Topic 2.6
Changes

http://www.youtube.com/watch?v=
xMQ0Ryy01yE
Limiting Factors and Carrying Capacity
• Limiting Factors
–
–
–
–

Variables which constrain the growth of populations
These include temperature, light, water and nutrients
Wide range of environmental factors
= stenoecious species
Narrow range of environmental factors = euryoecious species

• Carrying Capacity
– The maximum number of organisms of a particular species that
a given area or ecosystem can sustainably support
population
size

carrying capacity

time
Limiting Factors and Carrying Capacity

oligotypic species

mesotypic species

polytypic species
Temperature
• Plants have different niches with regard to
temperature
• Different temperatures may be limiting at
different stages in a plant’s lifecycle
• e.g. The South African Protea flower only
germinates after bush fires activate its seeds, kill
off competitors and provide ash to enrich the soil
with nutrients
Water
• Too little water may cause water
stress in plants:
– Germination may fail
– Seedlings may die
– Seed yield may be reduced

• Plants have developed adaptations to
survive in different levels of water
stress:
– Hydrophytes – water tolerant plants
– Mesophytes –plants that survive in
moist environments
– Xerophytes – plants that survive in dry
environments
Population Growth
Population Growth
• When a species is introduced into a new
environment its population grows in a characteristic
way.
• The curve is generally called a sigmoid growth curve
or S-curve
Population Growth
S-Curve
• The S-curve has three phases
(1,2,3)
– 1. Exponential growth phase
Resources are plentiful. Birth rate
(natality) is greater than death rate
(mortality)
– 2. Transitional phase
Natility falling, mortality rising. But natality
is still greater than mortality
– 3.Plateau phase
natality = mortality. Something is now
limiting the birth rate. Eg predation,
competition for resources, food
shortage, disease. In reality the
population wobbles around k, with
overshoot and die-back

k

k = carrying capacity

The s-curve is typical of longlived species that are able to
reach their carrying capacity –
e.g. top predators
Population Growth
J-Curve
• The J-curve only shows
exponential growth
• The species does not reach
the transitional or plateau
phases, therefore growth
does not slow down
The J-curve is typical of shortlived species that exploit a ‘boom
and bust’ strategy – e.g. rodents,
pest insects and microbes
Density-dependent Limiting
Factors
• These factors increase mortality rate as population
density increases
– e.g. competition for resources, space, disease, predation,
parasitism
– Predators are attracted to more dense populations,
disease spreads more easily

• They act as negative feedback mechanisms and lead to
stability around the carrying capacity
• They also act as natural selection factors which help to
increase the fitness of the population
• They include internal factors such as densitydependent fertility or size of available breeding
territory and external factors such as predation or
disease
Density-independent Limiting Factors
• These factors increase mortality rate but are not
related to population density – they are generally
abiotic factors. They may also reduce birth rate
– e.g. extremes of weather (drought, hurricanes), longterm climate change (natural and anthropogenic),
geophysical events such as tsunamis and volcanic
eruptions

• They may act in conjunction with densitydependent factors, but do not act to stabilise
populations
Human Influences on Limiting Factors
• Human activities may cause population increases by:
–
–
–
–

Increasing availability of resources (e.g. fertiliser use)
Reducing competition (e.g. pesticide use)
Reducing predation (e.g. by over-hunting)
Introducing animals to new areas

• Human activities may cause population decreases (or
even extinction) by:
– Habitat destruction
– Introduction of alien species
– Over-hunting
r- and K-Strategists
• Slow growing, long-lived species which exploit S-curve
growth are called K-strategists
• Fast growing, short-lived species which exploit J-curve
(boom and bust) growth are called r-strategists
• Species which employ a strategy somewhere between
these extremes are called C-strategists
• K-strategists tend to be large, have a small number of
offspring and high level of parental care (e.g.
mammals)
• r-strategists tend to be small, have large number of
offspring and very little parental care (e.g. insects)
r and K Survivorship Curves
K-strategists

Number of individuals surviving

1000

100

C-strategists

10

r-strategists

1
0

50
Percentage of lifespan

100
r and K Survivorship Curves
• K-strategists tend to survive for their entire
potential lifespan and then die over a short time
period (e.g. humans, salmon)
• r-strategists tend to die at a young age, and those
that don’t are likely to live a long time (e.g.
turtles, oysters)
• Limiting factors that affect the shape of the curve
include:
– Competition for resources
– Adverse environmental conditions
– Predator-prey relationships
Ecological Succession
• The long-term change in a community after it
starts to colonise bare substrate
• Pioneer community
climax community
• Bare rock
lithosere
• Freshwater

hydrosere

• Dry habitat

xerosere

http://www.bbc.co.uk/programmes/p0038s03
Succession Model (Lithosere)
Bare uncolonised rock exposed

Colonisation by lichens, weathering of rock and build up of dead organic material

Growth of moss, further weathering; soil begins to form

Growth of small plant such as grasses, leading to further improvement of soil

Larger plants can grow in the deeper and more nutrient rich soil

Climax Community of shrubs and trees
Succession
• Primary Succession
– Occurs on a previously uncolonised substrate (e.g. a
newly formed bit of bare igneous rock, newly exposed
surfaces such as landslips, newly quarried rock face,
newly exposed sanbanks or sanddunes)

• Secondary Succesion
– Occurs in places where a previously existing
community has been destroyed (e.g. by a forest fire,
newly exposed sediment at the edge of a lake)
– This occurs faster since soil and seed already exist
Succession
• Succession occurs in stages
• The first colonisers are pioneer species
– Fast growing species such as lichens and mosses which don’t require thick
soil

• Secondary species (especially grasses) then take over
– These are slower growing and are able to outcompete the pioneer species
for light and nutrients

• Tertiary species (especially herbaceous plants) then take over
– These take advantage of thicker soil appearing as litter breaks down

• Quaternary species then take over
– Largely shrubs appear which are able to outcompete the herbaceous
plants

• Finally a climax community is produced (e.g. oak forest)
– Thick soil has been produced, trapping more moisture and nutrients
– A community of soil organisms develops
– An animal community develops to exploit the available niches
http://edroness.blogspot.mx/2014/02/ecologicalsuccession.html
Private Life of Plants – episode 4
Succession
Feature

Start of Succession

End of Succession

Amount of organic matter

Small

Large

Amount of Nutrients

Small

Large

Nutrient conservation

Poor

Good

Amount of detritus

Small

Large

Niches

Few but wide

Many but small

Size of colonisers

Small

Large

Life cycles

Simple

Complex

Growth patterns

r-strategists dominate

K-strategists dominate

Diversity

Low

High

Stability

Low

High

Productivity

Low and unstable

High and stable

pH

High

Low

Biodiversity

Low

High
Productivity
• In the early stages of succession, GPP is low due to the low
density of producers. However, NPP is fairly high due to the
low respiration rates in the whole community
• As succession proceeds, GPP increases as soils become
more structured and the density of organisms increases.
NPP stabalises as niches become occupied
• The ratio of GPP/NPP is called the P/R ratio. In the climax
community, overall productivity is balanced by overall
respiration – therefore as succession proceeds, the P/R
ratio approaches a value of 1
Productivity
1

P/R Ratio

Climax Forest

Agricultural Crop

0

time
Plagioclimax
• An interruption to succession is termed plagioclimax
• Humans are often the source of this
• Sometimes it is accidental and sometimes on purpose (e.g.
farmers do not want forests to become established on their
land)
• The greatest impact is through direct deforestation
• Humans also affect succession by:
–
–
–
–
–

Erosion of footpaths
Trampling of plants
Hunting
Land clearance
Introduction of grazing animals
Questions
1. Briefly describe the stages of primary
succession
2. What is P/R ration and how does it change as
succession proceeds
3. List the characteristics of a typical climax
community
4. What is plagioclimax. Give examples of how
humans may cause it

Summary of topic 2.6

  • 1.
  • 2.
    Limiting Factors andCarrying Capacity • Limiting Factors – – – – Variables which constrain the growth of populations These include temperature, light, water and nutrients Wide range of environmental factors = stenoecious species Narrow range of environmental factors = euryoecious species • Carrying Capacity – The maximum number of organisms of a particular species that a given area or ecosystem can sustainably support population size carrying capacity time
  • 3.
    Limiting Factors andCarrying Capacity oligotypic species mesotypic species polytypic species
  • 4.
    Temperature • Plants havedifferent niches with regard to temperature • Different temperatures may be limiting at different stages in a plant’s lifecycle • e.g. The South African Protea flower only germinates after bush fires activate its seeds, kill off competitors and provide ash to enrich the soil with nutrients
  • 5.
    Water • Too littlewater may cause water stress in plants: – Germination may fail – Seedlings may die – Seed yield may be reduced • Plants have developed adaptations to survive in different levels of water stress: – Hydrophytes – water tolerant plants – Mesophytes –plants that survive in moist environments – Xerophytes – plants that survive in dry environments
  • 6.
  • 7.
    Population Growth • Whena species is introduced into a new environment its population grows in a characteristic way. • The curve is generally called a sigmoid growth curve or S-curve
  • 8.
    Population Growth S-Curve • TheS-curve has three phases (1,2,3) – 1. Exponential growth phase Resources are plentiful. Birth rate (natality) is greater than death rate (mortality) – 2. Transitional phase Natility falling, mortality rising. But natality is still greater than mortality – 3.Plateau phase natality = mortality. Something is now limiting the birth rate. Eg predation, competition for resources, food shortage, disease. In reality the population wobbles around k, with overshoot and die-back k k = carrying capacity The s-curve is typical of longlived species that are able to reach their carrying capacity – e.g. top predators
  • 9.
    Population Growth J-Curve • TheJ-curve only shows exponential growth • The species does not reach the transitional or plateau phases, therefore growth does not slow down The J-curve is typical of shortlived species that exploit a ‘boom and bust’ strategy – e.g. rodents, pest insects and microbes
  • 10.
    Density-dependent Limiting Factors • Thesefactors increase mortality rate as population density increases – e.g. competition for resources, space, disease, predation, parasitism – Predators are attracted to more dense populations, disease spreads more easily • They act as negative feedback mechanisms and lead to stability around the carrying capacity • They also act as natural selection factors which help to increase the fitness of the population • They include internal factors such as densitydependent fertility or size of available breeding territory and external factors such as predation or disease
  • 11.
    Density-independent Limiting Factors •These factors increase mortality rate but are not related to population density – they are generally abiotic factors. They may also reduce birth rate – e.g. extremes of weather (drought, hurricanes), longterm climate change (natural and anthropogenic), geophysical events such as tsunamis and volcanic eruptions • They may act in conjunction with densitydependent factors, but do not act to stabilise populations
  • 12.
    Human Influences onLimiting Factors • Human activities may cause population increases by: – – – – Increasing availability of resources (e.g. fertiliser use) Reducing competition (e.g. pesticide use) Reducing predation (e.g. by over-hunting) Introducing animals to new areas • Human activities may cause population decreases (or even extinction) by: – Habitat destruction – Introduction of alien species – Over-hunting
  • 13.
    r- and K-Strategists •Slow growing, long-lived species which exploit S-curve growth are called K-strategists • Fast growing, short-lived species which exploit J-curve (boom and bust) growth are called r-strategists • Species which employ a strategy somewhere between these extremes are called C-strategists • K-strategists tend to be large, have a small number of offspring and high level of parental care (e.g. mammals) • r-strategists tend to be small, have large number of offspring and very little parental care (e.g. insects)
  • 14.
    r and KSurvivorship Curves K-strategists Number of individuals surviving 1000 100 C-strategists 10 r-strategists 1 0 50 Percentage of lifespan 100
  • 15.
    r and KSurvivorship Curves • K-strategists tend to survive for their entire potential lifespan and then die over a short time period (e.g. humans, salmon) • r-strategists tend to die at a young age, and those that don’t are likely to live a long time (e.g. turtles, oysters) • Limiting factors that affect the shape of the curve include: – Competition for resources – Adverse environmental conditions – Predator-prey relationships
  • 16.
    Ecological Succession • Thelong-term change in a community after it starts to colonise bare substrate • Pioneer community climax community • Bare rock lithosere • Freshwater hydrosere • Dry habitat xerosere http://www.bbc.co.uk/programmes/p0038s03
  • 17.
    Succession Model (Lithosere) Bareuncolonised rock exposed Colonisation by lichens, weathering of rock and build up of dead organic material Growth of moss, further weathering; soil begins to form Growth of small plant such as grasses, leading to further improvement of soil Larger plants can grow in the deeper and more nutrient rich soil Climax Community of shrubs and trees
  • 18.
    Succession • Primary Succession –Occurs on a previously uncolonised substrate (e.g. a newly formed bit of bare igneous rock, newly exposed surfaces such as landslips, newly quarried rock face, newly exposed sanbanks or sanddunes) • Secondary Succesion – Occurs in places where a previously existing community has been destroyed (e.g. by a forest fire, newly exposed sediment at the edge of a lake) – This occurs faster since soil and seed already exist
  • 19.
    Succession • Succession occursin stages • The first colonisers are pioneer species – Fast growing species such as lichens and mosses which don’t require thick soil • Secondary species (especially grasses) then take over – These are slower growing and are able to outcompete the pioneer species for light and nutrients • Tertiary species (especially herbaceous plants) then take over – These take advantage of thicker soil appearing as litter breaks down • Quaternary species then take over – Largely shrubs appear which are able to outcompete the herbaceous plants • Finally a climax community is produced (e.g. oak forest) – Thick soil has been produced, trapping more moisture and nutrients – A community of soil organisms develops – An animal community develops to exploit the available niches http://edroness.blogspot.mx/2014/02/ecologicalsuccession.html Private Life of Plants – episode 4
  • 20.
    Succession Feature Start of Succession Endof Succession Amount of organic matter Small Large Amount of Nutrients Small Large Nutrient conservation Poor Good Amount of detritus Small Large Niches Few but wide Many but small Size of colonisers Small Large Life cycles Simple Complex Growth patterns r-strategists dominate K-strategists dominate Diversity Low High Stability Low High Productivity Low and unstable High and stable pH High Low Biodiversity Low High
  • 21.
    Productivity • In theearly stages of succession, GPP is low due to the low density of producers. However, NPP is fairly high due to the low respiration rates in the whole community • As succession proceeds, GPP increases as soils become more structured and the density of organisms increases. NPP stabalises as niches become occupied • The ratio of GPP/NPP is called the P/R ratio. In the climax community, overall productivity is balanced by overall respiration – therefore as succession proceeds, the P/R ratio approaches a value of 1
  • 22.
  • 23.
    Plagioclimax • An interruptionto succession is termed plagioclimax • Humans are often the source of this • Sometimes it is accidental and sometimes on purpose (e.g. farmers do not want forests to become established on their land) • The greatest impact is through direct deforestation • Humans also affect succession by: – – – – – Erosion of footpaths Trampling of plants Hunting Land clearance Introduction of grazing animals
  • 24.
    Questions 1. Briefly describethe stages of primary succession 2. What is P/R ration and how does it change as succession proceeds 3. List the characteristics of a typical climax community 4. What is plagioclimax. Give examples of how humans may cause it