Chapter 2: Process
Aim
This chapter focuses on processes, defines the three process analysis and process
control methods and describes one of them i.e., Performance statistics, in detail.
What is a process?
A process is a combination of machinery, materials, procedures and manpower that
are used to produce a product or deliver a service.
A process reveals information or data. Six Sigma methodology collects this data to
accurately assess the time, waste, defects or other variations associated with a
process. And this provides the information needed to improve the process itself.
Take for example, the customer complaint handling process. The quality of this
process could be quantified using certain parameters like the number of complaints
received, the response time for each complaint and reduced repetitiveness of the
same complaint. This is the data given out by the process. To enhance any of these
parameters, say to reduce the response cycle time, action needs to be taken over
the entire process. So the data from the process is used to improve the entire
process.
Key Characteristics
The features in a product or service that are most important to the user are called
the key characteristics of a product.
Typically, you would look at features that are most important to the customer and
call these the Key characteristics.
For example, while developing a software for the integration of databases and legacy
applications for a client, the emphasis would be on a bug free solution,
interoperability, stability and of course, on the client not losing any of his old
databases.
Statistical process control and capability measures should be applied to key
characteristics. Non-key characteristics are not unimportant. They will still receive
the same attention they have received traditionally.
By focusing on the Key characteristics, quality teams over time can analyze and
control most, if not all, of a company’s processes.
Page 2 of 2
© Copyright 2004, All Rights Reserved. Edutech Dimensions Pvt. Ltd.
Another way of looking at key characteristics is to use the loss function concept.
From this point of view, key characteristics are those whose variations cause the
greatest loss and would possess steep sided loss functions. This would indicate
significant potential losses owing to variation.
Flat loss function indicates low potential losses and represents non-key
characteristics.
Action on the Key Characteristic of the process
Actions on a process are most economical when taken on key-characteristics varying
far from target value. This maintains stability and variations within acceptable limits.
Action taken on output is not economical. Unless the root cause is removed, the
problem or non-conformance may appear once again.
Focusing on key characteristics provides a method to allocate quality resources in the
most effective manner
Summary
1. Any repetitive action constitutes a “process” and is a combination of
machinery, materials, procedures and so forth that are used to produce a
product or deliver a service.
2. Six Sigma methodology collects data to assess the time, waste, defects or
other variations associated with each process and uses these to improve the
process.
3. Key characteristics reflect manufacturing situations where there is a high
probability of a defect occurring or going undetected should it occur.
4. Six Sigma focuses on key characteristics and reduces the chance of defects to
a large extent.

More Related Content

What's hot (20)

Six sigma..
Six sigma..Six sigma..
Six sigma..
 
Introduction to Lean 6 sigma
Introduction to Lean 6 sigmaIntroduction to Lean 6 sigma
Introduction to Lean 6 sigma
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Lean Six Sigma in various Industries
Lean Six Sigma in various IndustriesLean Six Sigma in various Industries
Lean Six Sigma in various Industries
 
Lean 6 sigma
Lean 6 sigmaLean 6 sigma
Lean 6 sigma
 
six sigma in supply chain management
   six sigma in supply chain management   six sigma in supply chain management
six sigma in supply chain management
 
principle of six sigma
principle of six sigmaprinciple of six sigma
principle of six sigma
 
TQM- Six sigma
TQM- Six sigmaTQM- Six sigma
TQM- Six sigma
 
Six sigma
Six sigma Six sigma
Six sigma
 
2 Brian Hudson Lean 6 Sigma
2 Brian Hudson Lean 6 Sigma2 Brian Hudson Lean 6 Sigma
2 Brian Hudson Lean 6 Sigma
 
6 sigma assignment
6 sigma assignment6 sigma assignment
6 sigma assignment
 
Six Sigma Tutorial for Beginners | Six Sigma Explained | Invensis Learning
Six Sigma Tutorial for Beginners | Six Sigma Explained  | Invensis LearningSix Sigma Tutorial for Beginners | Six Sigma Explained  | Invensis Learning
Six Sigma Tutorial for Beginners | Six Sigma Explained | Invensis Learning
 
DMAIC Improvement Approach
DMAIC Improvement Approach DMAIC Improvement Approach
DMAIC Improvement Approach
 
iNTRODUCTION TO LEAN
iNTRODUCTION TO LEANiNTRODUCTION TO LEAN
iNTRODUCTION TO LEAN
 
Six sigma seminar
Six sigma seminarSix sigma seminar
Six sigma seminar
 
6 sigma
6 sigma6 sigma
6 sigma
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six sigma - learn 6 sigma steps
Six sigma - learn 6 sigma stepsSix sigma - learn 6 sigma steps
Six sigma - learn 6 sigma steps
 
6 sigma
6 sigma6 sigma
6 sigma
 
Six sigma
Six sigmaSix sigma
Six sigma
 

Similar to 6 Sigma - Chapter2

Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Ricky Smith CMRP
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTReaz Uddin
 
Quality Management
Quality ManagementQuality Management
Quality Managementmanobili17
 
A lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projectsA lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projectsSonata Software
 
Quality management in projects
Quality management in projectsQuality management in projects
Quality management in projectsselinasimpson311
 
Continous process improvement
Continous process improvementContinous process improvement
Continous process improvementSarfraz Ashraf
 
Quality management system process
Quality management system processQuality management system process
Quality management system processselinasimpson331
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodseSAT Journals
 
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...Angela Williams
 
Lean management in textile processing
Lean management in textile processingLean management in textile processing
Lean management in textile processingIEI GSC
 
Ensemble - Process, Strategy and Performance Management
Ensemble - Process, Strategy and Performance ManagementEnsemble - Process, Strategy and Performance Management
Ensemble - Process, Strategy and Performance ManagementRefik Tuncer
 
Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations ManagementNishant Agrawal
 
Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?gstevick1980
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Controldrishtipuro1234
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Controlsethnainaa
 
Applying Lean Sigma Into Validation
Applying Lean Sigma Into ValidationApplying Lean Sigma Into Validation
Applying Lean Sigma Into Validationtjcornish
 
Quality in operations management
Quality in operations managementQuality in operations management
Quality in operations managementselinasimpson1301
 
Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210pbaxter
 
Morrisons session 3
Morrisons session 3Morrisons session 3
Morrisons session 3philg2
 

Similar to 6 Sigma - Chapter2 (20)

Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENTTOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
A lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projectsA lean model based outlook on cost & quality optimization in software projects
A lean model based outlook on cost & quality optimization in software projects
 
Quality management in projects
Quality management in projectsQuality management in projects
Quality management in projects
 
Continous process improvement
Continous process improvementContinous process improvement
Continous process improvement
 
Quality management system process
Quality management system processQuality management system process
Quality management system process
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methods
 
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...
IMPLEMENTATION OF STATISTICAL PROCESS CONTROL TOOL IN AN AUTOMOBILE MANUFACTU...
 
Lean management in textile processing
Lean management in textile processingLean management in textile processing
Lean management in textile processing
 
Ensemble - Process, Strategy and Performance Management
Ensemble - Process, Strategy and Performance ManagementEnsemble - Process, Strategy and Performance Management
Ensemble - Process, Strategy and Performance Management
 
Spc assignment
Spc assignmentSpc assignment
Spc assignment
 
Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations Management
 
Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Control
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Control
 
Applying Lean Sigma Into Validation
Applying Lean Sigma Into ValidationApplying Lean Sigma Into Validation
Applying Lean Sigma Into Validation
 
Quality in operations management
Quality in operations managementQuality in operations management
Quality in operations management
 
Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210Measurement-Process-Effectiveness_paper_updated210
Measurement-Process-Effectiveness_paper_updated210
 
Morrisons session 3
Morrisons session 3Morrisons session 3
Morrisons session 3
 

More from Jitesh Gaurav (20)

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 
Weld material
Weld materialWeld material
Weld material
 
Spi link
Spi linkSpi link
Spi link
 
6 Sigma - Chapter5
6 Sigma - Chapter56 Sigma - Chapter5
6 Sigma - Chapter5
 
6 Sigma - Chapter4
6 Sigma - Chapter46 Sigma - Chapter4
6 Sigma - Chapter4
 
Pattern production
Pattern productionPattern production
Pattern production
 
smed
smedsmed
smed
 
Methods of kaizen
Methods of kaizenMethods of kaizen
Methods of kaizen
 
Dfmea rating
Dfmea ratingDfmea rating
Dfmea rating
 
Qip
QipQip
Qip
 
Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]
 
Tqm
TqmTqm
Tqm
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Failure mode effect_analysis_fmea
Failure mode effect_analysis_fmeaFailure mode effect_analysis_fmea
Failure mode effect_analysis_fmea
 
Dubtec hgcc[1]
Dubtec hgcc[1]Dubtec hgcc[1]
Dubtec hgcc[1]
 
Six sigma11
Six sigma11Six sigma11
Six sigma11
 
Six sigma[2]
Six sigma[2]Six sigma[2]
Six sigma[2]
 
Six sigma training
Six sigma trainingSix sigma training
Six sigma training
 
Six sigma
Six sigmaSix sigma
Six sigma
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

6 Sigma - Chapter2

  • 1. Page 1 of 2 © Copyright 2004, All Rights Reserved. Edutech Dimensions Pvt. Ltd. Chapter 2: Process Aim This chapter focuses on processes, defines the three process analysis and process control methods and describes one of them i.e., Performance statistics, in detail. What is a process? A process is a combination of machinery, materials, procedures and manpower that are used to produce a product or deliver a service. A process reveals information or data. Six Sigma methodology collects this data to accurately assess the time, waste, defects or other variations associated with a process. And this provides the information needed to improve the process itself. Take for example, the customer complaint handling process. The quality of this process could be quantified using certain parameters like the number of complaints received, the response time for each complaint and reduced repetitiveness of the same complaint. This is the data given out by the process. To enhance any of these parameters, say to reduce the response cycle time, action needs to be taken over the entire process. So the data from the process is used to improve the entire process. Key Characteristics The features in a product or service that are most important to the user are called the key characteristics of a product. Typically, you would look at features that are most important to the customer and call these the Key characteristics. For example, while developing a software for the integration of databases and legacy applications for a client, the emphasis would be on a bug free solution, interoperability, stability and of course, on the client not losing any of his old databases. Statistical process control and capability measures should be applied to key characteristics. Non-key characteristics are not unimportant. They will still receive the same attention they have received traditionally. By focusing on the Key characteristics, quality teams over time can analyze and control most, if not all, of a company’s processes.
  • 2. Page 2 of 2 © Copyright 2004, All Rights Reserved. Edutech Dimensions Pvt. Ltd. Another way of looking at key characteristics is to use the loss function concept. From this point of view, key characteristics are those whose variations cause the greatest loss and would possess steep sided loss functions. This would indicate significant potential losses owing to variation. Flat loss function indicates low potential losses and represents non-key characteristics. Action on the Key Characteristic of the process Actions on a process are most economical when taken on key-characteristics varying far from target value. This maintains stability and variations within acceptable limits. Action taken on output is not economical. Unless the root cause is removed, the problem or non-conformance may appear once again. Focusing on key characteristics provides a method to allocate quality resources in the most effective manner Summary 1. Any repetitive action constitutes a “process” and is a combination of machinery, materials, procedures and so forth that are used to produce a product or deliver a service. 2. Six Sigma methodology collects data to assess the time, waste, defects or other variations associated with each process and uses these to improve the process. 3. Key characteristics reflect manufacturing situations where there is a high probability of a defect occurring or going undetected should it occur. 4. Six Sigma focuses on key characteristics and reduces the chance of defects to a large extent.