SlideShare a Scribd company logo
S. S Power System
ISO Certified 9001:2008 Co.
Unique Innovation
Premium Quality
Economical price
Ist time in India with
Pre Magnetic Contactor
Technology
SUBTECH Introduction
 SUBTECH is a brand name for Two Decades since 1995.
 SUBTECH Industry Leader in power system Integrating Designs & Automation.
 Products useful in Apartments, Industries, Commercial, Residential for Automation of power supply.
 Manufacturer & Exporter of
 Power backup Solution, LT panel/DB panel, Bus bar panel, APFC Panel.
 Automatic Changeover/ ATS Panel, AMF Panel, ACCL/CLD, Battery charger.
 TIMER/SMART TIME SWITCH, Automatic Phase sequence panel, Automatic Phase changer.
 Submersible panel, Single/ Three Phase motor starter DOL /STAR Delta, GSM motor starter.
 Water Level Control Management System & Water Refrigeration*, Automatic motor starter, Water level Indication alarm, Water level controller.
 Fire Fighting Panel, Dual Source Prepaid Energy Meter*, Street Light Control Panel, Led Lightning*.
Water Level Control Management System
In modern society/ apartment every person is suffering from lack of water. Just because of wastage of water
from manual operation of pump, sometime operators are generally forgotten to stop the motor pump after
filling of tanks. SUBTECH has very wide range of solutions to get rid of overflow problems.
1. Water Level Indication Unit
 Indicate the water level of tank for protection of water /liquid tank from overflow.
 Cut-off with LED indication
 Buzzer sound on tank full & Empty for user.
2. Water tank Automation System
 Auto start when any water tank will empty
 Auto stop when any Water Tank Full.
 Indicate as well control the water overflow of water/liquid from tank.
 Automation of multiple as well Single tanks for Indication & Overflow protection.
Automatic Fire Protection Panel
In the present scenario, safety is the major concern, not only for the corporate & commercial complexes,
but in several multi-storied housing societies. More and more people are investing in the automatic fire
protection system now-a-days to ensure their places are completely safe and sound. We are providing
complete designing, supplying, installations support provided.
Power Backup Solution/ACCL
The Changeover doesn’t have any current limitation and consumers sometimes exceeds the
load, so just to prevent it, so MCB’s are used to limit the current but this is also not safe &
comfortable as once the MCB is tripped due to overloading, it doesn’t auto-reset, we need to
ON it manually. This procedure repeats itself & become a headache to us. But now this
headache transfer to the generator and it is overloaded, which decrease the life of generator.
 Fully automatic Over Load Protection system for efficient distribution with of individually
rationed generator power in multi storied apartments, commercial complex etc.
 As the current value exceeds the preset value for more than 7-8 sec. Current Limiting Device will trip the power supply for pre
determined time 10-30 sec. It will switch ON the power supply again & start monitoring the load current again & the whole process
will restart.
 Generator current allotment-as per buyer's specification is available on all load circuits
Street Light Control Panel
In the modem industrialized society, where power is essential ingredient of economic development. It is not being
wasted unnecessarily. One of them is the street lights on the poles which remain ON even in the day time and a
severe amount of power is wasted, when it’s not required. If they would be switched properly, not only It will
help in the saving of power and save money but the peoples travelling on the roads gets facilitated However, in
this era of changing technology, street lights are also being operated by GSM technology, which adds cost
due to the bulky hardware and software used and yearly maintenance expenditure for the system also GSM unit.
 Pre programmed Time switch as per season with Three Programs every month and for twelve months
thirty six programs specially designed for Street Light Automation.
 No need of reprogramming & rewiring.
 User-friendly, low running cost, Energy saving Efficient, Capable in Lowered Co2 Emissions.
 Capable of Saving Energy 35-40 %.( Depend upon user usage).
LT Distribution panel
A distribution panel panel is a component of an electricity supply system which divides an electrical power
feed into other circuits; It has a key role in supplying power and protecting permanently installed
equipment for building such as power and lighting facilities while providing a protective fuse or circuit
breaker for each circuit, in a common enclosure.
 Manufactured for multiple operations with PMC Technology advantages of having free form
problems like overheating & burning of coil.
 Manufactured Feeder Panel in GI sheets provide high strength, longer service life, corrosion free,
low maintenance cost.
 Provided with hinges, fixings and locks &fully enclosed switchgear.
APFC (Automatic Power Factor Correction) Panel
In present era power network is go through a wide variety of electrical load which create a varying
power demand in the power supply system. So in this varying condition of electrical load it’s very
difficult to maintain a constant power factor by the use of fixed capacitors bank to be manually
switched on/off to suit the variation of Electrical load. As far as industrial load concern heavy inductive
load is very common which will results in Low power factor. Low power factor results in higher demand
charges and also of low power factor penalties. It is therefore necessary to automatic switching
operation of the suitable capacitor bank for fixing power factor from load fluctuation. This can be
achieved by Automatic Power Factor Correction Panel.
 User friendly microprocessor based APFC relay.
 Modular design with easier assembly, Installation & maintenance for user.
 Aesthetically designed dust proof cabinet with power coating.
 Power factor correction done with help of power factor controller & power contactors by switching In/Out 4/6/8/12 steps of capacitor
banks.
Auto Phase Sequence Panel
In hosing society with having a wide variety of power demand there are lots of varying condition
of Load conditions. There are lots of time problems like Single Phasing, Reverse Phasing &
unbalance supply are one of the major issues in electrical systems. The major cause of maximum
load burn-out is overloading which occurs due to unbalance supply. Auto Phase sequence device
is the solution for these problems.
 Switching time is 0.5 second with an Operating Voltage 130V to 280V.
 Tamper proof and maintenances free Powder Coated Box.
 Microcontroller based technology with Pre Program interlocking to prevent short circuit.
 Minimum heat dissipation & energy losses.
 Remove problem of sparking & burning with the usage of Pre Magnetic Contactor.
Auto Mains Failure Panel
Auto main failure panel is used for the automatic operation of the Genset. It’s sure to provide
you the best effort: monitor the power availability both “MAINS” and “GENERATOR” automatically, and deliver
you the power; on the other hand it will monitor the operation state for Generator while the Generator is
running. During Abnormal common fault, AMF Panel will give feedback both the visual and audio signal to you by
LED display.
 Auto Start & Auto Stop the Genset when Mains fails & restores respectively.
 Auto / Manual mode selector available, automatically changes lines from Main AC to Gen Line and vice versa.
 Main restores delay time 10 sec, Start Delay Time 3-5 sec. Cool down time 30-40 sec, DG output delay time 8-10 sec.
 Cranking time standard three times cranking with Attempt cranking time of 15 sec.
 Low/high Voltage protection, Phase reverse protection
 Digital Volt, Amp. Hz. Meters & 4 Indication of Mains & DG in Display
 Contactor Coil Voltage-180-260 VAC & Pre Magnetic Contactor Coil Voltage- 130-280VAC
Automatic Changeover/Automatic Transfer Switch
SUBTECH make auto changeover/Automatic transfer switch is used to select one line in a specified manner
between Main Utility & Genset. It gives first priority for main utility. When main supply is resumed, the connected
load is automatically shifted to mains. If main utility will be fail than load transfer on available utility by another
source automatically. Mostly used for selection of input from the generator and main line with or without time
delay.
 Switching time for Genset to Mains is 0.5 second.
 Operating Voltage 130V to 280V.
 Powder Coated Box, Compact size Wall mounting, Tamper proof and maintenances free.
 LED Indication status for MAINS & GENERATOR On.
 Microcontroller based technology with Pre Program interlocking to prevent short circuit.
 Remove problem of sparking & burning because of usage of PMC in switching.
 Inbuilt SMPS supply for operate the circuit.
Submersible Panel Starter
The Submersible panel starter here, are designed and manufactured by keeping quality assurance on the top
priority with a reliable, cost-efficient solution with easy to install and lesser number of controlling wires than that
of other brands. All the starters have been inculcated with smart digital meter that monitors as well as control the
supply and equipment running and Pre magnetic contactor (PMC) for smooth and fastest switching. Motor starter
are used for safe operation of three phase motor which can work and control the motor very well in a wide band
of voltage range (200-440 V). Both motor starters are suitable in various purposes and operated in a voltage range
from 200-400 V.
Automatic Battery Charger
Automatic Battery Charger for charging generator battery automatically, with two type of Battery Charger.
 Transformer Base Battery Charger -12/24 VDC
 SMPS Base Battery Charger -12/24 VDC
LED Lighting Solution
Light is our daily need, but by using LED lights in place of the conventional lights, we can alter the ambience
and also contribute positively to the society and economy of our country. LED lighting systems are so
adaptable, so flexible, that a single lighting system can conjure up an almost limitless number of effects &
ambiances. Led lights are available in different sizes up to 290v.
Subtech profile
Subtech profile

More Related Content

What's hot

New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
Ijcem Journal
 
How to build a battery backup
How to build a battery backupHow to build a battery backup
How to build a battery backup
Mathy Mpassy Isinki
 
Solar Micro Inverter
Solar Micro InverterSolar Micro Inverter
Solar Micro Inverter
L'Obel Solar Power System
 
Riello master-wrap-around-static-bypass
Riello master-wrap-around-static-bypassRiello master-wrap-around-static-bypass
Riello master-wrap-around-static-bypass
Electrical and renewable energy engineering
 
PWM SOLAR CHARGE CONTROLLER ARDUINO NANO
PWM SOLAR CHARGE CONTROLLER ARDUINO NANOPWM SOLAR CHARGE CONTROLLER ARDUINO NANO
PWM SOLAR CHARGE CONTROLLER ARDUINO NANO
Saikat Bhandari
 
pwm solar charge controller designed for 10V solar Panel
pwm solar charge controller designed for 10V solar Panelpwm solar charge controller designed for 10V solar Panel
pwm solar charge controller designed for 10V solar Panel
Saikat Bhandari
 
Power backups
Power backupsPower backups
Power backups
Prachi Gupta
 
Riello Multi Sentry Uninterruptible Power Supplies Suppliers,London UK
  Riello Multi Sentry Uninterruptible Power Supplies Suppliers,London UK  Riello Multi Sentry Uninterruptible Power Supplies Suppliers,London UK
Riello Multi Sentry Uninterruptible Power Supplies Suppliers,London UK
Electrical and renewable energy engineering
 
A15 prepaid-energy-meter
A15 prepaid-energy-meterA15 prepaid-energy-meter
A15 prepaid-energy-meter
Aayush Patidar
 
Gamatronics Solutions for Data Centers
Gamatronics Solutions for Data CentersGamatronics Solutions for Data Centers
Gamatronics Solutions for Data Centers
Data Center Consultores
 
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET Journal
 
All products brochure
All products brochureAll products brochure
All products brochureJason Becker
 
StartOff ACCL [Automatic Source Changeover cum Current Limiter
StartOff ACCL [Automatic Source Changeover cum Current LimiterStartOff ACCL [Automatic Source Changeover cum Current Limiter
StartOff ACCL [Automatic Source Changeover cum Current Limiter
Zubair Kodiyathur
 
EPC Solutions Lighting Solutions
EPC Solutions Lighting SolutionsEPC Solutions Lighting Solutions
EPC Solutions Lighting Solutions
EPC Solutions LLP
 
Online UPS,Battery, Solar Inverter Supplier
Online UPS,Battery, Solar Inverter SupplierOnline UPS,Battery, Solar Inverter Supplier
Online UPS,Battery, Solar Inverter Supplier
suman bala
 
Aps
ApsAps
00001036 h
00001036 h00001036 h
00001036 h
Abiy Tadese
 
Operational Cost Avoidance through Harmonic Mitigation in Industrial Environm...
Operational Cost Avoidance through Harmonic Mitigation in Industrial Environm...Operational Cost Avoidance through Harmonic Mitigation in Industrial Environm...
Operational Cost Avoidance through Harmonic Mitigation in Industrial Environm...
Schneider Electric
 
#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...
#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...
#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...
Saikat Bhandari
 

What's hot (20)

New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
 
How to build a battery backup
How to build a battery backupHow to build a battery backup
How to build a battery backup
 
Solar Micro Inverter
Solar Micro InverterSolar Micro Inverter
Solar Micro Inverter
 
Riello master-wrap-around-static-bypass
Riello master-wrap-around-static-bypassRiello master-wrap-around-static-bypass
Riello master-wrap-around-static-bypass
 
PWM SOLAR CHARGE CONTROLLER ARDUINO NANO
PWM SOLAR CHARGE CONTROLLER ARDUINO NANOPWM SOLAR CHARGE CONTROLLER ARDUINO NANO
PWM SOLAR CHARGE CONTROLLER ARDUINO NANO
 
pwm solar charge controller designed for 10V solar Panel
pwm solar charge controller designed for 10V solar Panelpwm solar charge controller designed for 10V solar Panel
pwm solar charge controller designed for 10V solar Panel
 
Power backups
Power backupsPower backups
Power backups
 
Riello Multi Sentry Uninterruptible Power Supplies Suppliers,London UK
  Riello Multi Sentry Uninterruptible Power Supplies Suppliers,London UK  Riello Multi Sentry Uninterruptible Power Supplies Suppliers,London UK
Riello Multi Sentry Uninterruptible Power Supplies Suppliers,London UK
 
A15 prepaid-energy-meter
A15 prepaid-energy-meterA15 prepaid-energy-meter
A15 prepaid-energy-meter
 
Gamatronics Solutions for Data Centers
Gamatronics Solutions for Data CentersGamatronics Solutions for Data Centers
Gamatronics Solutions for Data Centers
 
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...
 
All products brochure
All products brochureAll products brochure
All products brochure
 
StartOff ACCL [Automatic Source Changeover cum Current Limiter
StartOff ACCL [Automatic Source Changeover cum Current LimiterStartOff ACCL [Automatic Source Changeover cum Current Limiter
StartOff ACCL [Automatic Source Changeover cum Current Limiter
 
EPC Solutions Lighting Solutions
EPC Solutions Lighting SolutionsEPC Solutions Lighting Solutions
EPC Solutions Lighting Solutions
 
Online UPS,Battery, Solar Inverter Supplier
Online UPS,Battery, Solar Inverter SupplierOnline UPS,Battery, Solar Inverter Supplier
Online UPS,Battery, Solar Inverter Supplier
 
Aps
ApsAps
Aps
 
00001036 h
00001036 h00001036 h
00001036 h
 
E emb brochure
E emb brochureE emb brochure
E emb brochure
 
Operational Cost Avoidance through Harmonic Mitigation in Industrial Environm...
Operational Cost Avoidance through Harmonic Mitigation in Industrial Environm...Operational Cost Avoidance through Harmonic Mitigation in Industrial Environm...
Operational Cost Avoidance through Harmonic Mitigation in Industrial Environm...
 
#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...
#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...
#Solar #Design #TOOL PV System Design Calculations Report at Neotia Universit...
 

Similar to Subtech profile

Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.
Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.
Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.
latesh sharma
 
Ats brochure
Ats brochureAts brochure
Ats brochure
Bimad Sinha
 
DIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
DIESEL GENERATOR AND ONLINE UPS By Accurate Power SystemsDIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
DIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
IndiaMART InterMESH Limited
 
COMPACT - SPC
COMPACT - SPCCOMPACT - SPC
COMPACT - SPC
Parimala Aravindan
 
SPC-Static Power Conditioner presentation - show final
SPC-Static Power Conditioner presentation - show finalSPC-Static Power Conditioner presentation - show final
SPC-Static Power Conditioner presentation - show finalR. Arvind arvind
 
Managementof Loads Using Maximum Demand Meter For Commercial Sector At Peak D...
Managementof Loads Using Maximum Demand Meter For Commercial Sector At Peak D...Managementof Loads Using Maximum Demand Meter For Commercial Sector At Peak D...
Managementof Loads Using Maximum Demand Meter For Commercial Sector At Peak D...
IJERA Editor
 
Wsp supermarkets e
Wsp supermarkets eWsp supermarkets e
Wsp supermarkets e
Jac van Megen
 
VEMC Control Panels
VEMC Control PanelsVEMC Control Panels
VEMC Control Panels
urjarathi
 
CONTROL PANELS BROCHURE | VEMC
CONTROL PANELS BROCHURE | VEMCCONTROL PANELS BROCHURE | VEMC
CONTROL PANELS BROCHURE | VEMC
urjarathi
 
Control panel brochure
Control panel brochureControl panel brochure
Control panel brochure
urjarathi
 
Elspec equalizer st-the_ultimate_motor_start-up_solution_datasheet
Elspec equalizer st-the_ultimate_motor_start-up_solution_datasheetElspec equalizer st-the_ultimate_motor_start-up_solution_datasheet
Elspec equalizer st-the_ultimate_motor_start-up_solution_datasheet
Angus Sankaran
 
DIGITAL DC DRIVES & SYSTEMS UPTO 5000 KW
DIGITAL DC DRIVES & SYSTEMS UPTO 5000 KWDIGITAL DC DRIVES & SYSTEMS UPTO 5000 KW
DIGITAL DC DRIVES & SYSTEMS UPTO 5000 KW
GemcoControls
 
Back page
Back pageBack page
Back page
Timothy Otto
 
BTech ECE project final report using Arduino
BTech ECE project final report using ArduinoBTech ECE project final report using Arduino
BTech ECE project final report using Arduino
Bhuvi85107
 
Littelfuse solutions for uninterrupted power supply and energy storage systems
Littelfuse solutions for uninterrupted power supply and energy storage systemsLittelfuse solutions for uninterrupted power supply and energy storage systems
Littelfuse solutions for uninterrupted power supply and energy storage systems
Littelfuse
 
INTELLIGENT AUTOMATIC POWER FACTOR CORRECTION
INTELLIGENT AUTOMATIC POWER FACTOR CORRECTIONINTELLIGENT AUTOMATIC POWER FACTOR CORRECTION
INTELLIGENT AUTOMATIC POWER FACTOR CORRECTION
ijiert bestjournal
 
MICROCONTROLLER BASED SOLAR POWER INVERTER
MICROCONTROLLER BASED SOLAR POWER INVERTERMICROCONTROLLER BASED SOLAR POWER INVERTER
MICROCONTROLLER BASED SOLAR POWER INVERTER
IAEME Publication
 
Smart street light management systems for street light energy conservation, a...
Smart street light management systems for street light energy conservation, a...Smart street light management systems for street light energy conservation, a...
Smart street light management systems for street light energy conservation, a...
Instruments Universal
 

Similar to Subtech profile (20)

Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.
Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.
Subtech:Automatic Changeover,ACCL, AMF Panel, Motor Starter etc.
 
Ats brochure
Ats brochureAts brochure
Ats brochure
 
DIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
DIESEL GENERATOR AND ONLINE UPS By Accurate Power SystemsDIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
DIESEL GENERATOR AND ONLINE UPS By Accurate Power Systems
 
COMPACT - SPC
COMPACT - SPCCOMPACT - SPC
COMPACT - SPC
 
SPC-Static Power Conditioner presentation - show final
SPC-Static Power Conditioner presentation - show finalSPC-Static Power Conditioner presentation - show final
SPC-Static Power Conditioner presentation - show final
 
Managementof Loads Using Maximum Demand Meter For Commercial Sector At Peak D...
Managementof Loads Using Maximum Demand Meter For Commercial Sector At Peak D...Managementof Loads Using Maximum Demand Meter For Commercial Sector At Peak D...
Managementof Loads Using Maximum Demand Meter For Commercial Sector At Peak D...
 
Wsp supermarkets e
Wsp supermarkets eWsp supermarkets e
Wsp supermarkets e
 
VEMC Control Panels
VEMC Control PanelsVEMC Control Panels
VEMC Control Panels
 
CONTROL PANELS BROCHURE | VEMC
CONTROL PANELS BROCHURE | VEMCCONTROL PANELS BROCHURE | VEMC
CONTROL PANELS BROCHURE | VEMC
 
Control panel brochure
Control panel brochureControl panel brochure
Control panel brochure
 
Elspec equalizer st-the_ultimate_motor_start-up_solution_datasheet
Elspec equalizer st-the_ultimate_motor_start-up_solution_datasheetElspec equalizer st-the_ultimate_motor_start-up_solution_datasheet
Elspec equalizer st-the_ultimate_motor_start-up_solution_datasheet
 
DIGITAL DC DRIVES & SYSTEMS UPTO 5000 KW
DIGITAL DC DRIVES & SYSTEMS UPTO 5000 KWDIGITAL DC DRIVES & SYSTEMS UPTO 5000 KW
DIGITAL DC DRIVES & SYSTEMS UPTO 5000 KW
 
E cwith scada
E cwith scadaE cwith scada
E cwith scada
 
Back page
Back pageBack page
Back page
 
Electrical Basics
Electrical BasicsElectrical Basics
Electrical Basics
 
BTech ECE project final report using Arduino
BTech ECE project final report using ArduinoBTech ECE project final report using Arduino
BTech ECE project final report using Arduino
 
Littelfuse solutions for uninterrupted power supply and energy storage systems
Littelfuse solutions for uninterrupted power supply and energy storage systemsLittelfuse solutions for uninterrupted power supply and energy storage systems
Littelfuse solutions for uninterrupted power supply and energy storage systems
 
INTELLIGENT AUTOMATIC POWER FACTOR CORRECTION
INTELLIGENT AUTOMATIC POWER FACTOR CORRECTIONINTELLIGENT AUTOMATIC POWER FACTOR CORRECTION
INTELLIGENT AUTOMATIC POWER FACTOR CORRECTION
 
MICROCONTROLLER BASED SOLAR POWER INVERTER
MICROCONTROLLER BASED SOLAR POWER INVERTERMICROCONTROLLER BASED SOLAR POWER INVERTER
MICROCONTROLLER BASED SOLAR POWER INVERTER
 
Smart street light management systems for street light energy conservation, a...
Smart street light management systems for street light energy conservation, a...Smart street light management systems for street light energy conservation, a...
Smart street light management systems for street light energy conservation, a...
 

Recently uploaded

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 

Recently uploaded (20)

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 

Subtech profile

  • 1. S. S Power System ISO Certified 9001:2008 Co. Unique Innovation Premium Quality Economical price Ist time in India with Pre Magnetic Contactor Technology
  • 2. SUBTECH Introduction  SUBTECH is a brand name for Two Decades since 1995.  SUBTECH Industry Leader in power system Integrating Designs & Automation.  Products useful in Apartments, Industries, Commercial, Residential for Automation of power supply.  Manufacturer & Exporter of  Power backup Solution, LT panel/DB panel, Bus bar panel, APFC Panel.  Automatic Changeover/ ATS Panel, AMF Panel, ACCL/CLD, Battery charger.  TIMER/SMART TIME SWITCH, Automatic Phase sequence panel, Automatic Phase changer.  Submersible panel, Single/ Three Phase motor starter DOL /STAR Delta, GSM motor starter.  Water Level Control Management System & Water Refrigeration*, Automatic motor starter, Water level Indication alarm, Water level controller.  Fire Fighting Panel, Dual Source Prepaid Energy Meter*, Street Light Control Panel, Led Lightning*. Water Level Control Management System In modern society/ apartment every person is suffering from lack of water. Just because of wastage of water from manual operation of pump, sometime operators are generally forgotten to stop the motor pump after filling of tanks. SUBTECH has very wide range of solutions to get rid of overflow problems. 1. Water Level Indication Unit  Indicate the water level of tank for protection of water /liquid tank from overflow.  Cut-off with LED indication  Buzzer sound on tank full & Empty for user. 2. Water tank Automation System  Auto start when any water tank will empty  Auto stop when any Water Tank Full.  Indicate as well control the water overflow of water/liquid from tank.  Automation of multiple as well Single tanks for Indication & Overflow protection. Automatic Fire Protection Panel In the present scenario, safety is the major concern, not only for the corporate & commercial complexes, but in several multi-storied housing societies. More and more people are investing in the automatic fire protection system now-a-days to ensure their places are completely safe and sound. We are providing complete designing, supplying, installations support provided. Power Backup Solution/ACCL The Changeover doesn’t have any current limitation and consumers sometimes exceeds the load, so just to prevent it, so MCB’s are used to limit the current but this is also not safe & comfortable as once the MCB is tripped due to overloading, it doesn’t auto-reset, we need to ON it manually. This procedure repeats itself & become a headache to us. But now this headache transfer to the generator and it is overloaded, which decrease the life of generator.  Fully automatic Over Load Protection system for efficient distribution with of individually rationed generator power in multi storied apartments, commercial complex etc.  As the current value exceeds the preset value for more than 7-8 sec. Current Limiting Device will trip the power supply for pre determined time 10-30 sec. It will switch ON the power supply again & start monitoring the load current again & the whole process will restart.  Generator current allotment-as per buyer's specification is available on all load circuits
  • 3. Street Light Control Panel In the modem industrialized society, where power is essential ingredient of economic development. It is not being wasted unnecessarily. One of them is the street lights on the poles which remain ON even in the day time and a severe amount of power is wasted, when it’s not required. If they would be switched properly, not only It will help in the saving of power and save money but the peoples travelling on the roads gets facilitated However, in this era of changing technology, street lights are also being operated by GSM technology, which adds cost due to the bulky hardware and software used and yearly maintenance expenditure for the system also GSM unit.  Pre programmed Time switch as per season with Three Programs every month and for twelve months thirty six programs specially designed for Street Light Automation.  No need of reprogramming & rewiring.  User-friendly, low running cost, Energy saving Efficient, Capable in Lowered Co2 Emissions.  Capable of Saving Energy 35-40 %.( Depend upon user usage). LT Distribution panel A distribution panel panel is a component of an electricity supply system which divides an electrical power feed into other circuits; It has a key role in supplying power and protecting permanently installed equipment for building such as power and lighting facilities while providing a protective fuse or circuit breaker for each circuit, in a common enclosure.  Manufactured for multiple operations with PMC Technology advantages of having free form problems like overheating & burning of coil.  Manufactured Feeder Panel in GI sheets provide high strength, longer service life, corrosion free, low maintenance cost.  Provided with hinges, fixings and locks &fully enclosed switchgear. APFC (Automatic Power Factor Correction) Panel In present era power network is go through a wide variety of electrical load which create a varying power demand in the power supply system. So in this varying condition of electrical load it’s very difficult to maintain a constant power factor by the use of fixed capacitors bank to be manually switched on/off to suit the variation of Electrical load. As far as industrial load concern heavy inductive load is very common which will results in Low power factor. Low power factor results in higher demand charges and also of low power factor penalties. It is therefore necessary to automatic switching operation of the suitable capacitor bank for fixing power factor from load fluctuation. This can be achieved by Automatic Power Factor Correction Panel.  User friendly microprocessor based APFC relay.  Modular design with easier assembly, Installation & maintenance for user.  Aesthetically designed dust proof cabinet with power coating.  Power factor correction done with help of power factor controller & power contactors by switching In/Out 4/6/8/12 steps of capacitor banks. Auto Phase Sequence Panel In hosing society with having a wide variety of power demand there are lots of varying condition of Load conditions. There are lots of time problems like Single Phasing, Reverse Phasing & unbalance supply are one of the major issues in electrical systems. The major cause of maximum load burn-out is overloading which occurs due to unbalance supply. Auto Phase sequence device is the solution for these problems.  Switching time is 0.5 second with an Operating Voltage 130V to 280V.  Tamper proof and maintenances free Powder Coated Box.  Microcontroller based technology with Pre Program interlocking to prevent short circuit.  Minimum heat dissipation & energy losses.  Remove problem of sparking & burning with the usage of Pre Magnetic Contactor.
  • 4. Auto Mains Failure Panel Auto main failure panel is used for the automatic operation of the Genset. It’s sure to provide you the best effort: monitor the power availability both “MAINS” and “GENERATOR” automatically, and deliver you the power; on the other hand it will monitor the operation state for Generator while the Generator is running. During Abnormal common fault, AMF Panel will give feedback both the visual and audio signal to you by LED display.  Auto Start & Auto Stop the Genset when Mains fails & restores respectively.  Auto / Manual mode selector available, automatically changes lines from Main AC to Gen Line and vice versa.  Main restores delay time 10 sec, Start Delay Time 3-5 sec. Cool down time 30-40 sec, DG output delay time 8-10 sec.  Cranking time standard three times cranking with Attempt cranking time of 15 sec.  Low/high Voltage protection, Phase reverse protection  Digital Volt, Amp. Hz. Meters & 4 Indication of Mains & DG in Display  Contactor Coil Voltage-180-260 VAC & Pre Magnetic Contactor Coil Voltage- 130-280VAC Automatic Changeover/Automatic Transfer Switch SUBTECH make auto changeover/Automatic transfer switch is used to select one line in a specified manner between Main Utility & Genset. It gives first priority for main utility. When main supply is resumed, the connected load is automatically shifted to mains. If main utility will be fail than load transfer on available utility by another source automatically. Mostly used for selection of input from the generator and main line with or without time delay.  Switching time for Genset to Mains is 0.5 second.  Operating Voltage 130V to 280V.  Powder Coated Box, Compact size Wall mounting, Tamper proof and maintenances free.  LED Indication status for MAINS & GENERATOR On.  Microcontroller based technology with Pre Program interlocking to prevent short circuit.  Remove problem of sparking & burning because of usage of PMC in switching.  Inbuilt SMPS supply for operate the circuit. Submersible Panel Starter The Submersible panel starter here, are designed and manufactured by keeping quality assurance on the top priority with a reliable, cost-efficient solution with easy to install and lesser number of controlling wires than that of other brands. All the starters have been inculcated with smart digital meter that monitors as well as control the supply and equipment running and Pre magnetic contactor (PMC) for smooth and fastest switching. Motor starter are used for safe operation of three phase motor which can work and control the motor very well in a wide band of voltage range (200-440 V). Both motor starters are suitable in various purposes and operated in a voltage range from 200-400 V. Automatic Battery Charger Automatic Battery Charger for charging generator battery automatically, with two type of Battery Charger.  Transformer Base Battery Charger -12/24 VDC  SMPS Base Battery Charger -12/24 VDC LED Lighting Solution Light is our daily need, but by using LED lights in place of the conventional lights, we can alter the ambience and also contribute positively to the society and economy of our country. LED lighting systems are so adaptable, so flexible, that a single lighting system can conjure up an almost limitless number of effects & ambiances. Led lights are available in different sizes up to 290v.