1. Balancing work and school leads to high stress levels, causing 56% of students to drop out within 6 years.
2. Students are often not mentally or emotionally prepared for the demands of college.
3. Juggling work and school leaves little time for studying, resulting in students feeling overwhelmed.
4. The need to work long hours to pay for expensive tuition puts additional pressure on students.
5. High societal expectations place stress on students to succeed, contributing to dropout rates.