SlideShare a Scribd company logo
cÜxáxÇàá
100%  R e l i a b l e P o w e r S h a r i n g S y s t e m
another technology leap from
Series
TM 
AUTOMATIC SOURCE CHANGEOVER
j|à{ CURRENT LIMITER [ACCL]
AUTOMATIC SOURCE CHANGEOVER j|à{ CURRENT LIMITER
[Digital]Series
TM 
Features
Micro-Controller based design
Automatic Source Change Over
Break before make change-over system
Neutral isolation for all models
Current Limiting function
Counter for number of interruptions, thereby
protecting your valuable equipment
Prevents over loading of the Generator
LED / Digital indication of Status
Saving in wiring and wall space
Energy Saving... Reduction of CO2 Emission
Functions
When the Mains Supply is available
The load is connected to the Mains supply (after initial delay) and the consumer can draw the full load as per the Sanctioned rating.
When the Mains Supply fails and Standby Generator Supply is available
The consumers are connected to the generator in a sequence depending upon the pre-set ‘Initial Delay’* timing, in order to limit the sudden load on
the Generator. The Unit Monitors the Current at factory “Set Limit”. *
If the Current exceeds the limit, the load is disconnected 5 times in 1 second intervals as a warning and then, automatically reconnects it after 5
minutes *. This cycle of interruptions and warning repeats 2 times and unless the load is reduced to the set limit the power supply will permanently
disconnected. The supply will be re connected only by an operator manually or when the Main / Dg supply restarts. During this period, the Consumer
is expected to switch off the non-essential loads and reduce it to within the limit.
When the load is within the ‘Set Limit’, the Generator continues to supply the load.
The supply from the Generator to the load can be restored after the Generator connection is reset by switching OFF/ON the Gen MCB. Or by pushing
the reset button on the StartOff unit.
When the Mains supply is restored
The Load is automatically transferred to the Mains supply after pre-set time.
LED Indicators: Over Voltage, Under Voltage, Over Load, Mains On, Generator On
Digital display: 2 line /4 line digital display : All the above status.
* These Parameters can be Pre-Programmed depending upon requirements of Customers and also can be Re-programmed at any time.
Automatic Load Changeover Relay is a high precession system for efficient distribution
of generator power in multi-storied apartments, commercial complexes etc.
StartOff ACCL Series are designed to connect mains supply to load till mains is
present. On mains failure and receiving generator power, it connects the load to DG
supply. During DG operation, load drawn is monitored. If the load exceeds the allotted
limit, it disrupts the supply and rechecks in intervals. On reducing the load and keeping
it within the limit, load is connected to DG supply. For different applications, we have
specific models. They are with load limiter, without load limiter, transfer of load from
one phase to other phase and many additional functions.
Special Features
Over Voltage (OV) / Under Voltage (UV) protection by intelligent
sensing technology.
This feature provide maximum protection to consumer’s electrical
equipment caused by voltage fluctuations or Over Voltage or
Under Voltage problems from EB and DG sides.
In both events, the StartOff ACCL automatically turn itself off and
protect the entire power supply system.
Under Voltage protection system save the Generator from
possible damages.
StartOff ACCL can with-stand high voltage fluctuations up to 300v
without any damage to the unit and thereby its life is very long
compared to any other brands.
Because of the high quality of components and the quality
controlled workmanship, StartOff ACCL unit is almost maintenance
free.
The Ultimate Solution for your power distribution needs…
Maintenance Service within 24 hours!
StartOff Products are engineered to provide you
uninterrupted hassle free performance. The product
is almost maintenance free for years. Even though,
StartOff service team is equipped to provide faster
service within 24 hours in case of any trouble.
Series
TM 
SPECIFICATIONS 
Technology  Microprocessor Based 
Frequency  50 Hz 
EB  Load Current  16 A, 32 A, 40 A , 63 A, 80 A, 100 A, 125 A   * 
DG Load Current  16 A, 32 A, 40 A 63 A, 80 A, 100 A, 125 A   * 
DG Max Current Range [Limiter]   (Factory Set) 0.1 A to 30A   *  
Models 
 
1 Phase EB & 1 Phase DG   
3 Phase EB & 3 Phase DG 
3 Phase EB & 1 Phase DG 
Product Warranty  18 Months   ** 
Enclosure  Powder Coated Cabinet 
Display  LED / Digital 
* 
**  
Specifications can be changed upon customer requirements. 
12 months Replacement + 6 Months Service. 
Product Specifications
…A leap ahead
Model Range
MODEL   SPECIFICATIONS  PHASE  [EB]  PHASE [DG]  MOUNTING 
SOP16LX  EB16A/DG LIMITER 200W‐1500W   SINGLE/THREE  SINGLE  PANEL 
SOP1616  EB16A/DG 16A  NON LIMITER  SINGLE/THREE  SINGLE/THREE  PANEL 
SOD16LX  EB16A/DG LIMITER 200W‐1500W   SINGLE/THREE  SINGLE  DB 
SOP30LX  EB30A/DG LIMITER 200W‐5000W   SINGLE/THREE  SINGLE  PANEL 
SOP3030  EB30A/DG 30A  NON LIMITER  SINGLE/THREE  SINGLE/THREE  PANEL 
SOD30LX  EB30A/DG LIMITER 200W‐5000W   SINGLE/THREE  SINGLE  DB 
SOP40LX  EB40A/DG LIMITER 200W‐5000W   THREE  SINGLE  PANEL 
SOP4040  EB40A/DG NON LIMITER   THREE  THREE  PANEL 
SOD40LX  EB40A/DG LIMITER 200W‐5000W   THREE  SINGLE  DB 
SOP60LX  EB60A/DG LIMITER 200W‐5000W   THREE  SINGLE  PANEL 
SOP6060  EB60A/DG NON LIMITER   THREE  THREE  PANEL 
SOP80LX  EB80A/DG LIMITER 200W‐5000W   THREE  SINGLE  PANEL 
SOP8080  EB80A/DG NON LIMITER   THREE  THREE  PANEL 
SOP100LX  EB100A/DG LIMITER 200W‐5000W   THREE  SINGLE  PANEL 
SOP100100  EB100A/DG NON LIMITER   THREE  THREE  PANEL 
SOP125LX  EB125A/DG LIMITER 200W‐5000W   THREE  SINGLE  PANEL 
SOP125125  EB125A/DG NON LIMITER   THREE  THREE  PANEL 
Panther Techno Labs
Karassery [P.O], Mukkam, Pin: 673602
Calicut, Kerala, India.
Tel: +91 9447950498, +91 9744212586
Email: panthertechnolabs@gmail.com
™ 
Division 
For enquiries: 
All Specifications and settings can be customized as per the requirement of specific needs

More Related Content

What's hot

SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.pptSEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.pptSUJAY RAVI KALE
 
Grid synchronisation
Grid synchronisationGrid synchronisation
Grid synchronisation
manogna gwen
 
Detection of power grid synchronization failure on sensing of frequency and v...
Detection of power grid synchronization failure on sensing of frequency and v...Detection of power grid synchronization failure on sensing of frequency and v...
Detection of power grid synchronization failure on sensing of frequency and v...
bharath nidumolu
 
DIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
DIESEL GENERATOR AND ONLINE UPS By Accurate Power SystemsDIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
DIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
IndiaMART InterMESH Limited
 
Power grid synopsis
Power grid synopsisPower grid synopsis
Power grid synopsis
Parveen Jaat
 
Detecting Power Grid Synchronization Failure on Sensing Frequency or Voltage ...
Detecting Power Grid Synchronization Failure on Sensing Frequency or Voltage ...Detecting Power Grid Synchronization Failure on Sensing Frequency or Voltage ...
Detecting Power Grid Synchronization Failure on Sensing Frequency or Voltage ...
Edgefxkits & Solutions
 
Solutions to wiring and grounding
Solutions to wiring and groundingSolutions to wiring and grounding
Solutions to wiring and grounding
SAI SREE
 
Design and Construction of Automatic Three Phase Power System Selector
Design and Construction of Automatic Three Phase Power System SelectorDesign and Construction of Automatic Three Phase Power System Selector
Design and Construction of Automatic Three Phase Power System Selector
iosrjce
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid design
susanta das
 
Traffic light controller
Traffic light controllerTraffic light controller
Traffic light controller
Shubham Sharma
 
overview of grid structure and synchronization for distributed power generati...
overview of grid structure and synchronization for distributed power generati...overview of grid structure and synchronization for distributed power generati...
overview of grid structure and synchronization for distributed power generati...
Shivani Kumari
 
Y R ENGG Company Profile 2
Y R ENGG Company Profile 2Y R ENGG Company Profile 2
Y R ENGG Company Profile 2R.K. Mathuria
 
SELF SWITCHING POWER SUPLLY
SELF SWITCHING POWER SUPLLYSELF SWITCHING POWER SUPLLY
SELF SWITCHING POWER SUPLLY
shiv kapil
 
Auto power supply control from 4 different sources using pic microcontroller
Auto power supply control from 4 different sources using pic microcontrollerAuto power supply control from 4 different sources using pic microcontroller
Auto power supply control from 4 different sources using pic microcontroller
Edgefxkits & Solutions
 
IRJET- Phase Changer Mechanism in Abnormal Conditions for Single Phase Applic...
IRJET- Phase Changer Mechanism in Abnormal Conditions for Single Phase Applic...IRJET- Phase Changer Mechanism in Abnormal Conditions for Single Phase Applic...
IRJET- Phase Changer Mechanism in Abnormal Conditions for Single Phase Applic...
IRJET Journal
 
Automated load shedding using microcontroller
Automated load shedding using microcontrollerAutomated load shedding using microcontroller
Automated load shedding using microcontroller
RajVerma175
 
Self Switching Power Supply
Self Switching Power SupplySelf Switching Power Supply
Self Switching Power Supply
Edgefxkits & Solutions
 
Auto power supply ppt
Auto power supply pptAuto power supply ppt
Auto power supply ppt
Hamed Raza
 
Automatic irrigation system
Automatic irrigation systemAutomatic irrigation system
Automatic irrigation system
GOVERNMENT ENGINEERING COLLAGE DAHOD
 

What's hot (20)

Eaton ats automatic transfer switch ats pwr
Eaton ats automatic transfer switch ats pwrEaton ats automatic transfer switch ats pwr
Eaton ats automatic transfer switch ats pwr
 
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.pptSEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
 
Grid synchronisation
Grid synchronisationGrid synchronisation
Grid synchronisation
 
Detection of power grid synchronization failure on sensing of frequency and v...
Detection of power grid synchronization failure on sensing of frequency and v...Detection of power grid synchronization failure on sensing of frequency and v...
Detection of power grid synchronization failure on sensing of frequency and v...
 
DIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
DIESEL GENERATOR AND ONLINE UPS By Accurate Power SystemsDIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
DIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
 
Power grid synopsis
Power grid synopsisPower grid synopsis
Power grid synopsis
 
Detecting Power Grid Synchronization Failure on Sensing Frequency or Voltage ...
Detecting Power Grid Synchronization Failure on Sensing Frequency or Voltage ...Detecting Power Grid Synchronization Failure on Sensing Frequency or Voltage ...
Detecting Power Grid Synchronization Failure on Sensing Frequency or Voltage ...
 
Solutions to wiring and grounding
Solutions to wiring and groundingSolutions to wiring and grounding
Solutions to wiring and grounding
 
Design and Construction of Automatic Three Phase Power System Selector
Design and Construction of Automatic Three Phase Power System SelectorDesign and Construction of Automatic Three Phase Power System Selector
Design and Construction of Automatic Three Phase Power System Selector
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid design
 
Traffic light controller
Traffic light controllerTraffic light controller
Traffic light controller
 
overview of grid structure and synchronization for distributed power generati...
overview of grid structure and synchronization for distributed power generati...overview of grid structure and synchronization for distributed power generati...
overview of grid structure and synchronization for distributed power generati...
 
Y R ENGG Company Profile 2
Y R ENGG Company Profile 2Y R ENGG Company Profile 2
Y R ENGG Company Profile 2
 
SELF SWITCHING POWER SUPLLY
SELF SWITCHING POWER SUPLLYSELF SWITCHING POWER SUPLLY
SELF SWITCHING POWER SUPLLY
 
Auto power supply control from 4 different sources using pic microcontroller
Auto power supply control from 4 different sources using pic microcontrollerAuto power supply control from 4 different sources using pic microcontroller
Auto power supply control from 4 different sources using pic microcontroller
 
IRJET- Phase Changer Mechanism in Abnormal Conditions for Single Phase Applic...
IRJET- Phase Changer Mechanism in Abnormal Conditions for Single Phase Applic...IRJET- Phase Changer Mechanism in Abnormal Conditions for Single Phase Applic...
IRJET- Phase Changer Mechanism in Abnormal Conditions for Single Phase Applic...
 
Automated load shedding using microcontroller
Automated load shedding using microcontrollerAutomated load shedding using microcontroller
Automated load shedding using microcontroller
 
Self Switching Power Supply
Self Switching Power SupplySelf Switching Power Supply
Self Switching Power Supply
 
Auto power supply ppt
Auto power supply pptAuto power supply ppt
Auto power supply ppt
 
Automatic irrigation system
Automatic irrigation systemAutomatic irrigation system
Automatic irrigation system
 

Similar to StartOff ACCL [Automatic Source Changeover cum Current Limiter

Subtech profile
Subtech profile Subtech profile
Subtech profile
latesh sharma
 
Flyer 4 page
Flyer 4 pageFlyer 4 page
Flyer 4 page
Timothy Otto
 
Report BQPS II- Saad Janjua
Report BQPS II- Saad JanjuaReport BQPS II- Saad Janjua
Report BQPS II- Saad JanjuaSaad Janjua
 
Ats brochure
Ats brochureAts brochure
Ats brochure
Bimad Sinha
 
Eaton ATS Automatic Transfer Switch ATS-PWR
Eaton ATS Automatic Transfer Switch ATS-PWREaton ATS Automatic Transfer Switch ATS-PWR
Eaton ATS Automatic Transfer Switch ATS-PWR
Thorne & Derrick International
 
Apfc final seminar
Apfc final seminarApfc final seminar
Apfc final seminar
diwaker tiwari
 
COMPACT - SPC
COMPACT - SPCCOMPACT - SPC
COMPACT - SPC
Parimala Aravindan
 
SPC-Static Power Conditioner presentation - show final
SPC-Static Power Conditioner presentation - show finalSPC-Static Power Conditioner presentation - show final
SPC-Static Power Conditioner presentation - show finalR. Arvind arvind
 
Wsp supermarkets e
Wsp supermarkets eWsp supermarkets e
Wsp supermarkets e
Jac van Megen
 
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET Journal
 
Voltage stabilizer
Voltage stabilizerVoltage stabilizer
Voltage stabilizer
Satyapal Singh
 
Smart – Optimizer ECOD
Smart – Optimizer ECODSmart – Optimizer ECOD
Smart – Optimizer ECOD
Andrew Dmitrev
 
Smart - Optimizer ECOD
Smart - Optimizer ECODSmart - Optimizer ECOD
Smart - Optimizer ECOD
Andrew Dmitrev
 
Gsm based transformer fault detection system
Gsm based transformer fault detection systemGsm based transformer fault detection system
Gsm based transformer fault detection system
Kabilesh K
 
Active_Rectifier
Active_RectifierActive_Rectifier
Active_Rectifier
raju_megamic
 
Joseph Staniowski - Design Project
Joseph Staniowski - Design ProjectJoseph Staniowski - Design Project
Joseph Staniowski - Design ProjectJoseph Staniowski
 
Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover
IJSRED
 
Tsi precision power conditioner
Tsi precision power conditionerTsi precision power conditioner
Tsi precision power conditioner
cw5lides
 
Condor St30 Specification
Condor St30 SpecificationCondor St30 Specification
Condor St30 SpecificationKrdenas
 

Similar to StartOff ACCL [Automatic Source Changeover cum Current Limiter (20)

Subtech profile
Subtech profile Subtech profile
Subtech profile
 
Dc rda-rdat-low
Dc rda-rdat-lowDc rda-rdat-low
Dc rda-rdat-low
 
Flyer 4 page
Flyer 4 pageFlyer 4 page
Flyer 4 page
 
Report BQPS II- Saad Janjua
Report BQPS II- Saad JanjuaReport BQPS II- Saad Janjua
Report BQPS II- Saad Janjua
 
Ats brochure
Ats brochureAts brochure
Ats brochure
 
Eaton ATS Automatic Transfer Switch ATS-PWR
Eaton ATS Automatic Transfer Switch ATS-PWREaton ATS Automatic Transfer Switch ATS-PWR
Eaton ATS Automatic Transfer Switch ATS-PWR
 
Apfc final seminar
Apfc final seminarApfc final seminar
Apfc final seminar
 
COMPACT - SPC
COMPACT - SPCCOMPACT - SPC
COMPACT - SPC
 
SPC-Static Power Conditioner presentation - show final
SPC-Static Power Conditioner presentation - show finalSPC-Static Power Conditioner presentation - show final
SPC-Static Power Conditioner presentation - show final
 
Wsp supermarkets e
Wsp supermarkets eWsp supermarkets e
Wsp supermarkets e
 
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...
 
Voltage stabilizer
Voltage stabilizerVoltage stabilizer
Voltage stabilizer
 
Smart – Optimizer ECOD
Smart – Optimizer ECODSmart – Optimizer ECOD
Smart – Optimizer ECOD
 
Smart - Optimizer ECOD
Smart - Optimizer ECODSmart - Optimizer ECOD
Smart - Optimizer ECOD
 
Gsm based transformer fault detection system
Gsm based transformer fault detection systemGsm based transformer fault detection system
Gsm based transformer fault detection system
 
Active_Rectifier
Active_RectifierActive_Rectifier
Active_Rectifier
 
Joseph Staniowski - Design Project
Joseph Staniowski - Design ProjectJoseph Staniowski - Design Project
Joseph Staniowski - Design Project
 
Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover
 
Tsi precision power conditioner
Tsi precision power conditionerTsi precision power conditioner
Tsi precision power conditioner
 
Condor St30 Specification
Condor St30 SpecificationCondor St30 Specification
Condor St30 Specification
 

Recently uploaded

Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
DianaGray10
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Product School
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
Abida Shariff
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 

Recently uploaded (20)

Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 

StartOff ACCL [Automatic Source Changeover cum Current Limiter

  • 1. cÜxáxÇàá 100%  R e l i a b l e P o w e r S h a r i n g S y s t e m another technology leap from Series TM  AUTOMATIC SOURCE CHANGEOVER j|à{ CURRENT LIMITER [ACCL]
  • 2. AUTOMATIC SOURCE CHANGEOVER j|à{ CURRENT LIMITER [Digital]Series TM  Features Micro-Controller based design Automatic Source Change Over Break before make change-over system Neutral isolation for all models Current Limiting function Counter for number of interruptions, thereby protecting your valuable equipment Prevents over loading of the Generator LED / Digital indication of Status Saving in wiring and wall space Energy Saving... Reduction of CO2 Emission Functions When the Mains Supply is available The load is connected to the Mains supply (after initial delay) and the consumer can draw the full load as per the Sanctioned rating. When the Mains Supply fails and Standby Generator Supply is available The consumers are connected to the generator in a sequence depending upon the pre-set ‘Initial Delay’* timing, in order to limit the sudden load on the Generator. The Unit Monitors the Current at factory “Set Limit”. * If the Current exceeds the limit, the load is disconnected 5 times in 1 second intervals as a warning and then, automatically reconnects it after 5 minutes *. This cycle of interruptions and warning repeats 2 times and unless the load is reduced to the set limit the power supply will permanently disconnected. The supply will be re connected only by an operator manually or when the Main / Dg supply restarts. During this period, the Consumer is expected to switch off the non-essential loads and reduce it to within the limit. When the load is within the ‘Set Limit’, the Generator continues to supply the load. The supply from the Generator to the load can be restored after the Generator connection is reset by switching OFF/ON the Gen MCB. Or by pushing the reset button on the StartOff unit. When the Mains supply is restored The Load is automatically transferred to the Mains supply after pre-set time. LED Indicators: Over Voltage, Under Voltage, Over Load, Mains On, Generator On Digital display: 2 line /4 line digital display : All the above status. * These Parameters can be Pre-Programmed depending upon requirements of Customers and also can be Re-programmed at any time. Automatic Load Changeover Relay is a high precession system for efficient distribution of generator power in multi-storied apartments, commercial complexes etc. StartOff ACCL Series are designed to connect mains supply to load till mains is present. On mains failure and receiving generator power, it connects the load to DG supply. During DG operation, load drawn is monitored. If the load exceeds the allotted limit, it disrupts the supply and rechecks in intervals. On reducing the load and keeping it within the limit, load is connected to DG supply. For different applications, we have specific models. They are with load limiter, without load limiter, transfer of load from one phase to other phase and many additional functions. Special Features Over Voltage (OV) / Under Voltage (UV) protection by intelligent sensing technology. This feature provide maximum protection to consumer’s electrical equipment caused by voltage fluctuations or Over Voltage or Under Voltage problems from EB and DG sides. In both events, the StartOff ACCL automatically turn itself off and protect the entire power supply system. Under Voltage protection system save the Generator from possible damages. StartOff ACCL can with-stand high voltage fluctuations up to 300v without any damage to the unit and thereby its life is very long compared to any other brands. Because of the high quality of components and the quality controlled workmanship, StartOff ACCL unit is almost maintenance free. The Ultimate Solution for your power distribution needs… Maintenance Service within 24 hours! StartOff Products are engineered to provide you uninterrupted hassle free performance. The product is almost maintenance free for years. Even though, StartOff service team is equipped to provide faster service within 24 hours in case of any trouble.
  • 3. Series TM  SPECIFICATIONS  Technology  Microprocessor Based  Frequency  50 Hz  EB  Load Current  16 A, 32 A, 40 A , 63 A, 80 A, 100 A, 125 A   *  DG Load Current  16 A, 32 A, 40 A 63 A, 80 A, 100 A, 125 A   *  DG Max Current Range [Limiter]   (Factory Set) 0.1 A to 30A   *   Models    1 Phase EB & 1 Phase DG    3 Phase EB & 3 Phase DG  3 Phase EB & 1 Phase DG  Product Warranty  18 Months   **  Enclosure  Powder Coated Cabinet  Display  LED / Digital  *  **   Specifications can be changed upon customer requirements.  12 months Replacement + 6 Months Service.  Product Specifications …A leap ahead Model Range MODEL   SPECIFICATIONS  PHASE  [EB]  PHASE [DG]  MOUNTING  SOP16LX  EB16A/DG LIMITER 200W‐1500W   SINGLE/THREE  SINGLE  PANEL  SOP1616  EB16A/DG 16A  NON LIMITER  SINGLE/THREE  SINGLE/THREE  PANEL  SOD16LX  EB16A/DG LIMITER 200W‐1500W   SINGLE/THREE  SINGLE  DB  SOP30LX  EB30A/DG LIMITER 200W‐5000W   SINGLE/THREE  SINGLE  PANEL  SOP3030  EB30A/DG 30A  NON LIMITER  SINGLE/THREE  SINGLE/THREE  PANEL  SOD30LX  EB30A/DG LIMITER 200W‐5000W   SINGLE/THREE  SINGLE  DB  SOP40LX  EB40A/DG LIMITER 200W‐5000W   THREE  SINGLE  PANEL  SOP4040  EB40A/DG NON LIMITER   THREE  THREE  PANEL  SOD40LX  EB40A/DG LIMITER 200W‐5000W   THREE  SINGLE  DB  SOP60LX  EB60A/DG LIMITER 200W‐5000W   THREE  SINGLE  PANEL  SOP6060  EB60A/DG NON LIMITER   THREE  THREE  PANEL  SOP80LX  EB80A/DG LIMITER 200W‐5000W   THREE  SINGLE  PANEL  SOP8080  EB80A/DG NON LIMITER   THREE  THREE  PANEL  SOP100LX  EB100A/DG LIMITER 200W‐5000W   THREE  SINGLE  PANEL  SOP100100  EB100A/DG NON LIMITER   THREE  THREE  PANEL  SOP125LX  EB125A/DG LIMITER 200W‐5000W   THREE  SINGLE  PANEL  SOP125125  EB125A/DG NON LIMITER   THREE  THREE  PANEL  Panther Techno Labs Karassery [P.O], Mukkam, Pin: 673602 Calicut, Kerala, India. Tel: +91 9447950498, +91 9744212586 Email: panthertechnolabs@gmail.com ™  Division  For enquiries:  All Specifications and settings can be customized as per the requirement of specific needs