SlideShare a Scribd company logo
1
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Center for Architecture Studies in Southeast Asia (MASSA)
Bachelor of Science (Honours) in Architecture
BUILDING CONSTRUCTION 2 [ARC 2513]
Project 1 : Skeletal Construction “A Shelter For One”
Marks : 40% (30% groupwork & 10% individual)
Duration : 4 weeks
Submission date : 28 April 2015 - Week 6
(Presentation, Testing & Submission of Report)
Introduction
Experiencing and understanding skeletal construction is important as it is one of the most widely used structures
for building support. As a designer we should know how skeletal structure works.
Objectives of Assignment
The objectives of this project are as follows:
 To create an understanding of skeletal structure and its relevant structural components.
 To understand how a skeletal structure reacts under loading.
 To demonstrate a convincing understanding of how Skeletal Construction works.
 To be able to manipulate Skeletal Construction to solve an oblique Design problem.
2
Learning Outcomes
Learning outcomes assessed in this project include:
 Apply construction system in design.
 Recognize the implication of construction systems in design.
 Analyse the issues of strength, stiffness and stability of structures including modes of structural
systems, forces, stress and strain and laws of static.
Tasks - Methodology
Your task is to construct a shelter according to the following specifications.
 SCALE-Your shelter should be constructed to fit for one person in a sitting position (1:1 ). Max height is
1.5m. Max base size is 0.75 x 0.75 m
 CONSTRUCTION- It should demonstrate the knowledge of skeletal frames and its joints
o Should be elevated at least 5 inches from the ground
 JOINTS-The joints should be constructed to reflect actual joints. Eg, if a group chooses recycle steel
materials for the frame, the joints should be made to resemble bolts and nuts etc. You are not allowed
to use inappropriate materials for joints such as rope for steel.
 MATERIALS- You are only allowed to use recycle materials such as newspaper, pet bottles, cans, etc.
However, the chosen materials must relate to its function. Eg, roofing materials should not be made
from newspaper.
 OTHER DESIGN CONSIDERATIONS- This is just a minor component however; the shelter should be
light and portable.
o Resistant to outdoor weather.
o Allows easy access in and out from the shelter
o Shelter SHOULD NOT BE OVERLY DESIGN and must conform to the design criteria.
 TEST-The completed shelter will be tested to withstand the weight of average 60kg person up to 2
minutes.
 Analysis on the design, construction progress and test results are to be provided in the form of an
A3 bound report.
 Students are encouraged to use annotated sketches / diagrams to explain the construction, joints,
forces, structural movement experienced during the testing of the shelter.
 Photographs of the shelter should also be incorporated into the presentation report
Submission Requirement
 1:1 model of the shelter (students name and ID should be clearly included on the model)
 A3 bound report complete with visuals, sketches and inclusive of the detailing and progressive
documentation of your project.
 Visuals / Photos used in the submission must be clear and well communicated.
 Sketches are meant to provide visual documentation and communication. Therefore sketches are
required to be neat, clear and annotated.
 Assumptions can be made through reference from book/drawings. DO NOT PLAGIARISE.
 Softcopy is required to be attached with the hardcopy.
3
Assessment criteria
The assessment for the shelter construction will be based on your
 Ability to apply the knowledge of skeletal construction and its joints to actual construction and design
 Ability of the shelter to take the load applied in the specified duration.
 Creative design elements within the given requirements
 Understanding of appropriate materials to suit the functions of the shelter
The assessment for the report will be based on your
 Quality of the documentation of visuals sketches, drawings and load and forces detailing of the construction
elements.
 Clarity of the analysis on success / failure of the shelter.
Marking criteria
Marks shall be distributed as follows:
(1) Group Component ( will be calculated to 30%)
Marking
criteria
Marks%
Acquired
TGC
Fail
Poor
Satisfactory
Good
Excellent
UNDERSTANDING OF SKELETAL
CONSTRUCTION & ITS JOINTS
 The use of frame components-
interpretation of columns, beams,
roofing structure etc
 Joints
40
STRENGTH OF SHELTER
Ability of the model to take the total
load applied in the specified duration.
20
DESIGN
 Originality & practicality
 Weather resistant
 Easy access 10
MATERIALS
 Appropriate recycle materials are
used to suit the functions
10
ANALYSIS REPORT
 Quality of the documentation of
visuals sketches, drawings and
load and forces detailing of the
construction elements.
 Clarity of the analysis on success /
failure of the shelter.
20
4
(2) Individual Component (10%)
 10% based on peer evaluation and instructor’s evaluation on individual performance of a group
member in a group.
Assessment Criteria
Group(30%)
UNDERSTANDING OF SKELETAL
CONSTRUCTION & ITS JOINTS
 The use of frame components- interpretation of columns, beams, roofing structure etc. Joints
(40%)
STRENGTH OF SHELTER
Ability of the model to take the total load applied in the specified duration.
(20%)
DESIGN
 Originality & practicality
 Weather resistant
 Easy access
(10%)
MATERIALS
 Appropriate recycle materials are used to suit the functions
(10%)
ANALYSIS REPORT
 Quality of the documentation of visuals sketches, drawings and load and forces detailing of the
construction elements.
 Clarity of the analysis on success / failure of the shelter.
(20%)
(Total 100% will be converted to 30%)
Individual
(10%)
 peer evaluation and instructor’s evaluation on individual performance of a group member in a
group.
(10 %)
References
1. Chudley, R. 2006, Construction Technology. 4thedition. Pearson and Prentice Hall.
2. Lyons, Arthur, 2004. A. Materials for Architects and Builders. 2nd Edition. Oxford. Elsevier Butterwort-
Heinemann
3. Seeley, Ivor H.1995, Building Technology. 5th edition. Basingstoke, Hants: MacMillan
4. Ching, Francis D.K. 1991. Building Construction Illustrated. New York. Van Nostrand Reinhold.
5. Simmon, H. Leslie, 2001. Construction: Principles, Materials and Method. 7th Edition. New York. John
Wiley & Sons.
6. Zannos, Alexander. 1987, Form and Structure in Architecture: The Role of Statistical Function. Von
Nostrand Reinhold Company, New York

More Related Content

Similar to Bcon 2 proj 1

Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016
Chow Hong Da
 
Project2 brief
Project2 briefProject2 brief
Project2 brief
Anthony Chew
 
Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)
Arvindhan Balasingam
 
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
Darshiini Vig
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
Preston Liew
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
Anthony Chew
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
JoyeeLee0131
 
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
Darshiini Vig
 
Chapter 1_JWAn_ECE 340.pptx
Chapter 1_JWAn_ECE 340.pptxChapter 1_JWAn_ECE 340.pptx
Chapter 1_JWAn_ECE 340.pptx
jinwooan4
 
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICESSEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
Darshiini Vig
 
B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)
Anthony Chew
 
B. structure project 2 brief august 2015
B. structure project 2 brief august 2015B. structure project 2 brief august 2015
B. structure project 2 brief august 2015
JoyeeLee0131
 
B. structure project 2 brief august 2015
B. structure project 2 brief august 2015B. structure project 2 brief august 2015
B. structure project 2 brief august 2015
Preston Liew
 
B sc (hons)(arch) asian architecture arc60403 project aug 2015
B sc (hons)(arch)  asian architecture arc60403 project aug 2015B sc (hons)(arch)  asian architecture arc60403 project aug 2015
B sc (hons)(arch) asian architecture arc60403 project aug 2015
Preston Liew
 
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)
Anthony Chew
 
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
Darshiini Vig
 
Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014
Preston Liew
 
Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014
Anthony Chew
 
COMPARATIVE STUDY OF SEISMIC ANALYSIS OF REGULAR AND IRREGULAR STRUCTURE WITH...
COMPARATIVE STUDY OF SEISMIC ANALYSIS OF REGULAR AND IRREGULAR STRUCTURE WITH...COMPARATIVE STUDY OF SEISMIC ANALYSIS OF REGULAR AND IRREGULAR STRUCTURE WITH...
COMPARATIVE STUDY OF SEISMIC ANALYSIS OF REGULAR AND IRREGULAR STRUCTURE WITH...
IRJET Journal
 
Building con 1 (arc1523) project 1 brief aug 2015
Building con 1 (arc1523) project 1 brief   aug 2015Building con 1 (arc1523) project 1 brief   aug 2015
Building con 1 (arc1523) project 1 brief aug 2015
Chow Hong Da
 

Similar to Bcon 2 proj 1 (20)

Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016
 
Project2 brief
Project2 briefProject2 brief
Project2 brief
 
Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)
 
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
 
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
 
Chapter 1_JWAn_ECE 340.pptx
Chapter 1_JWAn_ECE 340.pptxChapter 1_JWAn_ECE 340.pptx
Chapter 1_JWAn_ECE 340.pptx
 
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICESSEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
 
B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)
 
B. structure project 2 brief august 2015
B. structure project 2 brief august 2015B. structure project 2 brief august 2015
B. structure project 2 brief august 2015
 
B. structure project 2 brief august 2015
B. structure project 2 brief august 2015B. structure project 2 brief august 2015
B. structure project 2 brief august 2015
 
B sc (hons)(arch) asian architecture arc60403 project aug 2015
B sc (hons)(arch)  asian architecture arc60403 project aug 2015B sc (hons)(arch)  asian architecture arc60403 project aug 2015
B sc (hons)(arch) asian architecture arc60403 project aug 2015
 
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)
 
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
SEMESTER 3 : PROJECT 1 BRIEF BUILDING SCIENCE 1
 
Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014
 
Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014
 
COMPARATIVE STUDY OF SEISMIC ANALYSIS OF REGULAR AND IRREGULAR STRUCTURE WITH...
COMPARATIVE STUDY OF SEISMIC ANALYSIS OF REGULAR AND IRREGULAR STRUCTURE WITH...COMPARATIVE STUDY OF SEISMIC ANALYSIS OF REGULAR AND IRREGULAR STRUCTURE WITH...
COMPARATIVE STUDY OF SEISMIC ANALYSIS OF REGULAR AND IRREGULAR STRUCTURE WITH...
 
Building con 1 (arc1523) project 1 brief aug 2015
Building con 1 (arc1523) project 1 brief   aug 2015Building con 1 (arc1523) project 1 brief   aug 2015
Building con 1 (arc1523) project 1 brief aug 2015
 

More from Preston Liew

Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016
Preston Liew
 
Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016
Preston Liew
 
Architectural design project module outline august 2016
Architectural design project module outline august 2016Architectural design project module outline august 2016
Architectural design project module outline august 2016
Preston Liew
 
PUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CYPUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CY
Preston Liew
 
Site analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANISite analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANI
Preston Liew
 
Project brief 2 architecture studio 5 march 2016 v3
Project brief 2 architecture studio 5 march 2016  v3Project brief 2 architecture studio 5 march 2016  v3
Project brief 2 architecture studio 5 march 2016 v3
Preston Liew
 
Studio brief
Studio briefStudio brief
Studio brief
Preston Liew
 
Studio module outline
Studio module outline Studio module outline
Studio module outline
Preston Liew
 
B tech report proj 2 PRESTON
B tech report proj 2 PRESTONB tech report proj 2 PRESTON
B tech report proj 2 PRESTON
Preston Liew
 
Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016
Preston Liew
 
Btech module outline
Btech module outlineBtech module outline
Btech module outline
Preston Liew
 
Btech brief assignment 1
Btech brief assignment 1Btech brief assignment 1
Btech brief assignment 1
Preston Liew
 
Preston bsci proj 2
Preston bsci proj 2Preston bsci proj 2
Preston bsci proj 2
Preston Liew
 
Light report compiled
Light report compiledLight report compiled
Light report compiled
Preston Liew
 
Sound final
Sound finalSound final
Sound final
Preston Liew
 
Project 2 integration
Project 2  integrationProject 2  integration
Project 2 integration
Preston Liew
 
Project 1 performance evaluation
Project 1 performance evaluationProject 1 performance evaluation
Project 1 performance evaluation
Preston Liew
 
Research questions preston liew
Research questions   preston liewResearch questions   preston liew
Research questions preston liew
Preston Liew
 
Spirituality & sense of place
Spirituality & sense of placeSpirituality & sense of place
Spirituality & sense of place
Preston Liew
 
Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015
Preston Liew
 

More from Preston Liew (20)

Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016
 
Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016
 
Architectural design project module outline august 2016
Architectural design project module outline august 2016Architectural design project module outline august 2016
Architectural design project module outline august 2016
 
PUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CYPUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CY
 
Site analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANISite analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANI
 
Project brief 2 architecture studio 5 march 2016 v3
Project brief 2 architecture studio 5 march 2016  v3Project brief 2 architecture studio 5 march 2016  v3
Project brief 2 architecture studio 5 march 2016 v3
 
Studio brief
Studio briefStudio brief
Studio brief
 
Studio module outline
Studio module outline Studio module outline
Studio module outline
 
B tech report proj 2 PRESTON
B tech report proj 2 PRESTONB tech report proj 2 PRESTON
B tech report proj 2 PRESTON
 
Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016
 
Btech module outline
Btech module outlineBtech module outline
Btech module outline
 
Btech brief assignment 1
Btech brief assignment 1Btech brief assignment 1
Btech brief assignment 1
 
Preston bsci proj 2
Preston bsci proj 2Preston bsci proj 2
Preston bsci proj 2
 
Light report compiled
Light report compiledLight report compiled
Light report compiled
 
Sound final
Sound finalSound final
Sound final
 
Project 2 integration
Project 2  integrationProject 2  integration
Project 2 integration
 
Project 1 performance evaluation
Project 1 performance evaluationProject 1 performance evaluation
Project 1 performance evaluation
 
Research questions preston liew
Research questions   preston liewResearch questions   preston liew
Research questions preston liew
 
Spirituality & sense of place
Spirituality & sense of placeSpirituality & sense of place
Spirituality & sense of place
 
Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015
 

Bcon 2 proj 1

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Center for Architecture Studies in Southeast Asia (MASSA) Bachelor of Science (Honours) in Architecture BUILDING CONSTRUCTION 2 [ARC 2513] Project 1 : Skeletal Construction “A Shelter For One” Marks : 40% (30% groupwork & 10% individual) Duration : 4 weeks Submission date : 28 April 2015 - Week 6 (Presentation, Testing & Submission of Report) Introduction Experiencing and understanding skeletal construction is important as it is one of the most widely used structures for building support. As a designer we should know how skeletal structure works. Objectives of Assignment The objectives of this project are as follows:  To create an understanding of skeletal structure and its relevant structural components.  To understand how a skeletal structure reacts under loading.  To demonstrate a convincing understanding of how Skeletal Construction works.  To be able to manipulate Skeletal Construction to solve an oblique Design problem.
  • 2. 2 Learning Outcomes Learning outcomes assessed in this project include:  Apply construction system in design.  Recognize the implication of construction systems in design.  Analyse the issues of strength, stiffness and stability of structures including modes of structural systems, forces, stress and strain and laws of static. Tasks - Methodology Your task is to construct a shelter according to the following specifications.  SCALE-Your shelter should be constructed to fit for one person in a sitting position (1:1 ). Max height is 1.5m. Max base size is 0.75 x 0.75 m  CONSTRUCTION- It should demonstrate the knowledge of skeletal frames and its joints o Should be elevated at least 5 inches from the ground  JOINTS-The joints should be constructed to reflect actual joints. Eg, if a group chooses recycle steel materials for the frame, the joints should be made to resemble bolts and nuts etc. You are not allowed to use inappropriate materials for joints such as rope for steel.  MATERIALS- You are only allowed to use recycle materials such as newspaper, pet bottles, cans, etc. However, the chosen materials must relate to its function. Eg, roofing materials should not be made from newspaper.  OTHER DESIGN CONSIDERATIONS- This is just a minor component however; the shelter should be light and portable. o Resistant to outdoor weather. o Allows easy access in and out from the shelter o Shelter SHOULD NOT BE OVERLY DESIGN and must conform to the design criteria.  TEST-The completed shelter will be tested to withstand the weight of average 60kg person up to 2 minutes.  Analysis on the design, construction progress and test results are to be provided in the form of an A3 bound report.  Students are encouraged to use annotated sketches / diagrams to explain the construction, joints, forces, structural movement experienced during the testing of the shelter.  Photographs of the shelter should also be incorporated into the presentation report Submission Requirement  1:1 model of the shelter (students name and ID should be clearly included on the model)  A3 bound report complete with visuals, sketches and inclusive of the detailing and progressive documentation of your project.  Visuals / Photos used in the submission must be clear and well communicated.  Sketches are meant to provide visual documentation and communication. Therefore sketches are required to be neat, clear and annotated.  Assumptions can be made through reference from book/drawings. DO NOT PLAGIARISE.  Softcopy is required to be attached with the hardcopy.
  • 3. 3 Assessment criteria The assessment for the shelter construction will be based on your  Ability to apply the knowledge of skeletal construction and its joints to actual construction and design  Ability of the shelter to take the load applied in the specified duration.  Creative design elements within the given requirements  Understanding of appropriate materials to suit the functions of the shelter The assessment for the report will be based on your  Quality of the documentation of visuals sketches, drawings and load and forces detailing of the construction elements.  Clarity of the analysis on success / failure of the shelter. Marking criteria Marks shall be distributed as follows: (1) Group Component ( will be calculated to 30%) Marking criteria Marks% Acquired TGC Fail Poor Satisfactory Good Excellent UNDERSTANDING OF SKELETAL CONSTRUCTION & ITS JOINTS  The use of frame components- interpretation of columns, beams, roofing structure etc  Joints 40 STRENGTH OF SHELTER Ability of the model to take the total load applied in the specified duration. 20 DESIGN  Originality & practicality  Weather resistant  Easy access 10 MATERIALS  Appropriate recycle materials are used to suit the functions 10 ANALYSIS REPORT  Quality of the documentation of visuals sketches, drawings and load and forces detailing of the construction elements.  Clarity of the analysis on success / failure of the shelter. 20
  • 4. 4 (2) Individual Component (10%)  10% based on peer evaluation and instructor’s evaluation on individual performance of a group member in a group. Assessment Criteria Group(30%) UNDERSTANDING OF SKELETAL CONSTRUCTION & ITS JOINTS  The use of frame components- interpretation of columns, beams, roofing structure etc. Joints (40%) STRENGTH OF SHELTER Ability of the model to take the total load applied in the specified duration. (20%) DESIGN  Originality & practicality  Weather resistant  Easy access (10%) MATERIALS  Appropriate recycle materials are used to suit the functions (10%) ANALYSIS REPORT  Quality of the documentation of visuals sketches, drawings and load and forces detailing of the construction elements.  Clarity of the analysis on success / failure of the shelter. (20%) (Total 100% will be converted to 30%) Individual (10%)  peer evaluation and instructor’s evaluation on individual performance of a group member in a group. (10 %) References 1. Chudley, R. 2006, Construction Technology. 4thedition. Pearson and Prentice Hall. 2. Lyons, Arthur, 2004. A. Materials for Architects and Builders. 2nd Edition. Oxford. Elsevier Butterwort- Heinemann 3. Seeley, Ivor H.1995, Building Technology. 5th edition. Basingstoke, Hants: MacMillan 4. Ching, Francis D.K. 1991. Building Construction Illustrated. New York. Van Nostrand Reinhold. 5. Simmon, H. Leslie, 2001. Construction: Principles, Materials and Method. 7th Edition. New York. John Wiley & Sons. 6. Zannos, Alexander. 1987, Form and Structure in Architecture: The Role of Statistical Function. Von Nostrand Reinhold Company, New York