APPLYING LEAN 
TECHNIQUES IN THE 
INFRASTRUCTURE 
PROJECT 
Jubail Industrial City , Suadi Arabia 
Presented By- 
Ameer Hasan 
DFT 7 
NIFT KANNUR 
ameerhasan.nift@gmail.com
Lean Case Study Brief - Jubail Industrial City 
The case study performed for this study focused on Jubail Industrial City in Saudi 
Arabia. 
 It is a planned city of 140,000, including facilities and infrastructure construction. 
 Bechtel used a value stream map, system diagnosis, process simulation, pull 
operations, standard work, and improved supply chain logistics to improve the 
construction performance, identify wastes and drastically improve productivity. 
NIFT Kannur - DFT (By - Ameer Hasan) 
2
Jubail Industrial City - Location 
• Jubail Industrial City' Jubail Industrial City (Figure) is one of the largest 
civil engineering projects in the world today. 
• The city serves 40 primary and secondary industries including oil 
refining, petrochemicals and steel as well as hosts a community for 
140,000 residents. 
• Bechtel has been in charge of managing the project on behalf of the 
Royal Commission for Jubail and Yanbu for the past 30 years. 
• Bechtel has provided engineering, procurement, and construction 
management of all of the facilities and the accompanying infrastructure 
for the city located in Northeast Saudi Arabia. 
NIFT Kannur - DFT (By - Ameer Hasan) 
3
Jubail Industrial City Delay 
 In 2008, the Royal Commission re-launched its "Home Ownership Program" for its employees. 
 The first set of construction contracts for the 415 villas was awarded in April 2008. 
 In May 2009, the contractor had failed to erect and complete the super structure for a single 
villa. 
 Due to this delay, Bechtel initiated a system diagnosis to determine the root causes. 
 The targeted area of improvement was increasing the number of exterior insulated panels that 
were delivered to the construction site. 
 The baseline performance target was 18 panels per day which had to be increased by 300% to 
75 panels per day. 
 The team needed to find the best way to achieve this goal in order to get construction of the city 
back on track. 
NIFT Kannur - DFT (By - Ameer Hasan) 
4
Jubail Industrial City: Waste Identified 
 In order to thoroughly understand the current 
state of the process the improvement team 
created a VSM. 
 This map was used to identify the causes for 
delay and determine where the inefficiencies 
were occurring. 
The VSM focused on the cycle from mixing the 
batch of concrete through to transporting 
panels to the site. 
The basic panel cycle is shown in Figure. 
NIFT Kannur - DFT (By - Ameer Hasan) 
5
Jubail Industrial City: Waste Identified 
 The team was looking for 
evidence of waste in the 
process which could be 
improved. 
 The team found five main 
wastes that were 
impacting the success of 
the project as seen in 
Figure 
NIFT Kannur - DFT (By - Ameer Hasan) 
6
Analysing the wastes in the project 
The assessment was made that the contractor had the basic resources in 
place; the deficiencies were due to 
 leadership, 
 The process, and 
 control of the project. 
In order to address the new issues the team identified seven key areas of 
focus and used six Lean tools to establish the performance metrics and 
remedial measures to determine the current and desired performance. 
NIFT Kannur - DFT (By - Ameer Hasan) 
7
Analysing the wastes in the project 
The seven improvement areas the team focused on were: 
• 1) Organization/Leadership; 
• 2) Process/Flow; 
• 3) Waste Nisual Controls; 
• 4) Pull Systems; 
• 5) Standard Work; 
• 6) Resource Configuration; and 
• 7) Logistics. 
NIFT Kannur - DFT (By - Ameer Hasan) 
8
Analysing the wastes in the project 
• These seven areas were analyzed using the following six Lean 
tools: 
• 1) Value Stream Mapping 
• 2) Simulation/Modeling 
• 3) Gemba/Kaizen 
• 4) Takt Time/Pitch 
• 5) Work Balancing; and 
• 6) Control/Capability Charts. 
NIFT Kannur - DFT (By - Ameer Hasan) 
9
Improvement Process 
NIFT Kannur - DFT (By - Ameer Hasan) 
10
Improved Leadership/Supervision 
The team found that there was a lack of top down supervision and this had crippled 
the project's operations. 
To correct this matter, the contractor realized that they had to break down 
communication silos and create a collaborative environment. 
This was done by first identifying a plant manager as well as a general site 
superintendent. 
Additionally, four foremen were appointed to six different production areas, and a full 
time quality engineer was hired to reduce defects. 
 These efforts helped to boost team morale and get the project back on track. 
NIFT Kannur - DFT (By - Ameer Hasan) 
11
Optimized Process Flow Through Increased 
Resource Utilization 
A process simulation was performed on the pre-cast facility and significant 
queuing time was identified for both the Gantry Cranes and the Concrete 
Bucket. 
Resources were quickly reallocated and two Gantry Cranes were then 
dedicated to the production area instead of the one shared crane. 
An additional concrete bucket was also introduced to speed up the casting 
process. 
These as well as a few other adjustments led to constant work on the 
production line and created a higher daily throughput. 
NIFT Kannur - DFT (By - Ameer Hasan) 
12
Eliminated Waste through Better Inventory 
Management 
Reconfiguration of the Panel Stockyard was recommended for better 
access and control as it was a major bottleneck of the production process. 
 The yard was unorganized which led to double handling while moving 
and storing panels as inventory built up. 
To correct the bottleneck issue, the team utilized a grid system which 
provided an efficient method for correctly storing and locating panels. 
Also, an extra transportation lane was added in order to load the panels 
more effectively. 
NIFT Kannur - DFT (By - Ameer Hasan) 
13
Transitioned to Pull Versus Push Operations 
 It was discovered that the fabrication crew was producing panels that were not 
needed immediately on site, which resulted in large inventory build-up. 
To correct this, the fabrication crew worked with the contractor to develop daily 
production schedules to determine which panels needed to be delivered and 
when. 
This helped the crew to develop a Takt Time (see Glossary) in which they found a 
measurement of four panels an hour was required to achieve the 75 panels per 
day requirement. 
This effort led to increased productivity and collaboration on the project. 
NIFT Kannur - DFT (By - Ameer Hasan) 
14
Documented Standard Work 
A lack of standard activities with clear roles, responsibilities, and 
accountabilities led to low craft productivity. 
 The improvement team worked with site management to create 
uniform standard work for both shifts and created a procedure-based 
mode of operations. 
As a result of standard methods, process cycle efficiency increased 
from 6.6% to 22%. 
NIFT Kannur - DFT (By - Ameer Hasan) 
15
Expanded Sandblasting Area with Dedicated 
Resources 
A major bottleneck in the flow of the panels was the lack of sand 
blasting equipment and a secure and safe area in which to work. 
 The improvement team found that the crew size had to be 
increased from two to ten in order to handle the demand of the 
project. 
 Additionally, a new sand blasting area was created and one tower 
crane and two mobile cranes were dedicated solely to this 
operation. 
NIFT Kannur - DFT (By - Ameer Hasan) 
16
Improved Logistics and Supply Chain 
Long turnaround time of panel delivery trucks was cited as a major 
delay due to the fact that one truck was delivering panels to many 
different locations. 
To solve this inefficiency, the stockyard crew was instructed to load 
the panels in clusters of panels that were to be delivered to the 
same location. 
 This helped speed up deliveries and reduce cycle time. 
NIFT Kannur - DFT (By - Ameer Hasan) 
17
Conclusion 18 
Jubail Improvement Results 
NIFT Kannur - DFT (By - Ameer Hasan)
By moving through these steps, 
 The project was able to achieve a 300% productivity gain in the span of one month due to the 
implementation of the results from using LPD tools. 
1. Further data collection and analysis confirmed that the process was in statistical control and that the 
contractor was able to increase the mean output of panels to 80 per day, or a 44% increase from the 
baseline. 
2. Further analysis was conducted in order to confirm that the process was producing consistently and was 
capable of meeting the specifications. 
3. It was determined with a 95% Confidence Level that the improved process would deliver the required 
output 87% of the time. 
NIFT Kannur - DFT (By - Ameer Hasan) 
19
THANK YOU 
National Institute of Fashion Technology , Kannur (India) 
Presented By- 
Ameer Hasan Malik 
Ameerhasan.nift@gmail.com

More Related Content

What's hot

ITFT - Project Management
ITFT - Project ManagementITFT - Project Management
ITFT - Project ManagementPooja
 
Quebec Bridge Collapse - A Case Study
Quebec Bridge Collapse - A Case StudyQuebec Bridge Collapse - A Case Study
Quebec Bridge Collapse - A Case StudyThings Simplified
 
The Untold Story of Konkan Railway
The Untold Story of Konkan RailwayThe Untold Story of Konkan Railway
The Untold Story of Konkan RailwayRohit Dhoundiyal
 
Ropeways in nepal a report by dipak gewali, ajaya dixit and madhukar upadhyaya
Ropeways in nepal a report by dipak gewali, ajaya dixit and madhukar upadhyaya Ropeways in nepal a report by dipak gewali, ajaya dixit and madhukar upadhyaya
Ropeways in nepal a report by dipak gewali, ajaya dixit and madhukar upadhyaya Bhim Upadhyaya
 
Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyMohit Gaur
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)Gurjit Kaur Kaler
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 
Summary chunnel tunnel project management
Summary chunnel tunnel project managementSummary chunnel tunnel project management
Summary chunnel tunnel project managementNilesh Dhotre
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship reportMd Mohsin Mohsin
 
Ajmer singh CV- Urban Planner & GIS expert
Ajmer singh CV- Urban Planner & GIS expertAjmer singh CV- Urban Planner & GIS expert
Ajmer singh CV- Urban Planner & GIS expertAjmer Singh
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource SchedulingNicola2903
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge ConstructionSukhdeep Jat
 
Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)Shubham Bhargava Slideshares
 
Bandra - Worli sea link
Bandra - Worli sea linkBandra - Worli sea link
Bandra - Worli sea linkAnkita Pal
 

What's hot (20)

ITFT - Project Management
ITFT - Project ManagementITFT - Project Management
ITFT - Project Management
 
Quebec Bridge Collapse - A Case Study
Quebec Bridge Collapse - A Case StudyQuebec Bridge Collapse - A Case Study
Quebec Bridge Collapse - A Case Study
 
The Untold Story of Konkan Railway
The Untold Story of Konkan RailwayThe Untold Story of Konkan Railway
The Untold Story of Konkan Railway
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
 
Ropeways in nepal a report by dipak gewali, ajaya dixit and madhukar upadhyaya
Ropeways in nepal a report by dipak gewali, ajaya dixit and madhukar upadhyaya Ropeways in nepal a report by dipak gewali, ajaya dixit and madhukar upadhyaya
Ropeways in nepal a report by dipak gewali, ajaya dixit and madhukar upadhyaya
 
Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC Study
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Hyd metro rail
Hyd metro railHyd metro rail
Hyd metro rail
 
Ganga cleanup action plan
Ganga cleanup action planGanga cleanup action plan
Ganga cleanup action plan
 
Summary chunnel tunnel project management
Summary chunnel tunnel project managementSummary chunnel tunnel project management
Summary chunnel tunnel project management
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship report
 
Ajmer singh CV- Urban Planner & GIS expert
Ajmer singh CV- Urban Planner & GIS expertAjmer singh CV- Urban Planner & GIS expert
Ajmer singh CV- Urban Planner & GIS expert
 
Resource Scheduling
Resource SchedulingResource Scheduling
Resource Scheduling
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
Internship review (Civil Engineering)
Internship review (Civil Engineering)Internship review (Civil Engineering)
Internship review (Civil Engineering)
 
Bandra Worli Sea Link
Bandra Worli Sea LinkBandra Worli Sea Link
Bandra Worli Sea Link
 
Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)
 
Bandra - Worli sea link
Bandra - Worli sea linkBandra - Worli sea link
Bandra - Worli sea link
 
REVIT TEST.pdf
REVIT TEST.pdfREVIT TEST.pdf
REVIT TEST.pdf
 

Viewers also liked

LEAN SOFTWARE DEVELOPMENT: A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...
LEAN SOFTWARE DEVELOPMENT:  A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...LEAN SOFTWARE DEVELOPMENT:  A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...
LEAN SOFTWARE DEVELOPMENT: A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...Mehran Misaghi
 
Lean forward case study at Cisco
Lean forward case study at CiscoLean forward case study at Cisco
Lean forward case study at CiscoMudit Agarwal
 
Quality Systems Evaluation and Upgradation _Allen solly and Van Heusen Womens...
Quality Systems Evaluation and Upgradation _Allen solly and Van Heusen Womens...Quality Systems Evaluation and Upgradation _Allen solly and Van Heusen Womens...
Quality Systems Evaluation and Upgradation _Allen solly and Van Heusen Womens...Anusha Murthy
 
Lean Software management: BBC Worldwide case study
Lean Software management: BBC Worldwide case studyLean Software management: BBC Worldwide case study
Lean Software management: BBC Worldwide case studyOperae Partners
 
Take advantage of new trends in agile: Iterationless Kanban and Continuous De...
Take advantage of new trends in agile: Iterationless Kanban and Continuous De...Take advantage of new trends in agile: Iterationless Kanban and Continuous De...
Take advantage of new trends in agile: Iterationless Kanban and Continuous De...Atlassian
 
A MEI Lean IT case study - European Lean IT Summit 2012
A MEI Lean IT case study - European Lean IT Summit 2012 A MEI Lean IT case study - European Lean IT Summit 2012
A MEI Lean IT case study - European Lean IT Summit 2012 Institut Lean France
 
Agile & Lean & Kanban in the Real World - A Case Study
Agile & Lean & Kanban in the Real World - A Case StudyAgile & Lean & Kanban in the Real World - A Case Study
Agile & Lean & Kanban in the Real World - A Case StudyRussell Pannone
 
Project Work presentation
Project Work  presentationProject Work  presentation
Project Work presentationShaif Uddin
 
Case Study - Lean Implementation (Manufacturing)
Case Study - Lean Implementation (Manufacturing)Case Study - Lean Implementation (Manufacturing)
Case Study - Lean Implementation (Manufacturing)Business Impact UK Ltd
 
lean management- case study on jaguar
lean management- case study on jaguarlean management- case study on jaguar
lean management- case study on jaguarRachita Kochhar
 
Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study Ananth Palaniappan
 

Viewers also liked (15)

LEAN SOFTWARE DEVELOPMENT: A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...
LEAN SOFTWARE DEVELOPMENT:  A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...LEAN SOFTWARE DEVELOPMENT:  A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...
LEAN SOFTWARE DEVELOPMENT: A CASE STUDY IN A MEDIUM-SIZED COMPANY IN BRAZILI...
 
Lean forward case study at Cisco
Lean forward case study at CiscoLean forward case study at Cisco
Lean forward case study at Cisco
 
Lean software management bbc worldwide case study nov less 2011
Lean software management bbc worldwide case study nov less  2011Lean software management bbc worldwide case study nov less  2011
Lean software management bbc worldwide case study nov less 2011
 
Quality Systems Evaluation and Upgradation _Allen solly and Van Heusen Womens...
Quality Systems Evaluation and Upgradation _Allen solly and Van Heusen Womens...Quality Systems Evaluation and Upgradation _Allen solly and Van Heusen Womens...
Quality Systems Evaluation and Upgradation _Allen solly and Van Heusen Womens...
 
Case Study Lean Scm Dell
Case Study Lean Scm DellCase Study Lean Scm Dell
Case Study Lean Scm Dell
 
Lean Software management: BBC Worldwide case study
Lean Software management: BBC Worldwide case studyLean Software management: BBC Worldwide case study
Lean Software management: BBC Worldwide case study
 
Take advantage of new trends in agile: Iterationless Kanban and Continuous De...
Take advantage of new trends in agile: Iterationless Kanban and Continuous De...Take advantage of new trends in agile: Iterationless Kanban and Continuous De...
Take advantage of new trends in agile: Iterationless Kanban and Continuous De...
 
A MEI Lean IT case study - European Lean IT Summit 2012
A MEI Lean IT case study - European Lean IT Summit 2012 A MEI Lean IT case study - European Lean IT Summit 2012
A MEI Lean IT case study - European Lean IT Summit 2012
 
Agile & Lean & Kanban in the Real World - A Case Study
Agile & Lean & Kanban in the Real World - A Case StudyAgile & Lean & Kanban in the Real World - A Case Study
Agile & Lean & Kanban in the Real World - A Case Study
 
Project Work presentation
Project Work  presentationProject Work  presentation
Project Work presentation
 
Lean vs scrum
Lean vs scrumLean vs scrum
Lean vs scrum
 
Case Study - Lean Implementation (Manufacturing)
Case Study - Lean Implementation (Manufacturing)Case Study - Lean Implementation (Manufacturing)
Case Study - Lean Implementation (Manufacturing)
 
lean management- case study on jaguar
lean management- case study on jaguarlean management- case study on jaguar
lean management- case study on jaguar
 
Efficient Android Threading
Efficient Android ThreadingEfficient Android Threading
Efficient Android Threading
 
Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study Lean Manufacturing Implementation - Case Study
Lean Manufacturing Implementation - Case Study
 

Similar to Implementation of Lean - Case Study

RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Sagar Sangam Sahu
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
The Cleaner Seas Project Alliance
The Cleaner Seas Project AllianceThe Cleaner Seas Project Alliance
The Cleaner Seas Project AllianceUGL Limited
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in constructionKartikeya Pandey
 
SumitGaur_Resume
SumitGaur_ResumeSumitGaur_Resume
SumitGaur_ResumeSumit Gaur
 
Longwall Improvement at Kestrel Mine
Longwall Improvement at Kestrel MineLongwall Improvement at Kestrel Mine
Longwall Improvement at Kestrel MineJohn Coughlan
 
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina
 
Blasting inprovement techniques
Blasting inprovement techniquesBlasting inprovement techniques
Blasting inprovement techniquesKrishna Deo Prasad
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaNarendra Vasudeva
 
Improvement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream MappingImprovement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream Mappingijsrd.com
 
Productivity Improvement Study
Productivity Improvement StudyProductivity Improvement Study
Productivity Improvement Studysaranshshah
 

Similar to Implementation of Lean - Case Study (20)

RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron
 
Resume rahul iyer jan 2014 vietnam
Resume rahul iyer jan 2014 vietnamResume rahul iyer jan 2014 vietnam
Resume rahul iyer jan 2014 vietnam
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
The Cleaner Seas Project Alliance
The Cleaner Seas Project AllianceThe Cleaner Seas Project Alliance
The Cleaner Seas Project Alliance
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in construction
 
SumitGaur_Resume
SumitGaur_ResumeSumitGaur_Resume
SumitGaur_Resume
 
Longwall Improvement at Kestrel Mine
Longwall Improvement at Kestrel MineLongwall Improvement at Kestrel Mine
Longwall Improvement at Kestrel Mine
 
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
 
Stewartclyde4
Stewartclyde4Stewartclyde4
Stewartclyde4
 
Blasting inprovement techniques
Blasting inprovement techniquesBlasting inprovement techniques
Blasting inprovement techniques
 
Resume rahul iyer jan 2014 international
Resume rahul iyer jan 2014 internationalResume rahul iyer jan 2014 international
Resume rahul iyer jan 2014 international
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
 
Improvement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream MappingImprovement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream Mapping
 
L_Bacha_Project_Summary
L_Bacha_Project_SummaryL_Bacha_Project_Summary
L_Bacha_Project_Summary
 
EGR 590 Final GM
EGR 590 Final GM EGR 590 Final GM
EGR 590 Final GM
 
Productivity Improvement Study
Productivity Improvement StudyProductivity Improvement Study
Productivity Improvement Study
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 

Recently uploaded

“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 

Implementation of Lean - Case Study

  • 1. APPLYING LEAN TECHNIQUES IN THE INFRASTRUCTURE PROJECT Jubail Industrial City , Suadi Arabia Presented By- Ameer Hasan DFT 7 NIFT KANNUR ameerhasan.nift@gmail.com
  • 2. Lean Case Study Brief - Jubail Industrial City The case study performed for this study focused on Jubail Industrial City in Saudi Arabia.  It is a planned city of 140,000, including facilities and infrastructure construction.  Bechtel used a value stream map, system diagnosis, process simulation, pull operations, standard work, and improved supply chain logistics to improve the construction performance, identify wastes and drastically improve productivity. NIFT Kannur - DFT (By - Ameer Hasan) 2
  • 3. Jubail Industrial City - Location • Jubail Industrial City' Jubail Industrial City (Figure) is one of the largest civil engineering projects in the world today. • The city serves 40 primary and secondary industries including oil refining, petrochemicals and steel as well as hosts a community for 140,000 residents. • Bechtel has been in charge of managing the project on behalf of the Royal Commission for Jubail and Yanbu for the past 30 years. • Bechtel has provided engineering, procurement, and construction management of all of the facilities and the accompanying infrastructure for the city located in Northeast Saudi Arabia. NIFT Kannur - DFT (By - Ameer Hasan) 3
  • 4. Jubail Industrial City Delay  In 2008, the Royal Commission re-launched its "Home Ownership Program" for its employees.  The first set of construction contracts for the 415 villas was awarded in April 2008.  In May 2009, the contractor had failed to erect and complete the super structure for a single villa.  Due to this delay, Bechtel initiated a system diagnosis to determine the root causes.  The targeted area of improvement was increasing the number of exterior insulated panels that were delivered to the construction site.  The baseline performance target was 18 panels per day which had to be increased by 300% to 75 panels per day.  The team needed to find the best way to achieve this goal in order to get construction of the city back on track. NIFT Kannur - DFT (By - Ameer Hasan) 4
  • 5. Jubail Industrial City: Waste Identified  In order to thoroughly understand the current state of the process the improvement team created a VSM.  This map was used to identify the causes for delay and determine where the inefficiencies were occurring. The VSM focused on the cycle from mixing the batch of concrete through to transporting panels to the site. The basic panel cycle is shown in Figure. NIFT Kannur - DFT (By - Ameer Hasan) 5
  • 6. Jubail Industrial City: Waste Identified  The team was looking for evidence of waste in the process which could be improved.  The team found five main wastes that were impacting the success of the project as seen in Figure NIFT Kannur - DFT (By - Ameer Hasan) 6
  • 7. Analysing the wastes in the project The assessment was made that the contractor had the basic resources in place; the deficiencies were due to  leadership,  The process, and  control of the project. In order to address the new issues the team identified seven key areas of focus and used six Lean tools to establish the performance metrics and remedial measures to determine the current and desired performance. NIFT Kannur - DFT (By - Ameer Hasan) 7
  • 8. Analysing the wastes in the project The seven improvement areas the team focused on were: • 1) Organization/Leadership; • 2) Process/Flow; • 3) Waste Nisual Controls; • 4) Pull Systems; • 5) Standard Work; • 6) Resource Configuration; and • 7) Logistics. NIFT Kannur - DFT (By - Ameer Hasan) 8
  • 9. Analysing the wastes in the project • These seven areas were analyzed using the following six Lean tools: • 1) Value Stream Mapping • 2) Simulation/Modeling • 3) Gemba/Kaizen • 4) Takt Time/Pitch • 5) Work Balancing; and • 6) Control/Capability Charts. NIFT Kannur - DFT (By - Ameer Hasan) 9
  • 10. Improvement Process NIFT Kannur - DFT (By - Ameer Hasan) 10
  • 11. Improved Leadership/Supervision The team found that there was a lack of top down supervision and this had crippled the project's operations. To correct this matter, the contractor realized that they had to break down communication silos and create a collaborative environment. This was done by first identifying a plant manager as well as a general site superintendent. Additionally, four foremen were appointed to six different production areas, and a full time quality engineer was hired to reduce defects.  These efforts helped to boost team morale and get the project back on track. NIFT Kannur - DFT (By - Ameer Hasan) 11
  • 12. Optimized Process Flow Through Increased Resource Utilization A process simulation was performed on the pre-cast facility and significant queuing time was identified for both the Gantry Cranes and the Concrete Bucket. Resources were quickly reallocated and two Gantry Cranes were then dedicated to the production area instead of the one shared crane. An additional concrete bucket was also introduced to speed up the casting process. These as well as a few other adjustments led to constant work on the production line and created a higher daily throughput. NIFT Kannur - DFT (By - Ameer Hasan) 12
  • 13. Eliminated Waste through Better Inventory Management Reconfiguration of the Panel Stockyard was recommended for better access and control as it was a major bottleneck of the production process.  The yard was unorganized which led to double handling while moving and storing panels as inventory built up. To correct the bottleneck issue, the team utilized a grid system which provided an efficient method for correctly storing and locating panels. Also, an extra transportation lane was added in order to load the panels more effectively. NIFT Kannur - DFT (By - Ameer Hasan) 13
  • 14. Transitioned to Pull Versus Push Operations  It was discovered that the fabrication crew was producing panels that were not needed immediately on site, which resulted in large inventory build-up. To correct this, the fabrication crew worked with the contractor to develop daily production schedules to determine which panels needed to be delivered and when. This helped the crew to develop a Takt Time (see Glossary) in which they found a measurement of four panels an hour was required to achieve the 75 panels per day requirement. This effort led to increased productivity and collaboration on the project. NIFT Kannur - DFT (By - Ameer Hasan) 14
  • 15. Documented Standard Work A lack of standard activities with clear roles, responsibilities, and accountabilities led to low craft productivity.  The improvement team worked with site management to create uniform standard work for both shifts and created a procedure-based mode of operations. As a result of standard methods, process cycle efficiency increased from 6.6% to 22%. NIFT Kannur - DFT (By - Ameer Hasan) 15
  • 16. Expanded Sandblasting Area with Dedicated Resources A major bottleneck in the flow of the panels was the lack of sand blasting equipment and a secure and safe area in which to work.  The improvement team found that the crew size had to be increased from two to ten in order to handle the demand of the project.  Additionally, a new sand blasting area was created and one tower crane and two mobile cranes were dedicated solely to this operation. NIFT Kannur - DFT (By - Ameer Hasan) 16
  • 17. Improved Logistics and Supply Chain Long turnaround time of panel delivery trucks was cited as a major delay due to the fact that one truck was delivering panels to many different locations. To solve this inefficiency, the stockyard crew was instructed to load the panels in clusters of panels that were to be delivered to the same location.  This helped speed up deliveries and reduce cycle time. NIFT Kannur - DFT (By - Ameer Hasan) 17
  • 18. Conclusion 18 Jubail Improvement Results NIFT Kannur - DFT (By - Ameer Hasan)
  • 19. By moving through these steps,  The project was able to achieve a 300% productivity gain in the span of one month due to the implementation of the results from using LPD tools. 1. Further data collection and analysis confirmed that the process was in statistical control and that the contractor was able to increase the mean output of panels to 80 per day, or a 44% increase from the baseline. 2. Further analysis was conducted in order to confirm that the process was producing consistently and was capable of meeting the specifications. 3. It was determined with a 95% Confidence Level that the improved process would deliver the required output 87% of the time. NIFT Kannur - DFT (By - Ameer Hasan) 19
  • 20. THANK YOU National Institute of Fashion Technology , Kannur (India) Presented By- Ameer Hasan Malik Ameerhasan.nift@gmail.com