SlideShare a Scribd company logo
1
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Centre for Modern Architecture Studies in Southeast Asia (MASSA)
Bachelor of Science (Honours) (Architecture)
BUILDING CONSTRUCTION 2 (BLD 60703/ARC 2513)
Project 2 : Understanding Forces in Building Construction
Marks : 40% (GROUP + Peer Assessment)
Duration : 5 weeks
Submission date : 28 June 2016 - Week 13
Introduction
A building normally comprises of several different types of constructional systems, either due to its function or
building code requirements. As designers, it is very important that you understand when and where each of the
different type of constructional system is used. Today, tensile and grid shell construction methods are becoming
widely used structures for building support. It provides the required load bearing resistance and aesthetics
required by designers. Today, technological advancement is creating the path for innovations in building
construction through exploration of materials, construction techniques and information technologies to produce
more effective design approaches and features that will suit the designers’ preferences, environment needs and
etc..
Objectives of Assignment
The objectives of this project are as follows:
 To create an understanding of building components used and its assembly.
 To demonstrate good drawing skills in building details and how it reacts under loading and force.
 To be able to manipulate the selection of materials used and ensure its buildability.
Learning Outcomes
Learning outcomes assessed in this project include:
 Identifications of basic structural systems in construction
 Differentiate in terms of loads and forces acting on structural elements.
 Recognize and apply the implications of construction system in design.
 Analyse the issues of strength, stiffness and stability of structures including modes of structural
systems, forces, stress and strain and laws of static.
2
Tasks - Methodology
Group Task
1. You are to propose a building (tensile/membrane construction or grid shell construction) and identify the
structural systems used in the construction of the building of your choice.
2. Describe each structural system identified in terms of Function, Material and Load Distribution.
3. Produce a model on an A3 base showing the structural systems used in the above building. A detailed
model showing appropriate constructional joints is encouraged.
4. Suitable scale and material to be used for the construction of the model shall depend entirely on you.
However, do take note that quality and workmanship of the model produced will be considered in the
assessment of this project.
5. You are then required to prepare ONE (1) A2 size sheet, utilizing both sides of the sheet. It includes,
analysing the success or failure of the model together with the mitigating measures. You are also to
include a brief introduction of the building, construction method from its sub-structure to super structure,
modelling process as well as detailing of different parts of the buildings to show how it is constructed.
6. Students are encouraged to use annotated sketches / diagrams to explain the forces, structural
movement experienced.
7. Additional to the above requirements, you will also need to manually draw one (1) exploded
Axonometric construction detail. This includes plan, elevation and section as key reference – printed.
8. The details must be complete with annotations, specifications as well as references to show your
understanding on how the building is constructed.
9. Use appropriate scale for the detailing.
10. Photographs of the model and the process in making the model should also be incorporated into this A2
sized sheet.
11. The model and A2 sheet must be complete with title block format with student’s name, student ID
and Tutor-In-Charge.
Submission Requirement
 1 (ONE) construction detail model with suitable scales and materials to fit on an A3 size base.
 1 (ONE) A2 size sheet utilizing both sides (submitted in plastic envelope).
- brief introduction of the building, modelling process, diagrams, photos and other relevant
information deem necessary with regards to this exercise.
- the exploded axonometric construction details – manually drawn with appropriate scale. Including
relevant plan, elevation and section as key reference – printed, you can use from the references.
 Visuals / Photos used in the submission must be clear and well communicated.
 Sketches are meant to provide visual documentation and communication. Therefore sketches are
required to be neat, clear and annotated.
 Assumptions can be made through reference from book/drawings. DO NOT PLAGIARISE.
Assessment criteria
The assessment for this assignment will be based on your :
 Buildability and workmanship of the construction detail model.
 Creativity and clarity of ideas, materiality and richness of content both shown in the model and drawing
presentation.
 Clarity of the information specified in the drawings.
 Quality of the documentation of visuals sketches, drawings and load and forces detailing of the construction
elements.
 Clear visual and verbal communication of your understanding of the project.
 Appropriate and sufficient referencing
3
Marking criteria
Marks shall be distributed as follows:
(1) Assessment Component ( will be calculated to 40%)
Marking
criteria
Marks%
Acquired
TGC
Fail
Poor
Satisfactory
Good
Excellent
UNDERSTANDING OF DETAILS
Ability to identify the functional
requirements of the construction
systems
40
DETAILED SPECIFICATIONS
GIVEN
 Originality & practicality
 Material attributes and
method of construction.
25
EXPLODED AXONOMETRIC
CONSTRUCTION DETAIL
Ability to identify construction
members and joints
15
CLARITY AND NEATNESS OF
PRESENTATION
Quality / workmanship of the model
produced.
10
REFERENCE IN RELATION TO
DESIGN REQUIREMENTS,
BUILDING STANDARDS AND BY-
LAWS
-Quality of the documentation of
visuals sketches, drawings and load
and forces detailing of the
construction elements.
-Clear visual and verbal
communication of your understanding
of the projects (Student’s Progress).
5
PEER EVALUATION 5
 5% based on peer evaluation and instructor’s evaluation on individual performance of a group
member in a group
4
References
1. Chudley, R. 2006, Construction Technology. 4thedition. Pearson and Prentice Hall.
2. Lyons, Arthur, 2004. A. Materials for Architects and Builders. 2nd Edition. Oxford. Elsevier Butterwort-
Heinemann
3. Seeley, Ivor H.1995, Building Technology. 5th edition. Basingstoke, Hants: MacMillan
4. Ching, Francis D.K. 1991. Building Construction Illustrated. New York. Van Nostrand Reinhold.
5. Simmon, H. Leslie, 2001. Construction: Principles, Materials and Method. 7th Edition. New York. John
Wiley & Sons.
6. Zannos, Alexander. 1987, Form and Structure in Architecture: The Role of Statistical Function. Von
Nostrand Reinhold Company, New York

More Related Content

Similar to Project brief 2 b construction 2 march 2016 1

Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)
Arvindhan Balasingam
 
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
Darshiini Vig
 
Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016
Chow Hong Da
 
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTIONSEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
Darshiini Vig
 
Building Construction Project 1 Brief
Building Construction Project 1 BriefBuilding Construction Project 1 Brief
Building Construction Project 1 Brief
JoyeeLee0131
 
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICESSEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
Darshiini Vig
 
Building con 1 (arc1523) project 2 brief august 2015
Building con 1 (arc1523) project 2 brief   august 2015Building con 1 (arc1523) project 2 brief   august 2015
Building con 1 (arc1523) project 2 brief august 2015
Chow Hong Da
 
Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Preston Liew
 
Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)Anthony Chew
 
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
Darshiini Vig
 
Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014Preston Liew
 
Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014Anthony Chew
 
Building con 1 (arc1523) project 1 brief aug 2015
Building con 1 (arc1523) project 1 brief   aug 2015Building con 1 (arc1523) project 1 brief   aug 2015
Building con 1 (arc1523) project 1 brief aug 2015
Chow Hong Da
 
SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1 SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1
Darshiini Vig
 
Project 1 brief b.services aug 2015 (1)
Project 1 brief b.services aug 2015 (1)Project 1 brief b.services aug 2015 (1)
Project 1 brief b.services aug 2015 (1)
Preston Liew
 
Project 1 brief b.services aug 2015
Project 1 brief b.services aug 2015Project 1 brief b.services aug 2015
Project 1 brief b.services aug 2015
Anthony Chew
 
Project 2 measured drawing jan2015 rev
Project 2 measured drawing jan2015 revProject 2 measured drawing jan2015 rev
Project 2 measured drawing jan2015 revAnthony Chew
 

Similar to Project brief 2 b construction 2 march 2016 1 (20)

Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)
 
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
 
Project2 brief
Project2 briefProject2 brief
Project2 brief
 
Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016Project brief 1 b construction 2 march 2016
Project brief 1 b construction 2 march 2016
 
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTIONSEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
SEMESTER 3 : PROJECT 1 BRIEF BUILDING CONSTRUCTION
 
Project 1 brief
Project 1 briefProject 1 brief
Project 1 brief
 
Building Construction Project 1 Brief
Building Construction Project 1 BriefBuilding Construction Project 1 Brief
Building Construction Project 1 Brief
 
Bcon 2 proj 1
Bcon 2 proj 1Bcon 2 proj 1
Bcon 2 proj 1
 
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICESSEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
SEM 4 : PROJECT 1 BRIEF BUILDING SERVICES
 
Building con 1 (arc1523) project 2 brief august 2015
Building con 1 (arc1523) project 2 brief   august 2015Building con 1 (arc1523) project 2 brief   august 2015
Building con 1 (arc1523) project 2 brief august 2015
 
Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014
 
Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)
 
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
SEM 4 : PROJECT 1 BRIEF BUILDING STRUCTURE
 
Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014
 
Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014Building con 1 (arc 1523) project 1 brief aug 2014
Building con 1 (arc 1523) project 1 brief aug 2014
 
Building con 1 (arc1523) project 1 brief aug 2015
Building con 1 (arc1523) project 1 brief   aug 2015Building con 1 (arc1523) project 1 brief   aug 2015
Building con 1 (arc1523) project 1 brief aug 2015
 
SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1 SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1
 
Project 1 brief b.services aug 2015 (1)
Project 1 brief b.services aug 2015 (1)Project 1 brief b.services aug 2015 (1)
Project 1 brief b.services aug 2015 (1)
 
Project 1 brief b.services aug 2015
Project 1 brief b.services aug 2015Project 1 brief b.services aug 2015
Project 1 brief b.services aug 2015
 
Project 2 measured drawing jan2015 rev
Project 2 measured drawing jan2015 revProject 2 measured drawing jan2015 rev
Project 2 measured drawing jan2015 rev
 

More from Chow Hong Da

B sc (hons)(arch) studio arc60306 project 2 march 2017_v2 signed
B sc (hons)(arch)  studio arc60306   project 2 march 2017_v2 signedB sc (hons)(arch)  studio arc60306   project 2 march 2017_v2 signed
B sc (hons)(arch) studio arc60306 project 2 march 2017_v2 signed
Chow Hong Da
 
Comic porject2
Comic porject2Comic porject2
Comic porject2
Chow Hong Da
 
LOGSHEET+REPORT
LOGSHEET+REPORTLOGSHEET+REPORT
LOGSHEET+REPORT
Chow Hong Da
 
Research proposal
Research proposalResearch proposal
Research proposal
Chow Hong Da
 
Aa compile
Aa compileAa compile
Aa compile
Chow Hong Da
 
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
Chow Hong Da
 
Studio project 1 brief (1)
Studio project 1 brief (1)Studio project 1 brief (1)
Studio project 1 brief (1)
Chow Hong Da
 
Project brief buidling science 1 aug 2015_basic bldg design v2
Project  brief buidling science 1 aug 2015_basic bldg design v2Project  brief buidling science 1 aug 2015_basic bldg design v2
Project brief buidling science 1 aug 2015_basic bldg design v2
Chow Hong Da
 
Sun yat sen museum penang measured drawings
Sun yat sen museum penang measured drawingsSun yat sen museum penang measured drawings
Sun yat sen museum penang measured drawings
Chow Hong Da
 
Sun yat sen museum penang presentation slides
Sun yat sen museum penang presentation slidesSun yat sen museum penang presentation slides
Sun yat sen museum penang presentation slides
Chow Hong Da
 
Arc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawingsArc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawings
Chow Hong Da
 
Arc60305 project 2 building report and video
Arc60305 project 2 building report and videoArc60305 project 2 building report and video
Arc60305 project 2 building report and video
Chow Hong Da
 
Arc 60305 project 1 sketchbook and journal 010216
Arc 60305 project 1 sketchbook and journal 010216Arc 60305 project 1 sketchbook and journal 010216
Arc 60305 project 1 sketchbook and journal 010216
Chow Hong Da
 
Arch cult 2 project 1 brief march 2015 timeline
Arch cult 2 project 1 brief march 2015 timelineArch cult 2 project 1 brief march 2015 timeline
Arch cult 2 project 1 brief march 2015 timeline
Chow Hong Da
 
Esd project 1 2015
Esd project 1 2015Esd project 1 2015
Esd project 1 2015
Chow Hong Da
 
Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)
Chow Hong Da
 
Arc1126 project 2a observation deck @ cape rachado
Arc1126 project 2a observation deck @ cape rachadoArc1126 project 2a observation deck @ cape rachado
Arc1126 project 2a observation deck @ cape rachado
Chow Hong Da
 
Arc1126 project 1 famous people, familiar faces (august 2015)
Arc1126 project 1 famous people, familiar faces (august 2015)Arc1126 project 1 famous people, familiar faces (august 2015)
Arc1126 project 1 famous people, familiar faces (august 2015)
Chow Hong Da
 
Building construction 1 experiencing construction (zone innovation park klang)
Building construction 1 experiencing construction (zone innovation park klang)Building construction 1 experiencing construction (zone innovation park klang)
Building construction 1 experiencing construction (zone innovation park klang)
Chow Hong Da
 
Project 2 brief b materials march 2015
Project 2 brief b materials march 2015Project 2 brief b materials march 2015
Project 2 brief b materials march 2015
Chow Hong Da
 

More from Chow Hong Da (20)

B sc (hons)(arch) studio arc60306 project 2 march 2017_v2 signed
B sc (hons)(arch)  studio arc60306   project 2 march 2017_v2 signedB sc (hons)(arch)  studio arc60306   project 2 march 2017_v2 signed
B sc (hons)(arch) studio arc60306 project 2 march 2017_v2 signed
 
Comic porject2
Comic porject2Comic porject2
Comic porject2
 
LOGSHEET+REPORT
LOGSHEET+REPORTLOGSHEET+REPORT
LOGSHEET+REPORT
 
Research proposal
Research proposalResearch proposal
Research proposal
 
Aa compile
Aa compileAa compile
Aa compile
 
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
 
Studio project 1 brief (1)
Studio project 1 brief (1)Studio project 1 brief (1)
Studio project 1 brief (1)
 
Project brief buidling science 1 aug 2015_basic bldg design v2
Project  brief buidling science 1 aug 2015_basic bldg design v2Project  brief buidling science 1 aug 2015_basic bldg design v2
Project brief buidling science 1 aug 2015_basic bldg design v2
 
Sun yat sen museum penang measured drawings
Sun yat sen museum penang measured drawingsSun yat sen museum penang measured drawings
Sun yat sen museum penang measured drawings
 
Sun yat sen museum penang presentation slides
Sun yat sen museum penang presentation slidesSun yat sen museum penang presentation slides
Sun yat sen museum penang presentation slides
 
Arc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawingsArc 60305 project 3 measured drawings
Arc 60305 project 3 measured drawings
 
Arc60305 project 2 building report and video
Arc60305 project 2 building report and videoArc60305 project 2 building report and video
Arc60305 project 2 building report and video
 
Arc 60305 project 1 sketchbook and journal 010216
Arc 60305 project 1 sketchbook and journal 010216Arc 60305 project 1 sketchbook and journal 010216
Arc 60305 project 1 sketchbook and journal 010216
 
Arch cult 2 project 1 brief march 2015 timeline
Arch cult 2 project 1 brief march 2015 timelineArch cult 2 project 1 brief march 2015 timeline
Arch cult 2 project 1 brief march 2015 timeline
 
Esd project 1 2015
Esd project 1 2015Esd project 1 2015
Esd project 1 2015
 
Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)Arc1126 project 2b retreat house (aug 2015)
Arc1126 project 2b retreat house (aug 2015)
 
Arc1126 project 2a observation deck @ cape rachado
Arc1126 project 2a observation deck @ cape rachadoArc1126 project 2a observation deck @ cape rachado
Arc1126 project 2a observation deck @ cape rachado
 
Arc1126 project 1 famous people, familiar faces (august 2015)
Arc1126 project 1 famous people, familiar faces (august 2015)Arc1126 project 1 famous people, familiar faces (august 2015)
Arc1126 project 1 famous people, familiar faces (august 2015)
 
Building construction 1 experiencing construction (zone innovation park klang)
Building construction 1 experiencing construction (zone innovation park klang)Building construction 1 experiencing construction (zone innovation park klang)
Building construction 1 experiencing construction (zone innovation park klang)
 
Project 2 brief b materials march 2015
Project 2 brief b materials march 2015Project 2 brief b materials march 2015
Project 2 brief b materials march 2015
 

Recently uploaded

Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
deeptiverma2406
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
gb193092
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
chanes7
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
kimdan468
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 

Recently uploaded (20)

Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Best Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDABest Digital Marketing Institute In NOIDA
Best Digital Marketing Institute In NOIDA
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 

Project brief 2 b construction 2 march 2016 1

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Centre for Modern Architecture Studies in Southeast Asia (MASSA) Bachelor of Science (Honours) (Architecture) BUILDING CONSTRUCTION 2 (BLD 60703/ARC 2513) Project 2 : Understanding Forces in Building Construction Marks : 40% (GROUP + Peer Assessment) Duration : 5 weeks Submission date : 28 June 2016 - Week 13 Introduction A building normally comprises of several different types of constructional systems, either due to its function or building code requirements. As designers, it is very important that you understand when and where each of the different type of constructional system is used. Today, tensile and grid shell construction methods are becoming widely used structures for building support. It provides the required load bearing resistance and aesthetics required by designers. Today, technological advancement is creating the path for innovations in building construction through exploration of materials, construction techniques and information technologies to produce more effective design approaches and features that will suit the designers’ preferences, environment needs and etc.. Objectives of Assignment The objectives of this project are as follows:  To create an understanding of building components used and its assembly.  To demonstrate good drawing skills in building details and how it reacts under loading and force.  To be able to manipulate the selection of materials used and ensure its buildability. Learning Outcomes Learning outcomes assessed in this project include:  Identifications of basic structural systems in construction  Differentiate in terms of loads and forces acting on structural elements.  Recognize and apply the implications of construction system in design.  Analyse the issues of strength, stiffness and stability of structures including modes of structural systems, forces, stress and strain and laws of static.
  • 2. 2 Tasks - Methodology Group Task 1. You are to propose a building (tensile/membrane construction or grid shell construction) and identify the structural systems used in the construction of the building of your choice. 2. Describe each structural system identified in terms of Function, Material and Load Distribution. 3. Produce a model on an A3 base showing the structural systems used in the above building. A detailed model showing appropriate constructional joints is encouraged. 4. Suitable scale and material to be used for the construction of the model shall depend entirely on you. However, do take note that quality and workmanship of the model produced will be considered in the assessment of this project. 5. You are then required to prepare ONE (1) A2 size sheet, utilizing both sides of the sheet. It includes, analysing the success or failure of the model together with the mitigating measures. You are also to include a brief introduction of the building, construction method from its sub-structure to super structure, modelling process as well as detailing of different parts of the buildings to show how it is constructed. 6. Students are encouraged to use annotated sketches / diagrams to explain the forces, structural movement experienced. 7. Additional to the above requirements, you will also need to manually draw one (1) exploded Axonometric construction detail. This includes plan, elevation and section as key reference – printed. 8. The details must be complete with annotations, specifications as well as references to show your understanding on how the building is constructed. 9. Use appropriate scale for the detailing. 10. Photographs of the model and the process in making the model should also be incorporated into this A2 sized sheet. 11. The model and A2 sheet must be complete with title block format with student’s name, student ID and Tutor-In-Charge. Submission Requirement  1 (ONE) construction detail model with suitable scales and materials to fit on an A3 size base.  1 (ONE) A2 size sheet utilizing both sides (submitted in plastic envelope). - brief introduction of the building, modelling process, diagrams, photos and other relevant information deem necessary with regards to this exercise. - the exploded axonometric construction details – manually drawn with appropriate scale. Including relevant plan, elevation and section as key reference – printed, you can use from the references.  Visuals / Photos used in the submission must be clear and well communicated.  Sketches are meant to provide visual documentation and communication. Therefore sketches are required to be neat, clear and annotated.  Assumptions can be made through reference from book/drawings. DO NOT PLAGIARISE. Assessment criteria The assessment for this assignment will be based on your :  Buildability and workmanship of the construction detail model.  Creativity and clarity of ideas, materiality and richness of content both shown in the model and drawing presentation.  Clarity of the information specified in the drawings.  Quality of the documentation of visuals sketches, drawings and load and forces detailing of the construction elements.  Clear visual and verbal communication of your understanding of the project.  Appropriate and sufficient referencing
  • 3. 3 Marking criteria Marks shall be distributed as follows: (1) Assessment Component ( will be calculated to 40%) Marking criteria Marks% Acquired TGC Fail Poor Satisfactory Good Excellent UNDERSTANDING OF DETAILS Ability to identify the functional requirements of the construction systems 40 DETAILED SPECIFICATIONS GIVEN  Originality & practicality  Material attributes and method of construction. 25 EXPLODED AXONOMETRIC CONSTRUCTION DETAIL Ability to identify construction members and joints 15 CLARITY AND NEATNESS OF PRESENTATION Quality / workmanship of the model produced. 10 REFERENCE IN RELATION TO DESIGN REQUIREMENTS, BUILDING STANDARDS AND BY- LAWS -Quality of the documentation of visuals sketches, drawings and load and forces detailing of the construction elements. -Clear visual and verbal communication of your understanding of the projects (Student’s Progress). 5 PEER EVALUATION 5  5% based on peer evaluation and instructor’s evaluation on individual performance of a group member in a group
  • 4. 4 References 1. Chudley, R. 2006, Construction Technology. 4thedition. Pearson and Prentice Hall. 2. Lyons, Arthur, 2004. A. Materials for Architects and Builders. 2nd Edition. Oxford. Elsevier Butterwort- Heinemann 3. Seeley, Ivor H.1995, Building Technology. 5th edition. Basingstoke, Hants: MacMillan 4. Ching, Francis D.K. 1991. Building Construction Illustrated. New York. Van Nostrand Reinhold. 5. Simmon, H. Leslie, 2001. Construction: Principles, Materials and Method. 7th Edition. New York. John Wiley & Sons. 6. Zannos, Alexander. 1987, Form and Structure in Architecture: The Role of Statistical Function. Von Nostrand Reinhold Company, New York