SlideShare a Scribd company logo
Steps of Installation| Vivaan Solar Private Limited
Harnessing the power of Sun to Energy
Steps of installation of solar power plant
Note : All photos used in the presentation are actual site photographs.
SITE PREPARATION
Inspection of site - topographical features.
Markings are made as per the prepared design and bored on particular points
In case of highly irregular surface, where leveling cost is too high, disk and roll technique is used
Disk and Roll technique: Soil is locally distributed to maintain minimum embedment, and distance from ground.
Site Preparation, Levelling and Boring
Disk and Roll Technique
Note : All photos used in the presentation are actual site photographs.
POST CASTING
Posts are casted on the marked points for mounting panel structures
Minimum Embedment of poles/posts is necessary:1 m
Embedment depends on Soil Strata( after soil testing)
1 m- 1.8 m : Hard Soil ; More than 1.8 m: Soft Soil
Right Entrenchment provides strength to overall structure during heavy wind flow
Width of post : Width: 1 50 mm- 200mm
Initial Post Casting at Site
Ground Level
Min Embedment: 1 m
Width : 150-200 mm
Note : All photos used in the presentation are actual site photographs.
MOUNTING OF PANEL STRUCTURES
Panel structures are mounted on the casted posts
Posts are checked for their right vertical alignment using SPIRIT LEVEL TECHNIQUE (a magnetic method)
Technique helps in leveled panel – with zero wave formation and correctly fitted panels on tile structures
Mounting of panel structures
Note : All photos used in the presentation are actual site photographs.
STRUCTRE ALIGNMENT AND TORQUING PROCESS
Right amount of torque is applied on nuts and bolts -5 turns by hand then, socket driver to finish tightening
Loose fastening : may not withstand wind pressure ; Tight Fastening : may damage the threads of nuts and bolts
Structure alignment
Bolt Tightening Technique
Note : All photos used in the presentation are actual site photographs.
Cables, Pipes and Joints
CEMENTED PIPE
For easy travelling of vehicles
Ensures strength of pipe for long run
Minimizes losses due to breakage of
pipes
DWC PIPE
Minimizes wear and tear of pipe due to sun
exposure
Augment life of cables and wires
Thus, increasing life-span of park
T-JOINTS +DWC PIPES
Protection of cables @ detailed
level
Enhances longevity of plant
Boost strength of overall
structure
Note : All photos used in the presentation are actual site photographs.
Installation of Junction Box
SEALED CAPS
Protection from rodents/insects
Augment life of cables and wires
Note : All photos used in the presentation are actual site photographs.
MODULES CONNECTION AND PLACEMENT
Modules in wooden box/iron boxes are placed in front of structures before placing them on tilt structures
Panels are vertically aligned in the packed boxes- after stripping of packed boxes, modules are first stacked.
Stacking of panels becomes necessary as module sheet may damage due to weight on consecutive modules once
first comes out
Safety Gloves and helmets are used for electrical connections of panels
Placement of Modules
Note : All photos used in the presentation are actual site photographs.
First Solar Thin Film
Place: Ujjain, Zone 1
Solar Frontier CIS
Place: Ujjain Zone 2
Polycrystalline,
Canadain Solar
Place: Uttarakhand
Note : All photos used in the presentation are actual site photographs.
We researched thoroughly across the globe for the panels to use of best technology available
Polycrystalline(Candian Solar)
Thin Fim Techonology (First Solar, US)
CIS Frontier (Solar Frontier, Japan)
Inverter Rooms
Matt- fitted inverter rooms to soak dust and water
Place: Ujjain, M.P., Inside Inverter Room
Tier 1 Inverter Supplier: AEG/ ABB/TMEIC(Japan)
Enhances longevity of plant
Reduces maintenance work
Proper Ventilation in Inverter rooms
Net covering provides protection from
rodents/insects
Ventilation maintains temperature of inverter rooms
Note : All photos used in the presentation are actual site photographs.
PV Switchgear and Substation
Lightening Conductor
Prevention from lighting
SEARCH PROTECTION DEVICE FITTED COMBINER BOX
Tier 1 Supplier: AEG/Skytron
Detects output of each panel
Locates any faulty panel
Helps in maintaining output levels Note : All photos used in the presentation are actual site photographs.
WEEKLY MAINTENANCE OF INVERTERS
Specialised vacuum cleaners for inverter rooms
 Regular cleaning increases life of inverters
 Reduces breakdowns due to blockage of dust Note : All photos used in the presentation are actual site photographs.
Yes, the life of a solar park is minimum 25 years…
provided we follow systematic, meticulous
procedures during installation!!
Locations & Contact Details
Web: www.vivaansolar.com | Mail: info@vivaansolar.com
Instant Helpline: (91) 9999055452
Corporate Office- Haridwar
Second Floor, Heera Complex
Ranipur Modh, Haridwar – 249403
p: +91-133-4265178| f: +91-133-4265179
Registered Office- Gwalior
Bansal Office, Nehru colony
Thatipur, Gwalior- 474011
p: +91-751-2341195, f: +91-751-4014414
Get
Social:

More Related Content

What's hot

Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
Akshika Mahanama
 
Construction site management
Construction site managementConstruction site management
Construction site management
rajlaxmipardeshi
 
Tn 2012 permen pu 20 bag2 jalan
Tn 2012 permen pu 20 bag2 jalanTn 2012 permen pu 20 bag2 jalan
Tn 2012 permen pu 20 bag2 jalan
Hendro Widagdo
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
Rajat Nainwal
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management
A Makwana
 
Building Construction P1: Experiencing Construction full
Building Construction P1: Experiencing Construction fullBuilding Construction P1: Experiencing Construction full
Building Construction P1: Experiencing Construction full
Mazin Rady
 
Digital construction for integrated project delivery
Digital construction for integrated project deliveryDigital construction for integrated project delivery
Digital construction for integrated project delivery
Stephen Au
 
measurement wall to floor ratio 2013
measurement wall to floor ratio  2013measurement wall to floor ratio  2013
measurement wall to floor ratio 2013Daniel Ross
 
Thesis on Labor Management Practices
Thesis on Labor Management PracticesThesis on Labor Management Practices
Thesis on Labor Management Practices
oriental consultants global co. ltd
 
CONSTRUCTION EQUIPMENTS
CONSTRUCTION EQUIPMENTSCONSTRUCTION EQUIPMENTS
CONSTRUCTION EQUIPMENTS
shalz_singh
 
Slide show urban design 6
Slide show urban design 6Slide show urban design 6
Slide show urban design 6
Riam Elmorshedy
 
Ct assignment (2)
Ct assignment (2)Ct assignment (2)
Ct assignment (2)
Shane Ah
 
BUILDING INSPECTION EQUIPMENT
BUILDING INSPECTION EQUIPMENTBUILDING INSPECTION EQUIPMENT
BUILDING INSPECTION EQUIPMENT
Inspect East Building Inspections
 
Final report design of a pedestrian bridge - fall 2009
Final report   design of a pedestrian bridge - fall 2009Final report   design of a pedestrian bridge - fall 2009
Final report design of a pedestrian bridge - fall 2009
Sanamau Waitogu
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
IDHAMUKI
 
دارة الملك عبدالله الثاني
دارة الملك عبدالله الثانيدارة الملك عبدالله الثاني
دارة الملك عبدالله الثاني
Dania Abdel-aziz
 
Construction accidents and safety management
Construction accidents and safety managementConstruction accidents and safety management
Construction accidents and safety management
Swarna Rajan
 
How to prevent accidents in construction sites
How to prevent accidents in construction sitesHow to prevent accidents in construction sites
How to prevent accidents in construction sites
George W. Ganim, Jr.
 
FOOTING CONSTRUCTION
FOOTING CONSTRUCTIONFOOTING CONSTRUCTION
FOOTING CONSTRUCTION
Md Shadab
 
Civil engineering powerpoint
Civil engineering powerpointCivil engineering powerpoint
Civil engineering powerpointchrisminer01
 

What's hot (20)

Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Construction site management
Construction site managementConstruction site management
Construction site management
 
Tn 2012 permen pu 20 bag2 jalan
Tn 2012 permen pu 20 bag2 jalanTn 2012 permen pu 20 bag2 jalan
Tn 2012 permen pu 20 bag2 jalan
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management
 
Building Construction P1: Experiencing Construction full
Building Construction P1: Experiencing Construction fullBuilding Construction P1: Experiencing Construction full
Building Construction P1: Experiencing Construction full
 
Digital construction for integrated project delivery
Digital construction for integrated project deliveryDigital construction for integrated project delivery
Digital construction for integrated project delivery
 
measurement wall to floor ratio 2013
measurement wall to floor ratio  2013measurement wall to floor ratio  2013
measurement wall to floor ratio 2013
 
Thesis on Labor Management Practices
Thesis on Labor Management PracticesThesis on Labor Management Practices
Thesis on Labor Management Practices
 
CONSTRUCTION EQUIPMENTS
CONSTRUCTION EQUIPMENTSCONSTRUCTION EQUIPMENTS
CONSTRUCTION EQUIPMENTS
 
Slide show urban design 6
Slide show urban design 6Slide show urban design 6
Slide show urban design 6
 
Ct assignment (2)
Ct assignment (2)Ct assignment (2)
Ct assignment (2)
 
BUILDING INSPECTION EQUIPMENT
BUILDING INSPECTION EQUIPMENTBUILDING INSPECTION EQUIPMENT
BUILDING INSPECTION EQUIPMENT
 
Final report design of a pedestrian bridge - fall 2009
Final report   design of a pedestrian bridge - fall 2009Final report   design of a pedestrian bridge - fall 2009
Final report design of a pedestrian bridge - fall 2009
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
دارة الملك عبدالله الثاني
دارة الملك عبدالله الثانيدارة الملك عبدالله الثاني
دارة الملك عبدالله الثاني
 
Construction accidents and safety management
Construction accidents and safety managementConstruction accidents and safety management
Construction accidents and safety management
 
How to prevent accidents in construction sites
How to prevent accidents in construction sitesHow to prevent accidents in construction sites
How to prevent accidents in construction sites
 
FOOTING CONSTRUCTION
FOOTING CONSTRUCTIONFOOTING CONSTRUCTION
FOOTING CONSTRUCTION
 
Civil engineering powerpoint
Civil engineering powerpointCivil engineering powerpoint
Civil engineering powerpoint
 

Similar to Steps for conceptualization of a solar power plant vivaan solar v2

Steps for conceptualization of a solar power plant vivaan solar v2
Steps for conceptualization of a solar power plant vivaan      solar v2Steps for conceptualization of a solar power plant vivaan      solar v2
Steps for conceptualization of a solar power plant vivaan solar v2
Varsha Gupta
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
Tej Raj Upreti
 
building services 1 presentation slides
building services 1 presentation slidesbuilding services 1 presentation slides
building services 1 presentation slides
kellyxc
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
Mahesh Chandra Manav
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
Mahesh Chandra Manav
 
Spec u kon fsi 2021
Spec u kon fsi 2021Spec u kon fsi 2021
Spec u kon fsi 2021
Blair Davies, P.Eng., M.B.A.
 
CLFR 1 MW THAILAND
CLFR 1 MW THAILANDCLFR 1 MW THAILAND
CLFR 1 MW THAILAND
Jack Wong
 
Flame Treatment Technology for the Photovoltaic Industry
Flame Treatment Technology for the Photovoltaic IndustryFlame Treatment Technology for the Photovoltaic Industry
Flame Treatment Technology for the Photovoltaic IndustryStefano Mancinelli
 
Supply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemSupply of technology by l'obel solar power system
Supply of technology by l'obel solar power system
Chintan Gandhi
 
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeAerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
IRJET Journal
 
Turbine blade faliure
Turbine blade faliureTurbine blade faliure
Turbine blade faliure
skncoe86
 
Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)
Mahesh Chandra Manav
 
Corporate presentation for l&t solar div by jmv lps
Corporate presentation  for l&t solar div by jmv lpsCorporate presentation  for l&t solar div by jmv lps
Corporate presentation for l&t solar div by jmv lps
Mahesh Chandra Manav
 
IRJET- Design of Fixture for Wind Mill Door Segment
IRJET- Design of Fixture for Wind Mill Door SegmentIRJET- Design of Fixture for Wind Mill Door Segment
IRJET- Design of Fixture for Wind Mill Door Segment
IRJET Journal
 
Aluminum work
Aluminum workAluminum work
Aluminum work
Rajiva Gupta
 
ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by M...
ICWES15 - Challenging Design: Foundations for Tall Buildings.  Presented by M...ICWES15 - Challenging Design: Foundations for Tall Buildings.  Presented by M...
ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by M...Engineers Australia
 
Jmv presentation solar
Jmv  presentation solarJmv  presentation solar
Jmv presentation solar
Mahesh Chandra Manav
 
A+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile StructuresA+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile Structures
A+ Sun Systems
 
Hybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lpsHybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lps
Mahesh Chandra Manav
 

Similar to Steps for conceptualization of a solar power plant vivaan solar v2 (20)

Steps for conceptualization of a solar power plant vivaan solar v2
Steps for conceptualization of a solar power plant vivaan      solar v2Steps for conceptualization of a solar power plant vivaan      solar v2
Steps for conceptualization of a solar power plant vivaan solar v2
 
PORTFOLIO-Model
PORTFOLIO-ModelPORTFOLIO-Model
PORTFOLIO-Model
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 
building services 1 presentation slides
building services 1 presentation slidesbuilding services 1 presentation slides
building services 1 presentation slides
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
Spec u kon fsi 2021
Spec u kon fsi 2021Spec u kon fsi 2021
Spec u kon fsi 2021
 
CLFR 1 MW THAILAND
CLFR 1 MW THAILANDCLFR 1 MW THAILAND
CLFR 1 MW THAILAND
 
Flame Treatment Technology for the Photovoltaic Industry
Flame Treatment Technology for the Photovoltaic IndustryFlame Treatment Technology for the Photovoltaic Industry
Flame Treatment Technology for the Photovoltaic Industry
 
Supply of technology by l'obel solar power system
Supply of technology by l'obel solar power systemSupply of technology by l'obel solar power system
Supply of technology by l'obel solar power system
 
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeAerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
 
Turbine blade faliure
Turbine blade faliureTurbine blade faliure
Turbine blade faliure
 
Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)
 
Corporate presentation for l&t solar div by jmv lps
Corporate presentation  for l&t solar div by jmv lpsCorporate presentation  for l&t solar div by jmv lps
Corporate presentation for l&t solar div by jmv lps
 
IRJET- Design of Fixture for Wind Mill Door Segment
IRJET- Design of Fixture for Wind Mill Door SegmentIRJET- Design of Fixture for Wind Mill Door Segment
IRJET- Design of Fixture for Wind Mill Door Segment
 
Aluminum work
Aluminum workAluminum work
Aluminum work
 
ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by M...
ICWES15 - Challenging Design: Foundations for Tall Buildings.  Presented by M...ICWES15 - Challenging Design: Foundations for Tall Buildings.  Presented by M...
ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by M...
 
Jmv presentation solar
Jmv  presentation solarJmv  presentation solar
Jmv presentation solar
 
A+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile StructuresA+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile Structures
 
Hybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lpsHybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lps
 

Recently uploaded

6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptxTOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
nikitacareer3
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 

Recently uploaded (20)

6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptxTOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
TOP 10 B TECH COLLEGES IN JAIPUR 2024.pptx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 

Steps for conceptualization of a solar power plant vivaan solar v2

  • 1. Steps of Installation| Vivaan Solar Private Limited Harnessing the power of Sun to Energy
  • 2. Steps of installation of solar power plant Note : All photos used in the presentation are actual site photographs.
  • 3. SITE PREPARATION Inspection of site - topographical features. Markings are made as per the prepared design and bored on particular points In case of highly irregular surface, where leveling cost is too high, disk and roll technique is used Disk and Roll technique: Soil is locally distributed to maintain minimum embedment, and distance from ground. Site Preparation, Levelling and Boring Disk and Roll Technique Note : All photos used in the presentation are actual site photographs.
  • 4. POST CASTING Posts are casted on the marked points for mounting panel structures Minimum Embedment of poles/posts is necessary:1 m Embedment depends on Soil Strata( after soil testing) 1 m- 1.8 m : Hard Soil ; More than 1.8 m: Soft Soil Right Entrenchment provides strength to overall structure during heavy wind flow Width of post : Width: 1 50 mm- 200mm Initial Post Casting at Site Ground Level Min Embedment: 1 m Width : 150-200 mm Note : All photos used in the presentation are actual site photographs.
  • 5. MOUNTING OF PANEL STRUCTURES Panel structures are mounted on the casted posts Posts are checked for their right vertical alignment using SPIRIT LEVEL TECHNIQUE (a magnetic method) Technique helps in leveled panel – with zero wave formation and correctly fitted panels on tile structures Mounting of panel structures Note : All photos used in the presentation are actual site photographs.
  • 6. STRUCTRE ALIGNMENT AND TORQUING PROCESS Right amount of torque is applied on nuts and bolts -5 turns by hand then, socket driver to finish tightening Loose fastening : may not withstand wind pressure ; Tight Fastening : may damage the threads of nuts and bolts Structure alignment Bolt Tightening Technique Note : All photos used in the presentation are actual site photographs.
  • 7. Cables, Pipes and Joints CEMENTED PIPE For easy travelling of vehicles Ensures strength of pipe for long run Minimizes losses due to breakage of pipes DWC PIPE Minimizes wear and tear of pipe due to sun exposure Augment life of cables and wires Thus, increasing life-span of park T-JOINTS +DWC PIPES Protection of cables @ detailed level Enhances longevity of plant Boost strength of overall structure Note : All photos used in the presentation are actual site photographs.
  • 8. Installation of Junction Box SEALED CAPS Protection from rodents/insects Augment life of cables and wires Note : All photos used in the presentation are actual site photographs.
  • 9. MODULES CONNECTION AND PLACEMENT Modules in wooden box/iron boxes are placed in front of structures before placing them on tilt structures Panels are vertically aligned in the packed boxes- after stripping of packed boxes, modules are first stacked. Stacking of panels becomes necessary as module sheet may damage due to weight on consecutive modules once first comes out Safety Gloves and helmets are used for electrical connections of panels Placement of Modules Note : All photos used in the presentation are actual site photographs.
  • 10. First Solar Thin Film Place: Ujjain, Zone 1 Solar Frontier CIS Place: Ujjain Zone 2 Polycrystalline, Canadain Solar Place: Uttarakhand Note : All photos used in the presentation are actual site photographs. We researched thoroughly across the globe for the panels to use of best technology available Polycrystalline(Candian Solar) Thin Fim Techonology (First Solar, US) CIS Frontier (Solar Frontier, Japan)
  • 11. Inverter Rooms Matt- fitted inverter rooms to soak dust and water Place: Ujjain, M.P., Inside Inverter Room Tier 1 Inverter Supplier: AEG/ ABB/TMEIC(Japan) Enhances longevity of plant Reduces maintenance work Proper Ventilation in Inverter rooms Net covering provides protection from rodents/insects Ventilation maintains temperature of inverter rooms Note : All photos used in the presentation are actual site photographs.
  • 12. PV Switchgear and Substation Lightening Conductor Prevention from lighting
  • 13. SEARCH PROTECTION DEVICE FITTED COMBINER BOX Tier 1 Supplier: AEG/Skytron Detects output of each panel Locates any faulty panel Helps in maintaining output levels Note : All photos used in the presentation are actual site photographs.
  • 14. WEEKLY MAINTENANCE OF INVERTERS Specialised vacuum cleaners for inverter rooms  Regular cleaning increases life of inverters  Reduces breakdowns due to blockage of dust Note : All photos used in the presentation are actual site photographs.
  • 15. Yes, the life of a solar park is minimum 25 years… provided we follow systematic, meticulous procedures during installation!!
  • 16. Locations & Contact Details Web: www.vivaansolar.com | Mail: info@vivaansolar.com Instant Helpline: (91) 9999055452 Corporate Office- Haridwar Second Floor, Heera Complex Ranipur Modh, Haridwar – 249403 p: +91-133-4265178| f: +91-133-4265179 Registered Office- Gwalior Bansal Office, Nehru colony Thatipur, Gwalior- 474011 p: +91-751-2341195, f: +91-751-4014414 Get Social:

Editor's Notes

  1. Each step has its own importance and can not be undermined. Every step takes its own time to execute and meticulously handled
  2. Wind flow is heavy due to open ground so, it becomes mandatory to provide strength to the panel structure at the very initial stage
  3. Varsha: change successfully installed panels
  4. Varsha: Change the content