CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING
Test Correlation Table            Question Types/Level of Difficulty

   LEARNING OBJECTIVES                      Easy             Moderate               Difficult
1. Describe four types of         TF            1, 6         2, 3, 4, 5, 7              —
   organizational change.

                                  MC        1, 4, 5, 9     6, 10, 11, 12, 14,   2, 3, 7, 8, 13, 16,
                                                                   15                   17

                                  ES            —                  1                    —

2. Explain the planning process   TF     10, 13, 15, 16,     8, 11, 14, 19        9, 12, 17, 20
   for organizational change.                  18

                                  MC     19, 22, 24, 29,    18, 23, 26, 27,      20, 21, 25, 32,
                                         35, 37, 40, 41,    28, 30, 31, 33,      34, 38, 43, 44,
                                               53           36, 39, 42, 46,     45, 47, 49, 51, 57
                                                            48, 50, 52, 54,
                                                                55, 56

                                  ES             4                —                    2, 3

3. Identify four methods of       TF     26, 29, 30, 31,    22, 24, 25, 27,     21, 23, 28, 32, 37
   organizational change.                      36             33, 34, 35

                                  MC     67, 71, 75, 78,    59, 60, 62, 65,      58, 61, 64, 66,
                                             84, 85         68, 69, 72, 73,      74, 80, 83, 89
                                                            76, 77, 81, 82,
                                                            86, 87, 88, 90

                                  ES            —                 —                     5

4. Describe how innovation        TF            38            39, 40, 42                41
   relates to organizational
   change.

                                  MC      91, 95, 101       94, 96, 98, 99       92, 93, 97, 100

                                  ES            —                  6                    —

5. Discuss how learning           TF         43, 44           46, 48, 49              45, 47
   organizations foster change.

                                  MC     102, 103, 107,     104, 106, 108,       105, 110, 117
                                           114, 115         109, 111, 113,
                                                                 116

                                  ES            —                  8                    7




                                           50
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


     True/False Questions

     Learning Objective 1

1.   Radical change occurs when organizations make major adjustments in the ways they do
     business.

     ANSWER: T, Knowledge, Easy, p. 325

2.   The radical change model was developed by professors at the Harvard School of
     Business.

     ANSWER: F, Knowledge, Moderate, p. 325

3.   During radical change, the transitioning stage occurs between the unfreezing and the
     freezing stage.

     ANSWER: T, Knowledge, Moderate, p. 325

4.   Total Quality Management (TQM) is an approach that relies heavily on radical change.

     ANSWER: F, Knowledge, Moderate, p. 326

5.   Timing has very little to do with the magnitude or results of an organizational change.

     ANSWER: F, Knowledge, Moderate, p. 326

6.   Reactive change can be incremental or radical.

     ANSWER: T, Knowledge, Easy, p. 327

7.   Incremental anticipatory change is future-oriented and results from constant tinkering
     and improvements.

     ANSWER: T, Knowledge, Moderate, p. 328

     Learning Objective 2

8.   Chaos is a symptom of a poorly managed organizational change.

     ANSWER: F, Knowledge, Moderate, p. 329

9.   For innovation and change to occur without chaos or disorder, the nine steps that
     constitute the basic components of a change process must be followed in their proper
     sequence.

     ANSWER: F, Knowledge, Difficult, p. 329




                                            51
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


10.   A roofing company that receives a large number of water damage claims is experiencing
      a performance gap.

      ANSWER: T, Knowledge, Easy, p. 330

11.   Organizational diagnosis identifies both the nature and the extent of problems.

      ANSWER: T, Knowledge, Moderate, p. 330

12.   Organizations often hire outside consultants to assist with problem diagnosis because
      they offer expertise that the organization lacks to conduct and properly analyze
      employee attitude surveys.

      ANSWER: T, Knowledge, Difficult, p. 330

13.   Organizational diagnosis is where the need for change is articulated in describing
      specific measures to be used in progressing toward goals.

      ANSWER: F, Knowledge, Easy, p. 331

14.   Some resistance to change is good, with employees operating as a check-and-balance
      mechanism to ensure that management properly plans and implements change well.

      ANSWER: T, Knowledge, Moderate, p. 333

15.   Education, participation, and incentives are three methods used by managers to
      overcome resistance of employees.

      ANSWER: T, Knowledge, Easy, p. 333

16.   Managers can effectively use fear tactics to eliminate the effects of vested interests.

      ANSWER: F, Knowledge, Easy, p. 333

17.   Managers who initiate change are wrong if they believe that anyone with the same
      information would make the same decision.

      ANSWER: T, Knowledge, Difficult, p. 333

18.   Empowering workers by giving them some control over the change process is an
      effective way to reduce the stress they experience.

      ANSWER: T, Knowledge, Easy, p. 333

19.   One way to reduce cynicism is to make changes take place as infrequently as possible.

      ANSWER: F, Knowledge, Moderate, p. 334

20.   The results of a change process are monitored typically at predetermined intervals.

      ANSWER: T, Knowledge, Difficult, p. 334


                                              52
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING

      Learning Objective 3

21.   There are four methods of organizational change: technological, organization redesign,
      job redesign, and organizational development. Seldom can significant change be based
      on one of these methods alone.

      ANSWER: T, Knowledge, Difficult, pp. 335–336

22.   Structural change involves incremental changes that affect workflows, production
      methods, and materials.

      ANSWER: F, Knowledge, Moderate, p. 335

23.   Sometimes the need for organizational redesign follows directly from implementing new
      technologies.

      ANSWER: T, Knowledge, Difficult, p. 336

24.   Downsizing is a familiar approach to structural redesign.

      ANSWER: T, Knowledge, Moderate, p. 336

25.   Reengineering typically means reconfiguring the organization by changing the levels of
      authority, responsibility, and control.

      ANSWER: F, Knowledge, Moderate, p. 336

26.   Downsizing is a painful process but it continues to be popular because it has proven to
      be highly effective as a survival strategy.

      ANSWER: F, Knowledge, Easy, pp. 336–337

27.   Several researchers have found that restructuring is not guaranteed to work. Several
      studies indicate that restructured firms end up in worse financial shape after the
      restructuring than they were before.

      ANSWER: T, Knowledge, Moderate, pp. 336–337

28.   Reengineering involves redesign of an organization’s processes (e.g., logistics,
      distribution, and manufacturing) with the goal of designing the most effective process for
      making and delivering a product.

      ANSWER: T, Knowledge, Difficult, p. 337

29.   Job enrichment involves the scientific analysis of tasks performed by employees in order
      to discover procedures that produce the maximum output for the minimum input.

      ANSWER: F, Knowledge, Easy, p. 337




                                             53
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


30.   Changing job specifications to broaden and add challenge to required tasks in order to
      increase productivity is called job enrichment.

      ANSWER: T, Knowledge, Easy, p. 338

31.   The downside to job enrichment is that it leads to low employee commitment and high
      turnover.

      ANSWER: F, Knowledge, Easy, p. 337

32.   Organizational development is a broad term that refers to several different methods for
      creating organizational change.

      ANSWER: T, Knowledge, Difficult, p. 338

33.   Focus groups need to operate in an open, nonthreatening environment where there is
      no designated leader that can dominate and make people feel inhibited.

      ANSWER: F, Knowledge, Moderate, p. 338

34.   When employee surveys are designed to address issues of strategic importance, they
      can be used to enhance the organization’s competitive advantage.

      ANSWER: T, Knowledge, Moderate, p. 339

35.   Team building is more important in tall organizations with narrow spans of control.

      ANSWER: F, Application, Moderate, p. 339

36.   E-engineering is a reengineering initiative that uses Web-based technology.

      ANSWER: T, Knowledge, Easy, p. 340

37.   Installing ERP software is considered an incremental change.

      ANSWER: F, Application, Difficult, p. 340

      Learning Objective 4

38.   Innovation is just another name for change.

      ANSWER: F, Knowledge, Easy, p. 341

39.   Innovation and change are more important environmental elements for new
      organizations than for established organizations.

      ANSWER: F, Knowledge, Moderate, p. 341

40.   Three basic types of innovation are technical, process, and administrative.

      ANSWER: T, Knowledge, Moderate, p. 341

41.   Convergence and implementation are basic types of innovation.
                                             54
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


      ANSWER: F, Knowledge, Difficult, p. 341

42.   Offering telecommuting to employees is an example of an administrative innovation.

      ANSWER: T, Knowledge, Moderate, p. 342

      Learning Objective 5

43.   A learning organization is one that sees changes and innovations as a part of a daily
      routine.

      ANSWER: T, Knowledge, Easy, p. 343

44.   Learning organizations have the distinction of being customer-focused.

      ANSWER: T, Knowledge, Easy, p. 344

45.   As a result of providing a culture of innovation within the organization, Continental
      Airlines created and was the first to use electronic ticketing in airline travel.

      ANSWER: F, Knowledge, Difficult, p. 345

46.   The flat, team-based structure found in learning organizations facilitates learning more
      than a vertical organization.

      ANSWER: T, Knowledge, Moderate, p. 346

47.   Knight-Ridder’s long-term perspective led it to successfully enter broadcast journalism.

      ANSWER: F, Knowledge, Difficult, p. 346

48.   Xerox hired an anthropologist to study the ways the firm’s workers went about their jobs.

      ANSWER: T, Knowledge, Moderate, p. 347

49.   Scanning the environment includes the observation of tacit knowledge or gossip.

      ANSWER: F, Knowledge, Moderate, p. 347




                                              55
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


     Multiple Choice Questions

     Preview
1.   When Bill Zollars started his survival campaign to make the necessary changes at
     Yellow Freight, all of the following had recently happened except __________.
     a. deregulation of the trucking industry
     b. company losses of $30 million
     c. two rounds of layoffs
     d. a major strike by the teamsters union

     ANSWER: A, Knowledge, Easy, p. 324

2.   Yellow Freight employees now have adequate __________ to enable them to solve
     problems and assess the performance of their company.
     a. motivation
     b. information
     c. incentives
     d. all of the above

     ANSWER: B, Knowledge, Difficult, p. 324

     Learning Objective 1

     Types of Organizational Change
3.   All of the following are considered types of organizational change except __________.
     a. fast-paced accrual change
     b. incremental anticipatory change
     c. incremental reactive change
     d. radical reactive change

     ANSWER: A, Knowledge, Difficult, p. 327

4.   __________ change refers to any transformation in the design or functioning of an
     organization.
     a. Restructuring
     b. Redesigning
     c. Organizational
     d. Incremental

     ANSWER: C, Knowledge, Easy, p. 324

5.   A(n) _______ change occurs when organizations make major adjustments in the ways
     they do business.
     a. organizational
     b. incremental
     c. radical
     d. redesigning

     ANSWER: C, Knowledge, Easy, p. 325




                                           56
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


6.    All of the following are true concerning radical change except __________.
      a. it occurs relatively infrequently
      b. adopting a new organizational structure is an example
      c. it generally takes a short time to implement
      d. it can be stimulated by changes in the environment

      ANSWER: C, Knowledge, Moderate, p. 325

7.    All of the following correctly describe the common framework for radical organizational
      change except __________.
      a. the framework was developed by social scientist Kurt Lewin
      b. the model divides the change process into four stages
      c. stage 1 is referred to as “unfreezing”
      d. the change is solidified in the “refreezing” stage

      ANSWER: B, Knowledge, Difficult, p. 325

8.    Monitoring the intended outcomes and providing support for new behaviors are
      completed in what stage of radical organizational change?
      a. freezing
      b. refreezing
      c. transitioning
      d. none of the above

      ANSWER: B, Knowledge, Difficult, p. 325

9.    __________ change is an ongoing process of evolution over time, during which small
      changes occur routinely.
      a. Incremental
      b. Radical
      c. Transitory
      d. Anticipatory

      ANSWER: A, Knowledge, Easy, pp. 325–326

10.   TQM (total qualify management) relies heavily on what type of organizational change?
      a. radical
      b. incremental
      c. anticipatory
      d. none of the above

      ANSWER: B, Knowledge, Moderate, p. 326

11.   The degree and ________ of change combine to form different types of change.
      a. severity
      b. depth
      c. timing
      d. consequence

      ANSWER: C, Knowledge, Moderate, p. 326




                                             57
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


12.   What type of change occurs when an organization is forced to change in response to
      some event in the external or internal environment?
      a. anticipatory
      b. large-scale
      c. evolutionary
      d. reactive

      ANSWER: D, Knowledge, Moderate, p. 326

13.   General Electric managers are encouraged to make __________ through Work-Out
      sessions.
      a. reactive change
      b. anticipatory change
      c. incremental change
      d. both a and c

      ANSWER: D, Knowledge, Difficult, p. 327

14.   Reactive change can be incremental or radical. What company’s share price fell 50
      percent in 6 months after the CEO attempted to make a radical reactive change instead
      of radical incremental change?
      a. Prudential
      b. Citibank
      c. AT&T
      d. P&G

      ANSWER: D, Knowledge, Moderate, p. 327

15.   What type of change occurs when managers make organizational changes in advance
      of upcoming events or early in the cycle of a new trend?
      a. anticipatory
      b. reactive
      c. radical
      d. incremental

      ANSWER: A, Knowledge, Moderate, p. 328

16.   Davis Owen has just administered questionnaires (like the one in your textbook) to each
      of his employees concerning how they respond to innovation and change. Over 80% of
      his employees received a score more than 9. What can Davis conclude from this new
      information?
      a. His employees would be most comfortable in a traditional environment.
      b. They will enjoy working in an organization that offers cutting-edge products or
          services.
      c. They are unlikely to create changes in the organization.
      d. They do not see how change can improve performance.

      ANSWER: B, Application, Difficult, pp. 328–329




                                            58
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


17.   Ramona Chavez has just completed the self-management competency questionnaire
      and has determined from her score that she would work well in an organization that
      makes changes fast. Despite her overall high score however, her supervisor is
      concerned about a response she gave on one of the questions. Which question and
      response indicates she may prefer an organization that makes changes more slowly?
      a. She seldom follows rules that she think are silly or ineffective
      b. She will have a new job in five years that she can’t even imagine yet
      c. She believes she would prefer a job that she can master and become a real expert
         at doing
      d. She enjoys trying news foods, even if she isn’t sure of the ingredients

      ANSWER: C, Application, Difficult, pp. 328–329

      Learning Objective 2

      Planning for Organizational Change
18.   The process of planned organizational change comprises a series of steps. The first
      step is to __________.
      a. follow-up the change
      b. assess the environment
      c. diagnose organizational problems
      d. identify sources of resistance

      ANSWER: B, Knowledge, Moderate, p. 329

19.   All of the following are components of organizational change except for __________.
      a. assessing the environment
      b. reducing the resistance
      c. diagnosing organizational problems
      d. All of the above are components of organizational change.

      ANSWER: D, Knowledge, Easy, p. 329

20.   Of the environmental factors listed, which is the least responsible for stimulating
      organizational change?
      a. customers
      b. technology
      c. unions
      d. workforce

      ANSWER: C, Knowledge, Difficult, p. 330

21.   Of the environmental factors listed, which is the most responsible for stimulating
      organizational change?
      a. globalization
      b. technological advances
      c. actions of important stakeholders
      d. competitors

      ANSWER: D, Knowledge, Difficult, p. 330



                                              59
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING

22.   Marriott Hotels and Bank of America use __________ and other forms of market
      research to assess customers’ preferences.
      a. customer satisfaction surveys
      b. “whack-o-meter” sessions
      c. performance appraisals
      d. diagnostic methods

      ANSWER: A, Knowledge, Easy, p. 330

23.   Ed Zander, president of Microsystems, Inc., used __________ to assess the
      competitive marketplace.
      a. performance appraisals
      b. customer satisfaction surveys
      c. “whack-o-meter” sessions
      d. diagnostic methods

      ANSWER: C, Knowledge, Moderate, p. 330

24.   The __________ is the difference between what the organization wants to do and what
      it actually does.
      a. conversion system
      b. codifying values
      c. performance gap
      d. behavioral displacement

      ANSWER: C, Knowledge, Easy, p. 330

25.   Whalen Industries is going through a planned process for organizational change. They
      have already analyzed the environment and they should now ___________.
      a. get feedback from the environment
      b. determine the difference between what the organization aspires to do to take
         advantage of its opportunities and what it actually does
      c. determine all new technical breakthroughs
      d. none of the above

      ANSWER: B, Application, Difficult, p. 330

26.   The aim of the __________ step in the planning process for organizational change is to
      identify the nature and extent of problems before taking action.
      a. communication
      b. refreezing
      c. assessment
      d. organizational diagnosis

      ANSWER: D, Knowledge, Moderate, p. 330




                                            60
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


27.   The HR director at Food Ingredient Specialties used __________ to encourage
      employees to creatively analyze company problems.
      a. motivational speakers
      b. videos
      c. music
      d. all of the above

      ANSWER: C, Knowledge, Moderate, p. 330

28.   The fourth step in planning for organizational change is:
      a. diagnosis of organizational problems.
      b. articulating and communicating a vision.
      c. anticipate resistance.
      d. There are no steps to organizational change.

      ANSWER: B, Knowledge, Moderate, p. 329

29.   Bill Zollar communicated his vision for Yellow Freight Systems by:
      a. announcing the vision in memos.
      b. publishing the vision in employee newspapers.
      c. taking an 18-month road trip.
      d. taking out a display ad in the Wall Street Journal.

      ANSWER: C, Knowledge, Easy, p. 331

30.   The fifth step in planning for organizational change is:
      a. develop and implement an action plan.
      b. determine the performance gap.
      c. assess the environment.
      d. diagnose organizational problems.

      ANSWER: A, Knowledge, Moderate, p. 329

31.   An action plan provides all of the following except __________.
      a. articulation of the goals for change
      b. describes the specific measures to be used to monitor progress
      c. describes specific measures to be used to evaluate progress toward those goals
      d. An action plan provides all of the above.

      ANSWER: D, Knowledge, Moderate, p. 331

32.   The text mentioned all of the following alternatives to layoffs except __________.
      a. reducing hours
      b. reducing pay
      c. encouraging leaves of absence
      d. getting rid of part-time workers

      ANSWER: B, Knowledge, Difficult, p. 331




                                              61
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


33.   What is the best way to assure that a plan for organizational change will be
      implemented?
      a. involve employees early in the process
      b. correctly diagnose the problem
      c. empower a task force to implement the change
      d. prioritize short-term goals over long-term goals.

      ANSWER: A, Knowledge, Moderate, p. 331

34.   As one of the world’s largest companies with 101,000 employees and $128 billion in
      annual revenues, size could not protect Royal Dutch/Shell from __________.
      a. the World Trade Organization
      b. European hypermarkets
      c. price shocks in the oil markets
      d. environmental threats

      ANSWER: B, Knowledge, Difficult, p. 332

35.   Royal Dutch/Shell needed a more fundamental change than downsizing. One of the
      major challenges that were identified was __________.
      a. making its prices more competitive
      b. achieving consistent brand recognition internationally
      c. boosting retail outlet sales
      d. inefficient use of its refinery capabilities

      ANSWER: C, Knowledge, Easy, p. 332

36.   Steve Miller, managing director of Royal Dutch/Shell, is convinced that creating change
      is __________.
      a. a top-down task
      b. a bottom-up task
      c. the most essential activity
      d. an unending cycle

      ANSWER: B, Knowledge, Moderate, p. 332

37.   For change to be effective, __________ should be set before the change effort is
      started.
      a. reasons
      b. rewards
      c. guarantees
      d. goals

      ANSWER: D, Knowledge, Easy, p. 332




                                             62
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING

38.   Phillip French is setting goals for his organization. For change to be effective, goals
      should incorporate all of the following except __________.
      a. be based on realistic objectives
      b. be stated in clear and measurable terms
      c. be consistent with the organization’s policies
      d. all of the above

      ANSWER: D, Application, Difficult, p. 332

39.   Step six in the process of organizational change is:
      a. assess the environment.
      b. determine the performance gap.
      c. develop a strategic plan.
      d. anticipate and reduce resistance.

      ANSWER: D, Knowledge, Moderate, p. 329

40.   Experienced managers are aware of all the following forms of resistance to change
      mentioned in the chapter except __________.
      a. sabotage
      b. silence
      c. lawsuit
      d. defiance

      ANSWER: C, Knowledge, Easy, p. 333

41.   Jimmie Compton is a manager of a computer software company and is interested in
      implementing changes within the organization. What forms of resistance is Compton
      likely to encounter?
      a. silence
      b. sabotage
      c. in-your-face defiance
      d. All of the above are forms of resistance.

      ANSWER: D, Application, Easy, p. 333

42.   Lakisha Bullock is hoping to select the correct method of overcoming employee
      resistance to change. Her choices include all of the following except __________.
      a. education
      b. participation
      c. fear
      d. all are the above

      ANSWER: C, Knowledge, Moderate, p. 333

43.   In general, people—and sometimes even entire organizations—tend to resist change for
      certain reasons. Which of the following is not a typical reason to resist change?
      a. fear
      b. vested interests
      c. interactivity
      d. misunderstandings

      ANSWER: C, Knowledge, Difficult, p. 333

                                              63
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING

44.   Shirley Mason, manager of Falcon Fabrication, has tried to computerize her billing
      department. Most employees in that department have been working for the firm for
      many years and don’t feel comfortable with the prospect of having to deal with
      computers. Mason is likely to encounter resistance to her plans because of
      __________.
      a. fear of the unknown
      b. vested interests
      c. interorganizational agreements
      d. limited resources

      ANSWER: A, Application, Difficult, p. 333

45.   Mercedes-Benz Credit Corporation set out to restructure its operations in the United
      States by instituting all of the following except:
      a. offered the security of a new job to anyone bold enough to eliminate his or her
         current position.
      b. reminded employees that fear was a normal and essential element of change.
      c. eliminated four layers of management as a result of employee recommendations.
      d. used financial incentives to convince employees that even cutting their own jobs
         wouldn’t hurt them.

      ANSWER: B, Knowledge, Difficult, p. 333

46.   Howard Chamberlain has been resisting change within his organization because he
      feels that he is unable to develop the new skills and behaviors required of him. Howard
      is experiencing __________.
      a. fear of the unknown
      b. cynicism
      c. competition
      d. vested interests

      ANSWER: A, Application, Moderate, p. 333

47.   Fear often goes hand in hand with __________.
      a. misunderstandings
      b. cynicism
      c. vested interests
      d. technological change

      ANSWER: C, Knowledge, Difficult, p. 333

48.   Individuals within organizations may become resistant to change if they believe that it
      conflicts with their own self-interests. This resistance is usually based on _________.
      a. fear of the unknown
      b. vested interests
      c. misunderstandings
      d. cynicism

      ANSWER: B, Knowledge, Moderate, p. 333




                                             64
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


49.   Prudential communicated the implications of its change policies through the use of a
      board game similar to Monopoly in order to alleviate negative effects that might be
      caused by __________.
      a. misunderstandings
      b. fear
      c. vested interests
      d. cynicism

      ANSWER: A, Knowledge, Difficult, p. 334

50.   Katie Schroeder is very resistant toward any change. Her manager knows that getting
      employees to discuss their problems openly is crucial to overcoming resistance to
      change. What is Schroeder’s manager trying to resolve?
      a. fear of the unknown
      b. vested interest
      c. misunderstanding
      d. interorganizational disagreement

      ANSWER: C, Application, Moderate, p. 334

51.   Kasey McLaughlin’s subordinates are resisting his “Quality is #1” campaign because
      they think it is just another management fad. In order to succeed with the program,
      Kasey will need to eliminate __________.
      a. the leader of resistance
      b. fear of the unknown
      c. cynicism
      d. misunderstandings

      ANSWER: C, Application, Difficult, p. 334

52.   Mark Morgan’s plan to implement organizational change was met with rumblings from
      his employees that he was trying to get promoted to administrative vice president.
      Morgan’s changes may not succeed because of his employees’ __________.
      a. misunderstanding
      b. cynicism
      c. fear
      d. impatience

      ANSWER: B, Application, Moderate, p. 334

53.   In the __________ step, managers monitor the results of the change process.
      a. initial
      b. search
      c. final
      d. identification

      ANSWER: C, Knowledge, Easy, p. 334




                                            65
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


54.   The final stage of planned organizational change is __________.
      a. diagnosis of organizational problems
      b. identification of sources of resistance
      c. plan the next cycle of change
      d. monitor change

      ANSWER: D, Knowledge, Moderate, p. 334

55.   Jeanine Yates has initiated and implemented many changes in her workplace. Some
      have been successful, and others have not. Yates must understand that the ability to
      sustain and make change work depends primarily on ___________.
      a. the ability to terminate poor workers after change has been made
      b. the skill of the change initiator
      c. how well the organization monitors reactions and improvements after the change
         effort
      d. the skills and abilities of the employees involved in the change

      ANSWER: C, Application, Moderate, p. 334

56.   Carol Bernick believed the best way to change Alberto-Culver’s performance was to
      __________.
      a. change its marketing
      b. change its culture
      c. change its pricing structure
      d. change the top management team

      ANSWER: B, Knowledge, Moderate, p. 335

57.   Alberto-Culver created growth development leaders to take part in all of the following
      except __________.
      a. performance reviews
      b. one-on-one mentoring
      c. communicating the family friendly benefits
      d. meeting and communicating with the CEO

      ANSWER: B, Knowledge, Difficult, p. 335

      Learning Objective 3

      Implementing Change
58.   Sabrina Neely has been very involved with incorporating planned organizational
      change. In fact, she has already assessed the environment, determined the
      performance gap, diagnosed organizational problems, identified sources of resistance,
      reduced those sources of resistance, and developed a method to monitor organizational
      change. Sabrina must next __________.
      a. follow-up on the goals
      b. search for approaches to change
      c. implement the change
      d. reassess the environment

      ANSWER: B, Application, Difficult, p. 335

59.   There are four methods of organizational change that include all of the following except
                                             66
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING

      __________.
      a. job redesign
      b. organization redesign
      c. environmental change
      d. technological change

      ANSWER: C, Knowledge, Moderate, p. 336

60.   __________ comprises complex networks of computer, telecommunications systems,
      and remote-controlled devices.
      a. Information technology
      b. Inventory management
      c. Network design
      d. Infrastructure management

      ANSWER: A, Knowledge, Moderate, p. 335

61.   Deluxe Electronics can link its manufacturing and inventory functions so that as soon as
      the system runs low on a part, a central computer automatically executes an electronic
      purchase order signaling the supplier to ship new parts. Deluxe is effectively utilizing
      __________.
      a. a warehouse control system
      b. information technology
      c. just-in-time technology
      d. interval schedules

      ANSWER: B, Application, Difficult, p. 335

62.   At Wal-Mart, the electronic cash register monitors the goods sold, their prices, and the
      amounts remaining on hand. If the inventory of an item is low, the system sends the
      message to the appropriate distribution center and a reorder is placed. What approach
      to implementing change is Wal-Mart using?
      a. technological change
      b. organization Redesign
      c. organization development
      d. none of the above

      ANSWER: A, Knowledge, Moderate, p. 335

63.   Kristina Falk has noticed that her plant needs improvement when it comes to workflows
      and production methods. The change that Kristina should initiate is a __________.
      a. conceptual framework strategy
      b. organization redesign
      c. organization development
      d. technological change

      ANSWER: D, Knowledge, Moderate, p. 335




                                             67
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


64.   Regardless of the type of redesign selected, the intent is usually to clarify what gives the
      organization its __________.
      a. technological superiority
      b. leadership position with customers
      c. maximum efficiency
      d. best possible profitability

      ANSWER: B, Knowledge, Difficult, p. 336

65.   As Mellon Bank’s customers became more comfortable using ATMs, the bank found
      that it needed 30 percent fewer branches. The remaining branches were changed by
      what method?
      a. organization redesign
      b. technological change
      c. job redesign
      d. a combination of the above

      ANSWER: A, Knowledge, Moderate, p. 336

66.   Which of the following statements is true concerning the organization redesign method?
      a. One basic approach to organizational design is changing the organization’s
         processes.
      b. The intent of redesigning organizations is to clarify what gives the organization its
         leadership position with its customers.
      c. Design changes should capitalize on the capabilities that differentiate the
         organization from its competitors.
      d. All of the above are true.

      ANSWER: D, Knowledge, Difficult, p. 336

67.   Managers are being bombarded by ideas on how to redesign their organizations to
      improve customer satisfaction. These recommendations include all of the following
      except __________.
      a. redesigning
      b. downsizing
      c. reengineering
      d. reformation

      ANSWER: D, Knowledge, Easy, pp. 336–337

68.   __________ typically means reconfiguring the distribution of authority, responsibility,
      and control in an organization.
      a. Streamlining
      b. Standardization
      c. Restructuring
      d. Re-aligning

      ANSWER: C, Knowledge, Moderate, p. 336




                                              68
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


69.   In 1994, Sears, Roebuck, & Company sold off interests in insurance, real estate, and
      finance to focus on its core competency of merchandising. Sears was thereby
      __________.
      a. simplifying
      b. restructuring
      c. re-shuffling
      d. resisting change

      ANSWER: B, Application, Moderate, p. 336

70.   What approach to structural redesign is known to be used as a response to poor
      organizational performance, is seldom effective in the long run, and presents a painful
      experience to those who endure the process?
      a. reengineering
      b. downsizing
      c. job simplification
      d. job creation

      ANSWER: B, Knowledge, Moderate, pp. 336–337

71.   __________ has to do with changing the processes by which work is carried out.
      a. Feedback control
      b. Reengineering
      c. Ingenuity
      d. Standardization

      ANSWER: B, Knowledge, Easy, p. 337

72.   Donovan Feldman has been involved in reengineering his organization. He is
      redesigning the organization’s processes to ensure __________.
      a. lower costs
      b. better quality
      c. increased speed
      d. All of the above may result from reengineering.

      ANSWER: D, Application, Moderate, p. 337

73.   When organizations want to improve their efficiency and the quality of their products and
      services, they often examine their __________.
      a. internal production processes
      b. focus group results
      c. acquisition of resources
      d. all of the above

      ANSWER: A, Knowledge, Moderate, 337




                                             69
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


74.   By __________ its insurance claims processes, National Grange Mutual was able to
      reduce its response time by 55 percent.
      a. redesigning
      b. restructuring
      c. reengineering
      d. streamlining

      ANSWER: C, Knowledge, Difficult, p. 337

75.   __________ involves the scientific analysis of tasks performed by employees in order to
      discover procedures that produce the maximum output for the minimum input.
      a. Job enrichment
      b. Job simplification
      c. Job redesign
      d. Job empowerment

      ANSWER: B, Knowledge, Easy, p. 337

76.   The oldest task approach to change is __________.
      a. job enrichment
      b. job simplification
      c. job empowerment
      d. job deployment

      ANSWER: B, Knowledge, Moderate, p. 337

77.   Fast-food restaurants most likely use __________. They use this design because their
      employees can learn tasks rapidly, they have short work cycles, and low-skilled and low-
      paid employees can be trained easily.
      a. team-based structures
      b. tangible outputs
      c. situation analysis leadership
      d. job simplification

      ANSWER: D, Application, Easy, p. 337

78.   At “Toys for Tots,” specific jobs were changed with the intent of broadening and adding
      to the challenge of the tasks required. Productivity improved due to the company’s
      __________ approach to change.
      a. trend line
      b. job rotation
      c. job enrichment
      d. job engineering

      ANSWER: C, Application, Easy, p. 338




                                            70
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


79.   Beth Hayden has been attempting to increase productivity through job enrichment. Job
      enrichment encompasses all of the following unique aspects except:
      a. employees are likely to develop attitudes that support the new job-related behaviors.
      b. job enrichment can humanize an organization.
      c. employees become more involved and more satisfied.
      d. All of the above are aspects of job enrichment.

      ANSWER: D, Application, Moderate, p. 338

80.   All of the following are true regarding job enrichment except:
      a. it changes the basic relationship between employees and their work.
      b. it changes employee behaviors in ways that gradually lead to more positive attitudes
          about the organization.
      c. it offers opportunities for initiating other types of organizational change.
      d. promotes social loafing within the organization.

      ANSWER: D, Knowledge, Difficult, p. 338

81.   Amelia Rash is studying various approaches to organizational change. She should use
      a(n) __________ approach if she needs a long-range strategy for developing her
      workforce and improving their effectiveness.
      a. organization development
      b. organization redesign
      c. reactive
      d. radical

      ANSWER: A, Application, Moderate, p. 338

82.   __________ is a planned, long-range behavioral science strategy for understanding,
      changing, and developing an organization’s work force in order to improve its
      effectiveness.
      a. Survey feedback
      b. Organization development
      c. Team building
      d. Behavior modification

      ANSWER: B, Knowledge, Moderate, p. 338

83.   Organization development (OD) has three most commonly used methods for achieving
      organizational change. All of the following are included except __________.
      a. focus groups
      b. information systems
      c. team building
      d. survey feedback

      ANSWER: B, Knowledge, Difficult, p. 338




                                            71
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


84.   __________ is an organization development (OD) method that allows managers and
      employees to report their thoughts and feelings about the organization and to learn
      about how others think and feel about their own behaviors.
      a. Survey feedback
      b. Semantics training
      c. Team building
      d. Reorientation

      ANSWER: A, Knowledge, Easy, p. 338

85.   Survey feedback is obtained by means of a __________.
      a. questionnaire
      b. portfolio
      c. PERT chart
      d. GANTT chart

      ANSWER: A, Knowledge, Easy, p. 338

86.   Intel conducted a survey of its 85,000 employees using a(n) __________ method.
      a. Web-based
      b. ERP
      c. pen and paper
      d. both a and c

      ANSWER: D, Knowledge, Moderate, p. 339

87.   Lonnie Hadley is a human resources manager for the credit card division of First USA.
      He has decided to initiate some team building activities which might include all of the
      following except __________.
      a. emphasis upon a trust-based environment
      b. outdoor adventures
      c. competitive games
      d. creativity exercises

      ANSWER: C, Application, Moderate, 339

88.   ___________ is a description of reengineering initiatives that use Web-based
      technology as the primary method for managing business-to-business processes.
      a. E-engineering
      b. E-commerce
      c. E-generation
      d. E-digitalizing

      ANSWER: A, Knowledge, Moderate, p. 340




                                             72
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


89.   The installation of ERP software at Fairchild Semiconductor was a radical change that
      created all of the following results except:
      a. it replaced all the business processes throughout the company.
      b. it allowed significant workforce reductions.
      c. it created “plain vanilla” processes that fit the generic software system.
      d. employees became more knowledgeable and excited about their roles in the
         company.

      ANSWER: B, Knowledge, Difficult, pp. 340–341

90.   Fairchild Semiconductor implemented an ERP application from Peoplesoft. A key step
      was to educate users on how their own work was related to the overall process so that
      the workers might __________.
      a. save training time
      b. make the purchase decision appear worthwhile
      c. be committed to fully using the new system
      d. not request pay raises for the extra work

      ANSWER: C, Knowledge, Moderate, pp. 340–341

      Learning Objective 4

      Role of Innovation in Organizational Change
91.   __________ is the process of creating and implementing a new idea.
      a. Change
      b. Strategy
      c. Innovation
      d. none of the above

      ANSWER: C, Knowledge, Easy, p. 341

92.   Kodak’s lack of innovation caused all of the following except __________.
      a. profits plummeted
      b. 34,000 workers were laid off
      c. the CEO was fired
      d. all of the above

      ANSWER: B, Knowledge, Difficult, p. 341

93.   Which of the following is not considered a basic type of innovation?
      a. technical innovation
      b. process innovation
      c. behavioral innovation
      d. All of the above are types of innovation

      ANSWER: C, Knowledge, Difficult, p. 341




                                             73
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


94.   Susan Tillery’s organization Silk Flowers, Inc., has created and adopted a substantially
      new method of producing silk flowers. This is an example of what type of innovation?
      a. process
      b. organizational
      c. administrative
      d. technical

      ANSWER: A, Application, Moderate, p. 342

95.   The shift to wireless communications systems represents what type of innovation?
      a. process
      b. administrative
      c. technical
      d. production

      ANSWER: C, Knowledge, Easy, pp. 341–342

96.   The introduction of do-it-yourself online stock trading represents what type of
      innovation?
      a. environmental
      b. technical
      c. production
      d. process

      ANSWER: D, Knowledge, Moderate, p. 342

97.   At   Toyota, oobeya was a process innovation that enabled the company to __________.
      a.    produce more futuristic automobile designs
      b.    maintain the perfect inventory levels at dealers
      c.    build cars with almost no workers
      d.    dramatically lower production costs

      ANSWER: D, Knowledge, Difficult, p. 342

98.   All of the following are examples of administrative innovation except __________.
      a. flexible work schedules
      b. telecommuting
      c. e-commerce
      d. virtual organizations

      ANSWER: C, Knowledge, Moderate, p. 342

99.   Champion International was a traditional __________ company that followed technical
      innovations and moved higher in Fortune’s listings for six consecutive years.
      a. spark plug manufacturing
      b. chemical
      c. food service
      d. paper manufacturing

      ANSWER: D, Knowledge, Moderate, p. 343




                                             74
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


100. Champion International made all of the following changes as a result of technical
     innovations except __________.
     a. major investments in technical skills training
     b. in-house manufacturing of its state-of-the-art equipment
     c. restructured 10 of its 11 mills
     d. changed management structure from hierarchical to team-based

       ANSWER: B, Knowledge, Difficult, p. 343

101. An architecture for innovation builds an infrastructure that encourages innovation and
     change. All of the following are key features of that architecture except __________.
     a. developing a learning environment
     b. fostering workforce resilience
     c. providing a support system for innovation
     d. all of the above

       ANSWER: D, Knowledge, Easy, p. 343

       Learning Objective 5

       Learning Organizations
102.   A(n) __________ organization has both the drive and the capabilities to improve its
       performance continuously.
       a. progressive
       b. redesigned
       c. innovative
       d. learning

       ANSWER: D, Knowledge, Easy, p. 343

103.   Which of the following are learning organizations least likely to learn from?
       a. past experiences
       b. textbooks
       c. other companies
       d. customers

       ANSWER: B, Knowledge, Easy, p. 343

104. All of the following are considered distinctive features of learning organizations except
       __________.
       a.   shared leadership
       b.   intensive use of information
       c.   hierarchical chain of command
       d.   organic organization design

       ANSWER: C, Knowledge, Moderate, p. 344




                                               75
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


105. Management of Nantucket Nectars encourages employees to learn by allowing them to
     make mistakes. Managers believe this will result in __________.
     a. lower worker turnover
     b. better quality beverages
     c. better financial performance in the long run
     d. another product breakthrough

      ANSWER: B, Knowledge, Difficult, p. 344

106. Which company first implemented an employee’s innovative idea of electronic plane
     tickets?
     a. Southwest Airlines
     b. Continental
     c. People Express
     d. British Airways

      ANSWER: A, Knowledge, Moderate, p. 345

107. When people feel they are part of a community, they are more willing to __________.
     a. share solutions to problems with their coworkers
     b. find problems
     c. make extra effort
     d. all of the above

      ANSWER: D, Knowledge, Easy, p. 345

108. Learning organizations encourage individual learning in which of the following ways?
     a. delegation
     b. empowerment
     c. “oobeya”
     d. all of the above

      ANSWER: B, Knowledge, Moderate, p. 346

109. What organizational structure facilitates learning?
     a. flat structure
     b. team-based structure
     c. hierarchical structure
     d. both a and b are correct

      ANSWER: D, Knowledge, Moderate, p. 346




                                             76
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


110. Which of the following is true concerning Knight-Ridder’s purchase of Dialog Information
     Services?
     a. The purchase price was attractive so Knight-Ridder decided to make the short-term
        investment.
     b. The new service reaches a newspaper readership audience of primarily 25 to 43
        year olds.
     c. The acquisition of Dialog transformed the traditional newspaper company to a leader
        in online business information.
     d. The company’s acceptance of the need for a short-term perspective was crucial for
        a learning organization.

      ANSWER: C, Application, Difficult, p. 346

111. The design of learning organizations emphasizes the use of all of the following except
     __________.
     a. teams
     b. strategic alliances
     c. boundaryless networks
     d. All of the above are emphasized in learning organizations.

      ANSWER: D, Knowledge, Moderate, p. 346

112. In addition to experimenting on their own, many learning organizations use strategic
     alliances with suppliers, customers, and even competitors as a method of learning.
     What alliance has Amgen, a Japanese biotech company, made with Kirin Brewery?
     a. Alcohol intake studies helping cancer research.
     b. Amgen learns about the fermentation processes, which are crucial for producing
          synthetic blood clotting protein.
     c. Kirin learns about amino-acid/protein combinations that can act as catalysts to
          speed up the brewing process.
     d. both b and c describe the “alliance”

      ANSWER: D, Application, Difficult, pp. 346–347

113. A design option for learning organizations is to become a network of cooperating units
     connected by a sense of community among a larger pool of people who share their
     diverse knowledge and expertise. What is this network design called?
     a. strategic alliance
     b. team-based
     c. measurement-oriented
     d. boundaryless

      ANSWER: D, Knowledge, Moderate, p. 347




                                            77
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


114. Information is the lifeblood of learning organizations. To be effective they must
     undertake all of the following except __________.
     a. extensive scanning
     b. be measurement oriented
     c. share problems
     d. all of the above

       ANSWER: D, Knowledge, Easy, p. 347

115. Learning organizations are measurement oriented in their efforts to improve
     performance. In learning organizations, what information do employees have access
     to?
     a. customer satisfaction surveys
     b. market share
     c. competitors’ strategies
     d. All of the above should be available to employees in learning organizations.

       ANSWER: D, Knowledge, Easy, p. 347

116. Pharmaceutical companies are described in the text as good examples of learning
     organizations. They do all of the following except __________.
     a. develop new products and bring them to the market
     b. rely on hierarchical structures to maintain control of the drug development process
     c. track the expertise of their scientists and engineers
     d. predict in advance the new products to be introduced

       ANSWER: B, Knowledge, Moderate, p. 347

117.   Xerox identified which of the following as one of its key strategic challenges?
       a. increasing the amount and effectiveness of soft information
       b. increasing the amount and effectiveness of audit data
       c. consolidating the international accounting network with national standards
       d. using e-mail more effectively

       ANSWER: A, Knowledge, Difficult, p. 347

       Essay Questions

       Learning Objective 1

1.     Describe four types of organizational change.

       Organizational changes vary in both degree and timing. In terms of degree, change can
       be radical or incremental. In terms of timing, change can be reactive or anticipatory.
       Combinations of these possibilities create four basic types of change: radical reactive
       change, radical anticipatory change, incremental reactive change, and incremental
       anticipatory change.

       Moderate, pp. 325–328




                                              78
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


     Learning Objective 2

2.   Explain the planning process for organizational change.

     Although change often involves a bit of chaos, organizations can usually reduce its
     amount and impact by carefully planning for major change. Through planning, the
     organization begins to unfreeze and prepares for the change. The key planning
     activities are (1) assessing the environment; (2) determining whether a performance gap
     exists, and if so, its nature and magnitude; (3) diagnosing organizational problems; (4)
     articulating and communicating a vision for the future; (5) developing an action plan for
     the change; (6) anticipating and making plans to reduce resistance; and (7) developing
     a way to monitor change and following up after the main initiatives have been
     implemented.

     Difficult, pp. 329–334

3.   What are some ways to cut costs that will avoid the long-term negative effects of laying
     off workers?

     a.   reduce working hours for all employees rather than eliminating individuals
     b.   encourage employees to take temporary leaves of absence
     c.   not renewing contracts for temporary and part-time workers
     d.   job sharing
     e.   reduction of executive salaries and bonuses

     Difficult, p. 331

4.   What are four of the reasons for the resistance to change?

     a.   fear
     b.   vested interests
     c.   misunderstandings
     d.   cynicism

     Easy, pp. 333–334




                                             79
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


     Learning Objective 3

5.   Identify four methods of organizational change.

     Many approaches to implementing change are possible. Four general methods are
     technological change, organization redesign, job redesign, and organization
     development. Technological change often involves changing the way work is done by
     adopting new information technologies. The organization redesign method may involve
     changing the organizational structure and/or organizational processes. Organization
     redesign normally affects large portions of an organization.           Downsizing and
     reengineering are examples of this method.            Job redesign involves changing
     employees’ jobs, either simplifying or enriching them. Organization development can be
     used to change employee attitudes and behaviors. Focus groups and survey feedback
     permits managers and employees to provide information about a range of topics,
     including job satisfaction, organizational commitment, and perceptions of supervisory
     and managerial behaviors. Team building is used to improve the functioning of people
     who must work together to achieve assigned tasks. Change efforts often involve a
     combination of these methods.

     Difficult, pp. 335–340

     Learning Objective 4

6.   Explain the relationship between innovation and organizational change.

     Innovation is the process of creating and implementing a new idea. Three basic types
     of innovation are technical, process, and administrative. Organizational change refers
     to any transformation in the design or functioning of an organization. Generally,
     innovations require organizational change. Innovation and change are important to
     both new and established organizations, owing to the dynamic nature of the external
     environments of most organizations.

     Moderate, pp. 341–343

     Learning Objective 5

7.   Discuss how learning organizations foster change.

     Organizations are redesigning themselves to become learning organizations capable of
     quickly adapting their practices to satisfy the needs of their customers. The basic
     features of such organizations are leadership that is shared, a culture that supports
     innovation, a strategy focused on customers, an organic organization design, and an
     intensive use of information. In a learning organization, change is not a special event;
     it’s a natural part of the organization’s continuous attempts to satisfy customers.

     Difficult, pp. 343–347




                                           80
CHAPTER 12: ORGANIZATIONAL CHANGE AND LEARNING


8.   Describe how information is effectively used in the learning organization.

     Learning organizations aggressively scan both the internal and external environments
     for information. They do not want to miss an important trend or change. Information is
     essential to judgements relating to the creation of new products and services.
     Systematic measurement is used to make these improvements possible. This includes
     data pertaining to profits, customer satisfaction, and competitors’ strategies. The
     learning organization gathers data and disseminates it internally. In addition to
     numerical data is “soft” information that may be gathered through anecdotal evidence.
     This can speed up the process of organizational learning.

     Moderate, p. 347




                                            81

Tb12

  • 1.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING Test Correlation Table Question Types/Level of Difficulty LEARNING OBJECTIVES Easy Moderate Difficult 1. Describe four types of TF 1, 6 2, 3, 4, 5, 7 — organizational change. MC 1, 4, 5, 9 6, 10, 11, 12, 14, 2, 3, 7, 8, 13, 16, 15 17 ES — 1 — 2. Explain the planning process TF 10, 13, 15, 16, 8, 11, 14, 19 9, 12, 17, 20 for organizational change. 18 MC 19, 22, 24, 29, 18, 23, 26, 27, 20, 21, 25, 32, 35, 37, 40, 41, 28, 30, 31, 33, 34, 38, 43, 44, 53 36, 39, 42, 46, 45, 47, 49, 51, 57 48, 50, 52, 54, 55, 56 ES 4 — 2, 3 3. Identify four methods of TF 26, 29, 30, 31, 22, 24, 25, 27, 21, 23, 28, 32, 37 organizational change. 36 33, 34, 35 MC 67, 71, 75, 78, 59, 60, 62, 65, 58, 61, 64, 66, 84, 85 68, 69, 72, 73, 74, 80, 83, 89 76, 77, 81, 82, 86, 87, 88, 90 ES — — 5 4. Describe how innovation TF 38 39, 40, 42 41 relates to organizational change. MC 91, 95, 101 94, 96, 98, 99 92, 93, 97, 100 ES — 6 — 5. Discuss how learning TF 43, 44 46, 48, 49 45, 47 organizations foster change. MC 102, 103, 107, 104, 106, 108, 105, 110, 117 114, 115 109, 111, 113, 116 ES — 8 7 50
  • 2.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING True/False Questions Learning Objective 1 1. Radical change occurs when organizations make major adjustments in the ways they do business. ANSWER: T, Knowledge, Easy, p. 325 2. The radical change model was developed by professors at the Harvard School of Business. ANSWER: F, Knowledge, Moderate, p. 325 3. During radical change, the transitioning stage occurs between the unfreezing and the freezing stage. ANSWER: T, Knowledge, Moderate, p. 325 4. Total Quality Management (TQM) is an approach that relies heavily on radical change. ANSWER: F, Knowledge, Moderate, p. 326 5. Timing has very little to do with the magnitude or results of an organizational change. ANSWER: F, Knowledge, Moderate, p. 326 6. Reactive change can be incremental or radical. ANSWER: T, Knowledge, Easy, p. 327 7. Incremental anticipatory change is future-oriented and results from constant tinkering and improvements. ANSWER: T, Knowledge, Moderate, p. 328 Learning Objective 2 8. Chaos is a symptom of a poorly managed organizational change. ANSWER: F, Knowledge, Moderate, p. 329 9. For innovation and change to occur without chaos or disorder, the nine steps that constitute the basic components of a change process must be followed in their proper sequence. ANSWER: F, Knowledge, Difficult, p. 329 51
  • 3.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 10. A roofing company that receives a large number of water damage claims is experiencing a performance gap. ANSWER: T, Knowledge, Easy, p. 330 11. Organizational diagnosis identifies both the nature and the extent of problems. ANSWER: T, Knowledge, Moderate, p. 330 12. Organizations often hire outside consultants to assist with problem diagnosis because they offer expertise that the organization lacks to conduct and properly analyze employee attitude surveys. ANSWER: T, Knowledge, Difficult, p. 330 13. Organizational diagnosis is where the need for change is articulated in describing specific measures to be used in progressing toward goals. ANSWER: F, Knowledge, Easy, p. 331 14. Some resistance to change is good, with employees operating as a check-and-balance mechanism to ensure that management properly plans and implements change well. ANSWER: T, Knowledge, Moderate, p. 333 15. Education, participation, and incentives are three methods used by managers to overcome resistance of employees. ANSWER: T, Knowledge, Easy, p. 333 16. Managers can effectively use fear tactics to eliminate the effects of vested interests. ANSWER: F, Knowledge, Easy, p. 333 17. Managers who initiate change are wrong if they believe that anyone with the same information would make the same decision. ANSWER: T, Knowledge, Difficult, p. 333 18. Empowering workers by giving them some control over the change process is an effective way to reduce the stress they experience. ANSWER: T, Knowledge, Easy, p. 333 19. One way to reduce cynicism is to make changes take place as infrequently as possible. ANSWER: F, Knowledge, Moderate, p. 334 20. The results of a change process are monitored typically at predetermined intervals. ANSWER: T, Knowledge, Difficult, p. 334 52
  • 4.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING Learning Objective 3 21. There are four methods of organizational change: technological, organization redesign, job redesign, and organizational development. Seldom can significant change be based on one of these methods alone. ANSWER: T, Knowledge, Difficult, pp. 335–336 22. Structural change involves incremental changes that affect workflows, production methods, and materials. ANSWER: F, Knowledge, Moderate, p. 335 23. Sometimes the need for organizational redesign follows directly from implementing new technologies. ANSWER: T, Knowledge, Difficult, p. 336 24. Downsizing is a familiar approach to structural redesign. ANSWER: T, Knowledge, Moderate, p. 336 25. Reengineering typically means reconfiguring the organization by changing the levels of authority, responsibility, and control. ANSWER: F, Knowledge, Moderate, p. 336 26. Downsizing is a painful process but it continues to be popular because it has proven to be highly effective as a survival strategy. ANSWER: F, Knowledge, Easy, pp. 336–337 27. Several researchers have found that restructuring is not guaranteed to work. Several studies indicate that restructured firms end up in worse financial shape after the restructuring than they were before. ANSWER: T, Knowledge, Moderate, pp. 336–337 28. Reengineering involves redesign of an organization’s processes (e.g., logistics, distribution, and manufacturing) with the goal of designing the most effective process for making and delivering a product. ANSWER: T, Knowledge, Difficult, p. 337 29. Job enrichment involves the scientific analysis of tasks performed by employees in order to discover procedures that produce the maximum output for the minimum input. ANSWER: F, Knowledge, Easy, p. 337 53
  • 5.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 30. Changing job specifications to broaden and add challenge to required tasks in order to increase productivity is called job enrichment. ANSWER: T, Knowledge, Easy, p. 338 31. The downside to job enrichment is that it leads to low employee commitment and high turnover. ANSWER: F, Knowledge, Easy, p. 337 32. Organizational development is a broad term that refers to several different methods for creating organizational change. ANSWER: T, Knowledge, Difficult, p. 338 33. Focus groups need to operate in an open, nonthreatening environment where there is no designated leader that can dominate and make people feel inhibited. ANSWER: F, Knowledge, Moderate, p. 338 34. When employee surveys are designed to address issues of strategic importance, they can be used to enhance the organization’s competitive advantage. ANSWER: T, Knowledge, Moderate, p. 339 35. Team building is more important in tall organizations with narrow spans of control. ANSWER: F, Application, Moderate, p. 339 36. E-engineering is a reengineering initiative that uses Web-based technology. ANSWER: T, Knowledge, Easy, p. 340 37. Installing ERP software is considered an incremental change. ANSWER: F, Application, Difficult, p. 340 Learning Objective 4 38. Innovation is just another name for change. ANSWER: F, Knowledge, Easy, p. 341 39. Innovation and change are more important environmental elements for new organizations than for established organizations. ANSWER: F, Knowledge, Moderate, p. 341 40. Three basic types of innovation are technical, process, and administrative. ANSWER: T, Knowledge, Moderate, p. 341 41. Convergence and implementation are basic types of innovation. 54
  • 6.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING ANSWER: F, Knowledge, Difficult, p. 341 42. Offering telecommuting to employees is an example of an administrative innovation. ANSWER: T, Knowledge, Moderate, p. 342 Learning Objective 5 43. A learning organization is one that sees changes and innovations as a part of a daily routine. ANSWER: T, Knowledge, Easy, p. 343 44. Learning organizations have the distinction of being customer-focused. ANSWER: T, Knowledge, Easy, p. 344 45. As a result of providing a culture of innovation within the organization, Continental Airlines created and was the first to use electronic ticketing in airline travel. ANSWER: F, Knowledge, Difficult, p. 345 46. The flat, team-based structure found in learning organizations facilitates learning more than a vertical organization. ANSWER: T, Knowledge, Moderate, p. 346 47. Knight-Ridder’s long-term perspective led it to successfully enter broadcast journalism. ANSWER: F, Knowledge, Difficult, p. 346 48. Xerox hired an anthropologist to study the ways the firm’s workers went about their jobs. ANSWER: T, Knowledge, Moderate, p. 347 49. Scanning the environment includes the observation of tacit knowledge or gossip. ANSWER: F, Knowledge, Moderate, p. 347 55
  • 7.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING Multiple Choice Questions Preview 1. When Bill Zollars started his survival campaign to make the necessary changes at Yellow Freight, all of the following had recently happened except __________. a. deregulation of the trucking industry b. company losses of $30 million c. two rounds of layoffs d. a major strike by the teamsters union ANSWER: A, Knowledge, Easy, p. 324 2. Yellow Freight employees now have adequate __________ to enable them to solve problems and assess the performance of their company. a. motivation b. information c. incentives d. all of the above ANSWER: B, Knowledge, Difficult, p. 324 Learning Objective 1 Types of Organizational Change 3. All of the following are considered types of organizational change except __________. a. fast-paced accrual change b. incremental anticipatory change c. incremental reactive change d. radical reactive change ANSWER: A, Knowledge, Difficult, p. 327 4. __________ change refers to any transformation in the design or functioning of an organization. a. Restructuring b. Redesigning c. Organizational d. Incremental ANSWER: C, Knowledge, Easy, p. 324 5. A(n) _______ change occurs when organizations make major adjustments in the ways they do business. a. organizational b. incremental c. radical d. redesigning ANSWER: C, Knowledge, Easy, p. 325 56
  • 8.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 6. All of the following are true concerning radical change except __________. a. it occurs relatively infrequently b. adopting a new organizational structure is an example c. it generally takes a short time to implement d. it can be stimulated by changes in the environment ANSWER: C, Knowledge, Moderate, p. 325 7. All of the following correctly describe the common framework for radical organizational change except __________. a. the framework was developed by social scientist Kurt Lewin b. the model divides the change process into four stages c. stage 1 is referred to as “unfreezing” d. the change is solidified in the “refreezing” stage ANSWER: B, Knowledge, Difficult, p. 325 8. Monitoring the intended outcomes and providing support for new behaviors are completed in what stage of radical organizational change? a. freezing b. refreezing c. transitioning d. none of the above ANSWER: B, Knowledge, Difficult, p. 325 9. __________ change is an ongoing process of evolution over time, during which small changes occur routinely. a. Incremental b. Radical c. Transitory d. Anticipatory ANSWER: A, Knowledge, Easy, pp. 325–326 10. TQM (total qualify management) relies heavily on what type of organizational change? a. radical b. incremental c. anticipatory d. none of the above ANSWER: B, Knowledge, Moderate, p. 326 11. The degree and ________ of change combine to form different types of change. a. severity b. depth c. timing d. consequence ANSWER: C, Knowledge, Moderate, p. 326 57
  • 9.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 12. What type of change occurs when an organization is forced to change in response to some event in the external or internal environment? a. anticipatory b. large-scale c. evolutionary d. reactive ANSWER: D, Knowledge, Moderate, p. 326 13. General Electric managers are encouraged to make __________ through Work-Out sessions. a. reactive change b. anticipatory change c. incremental change d. both a and c ANSWER: D, Knowledge, Difficult, p. 327 14. Reactive change can be incremental or radical. What company’s share price fell 50 percent in 6 months after the CEO attempted to make a radical reactive change instead of radical incremental change? a. Prudential b. Citibank c. AT&T d. P&G ANSWER: D, Knowledge, Moderate, p. 327 15. What type of change occurs when managers make organizational changes in advance of upcoming events or early in the cycle of a new trend? a. anticipatory b. reactive c. radical d. incremental ANSWER: A, Knowledge, Moderate, p. 328 16. Davis Owen has just administered questionnaires (like the one in your textbook) to each of his employees concerning how they respond to innovation and change. Over 80% of his employees received a score more than 9. What can Davis conclude from this new information? a. His employees would be most comfortable in a traditional environment. b. They will enjoy working in an organization that offers cutting-edge products or services. c. They are unlikely to create changes in the organization. d. They do not see how change can improve performance. ANSWER: B, Application, Difficult, pp. 328–329 58
  • 10.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 17. Ramona Chavez has just completed the self-management competency questionnaire and has determined from her score that she would work well in an organization that makes changes fast. Despite her overall high score however, her supervisor is concerned about a response she gave on one of the questions. Which question and response indicates she may prefer an organization that makes changes more slowly? a. She seldom follows rules that she think are silly or ineffective b. She will have a new job in five years that she can’t even imagine yet c. She believes she would prefer a job that she can master and become a real expert at doing d. She enjoys trying news foods, even if she isn’t sure of the ingredients ANSWER: C, Application, Difficult, pp. 328–329 Learning Objective 2 Planning for Organizational Change 18. The process of planned organizational change comprises a series of steps. The first step is to __________. a. follow-up the change b. assess the environment c. diagnose organizational problems d. identify sources of resistance ANSWER: B, Knowledge, Moderate, p. 329 19. All of the following are components of organizational change except for __________. a. assessing the environment b. reducing the resistance c. diagnosing organizational problems d. All of the above are components of organizational change. ANSWER: D, Knowledge, Easy, p. 329 20. Of the environmental factors listed, which is the least responsible for stimulating organizational change? a. customers b. technology c. unions d. workforce ANSWER: C, Knowledge, Difficult, p. 330 21. Of the environmental factors listed, which is the most responsible for stimulating organizational change? a. globalization b. technological advances c. actions of important stakeholders d. competitors ANSWER: D, Knowledge, Difficult, p. 330 59
  • 11.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 22. Marriott Hotels and Bank of America use __________ and other forms of market research to assess customers’ preferences. a. customer satisfaction surveys b. “whack-o-meter” sessions c. performance appraisals d. diagnostic methods ANSWER: A, Knowledge, Easy, p. 330 23. Ed Zander, president of Microsystems, Inc., used __________ to assess the competitive marketplace. a. performance appraisals b. customer satisfaction surveys c. “whack-o-meter” sessions d. diagnostic methods ANSWER: C, Knowledge, Moderate, p. 330 24. The __________ is the difference between what the organization wants to do and what it actually does. a. conversion system b. codifying values c. performance gap d. behavioral displacement ANSWER: C, Knowledge, Easy, p. 330 25. Whalen Industries is going through a planned process for organizational change. They have already analyzed the environment and they should now ___________. a. get feedback from the environment b. determine the difference between what the organization aspires to do to take advantage of its opportunities and what it actually does c. determine all new technical breakthroughs d. none of the above ANSWER: B, Application, Difficult, p. 330 26. The aim of the __________ step in the planning process for organizational change is to identify the nature and extent of problems before taking action. a. communication b. refreezing c. assessment d. organizational diagnosis ANSWER: D, Knowledge, Moderate, p. 330 60
  • 12.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 27. The HR director at Food Ingredient Specialties used __________ to encourage employees to creatively analyze company problems. a. motivational speakers b. videos c. music d. all of the above ANSWER: C, Knowledge, Moderate, p. 330 28. The fourth step in planning for organizational change is: a. diagnosis of organizational problems. b. articulating and communicating a vision. c. anticipate resistance. d. There are no steps to organizational change. ANSWER: B, Knowledge, Moderate, p. 329 29. Bill Zollar communicated his vision for Yellow Freight Systems by: a. announcing the vision in memos. b. publishing the vision in employee newspapers. c. taking an 18-month road trip. d. taking out a display ad in the Wall Street Journal. ANSWER: C, Knowledge, Easy, p. 331 30. The fifth step in planning for organizational change is: a. develop and implement an action plan. b. determine the performance gap. c. assess the environment. d. diagnose organizational problems. ANSWER: A, Knowledge, Moderate, p. 329 31. An action plan provides all of the following except __________. a. articulation of the goals for change b. describes the specific measures to be used to monitor progress c. describes specific measures to be used to evaluate progress toward those goals d. An action plan provides all of the above. ANSWER: D, Knowledge, Moderate, p. 331 32. The text mentioned all of the following alternatives to layoffs except __________. a. reducing hours b. reducing pay c. encouraging leaves of absence d. getting rid of part-time workers ANSWER: B, Knowledge, Difficult, p. 331 61
  • 13.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 33. What is the best way to assure that a plan for organizational change will be implemented? a. involve employees early in the process b. correctly diagnose the problem c. empower a task force to implement the change d. prioritize short-term goals over long-term goals. ANSWER: A, Knowledge, Moderate, p. 331 34. As one of the world’s largest companies with 101,000 employees and $128 billion in annual revenues, size could not protect Royal Dutch/Shell from __________. a. the World Trade Organization b. European hypermarkets c. price shocks in the oil markets d. environmental threats ANSWER: B, Knowledge, Difficult, p. 332 35. Royal Dutch/Shell needed a more fundamental change than downsizing. One of the major challenges that were identified was __________. a. making its prices more competitive b. achieving consistent brand recognition internationally c. boosting retail outlet sales d. inefficient use of its refinery capabilities ANSWER: C, Knowledge, Easy, p. 332 36. Steve Miller, managing director of Royal Dutch/Shell, is convinced that creating change is __________. a. a top-down task b. a bottom-up task c. the most essential activity d. an unending cycle ANSWER: B, Knowledge, Moderate, p. 332 37. For change to be effective, __________ should be set before the change effort is started. a. reasons b. rewards c. guarantees d. goals ANSWER: D, Knowledge, Easy, p. 332 62
  • 14.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 38. Phillip French is setting goals for his organization. For change to be effective, goals should incorporate all of the following except __________. a. be based on realistic objectives b. be stated in clear and measurable terms c. be consistent with the organization’s policies d. all of the above ANSWER: D, Application, Difficult, p. 332 39. Step six in the process of organizational change is: a. assess the environment. b. determine the performance gap. c. develop a strategic plan. d. anticipate and reduce resistance. ANSWER: D, Knowledge, Moderate, p. 329 40. Experienced managers are aware of all the following forms of resistance to change mentioned in the chapter except __________. a. sabotage b. silence c. lawsuit d. defiance ANSWER: C, Knowledge, Easy, p. 333 41. Jimmie Compton is a manager of a computer software company and is interested in implementing changes within the organization. What forms of resistance is Compton likely to encounter? a. silence b. sabotage c. in-your-face defiance d. All of the above are forms of resistance. ANSWER: D, Application, Easy, p. 333 42. Lakisha Bullock is hoping to select the correct method of overcoming employee resistance to change. Her choices include all of the following except __________. a. education b. participation c. fear d. all are the above ANSWER: C, Knowledge, Moderate, p. 333 43. In general, people—and sometimes even entire organizations—tend to resist change for certain reasons. Which of the following is not a typical reason to resist change? a. fear b. vested interests c. interactivity d. misunderstandings ANSWER: C, Knowledge, Difficult, p. 333 63
  • 15.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 44. Shirley Mason, manager of Falcon Fabrication, has tried to computerize her billing department. Most employees in that department have been working for the firm for many years and don’t feel comfortable with the prospect of having to deal with computers. Mason is likely to encounter resistance to her plans because of __________. a. fear of the unknown b. vested interests c. interorganizational agreements d. limited resources ANSWER: A, Application, Difficult, p. 333 45. Mercedes-Benz Credit Corporation set out to restructure its operations in the United States by instituting all of the following except: a. offered the security of a new job to anyone bold enough to eliminate his or her current position. b. reminded employees that fear was a normal and essential element of change. c. eliminated four layers of management as a result of employee recommendations. d. used financial incentives to convince employees that even cutting their own jobs wouldn’t hurt them. ANSWER: B, Knowledge, Difficult, p. 333 46. Howard Chamberlain has been resisting change within his organization because he feels that he is unable to develop the new skills and behaviors required of him. Howard is experiencing __________. a. fear of the unknown b. cynicism c. competition d. vested interests ANSWER: A, Application, Moderate, p. 333 47. Fear often goes hand in hand with __________. a. misunderstandings b. cynicism c. vested interests d. technological change ANSWER: C, Knowledge, Difficult, p. 333 48. Individuals within organizations may become resistant to change if they believe that it conflicts with their own self-interests. This resistance is usually based on _________. a. fear of the unknown b. vested interests c. misunderstandings d. cynicism ANSWER: B, Knowledge, Moderate, p. 333 64
  • 16.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 49. Prudential communicated the implications of its change policies through the use of a board game similar to Monopoly in order to alleviate negative effects that might be caused by __________. a. misunderstandings b. fear c. vested interests d. cynicism ANSWER: A, Knowledge, Difficult, p. 334 50. Katie Schroeder is very resistant toward any change. Her manager knows that getting employees to discuss their problems openly is crucial to overcoming resistance to change. What is Schroeder’s manager trying to resolve? a. fear of the unknown b. vested interest c. misunderstanding d. interorganizational disagreement ANSWER: C, Application, Moderate, p. 334 51. Kasey McLaughlin’s subordinates are resisting his “Quality is #1” campaign because they think it is just another management fad. In order to succeed with the program, Kasey will need to eliminate __________. a. the leader of resistance b. fear of the unknown c. cynicism d. misunderstandings ANSWER: C, Application, Difficult, p. 334 52. Mark Morgan’s plan to implement organizational change was met with rumblings from his employees that he was trying to get promoted to administrative vice president. Morgan’s changes may not succeed because of his employees’ __________. a. misunderstanding b. cynicism c. fear d. impatience ANSWER: B, Application, Moderate, p. 334 53. In the __________ step, managers monitor the results of the change process. a. initial b. search c. final d. identification ANSWER: C, Knowledge, Easy, p. 334 65
  • 17.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 54. The final stage of planned organizational change is __________. a. diagnosis of organizational problems b. identification of sources of resistance c. plan the next cycle of change d. monitor change ANSWER: D, Knowledge, Moderate, p. 334 55. Jeanine Yates has initiated and implemented many changes in her workplace. Some have been successful, and others have not. Yates must understand that the ability to sustain and make change work depends primarily on ___________. a. the ability to terminate poor workers after change has been made b. the skill of the change initiator c. how well the organization monitors reactions and improvements after the change effort d. the skills and abilities of the employees involved in the change ANSWER: C, Application, Moderate, p. 334 56. Carol Bernick believed the best way to change Alberto-Culver’s performance was to __________. a. change its marketing b. change its culture c. change its pricing structure d. change the top management team ANSWER: B, Knowledge, Moderate, p. 335 57. Alberto-Culver created growth development leaders to take part in all of the following except __________. a. performance reviews b. one-on-one mentoring c. communicating the family friendly benefits d. meeting and communicating with the CEO ANSWER: B, Knowledge, Difficult, p. 335 Learning Objective 3 Implementing Change 58. Sabrina Neely has been very involved with incorporating planned organizational change. In fact, she has already assessed the environment, determined the performance gap, diagnosed organizational problems, identified sources of resistance, reduced those sources of resistance, and developed a method to monitor organizational change. Sabrina must next __________. a. follow-up on the goals b. search for approaches to change c. implement the change d. reassess the environment ANSWER: B, Application, Difficult, p. 335 59. There are four methods of organizational change that include all of the following except 66
  • 18.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING __________. a. job redesign b. organization redesign c. environmental change d. technological change ANSWER: C, Knowledge, Moderate, p. 336 60. __________ comprises complex networks of computer, telecommunications systems, and remote-controlled devices. a. Information technology b. Inventory management c. Network design d. Infrastructure management ANSWER: A, Knowledge, Moderate, p. 335 61. Deluxe Electronics can link its manufacturing and inventory functions so that as soon as the system runs low on a part, a central computer automatically executes an electronic purchase order signaling the supplier to ship new parts. Deluxe is effectively utilizing __________. a. a warehouse control system b. information technology c. just-in-time technology d. interval schedules ANSWER: B, Application, Difficult, p. 335 62. At Wal-Mart, the electronic cash register monitors the goods sold, their prices, and the amounts remaining on hand. If the inventory of an item is low, the system sends the message to the appropriate distribution center and a reorder is placed. What approach to implementing change is Wal-Mart using? a. technological change b. organization Redesign c. organization development d. none of the above ANSWER: A, Knowledge, Moderate, p. 335 63. Kristina Falk has noticed that her plant needs improvement when it comes to workflows and production methods. The change that Kristina should initiate is a __________. a. conceptual framework strategy b. organization redesign c. organization development d. technological change ANSWER: D, Knowledge, Moderate, p. 335 67
  • 19.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 64. Regardless of the type of redesign selected, the intent is usually to clarify what gives the organization its __________. a. technological superiority b. leadership position with customers c. maximum efficiency d. best possible profitability ANSWER: B, Knowledge, Difficult, p. 336 65. As Mellon Bank’s customers became more comfortable using ATMs, the bank found that it needed 30 percent fewer branches. The remaining branches were changed by what method? a. organization redesign b. technological change c. job redesign d. a combination of the above ANSWER: A, Knowledge, Moderate, p. 336 66. Which of the following statements is true concerning the organization redesign method? a. One basic approach to organizational design is changing the organization’s processes. b. The intent of redesigning organizations is to clarify what gives the organization its leadership position with its customers. c. Design changes should capitalize on the capabilities that differentiate the organization from its competitors. d. All of the above are true. ANSWER: D, Knowledge, Difficult, p. 336 67. Managers are being bombarded by ideas on how to redesign their organizations to improve customer satisfaction. These recommendations include all of the following except __________. a. redesigning b. downsizing c. reengineering d. reformation ANSWER: D, Knowledge, Easy, pp. 336–337 68. __________ typically means reconfiguring the distribution of authority, responsibility, and control in an organization. a. Streamlining b. Standardization c. Restructuring d. Re-aligning ANSWER: C, Knowledge, Moderate, p. 336 68
  • 20.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 69. In 1994, Sears, Roebuck, & Company sold off interests in insurance, real estate, and finance to focus on its core competency of merchandising. Sears was thereby __________. a. simplifying b. restructuring c. re-shuffling d. resisting change ANSWER: B, Application, Moderate, p. 336 70. What approach to structural redesign is known to be used as a response to poor organizational performance, is seldom effective in the long run, and presents a painful experience to those who endure the process? a. reengineering b. downsizing c. job simplification d. job creation ANSWER: B, Knowledge, Moderate, pp. 336–337 71. __________ has to do with changing the processes by which work is carried out. a. Feedback control b. Reengineering c. Ingenuity d. Standardization ANSWER: B, Knowledge, Easy, p. 337 72. Donovan Feldman has been involved in reengineering his organization. He is redesigning the organization’s processes to ensure __________. a. lower costs b. better quality c. increased speed d. All of the above may result from reengineering. ANSWER: D, Application, Moderate, p. 337 73. When organizations want to improve their efficiency and the quality of their products and services, they often examine their __________. a. internal production processes b. focus group results c. acquisition of resources d. all of the above ANSWER: A, Knowledge, Moderate, 337 69
  • 21.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 74. By __________ its insurance claims processes, National Grange Mutual was able to reduce its response time by 55 percent. a. redesigning b. restructuring c. reengineering d. streamlining ANSWER: C, Knowledge, Difficult, p. 337 75. __________ involves the scientific analysis of tasks performed by employees in order to discover procedures that produce the maximum output for the minimum input. a. Job enrichment b. Job simplification c. Job redesign d. Job empowerment ANSWER: B, Knowledge, Easy, p. 337 76. The oldest task approach to change is __________. a. job enrichment b. job simplification c. job empowerment d. job deployment ANSWER: B, Knowledge, Moderate, p. 337 77. Fast-food restaurants most likely use __________. They use this design because their employees can learn tasks rapidly, they have short work cycles, and low-skilled and low- paid employees can be trained easily. a. team-based structures b. tangible outputs c. situation analysis leadership d. job simplification ANSWER: D, Application, Easy, p. 337 78. At “Toys for Tots,” specific jobs were changed with the intent of broadening and adding to the challenge of the tasks required. Productivity improved due to the company’s __________ approach to change. a. trend line b. job rotation c. job enrichment d. job engineering ANSWER: C, Application, Easy, p. 338 70
  • 22.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 79. Beth Hayden has been attempting to increase productivity through job enrichment. Job enrichment encompasses all of the following unique aspects except: a. employees are likely to develop attitudes that support the new job-related behaviors. b. job enrichment can humanize an organization. c. employees become more involved and more satisfied. d. All of the above are aspects of job enrichment. ANSWER: D, Application, Moderate, p. 338 80. All of the following are true regarding job enrichment except: a. it changes the basic relationship between employees and their work. b. it changes employee behaviors in ways that gradually lead to more positive attitudes about the organization. c. it offers opportunities for initiating other types of organizational change. d. promotes social loafing within the organization. ANSWER: D, Knowledge, Difficult, p. 338 81. Amelia Rash is studying various approaches to organizational change. She should use a(n) __________ approach if she needs a long-range strategy for developing her workforce and improving their effectiveness. a. organization development b. organization redesign c. reactive d. radical ANSWER: A, Application, Moderate, p. 338 82. __________ is a planned, long-range behavioral science strategy for understanding, changing, and developing an organization’s work force in order to improve its effectiveness. a. Survey feedback b. Organization development c. Team building d. Behavior modification ANSWER: B, Knowledge, Moderate, p. 338 83. Organization development (OD) has three most commonly used methods for achieving organizational change. All of the following are included except __________. a. focus groups b. information systems c. team building d. survey feedback ANSWER: B, Knowledge, Difficult, p. 338 71
  • 23.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 84. __________ is an organization development (OD) method that allows managers and employees to report their thoughts and feelings about the organization and to learn about how others think and feel about their own behaviors. a. Survey feedback b. Semantics training c. Team building d. Reorientation ANSWER: A, Knowledge, Easy, p. 338 85. Survey feedback is obtained by means of a __________. a. questionnaire b. portfolio c. PERT chart d. GANTT chart ANSWER: A, Knowledge, Easy, p. 338 86. Intel conducted a survey of its 85,000 employees using a(n) __________ method. a. Web-based b. ERP c. pen and paper d. both a and c ANSWER: D, Knowledge, Moderate, p. 339 87. Lonnie Hadley is a human resources manager for the credit card division of First USA. He has decided to initiate some team building activities which might include all of the following except __________. a. emphasis upon a trust-based environment b. outdoor adventures c. competitive games d. creativity exercises ANSWER: C, Application, Moderate, 339 88. ___________ is a description of reengineering initiatives that use Web-based technology as the primary method for managing business-to-business processes. a. E-engineering b. E-commerce c. E-generation d. E-digitalizing ANSWER: A, Knowledge, Moderate, p. 340 72
  • 24.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 89. The installation of ERP software at Fairchild Semiconductor was a radical change that created all of the following results except: a. it replaced all the business processes throughout the company. b. it allowed significant workforce reductions. c. it created “plain vanilla” processes that fit the generic software system. d. employees became more knowledgeable and excited about their roles in the company. ANSWER: B, Knowledge, Difficult, pp. 340–341 90. Fairchild Semiconductor implemented an ERP application from Peoplesoft. A key step was to educate users on how their own work was related to the overall process so that the workers might __________. a. save training time b. make the purchase decision appear worthwhile c. be committed to fully using the new system d. not request pay raises for the extra work ANSWER: C, Knowledge, Moderate, pp. 340–341 Learning Objective 4 Role of Innovation in Organizational Change 91. __________ is the process of creating and implementing a new idea. a. Change b. Strategy c. Innovation d. none of the above ANSWER: C, Knowledge, Easy, p. 341 92. Kodak’s lack of innovation caused all of the following except __________. a. profits plummeted b. 34,000 workers were laid off c. the CEO was fired d. all of the above ANSWER: B, Knowledge, Difficult, p. 341 93. Which of the following is not considered a basic type of innovation? a. technical innovation b. process innovation c. behavioral innovation d. All of the above are types of innovation ANSWER: C, Knowledge, Difficult, p. 341 73
  • 25.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 94. Susan Tillery’s organization Silk Flowers, Inc., has created and adopted a substantially new method of producing silk flowers. This is an example of what type of innovation? a. process b. organizational c. administrative d. technical ANSWER: A, Application, Moderate, p. 342 95. The shift to wireless communications systems represents what type of innovation? a. process b. administrative c. technical d. production ANSWER: C, Knowledge, Easy, pp. 341–342 96. The introduction of do-it-yourself online stock trading represents what type of innovation? a. environmental b. technical c. production d. process ANSWER: D, Knowledge, Moderate, p. 342 97. At Toyota, oobeya was a process innovation that enabled the company to __________. a. produce more futuristic automobile designs b. maintain the perfect inventory levels at dealers c. build cars with almost no workers d. dramatically lower production costs ANSWER: D, Knowledge, Difficult, p. 342 98. All of the following are examples of administrative innovation except __________. a. flexible work schedules b. telecommuting c. e-commerce d. virtual organizations ANSWER: C, Knowledge, Moderate, p. 342 99. Champion International was a traditional __________ company that followed technical innovations and moved higher in Fortune’s listings for six consecutive years. a. spark plug manufacturing b. chemical c. food service d. paper manufacturing ANSWER: D, Knowledge, Moderate, p. 343 74
  • 26.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 100. Champion International made all of the following changes as a result of technical innovations except __________. a. major investments in technical skills training b. in-house manufacturing of its state-of-the-art equipment c. restructured 10 of its 11 mills d. changed management structure from hierarchical to team-based ANSWER: B, Knowledge, Difficult, p. 343 101. An architecture for innovation builds an infrastructure that encourages innovation and change. All of the following are key features of that architecture except __________. a. developing a learning environment b. fostering workforce resilience c. providing a support system for innovation d. all of the above ANSWER: D, Knowledge, Easy, p. 343 Learning Objective 5 Learning Organizations 102. A(n) __________ organization has both the drive and the capabilities to improve its performance continuously. a. progressive b. redesigned c. innovative d. learning ANSWER: D, Knowledge, Easy, p. 343 103. Which of the following are learning organizations least likely to learn from? a. past experiences b. textbooks c. other companies d. customers ANSWER: B, Knowledge, Easy, p. 343 104. All of the following are considered distinctive features of learning organizations except __________. a. shared leadership b. intensive use of information c. hierarchical chain of command d. organic organization design ANSWER: C, Knowledge, Moderate, p. 344 75
  • 27.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 105. Management of Nantucket Nectars encourages employees to learn by allowing them to make mistakes. Managers believe this will result in __________. a. lower worker turnover b. better quality beverages c. better financial performance in the long run d. another product breakthrough ANSWER: B, Knowledge, Difficult, p. 344 106. Which company first implemented an employee’s innovative idea of electronic plane tickets? a. Southwest Airlines b. Continental c. People Express d. British Airways ANSWER: A, Knowledge, Moderate, p. 345 107. When people feel they are part of a community, they are more willing to __________. a. share solutions to problems with their coworkers b. find problems c. make extra effort d. all of the above ANSWER: D, Knowledge, Easy, p. 345 108. Learning organizations encourage individual learning in which of the following ways? a. delegation b. empowerment c. “oobeya” d. all of the above ANSWER: B, Knowledge, Moderate, p. 346 109. What organizational structure facilitates learning? a. flat structure b. team-based structure c. hierarchical structure d. both a and b are correct ANSWER: D, Knowledge, Moderate, p. 346 76
  • 28.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 110. Which of the following is true concerning Knight-Ridder’s purchase of Dialog Information Services? a. The purchase price was attractive so Knight-Ridder decided to make the short-term investment. b. The new service reaches a newspaper readership audience of primarily 25 to 43 year olds. c. The acquisition of Dialog transformed the traditional newspaper company to a leader in online business information. d. The company’s acceptance of the need for a short-term perspective was crucial for a learning organization. ANSWER: C, Application, Difficult, p. 346 111. The design of learning organizations emphasizes the use of all of the following except __________. a. teams b. strategic alliances c. boundaryless networks d. All of the above are emphasized in learning organizations. ANSWER: D, Knowledge, Moderate, p. 346 112. In addition to experimenting on their own, many learning organizations use strategic alliances with suppliers, customers, and even competitors as a method of learning. What alliance has Amgen, a Japanese biotech company, made with Kirin Brewery? a. Alcohol intake studies helping cancer research. b. Amgen learns about the fermentation processes, which are crucial for producing synthetic blood clotting protein. c. Kirin learns about amino-acid/protein combinations that can act as catalysts to speed up the brewing process. d. both b and c describe the “alliance” ANSWER: D, Application, Difficult, pp. 346–347 113. A design option for learning organizations is to become a network of cooperating units connected by a sense of community among a larger pool of people who share their diverse knowledge and expertise. What is this network design called? a. strategic alliance b. team-based c. measurement-oriented d. boundaryless ANSWER: D, Knowledge, Moderate, p. 347 77
  • 29.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 114. Information is the lifeblood of learning organizations. To be effective they must undertake all of the following except __________. a. extensive scanning b. be measurement oriented c. share problems d. all of the above ANSWER: D, Knowledge, Easy, p. 347 115. Learning organizations are measurement oriented in their efforts to improve performance. In learning organizations, what information do employees have access to? a. customer satisfaction surveys b. market share c. competitors’ strategies d. All of the above should be available to employees in learning organizations. ANSWER: D, Knowledge, Easy, p. 347 116. Pharmaceutical companies are described in the text as good examples of learning organizations. They do all of the following except __________. a. develop new products and bring them to the market b. rely on hierarchical structures to maintain control of the drug development process c. track the expertise of their scientists and engineers d. predict in advance the new products to be introduced ANSWER: B, Knowledge, Moderate, p. 347 117. Xerox identified which of the following as one of its key strategic challenges? a. increasing the amount and effectiveness of soft information b. increasing the amount and effectiveness of audit data c. consolidating the international accounting network with national standards d. using e-mail more effectively ANSWER: A, Knowledge, Difficult, p. 347 Essay Questions Learning Objective 1 1. Describe four types of organizational change. Organizational changes vary in both degree and timing. In terms of degree, change can be radical or incremental. In terms of timing, change can be reactive or anticipatory. Combinations of these possibilities create four basic types of change: radical reactive change, radical anticipatory change, incremental reactive change, and incremental anticipatory change. Moderate, pp. 325–328 78
  • 30.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING Learning Objective 2 2. Explain the planning process for organizational change. Although change often involves a bit of chaos, organizations can usually reduce its amount and impact by carefully planning for major change. Through planning, the organization begins to unfreeze and prepares for the change. The key planning activities are (1) assessing the environment; (2) determining whether a performance gap exists, and if so, its nature and magnitude; (3) diagnosing organizational problems; (4) articulating and communicating a vision for the future; (5) developing an action plan for the change; (6) anticipating and making plans to reduce resistance; and (7) developing a way to monitor change and following up after the main initiatives have been implemented. Difficult, pp. 329–334 3. What are some ways to cut costs that will avoid the long-term negative effects of laying off workers? a. reduce working hours for all employees rather than eliminating individuals b. encourage employees to take temporary leaves of absence c. not renewing contracts for temporary and part-time workers d. job sharing e. reduction of executive salaries and bonuses Difficult, p. 331 4. What are four of the reasons for the resistance to change? a. fear b. vested interests c. misunderstandings d. cynicism Easy, pp. 333–334 79
  • 31.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING Learning Objective 3 5. Identify four methods of organizational change. Many approaches to implementing change are possible. Four general methods are technological change, organization redesign, job redesign, and organization development. Technological change often involves changing the way work is done by adopting new information technologies. The organization redesign method may involve changing the organizational structure and/or organizational processes. Organization redesign normally affects large portions of an organization. Downsizing and reengineering are examples of this method. Job redesign involves changing employees’ jobs, either simplifying or enriching them. Organization development can be used to change employee attitudes and behaviors. Focus groups and survey feedback permits managers and employees to provide information about a range of topics, including job satisfaction, organizational commitment, and perceptions of supervisory and managerial behaviors. Team building is used to improve the functioning of people who must work together to achieve assigned tasks. Change efforts often involve a combination of these methods. Difficult, pp. 335–340 Learning Objective 4 6. Explain the relationship between innovation and organizational change. Innovation is the process of creating and implementing a new idea. Three basic types of innovation are technical, process, and administrative. Organizational change refers to any transformation in the design or functioning of an organization. Generally, innovations require organizational change. Innovation and change are important to both new and established organizations, owing to the dynamic nature of the external environments of most organizations. Moderate, pp. 341–343 Learning Objective 5 7. Discuss how learning organizations foster change. Organizations are redesigning themselves to become learning organizations capable of quickly adapting their practices to satisfy the needs of their customers. The basic features of such organizations are leadership that is shared, a culture that supports innovation, a strategy focused on customers, an organic organization design, and an intensive use of information. In a learning organization, change is not a special event; it’s a natural part of the organization’s continuous attempts to satisfy customers. Difficult, pp. 343–347 80
  • 32.
    CHAPTER 12: ORGANIZATIONALCHANGE AND LEARNING 8. Describe how information is effectively used in the learning organization. Learning organizations aggressively scan both the internal and external environments for information. They do not want to miss an important trend or change. Information is essential to judgements relating to the creation of new products and services. Systematic measurement is used to make these improvements possible. This includes data pertaining to profits, customer satisfaction, and competitors’ strategies. The learning organization gathers data and disseminates it internally. In addition to numerical data is “soft” information that may be gathered through anecdotal evidence. This can speed up the process of organizational learning. Moderate, p. 347 81