The project consists of a pre-engineered 90 ft diameter dome structure for storage of 4,400 tons of salt, stationary conveyor, above grade truck loading hopper and associated electrical, plumbing and site work. The key elements of the overall project scope include: New Prefabricated Geodesic Dome Stationary Conveyor Above-grade Loading Hopper Two Salt Containment Concrete Pads Two Underground Saline Water Storage Tanks Bio-retention Raingarden Additional Transitional Screening Trees & Landscaping