9. Equipment List
Tag Description
B-101 HDS Fired Heater
B-301 Pre-reformer Fired Heater
E-101 HDS Interchanger
E-301 AGHR Interchanger
E-401 HT Saturator Water Heater
E-402 NH3 Syngas Saturator Water Heater
E-403 NH3 Syngas Cooler
E-404 MeOH Syngas Saturator Water Heater
E-405 MeOH Syngas Cooler
J-201 Cool Saturator Water Pump
J-202 Hot Saturator Water Pump
K-101 Natural Gas Compressor
R-101 HDS
R-102A H2S Absorber 1
R-102B H2S Absorber 2
R-301 Pre-reformer
R-302 AGHR
R-303 ATR
R-401 Isothermal Shift
T-201 Saturator
V-401 NH3 Syngas KO Pot
V-402 MeOH Syngas KO Pot
X-501 CO2 Removal
X-502 Cold Box
10. To Saturator
Natural Gas
H2 Recycle
from CO2 Removal
S-414
S-101
K-101
B-101
E-101
S-107
R-101 R-102A
R-102B
Integration Flowsheet 1: Feed Preparation (HDS)
11. S-107
S-203S-201
MP Steam
To FXC
Water from
E-401
To E-401
Mixed Feed
to Reformer
Process
Condensate
To E-402
J-201
J-202
From HDS
S-202
T-201
Integration Flowsheet 2: Feed Preparation (Saturator Circuit)
12. Fuel Gas
O2 from ASU
R-301
R-302
R-303
E-301
S-203
Mixed Gas
from Saturator S-301
Reform Gas
to E-401
S-307
S-308
S-302
B-301
S-203
From FC
S-304
S-305
Integration Flowsheet 3: Pre-reformer, AGHR, ATR
13. From FCV
Water to
Saturator
E-403
To CO2
Removal
S-401
S-308
E-402
S-408
V-401
From
201
S-415
E-401
S-404
S-405
Reform
Gas from
E-301
From
J-202
R-301
From Co2
Removal
E-405E-404
MeOH
Syngas
S-420
V-402
S-410
Integration Flowsheet 4: Isothermal Shift