solution. This article examines how Linux is ready to meet or exceed all user requirements that NT provides and why Linux should be the preferred alternative to NT. Included are the steps, requirements, options, and costs involved. Linux will soon surpass NT in most if not all network service applications. It is an open source, multi–vendor, and multi–platform server operating system ... Show more content on Helpwriting.net ... A small business server handles under 50 users and an enterprise server 50 or more. Novell Netware, Windows NT, and other scalable server solutions will handle various numbers of small business user loads. At a certain point a business will require an enterprise server product. This OS will be capable of handling massive user traffic and provide a total solution: a comprehensive set of software tools that will allow a business to be run using computers. An enterprise OS will be run on a minicomputer such as the HP9000 or a super–microcomputer with large data processing capacity like a multi–processor Alpha Chip–based machine. Enterprise computing is a term describing a set of software tools with a network OS at its core. Enterprise computing provides not only a place to store and share files but everything required for a business to gather and manipulate information throughout the business as well as Internet access for customer support and business–to–business data flow. An enterprise computing product is generally made up of the network OS and components that provide one or more of the following: file service, print service, Web page hosting, Internet access/firewall, mail service, backup, and database, and/or SQL database services. A server is, as the name implies, a provider of computing resources. It is part of a client–server network configuration that generally ... Get more on HelpWriting.net ...
  • 7.
    Operating Systems AnalysisPaper Operating Systems Analysis Paper There are many operating systems that are common on the Internet today. Back when computers could only handle one command at a time, in the 1950 's, was very time consuming. Now, about sixty years later, a computer 's operating system can handle many applications at one time while delivering speed and is user friendly. Although there are many Operating Systems that are available, there are onle a few of them that are well knon and is commonly used. Some of the most common Operating Systems that are used on the Internet are the Windows platforms such as Windows XP, Sun Solaris, UNIX, Apple, and Linux Apache. A DNS (Domain Name System) system is what powers the Internet that we use to browse. It is ... Show more content on Helpwriting.net ... The current version is 2.6 that was released nearly seven years ago in 2003. The operating system itself can be used in the home or small office and is continuing to rise to popularity (What is Linux, 2008). Windows began in 1985, version 1.0 and was the very first Windows operating system. Back then, computers were slow and were not able to multitask like we do now. in the 1990 's, Windows bagan to be used in the office environment even though there were still no Internet services. Nearly ten years later, Windows were used in almost all businesses and not so much in the homes. With the Windows 95 version, the home user was able to dail–up to the Internet. That set forth the business use of computers and the business environment. By the time that the Windows Windows XP became available, computers were widely used all over the world. This version took care of the basic needs of all home and office use by being fast, reliable, and secure (The History of Microsoft Window 's Early Operating Systems, 2010). References Linux Online Inc. 2008. Linux Online. What is Linux. Retrieved July 31, 2010 from http://www.linux.org/info/ Miller, R. 2010. ArticleBase.com. The History of Microsoft Window 's Early Operating Systems. Recieved July 31, 2010 from http://www.articlesbase.com/operating–systems–articles/the–history– of–microsoft–windows–early–operating–systems–1740192.html The Open Group. 2010. UNIX. What is UNIX. Retrieved July 30, 2010 ... Get more on HelpWriting.net ...
  • 9.
    Quickbooks Accounting SoftwareEssay I. INTRODUCTION Information Technology (IT) is a foundation for conducting business today. It plays a critical role in increasing productivity of firms and entire nation. It is proven that firms who invested in IT have experienced continued growth in productivity and efficiency. Many companies' survival and even existence without use of IT is unimaginable. IT has become the largest component of capital investment for companies in the United States and many other countries. Accounting/Finance application systems like Peachtree, Net Suite and QuickBooks let you manage your business with a little or no experience. All three application systems allow the users to manage the companies' capital including bookkeeping, inventory, ... Show more content on Helpwriting.net ... It provides the most comprehensive tools for small business financial management. It is used to track expenses, prepare and send invoices, prepare financial statements, track inventory levels, and many other jobs that small businesses must perform to stay successful. New versions like Simple Start for new businesses and Enterprise version for larger businesses is currently out on the market available to purchase. Besides the desktop software, QuickBooks is offering an online version which is hosted though the online edition. Simple Start is the so called most simple version. It is designed for users that do not want or need full–fledged accounting software but still want an efficient way to keep track of sales, expenses, and customers. It is designed to help the user see how much money was made in a given month, which invoices have or have not been paid, who are the best customers etc. The "Tax Detail" report which is also available is designed to help the user save time during the tax time. It creates a report that can be handed to the accountant or the figures could be transferred to the return. Typical price for the Simple Start software package is $99.95. QuickBooks Enterprise Solutions software is the most powerful QuickBooks solution for larger, growing businesses that QuickBooks is currently offering. With the Enterprise Solutions software, one could save thousands in up–front and on–going system costs. ... Get more on HelpWriting.net ...
  • 11.
    Table Of Contents.I.Executive Summary2. Ii.Introduction2. Table of Contents I. Executive Summary 2 II. Introduction 2 III. Assumptions 2 IV. Network Design & Justification 4 Components Levels & Layouts Training Security Data Management (servers) V. Recommendations 9 Cost effectiveness vs Efficiency Expansion VI. Conclusion 9 VII. Appendix 10 Appendix A: Appendix B: VIII. References 11 Executive Summary Introduction The network for which the Public Relations Company (PRC) requires is one which uses the variety of technologies which will facilitate the company's employees. The use of the network will increase workflow and efficiency when dealing with clients allowing more feasibility in sharing data and using devices such as printers, projectors and OLED TVs. This is a project network design ... Show more content on Helpwriting.net ... As another resort the BYODs on the first level are able to connect to the network via a powerline adapter if they feel the need to have a physical connection to the network via a Cat cable from the powerline adapter. 2. Assuming that they don't use telephone communications rather they use the network internet as communication through their own or companies' mobile devices to communicate within the company or externally within protocol. 3. Assuming they don't need security cameras or Bio security in the server room which would be an added cost which would depend on how much expenditure the company is willing to invest into
  • 12.
    physical security. ThusI have left out these components in my diagram. 4. Wireless modems today mostly come with firewalls pre–installed, I have assumed for simplicity that the modem does not have a firewall and have placed one in the diagram in between the internet and the modem to show to Rebecca that there is protection for the network from malicious sources on the internet. 5. Since the senior staff have structural constraints I have assumed that can ascertain Wi–Fi connection via a Wi–Fi booster which will have 5Ghz speed enabled for their large data transfers across the ... Get more on HelpWriting.net ...
  • 14.
    Software Licensing ResearchPaper Software Licensing Microsoft Windows Server 2016 Microsoft Windows Storage Server 2016 (Standard Edition and Workgroup Edition) Microsoft Windows 10 Enterprise Windows Office 365: Office on PCs, tablets, and phones and Android, each user can install Office on 5 PCs or Macs, 5 tablets (Windows, iPad, and Android), and 5 phones ). (Cisco Small Business RV345 – Router – rack–mountable) Features Items and Capabilities The Cisco RV345 Dual WAN Gigabit VPN Router is the perfect choice for any small business network that requires performance, security, and reliability. An intuitive user interface helps you get up and running with Internet access in minutes. You'll enjoy reliable, highly secure connectivity that is so transparent you will ... Show more content on Helpwriting.net ... Prepare to meet tomorrow's business needs with native support for IPv6, which lets you take advantage of the latest networking applications and operating systems without having to upgrade your network. Reduce power consumption with "green" switches that employ power–efficient microprocessors and quiet, fan less operation in many models. Protect Your Business Investment Cisco 200 Series Switches offer the reliable performance, investment protection, and peace of mind you expect from a Cisco switch. Safeguard your investment with a limited lifetime warranty and a solution that has been tested to deliver the performance your business demands. Solve technical problems right away with expert phone support through the Cisco Small Business Support Center and extensive online tools. (PowerEdge R430 Server) Features and Capabilities Delivering peak 2– socket performance to space–constrained data centers, the PowerEdge R430 is a short–depth (24") entry rack server. It is an excellent fit for a wide range of workloads, including: High–performance computing (HPC) Web serving Infrastructure scale–out Surveillance and site security Performance Drive powerful performance across a wide range of workloads with the latest Intel® Xeon® processor E5–2600 v4 product family, with up to 22 cores per processor. Boost memory and I/O performance with: 12 DIMM slots that allow you to grow memory capacity over ... Get more on HelpWriting.net ...
  • 16.
    Riordan Windows OperatingSystem Upgrade Riordan Windows Operating System Upgrade SR–rm–006 Learning Team A Kevan Burton, Elizabeth Oshiro, Adam Steward, Jens Walker University of Phoenix POS/421 – Windows Server Networking Lydia Bell January 11, 2009 Riordan Windows Operating System Upgrade Riordan Manufacturing is a global manufacturing company of custom plastic products. Riordan has headquarters located in San Jose, California and additional plant locations in Albany, Georgia; Pontiac, Michigan and Hangzhou, China. Each of the company locations consist of aging and disparate computer system infrastructure. The company's Chief Information Officer, Maria Trinh, has submitted Service Request SR–rm–006 in an effort to recommend a potential upgrade of the Windows ... Show more content on Helpwriting.net ... System Requirements The system requirements recommended by Microsoft (2001) for Windows XP Professional include a personal computer (PC) with an Intel Pentium/Celeron family, AMD K6/Athlon/Duron family or a similar compatible processor with at least 300 MHz, or 233 MHz as the minimum requirement. The PC is also recommended to have 128 MB of RAM, or 64 MB at the minimum memory requirement. However, if only the minimum 64 MB is used, the performance of the operating system may suffer or have limited features. Additionally, a hard drive with at least 1.5 GB of available space is required. Riordan's San Jose office consists of Dell OptiPlex systems with 2.6 GHz Pentium 4 processors, 512 MB RAM and 60 GB hard drives, all comfortably above Microsoft's recommended hardware configuration levels. Costs The cost to upgrade to Windows XP Professional is priced at $189.99 per upgrade license (VioSoftware.com, 2009). While this cost is similar to the upgrade license cost of Vista, all PC's throughout all Riordan locations will only require upgrade licenses for Windows XP Professional, while upgrading the older Windows 98 PC's in Albany and Pontiac to Windows Vista will require full version licenses. For the 35 PCs in San Jose, the total software upgrade cost is $6649.65, plus installation time. Since these installations follow an upgrade path from existing older versions of Windows, installation ... Get more on HelpWriting.net ...
  • 18.
    Key Requirements SetBy Strata Engineering Ltd Introduction This report highlights key requirements set by Strata Engineering Ltd, in the briefing it was discussed that there are numerous changes that needs to be made in order for the company to maintain a firm contact with its clients all over the world and make the ICT network infrastructure efficient within the newly established ICT department in order to achieve that task. During the briefing the Managing Director put forward some suggestions regarding as to how to improve the ICT department network infrastructure, in the briefing the following points were discussed: (1) All IP addresses and Names dynamically managed (2) A redesigned logical structure to suit the organisational structure i.e. a centralised management of the office floor (3) Write permissions should be allocated to related jobs (4) Server based share strategy (5) A VPN server configuration so staff (consultants) only can connect to the network remotely (6) New laser printer to be installed, implementing a server printing strategy allowing all staff access to the printers, TD and Consultants printing jobs be processed quicker (7) Range of settings that would uniform the user environment (8) May extend operations into new European location, how IT could be managed from UK (9) A Budget of maximum £8000 is available and any purchasing or upgrade must be sourced from their preferred suppliers such as Dell UK (10) Keen to implement Windows server 2008 and wants to know the differences between an ... Get more on HelpWriting.net ...
  • 20.
    Nt1330 Unit 3Assignment 1 Question 1 – Goal/Introduction The goal of this lab was to set up a windows DNS server on the same network as the other Linux servers. This lab focused on using the windows DNS server to be the master DNS server with the Linux DNS server that was built in the last lab to be the slave. This means that the Linux had to be configured to be the slave and when the master (windows) was set up it would need the IP address or the hostname of the slave server (Linux). In order to configure the Linux to be the slave server, an edit to the dhcp.conf file in etc (/etc/dhcp/dchp.conf). Once in the file you need to add a zone with the name of the slave DNS server. In the options for it (anything inside the curly brackets) a type is needed. The type should ... Show more content on Helpwriting.net ... Windows Active Directory is a central hub where a system administrator can change anything about a users role in the organization and access on the network in a very short time unlike Linux. Because SELinux is host based that means each change to a user or group means going in and configuring them one at a time by hand while Active Directory GUI is much simpler to use when configuring. Another benefit to active directory is the ability to authenticate. Authenticating prevents a user without the proper rights to access something that they don't nee to edit or view. Once authenticated a user has access to all internal Microsoft services and features that the policy allows for. I feel that SELinux and OpenLdap if better for network management in the sense that it is very flexible and can better manage the network. The only downside to this is it is much harder to set up and configure. OpenLdap also has issues working with and connecting to windows devices on the network. It is very rare in an organization to only see Linux with no Microsoft servers or clients. Even though OpenLdap has the potential to be better at managing because of its flexibility a system administrator would be more inclined to use active directory because of its ease and compatibility with ... Get more on HelpWriting.net ...
  • 22.
    Pros And ConsOf The Internet Scenario 1 Introduction Internet is the major requirement of today's world. Without internet, it becomes very difficult to manage many things which are majorly distributed not only terms of geography but in terms of resources, system etc. Trident company is focused of this principal only, and hence managing network system in order to manage all the resources efficiently. This is accomplished by implementing different internet technology in order to provide efficient system so as to manage process of information exchange more secure and private. This may include wireless internet technology, intranet, email etc. But this strategy also has some pros and cons which may results in security breech for information that need to be exchanged. In the case of distributed system where all the process whole business depends upon the web, based information exchange process requires better network and security system in order to escape from serious security breech. Networking becomes primary requirement for every organization in order to run business smoothly with maximized profit. This is due to the increase in the demand of using network in the business in order to reduce the cost and to improve the efficiency and performance of the business. For example, the extend intranet enables the organization to establish communication between different departments as well branches in order to exchange the required data in real time. Following are the strategic competitive benefits that could be achieved by a company's use of extranets: Share Resources Real Time communication Data exchange Reduced Cost denial Every business support different type network requirement depending upon amount of data, size of business etc. Following are some different network which can be used for information exchange within or outside organization. Client/Server Networking: The benefit in this case can be the sharing of resources in order to minimize the cost in terms of individual service and in terms of management. The challenge can be the management of client/server network which needs a greater effort. Network computing: The benefit in this case can be the reduced work load which tremendously increases the efficiency of the ... Get more on HelpWriting.net ...
  • 24.
    Proposal for SBS2011 Essay examples Here at Knight Lite, commitment to long term operations is of great importance. Taking pride in a growing customer database and knowing how well business has flourished are two key factors in determining how current operations are beginning to show age and are no longer fit for the company. Technically, the current in–house systems are running Windows 2000 Pro and are centrally connected to server, with a Small Business Server 2003 configuration. A migration to newer operating systems highly recommended in order to achieve optimal work performance, with all terminals upgrading to Windows 7 Enterprise and the server over hauled to Small Business Server Standard Edition 2011. Knight Lite provides first class, 24 hour concierge service. As ... Show more content on Helpwriting.net ... Attached is a sample list of requirements for Small Business Server 2011 and comparison to the current existing setup (Microsoft Technet): Hardware Knight Lite SBS 2011 Requirements Processor Pentium IV 1.6 GHz x86 Quad core 2 GHz 64–bit (x64) or faster Physical Memory 1 GB of RAM 8 GB of RAM Storage Capacity 80 GB 120 Optical Disc Drive CD–ROM DVD–ROM As far as hardware requirement, the real world cost is not too much. A decent home–based server would range in cost from roughly $400 to $500. The Small Business Server 2011 operating system, however, currently sells for about $1,000. The software cost can rise, depending on the amount of CALs (Client Access Licenses) that are purchased. Customers can acquire additional 5–packs of CALs for the number of users or devices they wish to connect to Windows Small Business Server 2011 through Microsoft at about $360 (Microsoft Online Store). With that in mind, Knight Lite as a company would need to pay around $2,000 to cover all the users and their devices. Despite the initial cost to migrate to Small Business Server 2011, there are quite a few benefits that greatly outweigh the negatives, one of these being the configuration of the server and the user access. Attached is a screen shot of the standard task list that is automatically displayed when the installation of the server operating system is completed, but not configured (Stevens): The standard console ... Get more on HelpWriting.net ...
  • 26.
    Administering Desktop Clients:IT Consultation for Mr. Green I.T Consultation For Mr. Green CIS 329 – Administering Desktop Clients August 11, 2013 Mr. Green has decided to implement a network within his small business. This is a good choice in moving forward with his growing operations and size. He has several questions, and already has a few opinions about how he will go about this implementation, including both the software and hardware involved. My job as a private computer consultant will be to clarify some of the common misconceptions made by Mr. Green, and ensure that his network implementation will allow him to reach the goals he has as a small business owner. Mr. Green does not seem to have any interest in a Windows–based server up–front, ... Show more content on Helpwriting.net ... Usually this service would run from a server as opposed to a workstation running Windows 7 Ultimate. The closest Mr. Green could get to GPOs would be putting restrictions on the workgroup functionality, but there are very few settings that would mimic the functionality of a server. Several years pass, and Mr. Green is now running a network with Windows Server 2008, as well as Windows 7 Enterprise. The migration of the other machines on the network is now simpler, as there are machines on the network that are designed to simplify network infrastructure. One technique he could use to manage his other workstations and install Windows 7 Enterprise correctly on each one is a function called AppLocker, which "Specifies what software is allowed to run on the users PCs through centrally managed but flexible Group Policies" ("Windows 7 enterprise," 2013). He also has the option to put the installation media on his Windows Server 2008, within a folder that is shared across all computers. This is different from Windows 7 Ultimate because he can set group policies and permissions on each group of programs and files his workers need access to. Group Policies are yet another way that Mr. Green can implement software installations across a few dozen computers, and is probably the most effective way. ... Get more on HelpWriting.net ...
  • 28.
    Building a SmallBusiness: American One Car Essay This study, since I have been tasked as a network consultant for American One Car will cover the most reliable and efficient approach to building a small business network so American One Car and its staff can perform its duties without worry from the network side. First before we begin to cover hardware and internet speeds it is important first to cover a few questions to get a better feel as to what we are going to need. Since this is a small business we will be covering things not typically seen in a home network so the first thing we will ask is whether American One Car will be housing any servers? The second thing to consider is whether the network will need a wired, wireless or both connections. The third topic to cover is how many ... Show more content on Helpwriting.net ... Since we have determined that there could be roughly anywhere from 10 – 18 people on I believe a wired LAN is your most logical step. Based upon previous installations in the building we are given a few options to consider including cable, DSL and fiber. Fiber is going to give you the fastest speeds while something like DSL is going to save you the most money. If money is not a concern and based on that fiber is already installed a lot of the upfront cost of the installation is already covered, fiber would be the most recommended route especially if you plan to expand your business to more employees as fiber will handle the extra load more efficiently than DSL or cable. Typically DSL is going to give only up to 40Mbps while Fiber can offer anywhere from 150 to 500Mbps. Since we have determined our best approach for internet connectivity it is time to determine the type of hardware that will be needed to support this network. If we do decide to go with FIOS as our plan it is important to make sure we have the hardware to support fiber to include switches and routers. First off we are going to need a reliable router as it will be the main way in which we secure and manage our traffic. For this size business I would recommend a Cisco 2900 series router because it offers and supports a fiber connection as well as wired or wireless connectivity, which is also important because of the companies need ... Get more on HelpWriting.net ...
  • 30.
    3 Platform ResearchEssay Presented By: Mohiuddin Rana Windows Server: Windows Server is a server operating system from Microsoft Corporation. Windows Server offers ease of management through its interface. The Windows Sever web hosting environment supports major Web programming languages and databases such as PHP, MySQL, ASP.NET and MS SQL. Unix (Linux) Server: Unix is a registered trademark of The Open Group that refers to a family of computer operating systems. Officially licensed Unix operating systems include OS X (Apple), Solaris (Oracle), AIX (IBM), IRIX (SGI), and HP–UX (Hewlett–Packard). Mac OS X Server: OS X Server, formerly Mac OS X Server, was a separately sold Unix server operating system from Apple Inc. architecturally ... Show more content on Helpwriting.net ... Linux Server: Linux can choose the most suitable Linux–based server system. Those operating system have adequate compatibility with the common hardware. For the example, Ubuntu is listing the suitable hardware for the software they've developed. Mac OS X Server Mac OS X Server includes additional services, applications, and administration tools for managing and deploying servers. It's commonly found in small business, education, and large organizations. Findings: Windows Server: Windows is in commercial buildings, industrial facilities; Advantage: 1. Compatibility: Almost every application, driver will work on Windows. 2. Technical support: Having so many users, you can always find someone (either online or offline) who can help you with Windows. 3. Huge quantity of function: When you get to know Windows well, you'll find out that there are so many functions that you can do almost anything quite easily. Disadvantage: 1. Viruses: You may need to buy an antivirus program, although free ones exist. 2. Slow: Windows requires a lot of computer resources (memory, processor, disk space), and thus, runs slower. 3. Price: It easily costs over a hundred dollars. Mac OS X Server: Mac OS X is graphical–based operating system, being released one year before it's Microsoft counterpart. Advantage: 1. Viruses: Apple Macs get almost no viruses. 2. Reliability: Macs only run on Apple computers, and are thus less prone to hardware and software crashing. 3. Looks: Let's face ... Get more on HelpWriting.net ...
  • 32.
    Web Based InformationSystem Web–Based Application Development implications for project management and development processes The unique nature of many web–based applications broadens the role of traditional project management and adds a new dimension to the software development process.In addition to the participation and contribution of analysts, designers, programmers, architects, managers, domain experts and so on, web–based applications often contain significant multimedia content (images, movie clips, sound clips and text) requiring specialist resources for their development. Multimedia development Groups separate from the software engineers usually produce multimedia web content in parallel, in a similar way that on–line help is typically produced by a ... Show more content on Helpwriting.net ... Specific cross–border e–commerce platforms and business partnering networks now make globalization accessible also for small and medium sized companies. Face–to–face business networking Professionals who wish to leverage their presentation skills with the urgency of physically being present, attend general and exclusive events. Many professionals tend to prefer face–to–face networking over online based networking because the potential for higher quality relationships are possible. Many individuals also prefer face–to–face because people tend to prefer actually knowing and meeting who they intend to do business with. General business networking Before online networking, there was and has always been, networking face–to–face. "Schmoozing" or "rubbing elbows" are expressions used among business professionals for introducing and meeting one another, and establishing rapport. Business networking in the ICT domain Companies / organizations –– and related value chains / value networks –– need some sort of IT support. Traditionally, it is provided by software applications, software packages /suites, ERPs and/or workflows; presently, also by different types of web–based innovations. A truly "ICT" business networking approach rethinks –– and rebuilds –– the operating support from scratch, around two key business features: information contributions, to be provided by the ... Get more on HelpWriting.net ...
  • 34.
    Quality And CharacteristicsOf Different Platforms Aim of this report is to identify nature, quality and characteristics of different platforms available such as Peer–to–Peer, Client Server, and virtualization architecture to establish a communication network between computers in relation with administration, security and usability. Communication is the need for all businesses, with the growing number of population the demand to use better ways to communicate and share resources are increasing, and thanks to the fast emerging new technologies now organizations are able to share their resources efficiently. Today organizations can easily established a network of the computers and devices to fulfill their need to share information, files and resources over network. To do so, there are mainly three platforms available, each has its own pros and cons. Even after establishment of the network there is also a need of care so that network keep running smoothly without any problems. To optimize the working of the network, we need to administrate the network with best practice in place. There are many roles and responsibilities associated to in maintaining a network such as building, configuring, managing user's permissions to performing regular test and optimizing network, but with the rise in the shift the organization do their business also increases the threats associated to them. That is where the need for security arises to protect with the increasing threats of malicious attack such as viruses, hacking and botnets etc. So ... Get more on HelpWriting.net ...
  • 36.
    Capstone Review Essays Topic1 – INPUT/OUTPUT Level 1 – Definition 1. A person wishes to purchase a personal computer for home usage. Identify the internal hardware components this computer should contain. a. Student should identify the following: Power Supply, Motherboard, CPU, RAM, HDD, USB ports for I/O's such as mouse and keyboard. You also can add in DVD drives, I/O's for speakers, monitor, and microphone. Level 2 – Application 2. Explain in simple terms the I/O process. a. "Input/Output"... Data is entered into the computer through an input device such as a mouse or keyboard; given the application used the CPU will process the data into output. Level 3 – Troubleshooting 3. You typed "abcd" but the locally attached printer prints garbled text. How do you go ... Show more content on Helpwriting.net ... Can the PC connect to a different website? Topic 3 – SOHO Broadband Level 1 – Definition 1. Describe popular broadband solutions available to consumers in today's market. a. Brief definitions of broadband technologies such as ADSL, Cable, Satellite. A comparison and contrast of these technologies will be a plus. Level 2 – Application 2. Design a broadband solution for a home network that will accommodate access from multiple servers, computers, printers, TVs, phones, and mobile devices for the home entertainment and data storage/sharing as well as telephone services. a. The plan will incorporate the selection of the type of broadband technology and service provider, and render a wiring design based on the flow plan of a typical home and the location of each specific device determining the type of media and interconnection devices, including wired and wireless, and the type of sharing solutions for entertainment and data services with necessary security controls. Level 3 – Troubleshooting 3. A small law office is equipped with a broadband service. The office network has recently encountered various symptoms of degraded services. Some individuals are not able to access data from the file server hosted in house from time to time, while some others are not able to access the email and database through the internet occasionally. How do you propose to determine the cause and correct it? a. The answer should incorporate a logical analysis to identify ... Get more on HelpWriting.net ...
  • 38.
    An Introduction ofa Network Consulting Business 1. Prepare an opening statement that specifies your organization's capacities to handle a deployment of this size. The company being discussed in this paper is a small–sized network consulting business that concentrates on LAN setup, Inter–LAN routing framework, topology structures, and VLAN setups. Our quality group of specialists is all CCIE certified in the wide–ranging yet specific services that our company offers for the 2 networks when they are combined. Numerous of our experts are extremely renowned ranked high in the sector. The subsequent aspects are a fractional list of a few of the preceding ventures that our company has actually carried out for a selection of companies and projects. References can also be set forth upon request. We have actually made a hierarchical LAN topology structure. For an exclusive network we created their address system. We offered added network safety by setting up port protection on switches. We have actually offered the creating and setups for VLAN in numerous companies. We have actually offered appointments for businesses on the kinds and named brand names to be utilized for switches, Ethernet, routers, and numerous other networking gadgets. Established the appliances, software and tools for LAN Search for a significant market player As shown in the info offered above, our business has actually dealt with the majority of elements of offering an efficient network design for a selection of modern businesses. Our group of ... Get more on HelpWriting.net ...
  • 40.
    The Availabilty ofthe Internet of Everything Essay examples Introduction The internet of everything (IoE) can be briefly described as the connection that could exist and relate people with people (P2P), machine with machine(M2M) and people with machines (P2M), this can be summarized as connection between people, processes, machines or things and data, what this also means for P2P connection is that in terms of distances, cultures it will bring people from different parts of the world together and thus making them understand each other's difference which somehow bring the citizens of the world closer together, in terms of M2M it will allow for artificial intelligent machines to be able to maintain themselves which could result in the saving of funds and in terms of M2P it will allow for better ... Show more content on Helpwriting.net ... f the time for backup generators to come online as this will allow for a continual power supply if the generators have a problem coming online also the generators have to be able to power the infrastructure for more than 48 hours , the other thing that will be needed is the a cooling component it is known that since the data center will contain many components it will over heat and when they do they behave abnormally or stop operating so a reliable cooling fan will be needed to keep them cool, a network connection with in the data center to allow for data to be transmitted in and out of the data center and this thus will require more bandwidth transmition as huge ammounts of data will be dealt with, a Halon fire suspension which is a liquefied compressed gas that stops the spread of fire by chemically disrupting combustion this means unlike water it won't soak the components which will somehow allow for insurance to pay so this thus make it an ideal fire suppressor for the data center, also the use of real time monitoring software to keep an eye on the every component of the data center so that any abnormalities can be noticed and taken care off as soon as they occur, and also one important component or action that will be needed is a backup of the data that is in the data center as it has to be established that something can happen to the data center the information that was in it can still be accessed and the backups need to be tested after a while to ensure that they ... Get more on HelpWriting.net ...
  • 42.
    Windows NT 40vs. Lynix Essay Windows NT 40 vs. Lynix Founded in 1975, Microsoft (Nasdaq "MSFT") is the worldwide leader in software for personal computers. The company offers a wide range of products and services for business and personal use; each designed with the mission of making it easier and more enjoyable for people to take advantage of the full power of personal computing every day. The Linux operating system is not suitable for mainstream usage by business or home users. Today with Windows NT 4.0, customers can be confident in delivering applications that are scalable, secure, and reliableyet cost effective to deploy and manage. Linux clearly has a long way to go to be competitive with Windows NT 4.0. With the release of the Windows ... Show more content on Helpwriting.net ... Myth: Linux performs better than Windows NT Reality: Windows NT 4.0 Outperforms Linux On Common Customer Workloads The Linux community claims to have improved performance and scalability in the latest versions of the Linux Kernel (2.2), however it's clear that Linux remains inferior to the Windows NT 4.0 operating system. For file and print services, according to independent tests conducted by PC Week Labs, the Windows NT 4.0 operating system delivers 52 percent better performance on a single processor system, and 110 percent better performance on a 4way system than similarly configured single processor and 4way Linux/SAMBA systems. For Web servers, the same PC Week tests showed Windows NT 4.0 with Internet Information Server 4.0 delivers 41 percent better performance on a single processor system and 125 percent better performance on a 4way system than Linux and Apache. For ecommerce workloads using secure sockets (SSL), recent PC Magazine Windows 4 tests showed Windows NT 4.0 with Internet Information Server 4.0 delivers approximately five times the performance provided by Linux and Stronghold. For transactionorientated Line of Business applications, Windows NT 4.0 has achieved a result of 40,368 tpmC at a cost of $18.46 per transaction on a Compaq 8Way Pentium III XEON ... Get more on HelpWriting.net ...
  • 44.
    Understanding The TechnologiesRequired For E Commerce Assignment 1: Understanding the technologies required for e–commerce Shops are capable of being placed into three categories to separate and even differentiate them by how they trade, the first being 'Bricks'. These shops/businesses have no other way of trading other than customer facing outlets requiring physical transaction of products. Businesses that would be categorized as 'Bricks' would usually be small retailers such as local grocery stores and small local restaurant's. The second category is 'Clicks' which is exactly as it sounds, it simply means that the business is only able to trade using the internet. Amazon is a well–known online business selling solely through online distribution using nothing but warehouses to store and then dispatch their products. This type of business would be categorized as 'Click' as customers are only able to purchase from Amazon through the use of the Internet. Other examples would include Ebay and also Steam. The third and final category is labelled 'Bricks and Clicks' as they utilize both trading methods to trade. They will have customer facing shops for consumers to enter and physically purchase while also having a website that enables customers to also shop online and have their item delivered directly to them. Shops using this method would include most major supermarkets such as Tesco, Sainsbury's and ASDA. Before continuing to decide whether continuing your business online through e–commerce, first we need to fully understand ... Get more on HelpWriting.net ...
  • 46.
    Creating A WebsiteFor An Effective Website Having a website allows your network to benefit from an online presence and educate customers to its business. But what does it take to create such a website? What are the steps needed to create and operate an effective website, a site that encourages customers to do business with you? Technically, the creation of a single site is not something difficult: thousands of new sites are appearing on the web on a daily basis. But this "apparition" proves to be a handicap in terms of appearance and operation. Here are 6 steps to create a site likely to leave a favorable impression in the minds of customers, actual and potential. 1. Think about the goal, to the look and feel of your site Begin this discussion by assessing other similar sites in your industry or other network sites. Determine what you think is useful or not useful at these sites. Ask yourself the following questions: What connection is there between fashion design, use of illustrations and colors or tone of the text and the activity itself? Does the site offers easy access to the information that most customers have an immediate need? Will they want to visit it again, and why? Is it clear that the information will be updated on a regular basis? The fact to consider other sites allow you to better understand what you expect from yours. 3. Remove a domain name Your domain name is the Internet address that users type into their browser to find your site. For example, www.votreentrepise.com. You must file all domain ... Get more on HelpWriting.net ...
  • 48.
    Cis 175 Assignment1 Strayer University Week 10 Assignment 3: Business Intelligence and Data Warehouses CIS175008VA016–1154–001 Intro to Networking Professor Obi Ndubuisi June 14, 2015 For the company DesignIT, I would use a LAN type of network (for local–area network). This networks several computers, a mail (exchange) server, a database server and a file share server in one building and interconnects with each switch or backbone. I chose this for this small space because it is less than 100 square feet and is all within a single dwelling. This way the employees can all share their resources with one another, an intranet, database and printers. This network only needs a single modem with wireless capabilities and an optional access point ... Show more content on Helpwriting.net ... DesignIT would only need a basic television package with a single receiver in their conference room and a 10–15 line telephone service. Point–to–point topology would not be useful because each computer is connected directly. Mesh topology requires many cables and can handle a high–volume traffic. If the wireless access point or router fails it would only affect the computers and devices in the particular area, same with switches but not connected by a cable directly from the wall. In DesignIT's case, hopefully the failure is just in the access point so that at least the employees would have a medium–weak to weak wifi connection. I would suggest a central backbone installed in ceiling above the reception area. CAT5 or CAT6 cables can support up to 100 meters before signal degradation. These connections can be routed form the reception area ceiling coming out like a star and then down the walls or separations and out to a port jack. Each workstation's PC would connect to their corresponding wall Ethernet jack. In many workstation cases, the cable goes form the wall jack to their phone on their desk and back down to their CPU which usually sits on the florr or a lower–sitting platform. For a small company, like the last company I worked for (121 computers, 14 servers) or DeignIT, client–server networking would be the best to implement. All the computers are set up like desk workstations and connected to the same network with hubs. A server or several ... Get more on HelpWriting.net ...
  • 50.
    Summary: Administering WindowsServer Operating System Designed to help prepare for the Administering Windows Server exam, part of MCSE Server Infrastructure Certification. Prerequisite: CMIT 369. An overview of the management and administration of Windows Server operating systems. The goal is to manage and troubleshoot features of Windows Server operating systems, including Active Directory, DNS, Group Policy, Desktop Security, Remote Access, Windows Deployment, and User Accounts. Course Outcomes 1. Deploy, manage, and maintain Windows server to provide critical network services. 2. Configure and manage Windows services to secure the network infrastructure. 3. Implement secure remote access based on organizational IT policies Outcome 1: Deploy, manage, and maintain Windows server to provide ... Show more content on Helpwriting.net ... I created generic containers, OUs, and Group Policy objects. I have performed backup and recovery of Active Directory and after learning and performing these skills in the lab, I continued using many of them in the production environment as a member of the Windows Server engineering and deployment teams. Active Directory, users, and systems within Active Directory utilize DNS as a mechanism to locate domain controllers. Additionally, the namespace of the Active Directory domain structure is built on top of DNS naming structures (Microsoft, 2014). As a result, a functioning DNS is required in order to install and configure Active Directory. In support of the Active Directory installation for the Windows Server lab, I installed and managed DNS with Active Directory integrated zones. I configured forwarding with the corporate production DNS infrastructure. I created, edited and deleted static host [A], alias [CNAME] and reverse [PTR] records for Non–Windows hosts. I installed and managed DHCP in the Windows Server lab, and managed scopes and IP reservations for servers. I also implemented Distributed File System [DFS] services to create software installation shares that were available in each of the lab's local environments. DFS provides a mechanism to share files that are distributed in multiple locations across a network in a manner that ... Get more on HelpWriting.net ...
  • 52.
    A Research StudyOn Network Administration Essay ACTIVE DIRECTORY JULIUS MC NEIL In this independent study, I will be gathering unique data; I will exercise my analytic skills to produce a paper on the subject of Network Administration. Practice in research methods and quantitative analysis will be of great benefit and relevance to my future work. The independent study will allow me to explore my interest in the areas of nutritional anthropology not covered in existing courses. The purpose of the study: The study is focused on my goal for the future, to become a network administrator. Network administration is a profession where an administrator is in charge of the maintenance of the computer hardware and software systems that make up a computer network. The major role of the network administrator varies from company to company, I look forward to this career because of my passion for networking and computers and also due to the fact that computers are used internationally and also this would lead to a promising career in a field that is growing bigger every day. Objectives: Upon completion of the independent study, I will have acquired knowledge of network administration and cover a wide range of technologies used in a network or telecommunications network. Gain confidence in methods of field research gather and analyzed personally collected data, and finally, produce a professional paper in the field of network administration. Also, I would have established a more professional work and research habit. ... Get more on HelpWriting.net ...
  • 54.
    Network Security: Analysisof Windows Server 2008 Solution 1: With Windows Server 2008 Applications, you can make OU's, Groups and User's, and can set GPO's for the OU's, Groups and / or Users requirements or restrictions. Below are some reasons for upgrading to Windows Server 2008 R2 with service Pack 1(SP1). As we go through each one of the issues stated above, we address the concerns and exploit Windows Server 2008. With the new technology of today and the improvements with Windows Server 2008, not only is Windows Server 2008 an OSI, but it is much more. So let us take a look at some of the good reasons for upgrading. Windows Server provides new virtualization technology that enables you to deliver more advanced capabilities to your business for increased IT efficiency and agility. Whether you want to consolidate servers, build a private cloud, or offer Virtual Desktop Infrastructure, the addition of these powerful virtualization features enables you to take your datacenter and desktop virtualization strategy to a new level. Windows Server is the newest Windows Server operating system from Microsoft. It is designed to help organizations reduce operating costs and increase efficiencies and agility. Windows Server expands the Microsoft virtualization strategy for both server and desktop workloads by adding dynamic memory management for virtualized workloads with Dynamic Memory and Microsoft RemoteFX for a rich end user experience with a Virtual Desktop Infrastructure (VDI) and session virtualization (formerly known as ... Get more on HelpWriting.net ...
  • 56.
    Hrm/531 Week 3 Tomeet the requirements desired by the President and Vice President of the Acme Corporation, I believe that they will only need four servers, considering it is such a small business of less than 20 people. All of the servers will be running Windows Server 2008 R2. The following servers will be: a file and printer server, an email and web server, and an SQL server. The file and printing services will be put on the same server because they will more than likely be used together. "A file server allows you to centrally locate files to be accessed by multiple people. Because the files are centrally located, it is easier for multiple users to access and find files (assuming they are organized well) and it is easier to back up these files. When using Microsoft Windows to provide file sharing, you will usually be using Server Message Block (SMB) to access Microsoft Shares or shared folders" (MOAC,2011). As for the printing side of the server, "multiple users can access a centrally located printer using print services, ... Show more content on Helpwriting.net ... "The mail server is a server that stores and manages electronic messages (email) among users. If you are using Microsoft email products, you will be using Microsoft Exchange to act as your mail server, and you would most likely access the email using Microsoft Outlook or a web browser" (MOAC, 2011) . Having web services is ideal, as well. "Using a web server to provide web services means that users can access web pages using their browsers. These web services may be used to do research, provide leads for sales, allow customers to purchase goods and services, and provide customer support over the Internet. Web services may also be used to provide an easy method to access databases, run reports, track sales leads, provide customer support, and even help you with payroll and human resources" (MOAC, ... Get more on HelpWriting.net ...
  • 58.
    Pos 355 Week5 Operating Systems Analysis Team Paper... POS 355 Week 5 Operating Systems Analysis Team Paper Introduction When considering which operating system for a home or business office computer or network of computers, it is important to evaluate all areas of the different operating systems options. When evaluating Microsoft Windows XP, Microsoft Windows Server 2008, and Linux operating systems it is important to consider the system requirements, the different editions available, security features, system features, updates and support, user interface, and cost effectiveness. Depending on what a person's or organization's needs are will determine which operating system is best fit. Operating System Requirements Windows XP The system requirements for Windows XP Home Edition ... Show more content on Helpwriting.net ... It is similar to Windows XP Home, but is limited to low–end hardware, can only run 3 programs at a time, and has some other features either removed or disabled by default. Windows XP was based on Windows NT4 and Windows 2000 technology. Microsoft was positioning the Windows XP Professional Edition to replace Windows NT4 and Windows 2000 Professional. In addition, the Windows XP Home edition replaced Windows 95/98/ME (TechGenix Ltd., 2002). The gap between the Home and Professional Editions begins to widen when it comes to larger computer networks. Some of the features that are limited to the Professional Edition are Remote Desktop, Offline Files and Folders, Scalable Processor Support, Encrypting File System, Access Control, Designed to manage Microsoft Windows Servers, Centralized Administration, Group Control, Software Installation and Maintenance, Roaming User Profiles, and Remote Installation Service. Windows Server 2008 Windows Server 2008 R2 has seven different versions. Each edition provides key functionality to support any sized business and IT challenges. These editions will be described in this section. Windows server 2008 Foundation is the least expensive. It is an entry–level foundation that is targeted for small businesses. It has a reliable technology that provides organizations with the foundation to run the most prevalent business applications. Windows server 2008 ... Get more on HelpWriting.net ...
  • 60.
    Quickbooks Running Head: QUICKBOOKSQuickBooks BA Project Paper Penn State Harrisburg University I. INTRODUCTION Information Technology (IT) is a foundation for conducting business today. It plays a critical role in increasing productivity of firms and entire nation. It is proven that firms who invested in IT have experienced continued growth in productivity and efficiency. Many companies' survival and even existence without use of IT is unimaginable. IT has become the largest component of capital investment for companies in the United States and many other countries. Accounting/Finance application systems like Peachtree, Net Suite and QuickBooks let you manage your business with a little or no experience. All three application systems allow ... Show more content on Helpwriting.net ... For example, a screen used to record a check resembles a paper check or a customer invoice resembles a paper invoice form. After the information is entered, QuickBooks automatically records the appropriate accounting transaction using the information entered. Another feature that is offered with QuickBooks is the customization for individual needs. Using the professionally designed templates or build your own templates and customized forms with the QuickBooks Layout Designer, users can create professional looking estimates, invoices, sales receipts etc. to meet the individuals needs. In addition to customizing the look, QuickBooks allows users to turn features on and off, change the color of the interface to make it easier to distinguish between companies, and customize the reports to focus on specific information. QuickBooks Merchant Service is another feature that is offered, which allows the users to process credit cards with a click of a button. It is the only credit card processing solution that's completely integrated into QuickBooks. It is sold separately and there is no need for additional hardware or software. It saves the user money and makes the job easier by keeping more accurate records. Besides that it also tells the user when payments have been deposited to the bank account and it also allows the user to download merchant fees into QuickBooks. Being able to access any important ... Get more on HelpWriting.net ...
  • 62.
    NT 2580 ProjectPart 2 Issue one. Based on the premise that Richman has 5,000 employees throughout the main office and several branch offices, you must research solutions and detail the appropriate access controls including policies, standards, and procedures that define who users are, what they can do, which resources they can access, and which operations they can perform on a system. Issue two. Based on the premise that most of the managers have BlackBerry devices for instant communications and all employees are provided cell phones, you must research and detail the cryptography methods to protect organizational information using techniques that ensure its integrity, confidentiality, authenticity, and non–repudiation, and the recovery of encrypted information ... Show more content on Helpwriting.net ... Windows Server also provides enhanced management control over resources across the enterprise. It is designed to provide better energy efficiency and performance by reducing power consumption and lowering overhead costs. It also helps provide improved branch office capabilities, exciting new remote access experiences and streamlined server management. Overview of Top 10 Reasons to Upgrade: Powerful Hardware and Scaling Feature; PHSF Reduced Power Consumption; RPC Hyper–V in Windows Server 2008 R2 with SP1; HV Expand Desktop Deployment Options with VDI; EDDO with VDI Easier and More Efficient Server Management; EMESM Managing Data Not just Managing Storage; MDNMS Ubiquitous Remote Access; URA Improved Branch Office Performance and Management; IBOPM Simplified Management for SMBs; SMSMBs The Strongest web and Application Server to Date; SWA Top IT Pro Tasks Made Easier by Windows Server 2008 R2 with SP1 Do more with less. This has been the server manager's mantra for several years but never more than now. Fortunately, Windows Server 2008 R2 with SP1 has got your back with numerous and varied features designed specifically to address ... Get more on HelpWriting.net ...
  • 64.
    Difference Between PeerServer Vs Client Server Network Client–Server network Vs. Peer–Peer network. Key differences between Client Server network and Peer–Peer network: 1. Data path: The prominent difference between client to server network and peer to peer network is that in a client to server network, the designated clients request for services and the servers provide them (data flows from server to client), but in peer to peer network, peers act as service providers and service consumers and service providers at the same time (data flows within peers). 2. Configuration: The Client–server network requires a central security database which stores blocks of shared data as a backup, but the peer–peer network does not contain the central security database as each peer contains its own data. 3. Purpose: The purpose of Client–server network is to share ... Show more content on Helpwriting.net ... If any user crashes a computer and if some shared residue file is deleted, it poses serious threat to the stability of the entire network. 9. Hardware and software requirements: Client–Server network: Let us consider a client–server network, with up to 25 users as an example. Hardware requirements:  Dual processor: Each processor must be a Quad core with 2.6GhHz or more.  16GB RAM.  RAID–5 (Redundant array of independent drives) configuration with 3 disks of 250GB storage.  Ethernet cables.  This network has a dedicated server which has more computing speed, more memory and more storage space. Software requirements:  Microsoft Windows server 2008 R2 64 bit with SQL server 2008 R2 64 bit.  CALs*, as much needed. *CAL– It is not a software product but it is a license that gives user the rights to access the services of the server. In a Client–server network, the software needs to be installed only in the server and not in the client ... Get more on HelpWriting.net ...
  • 66.
    Sample Security PlanX Sample Security Plan: Adventure Works The following sample security plan was put together by a fictitious company named Adventure Works. Because of the increasing focus on security in the computing world, the company has decided to review security practices and put together a plan to improve those practices. Adventure Works' needs may differ from your company's needs, but reading through their plan should give you a good idea of the steps involved in creating a good security plan. This plan was developed by Matthew, Managing Director of Adventure Works, in cooperation with other key members of the Adventure Works staff. About Adventure Works We are a 20–person firm specializing in high–adventure travel packages. Our staff ... Show more content on Helpwriting.net ... The remainder are linked by an 802.11g wireless network with an access port. All computers run Windows XP Professional except for the two print servers and two administrative computers, which run Windows 98. Security We compared each computer against the checklist in the Security Guide for Small Business. We also ran the MBSA. These actions produced the following results: Virus protection: Not present on six computers; not up–to–date on four computers; generally, most users were aware of viruses but were a bit unsure about what they could do to prevent them. Spam–filtering software: Many users have begun to complain about spam, but no protection is in place. Firewall: We thought the ISP's router included a firewall, but it doesn't; so, we don't have one. Updates: All the Windows XP Professional systems are up–to–date because they were automatically checking and downloading updates. However, several installations of Microsoft Office need updating, and the Windows 98 computers are not updated at all.
  • 67.
    Passwords: A randomsampling ... Get more on HelpWriting.net ...
  • 69.
    Microsoft Word :Operating Systems Essay Operating systems: It is very common that businesses use older versions of Microsoft Word, as it is reliable and not costly at all, especially in smaller businesses such as dentists, etc. However, using old operating systems might require the employers to give new employees training as most employees might not be familiar with older versions of windows. Although windows 10 has been released, making its predecessors cheaper, smaller firms cannot afford to upgrade to windows 7 to XP due to it being costly and the entire system would be down for a while, it'll be difficult to manage information. However a larger company will be able to afford it, businesses likes to use Windows OS due to the fact being that it has better support than other OS, and it offers better hardware support e.g. printers, scanners, etc. Small businesses does not need a server for their business as they do not have a need of one, hence they only requires in their workstations, which is commonly Windows OS, Windows 7 is the most reliable out of windows 7/8.1/10, it is also an OS that has a user–friendly making the interface easy to use. However larger businesses will require more work stations, larger businesses will also require a server, or a computer that's more powerful than the work stations in order to store resources and manage accounts, etc. The server will run a different operating system than the work stations, e.g. Microsoft Windows Sever 2012, these are only beneficial to larger companies as ... Get more on HelpWriting.net ...
  • 71.
    Report On ConfigurationOf An Intranet Based Client Server... Second progress report Progress of my report on configuration of an intranet based client–server system for the data collection and data processing system with strong immunity against cyber intrusion Introduction The previous progress report was aimed at configuring the intranet client–server based network that can be implemented to different organizations and institutions. I used CISCO packet tracer to network the client–server system in order to make sure that all computers are in a position to share and exchange data and information with each other effectively. In this progress report, a lot has been done on installations of simple java codes in order to create a program that will enable communication over the network. Using this ... Show more content on Helpwriting.net ... A good example of a client server java program is chat application in java which employs the sockets which I specify 2017. I ran the code in my laptop, as local host because I did not have other computers to initiate the IP address for them, I used only one device, my own one. Whenever a person has already completed installation Microsoft Windows Server 2008 R2 (Microsoft, 2016) on their server, the window entitled Initial Configuration Tasks might come up: The initial arrangement tasks framework is utilized to fulfill the most essential or, program functions of Microsoft Windows Server 2008 R2. This particular window shows whenever the computer performs. If you don 't want to come up like that, just click the bottom check box. If associative error messages do not appear when the system of equipment operates than users must restart Windows, click Start –> Run, type be, and press Enter. Immediately after setting up the operating system, a few things you should do before continuing; you must make sure that the computers connected to the Internet If this is the first computer, you must make it a domain controller setup, this is not a requirement if the computer will not be a domain controller. The Server Name Dedicated servers (Microsoft, 2016) in the network must have a specific name. The configuration gives a default name that you can accept or change, accommodate windows installments, such as Small Business Server and ... Get more on HelpWriting.net ...
  • 73.
    Project Questions OnCloud Computing Essay Contents Chapter 1 2 Introduction and Concept Formulation 2 1.1 Case Study and Problem Statement 2 1.2 Objectives 3 1.3 Feasibility Aspects of the Project 3 1.3.1 Technical Feasibility 3 1.3.2 Legal Feasibility 3 1.3.3 Operational Feasibility 4 1.3.4 Economic Feasibility 4 1.3.5 Schedule Feasibility 4 1.4 Resources Required 5 1.4.1 Windows Server 5 1.4.2 Windows Server 2012 R2 5 1.4.3 Set–up 5 1.4.4 Virtual Machine 6 1.5 Introduction of Cloud Computing 6 1.5.1 Introduction 6 1.5.2 Example 7 1.5.3 Why to use Cloud Computing 7 1.5.4 Benefits of Cloud Computing 9 1.5.5 Types of Clouds 10 1.5.6 Cloud Computing Services 11 1.5.7 Cloud Computing Architecture 12 1.5.8 Security concern 13 1.5.9 Privacy Concern 14 1.5.10 Virtualization 14 1.6 Summary 16 Chapter 1 Introduction and Concept Formulation 1.1 Case Study and Problem Statement Dhaval Desai Group, IT Company in Auckland, who serve over 1000 customer through its 20 offices and 5 different global sites. The company provides logistic software and their support. The company develops customized logistic system for parcel service. Logistic system has to handle around 400 million parcels a year. They need effective solution to handle all structure. They have identified the benefits of Cloud Computing and start putting into effects. It works for them in various reasons and shown excellent performance. Hardware and software demand reduced for employees. The employees have to run Cloud Computing System to perform their IT ... Get more on HelpWriting.net ...
  • 75.
    Ms Windows vs.Unix/Linux MS Windows vs. Unix/Linux University of Phoenix POS/420 Introduction to Unix October 20, 2008 Scott Stewart MS Windows vs. Unix/Linux The Microsoft and Linux operating systems have been long considered to be in a competition to be the best operating systems on the market. This paper will compare and contrast these operating systems to help the consumer decide which is right for his or her environment. Such subjects as; cost, market share, hardware requirements, file processing, programming capabilities, availability if application software, networking, and user interface will be examined. Cost The cost difference between running a Linux desktop / server compared to a Microsoft desktop / server is overwhelming. ... Show more content on Helpwriting.net ... Finally, marketing is a big "reason" why Microsoft still holds a large place in the desktop market share. Microsoft is constantly keeping their products in the public eye view, where Linux does not, causing people to know of Microsoft desktops but not so much about Linux desktops. With that said, while Microsoft does hold a dominate place in the desktop world, the same is not so true in the server world. In the server marketplace, Microsoft is losing ground quickly to the Linux Server. Linux has been gaining ground in the server world for several reasons including; cost, ease of use, and dependability. The cost of the Linux server is much lower than that of the Microsoft server as we examined earlier. This cost difference is opening up IT departments to the ideal of using Linux over Microsoft, which in return is helping Linux gain server market share. Next, because Linux is becoming easier to administrate, that too is moving IT departments to convert. In the past, Linux was all "command prompt" oriented, today GUIs and such have been developed to help the novice
  • 76.
    user with systemadministration. Finally, dependability is probably the biggest reason Linux is gaining server market share. Perhaps the best way to explain Linux dependability is to explain that Linux does not need to be rebooted once a week. But in ... Get more on HelpWriting.net ...
  • 78.
    Riordan Manufacturing Upgrade RiordanManufacturing is a privately held company with plant operations in Albany, Georgia; Pontiac, Michigan; Hangzhou, China. The Corporate Headquarters are located in San Jose, California. Riordan Manufacturing is a subsidiary of Riordan Industries. The Chief Operating Officer (COO) is Hugh McCauley and the Chief Financial Officer (CFO) is Dale Edgel. The Company employs a work force of 550 people throughout the four locations. Corporate Headquarters in San Jose, California has recognized a growing need to upgrade the network operating system. Riordan 's current operating system is Windows NT 4.0. The Chief Information Officer (CIO) Maria Trinh has asked the Manager of IT Services, Patricia Miller to assemble a team of IT ... Show more content on Helpwriting.net ... The company would also have the ability to grant access to the Internet to users that need this resource while keeping others off the web. While most of the information that has been reviewed so far has some impact from a security point of view their still is the ability to grow the system. Windows 2003 is a network operating system that can grow with the company. Since the request to upgrade only the San Jose, CA location this will not limit the company to this location. Over time the company has the ability to integrate or update other locations to Windows 2003. This meaning that network administration can be centrally located to one or two locations, the first location would be used for the administration and the second location for back up and recovery. Consideration of other Operating System We decided to look at another Operation System (OS) besides Windows 2003. The Linux OS is an open sourced system and can be adapted to work with–in a multi–platform environment. First we looked at the fact that company wide we would have UNIX, Microsoft, and Linux if we went in this direction. Linux and UNIX work well together since Linux is based on Unix. They will be able to communicate with minimal intervention. Then the fact that the rest of the company would ... Get more on HelpWriting.net ...