IPE:4000- Project and Thesis
A Thesis On
IMPROVING OSH & PRODUCTIVITY OF RMG
INDUSTRIES BY IMPLEMENTING LEAN
TOOLS AND VARIOUS KEY PERFORMANCE
INDEX (KPI)
Supervised By: Dr. Mohammad Sarwar Morshed
Submitted By:
Karina Islam
 The garment industry played a pioneering role in
the development of industrial sector of
Bangladesh. Bangladesh's exports industry alone
comprised USD 31.2 billion in FY 2014-15,
81.69% of which was made up by ready-made
garments.
 Improving the productivity of RMG industries can
be profitable for our country .Productivity can
improve by applying lean tools like- 5s, JIT,
Muda, Root Cause analysis, KPIs, VSM.
 To survive and prosper in today's economic
times, companies have to consider both
-financial measures
-non-financial measures (customer &
employee satisfaction etc
 We have done our study based on a
renowned garments industry and try to
improve its overall production by improving
its schedule, layout , line balancing, OHS
structures & reducing waste .
Authors
Name
Title Sources Findings Remarks
Dragana
Velimirovic
Role &
Importance
of KPI
measureme
nt
Serbian
Journal of
Managemen
t
-way of KPI
selection
-some
practical
example
- Focused
only kpi
selection
sector
Koichi
Murata
The
Evaluation
of factory
Performanc
e Utilized
KPI with
data
envelopmen
t analysis
Journal of
the
Operation
research
society of
Japan
Constructin
g structure
of KPI
- Utilized
DEA
-focuses on
utilizing
DEA
Authors
Name
Title Sources Findings Remarks
MD.
Jahangir
Hossan
Improving
Working
Environmen
t &
Productivity
of a Sewing
floor in RMG
Inds
Kuet.ac.bd -KIZEN
focused
-Eliminate
non-value
added
activities
- Focused
only sewing
sector
P. Breslin Improving
OHS
standards in
the building
&constructi
on industry
through
safe design
Journal of
Occupation
al Health
and Safety,
Australia
and New
Zealand
Occupation
al health
-Safety
Australia:
Industries
and
resources
Authors
Name
Title Sources Findings Remarks
Antonsen,
S. (2009)
Safety
culture:
theory,
method and
improveme
nt
Ashgate Pub
Co, UK
Industrial
safety
culture
Improving
safety
standards
Productivity
required
DeJoy D.M.
(2005)
Behavior
change
versus
culture
change:
divergent
approaches
to managing
workplace
safety,
Safety
Science
Safety
culture
Maturity
model
OHS and
Productivity
model
developed
Authors
Name
Title Sources Findings Remarks
Reza
Hemmati &
Hedayat
Saboori
Short-term
bulk energy
storage
system
scheduling
for load
leveling in
unit
commitmen
t: modeling,
optimizatio
n, and
sensitivity
analysis.
Journal of
Advanced
Research
scheduling
for short
term
storage
system
focused
only storage
system
 Develop some inputs based on different criteria.
 Input data from qualitative to quantitative
expressions.
 Generate the data using engineering judgment.
 Train, test and check these data using Trial and
Error Method (TEM).
 Determine the least error.
 Develop FIS model using coding.
 Measure the ultimate output key performance
index. (KPI)
 Find the output decision
 What Is Scheduling?
Assigning an appropriate number of workers to
the jobs during each day of work is called
scheduling. Scheduling is that phase of
production control which rates the work in the
order of its priority and then provides for its
release to the plant at the proper time and in
the correct sequence
 Step 1: Identify Available Time
 Step 2: Schedule Essential Actions
 Step 3: Schedule High-Priority Activities
 Step 4: Schedule Contingency Time
 Step 5: Schedule Discretionary Time
 Step 6: Analyze Your Activities
 Scheduling is the way we actually manage a project.
Without scheduling, nothing or nobody is managing
the project and hence amounts to failure of a
project. Scheduling describes guidance and pathway
for a project to run.
 It defines certain milestones and deliverables which
need to be achieved on a timely basis for successful
completion of a project. Monitoring the schedule
provides an idea of the impact the current problems
are having on the project, and provides opportunities
to enhance or reduce the scope of a milestone/phase
in the project.
Category Quantity/Month
(May)
Quantity/Month
(May, June, July)
Order
Percentage
Allocated Number
of
Machi
nes
A 198518 577100 23% 1
5
B 9282 301076 12% 8
C 48536 125456 5% 3
D 131674 351354 14% 9
E 7316 100320 4% 3
F 31547 97312 3.8% 3
G 91440 378256 15% 9
H 4209 4209 0.17% Safety Machines of 15
for
these rest of irregular
categories against
23.2% order
percentages
I 4209 4209 0.17%
J 0 30359 1.2%
Others 0 539488 21.5%
Total 802407 2509130 99.84% 6
5
 We use lekin software for our desired
scheduling.We use it in sewing
section,washing section and iron section.
1. Accuracy
2. Security
3. People Impact
The layout of an operation is concerned with
the physical location of its transforming
resources, that is deciding where to put the
facilities, machines, equipments and other
staffs in the operation
 Facilitate attainment of product or service
quality
 Use workers & space efficiently
 Avoid bottlenecks
 Minimize unnecessary material handling cost
 Eliminate unnecessary movement of workers
or materials
 Minimize production time or customer
service time
 Design for safety
 Requires sustainable investment of money &
effort
 Involves long term commitments
 Has significant impact on cost & efficiency of
short term operations
 Process Layout
 Product Layout
 Fixed position Layout
 Cellular / Combination Layout
In our thesis work , we worked on cellular
layout
Line balancing means allocation of machine or work to
individual operation.
 In garments industry , line balancing is the process of
-Selecting an effective production line
-With competent machines regarding to worker
-To produce a specific order
- A certain time deadline
 We used line balancing technique to achieve :
1.The minimization of the number of
workstations
2.The minimization of cycle time
3.The maximization of workload smoothness
4. The maximization of work relatedness
- To improve per day production
- To minimize the production cost
 To maximize the production
 To improve per day production
 To minimize the production cost
 To find out the wasting time during a product making and
to minimize the wasting time
 Find out the problem restricting the production,
generating proper solutions and implement them in a
proper way
 To analyze what affects productivity in respect to a
garment factory
 To develop the best method
 To balance the line for best utilization of men , machine
and material.
Process Washing Ironing Sewing PQC Packing
Available
work
time(min/d
ay)
480 480 480 480 480
Demand
rate
(units/day)
2500 2500 2500 2500 2500
Takt time
(min/50unit
)
10 10 10 10 10
Current
loading
(min/50unit
)
15 15 10 7 5
Target
Operation Capacity/hour Target/hour
Washing 200 313
Ironing 200 313
Sewing 300 313
PQC 428 313
Packing 600 313
Balancing case no.1:In Washing section the required capacity
will be gained when we add extra 7 machines. Then the no of
machines will =(12+7)=19.
Balancing case no.2:In Ironing section the required capacity
will be gained when we add additional 6 machines. Then the
no of machines will be=(10+6)=16.
Balancing case no.3: In PQC section we remove 5 machines
.Then the no of machines will be =(20-5)=15.
Balancing case no.4 :In packing section, there are 17
workstations available. If we remove 8 workstations, then
the required capacity will be gained.
When we balance these all sections, all of these sections will
follow the Takt time(10 min).
Process Washing Ironing Sewing PQC Packing
Available
Work time
(min/day)
480 480 480 480 480
Demand rate
(units/day)
2500 2500 2500 2500 2500
Takt time
(min/50
units)
10 10 10 10 10
Current load –
Ing(min/50
units)
9.58 9.58 10 9.58 9.58
0
2
4
6
8
10
12
14
16
Washing Ironing Sewing PQC Packing
Loading(min/50 units)
Target
Lean manufacturing:
Eliminating any kind of waste within a manufacturing system that
does not add value to the product is called ‘lean manufacturing’
or ‘lean production’, often simply lean.
Muda:
Anything in the manufacturing process that does not add value
from the customer’s perspective.
VSM( Value Stream Map):
Value stream mapping (VSM) is a lean manufacturing tool that
seeks to map a process from supplier to customer, highlighting
the flows of product and information and identifying delays
and non-value adding processes.
Waste Amount
Overproduction -
Waiting 15 sec (for m/c in iron section)
12sec (for WIP product in sewing section)
Transport -
Motion 9sec (in sewing section)
Over processing -
Inventory -
Defects Avg 2 defects/batch
Process Name Washing Iron Sewing
Cycle time (secs) 76 75 69
Average Changeover/day 1 1 1
Changeover time (secs) 0 0 18
Batch Size 300 300 300
Effective Cycle Time (secs) 76 75 87
WIP Inventory 0 0 43
Available time (secs) 43200 43200 43200
Uptime 100% 100% 99.95%
Iron Section Sewing section
Before lean tools
implementation
After lean tools
implementation
Before lean tools
implementation
After lean tools
implementation
Effective cycle time
(secs)
75 62 87 77
WIP inventory 0 0 43 19
Changeover time (secs) 0 0 18 15
0
50
100
150
200
250
value added time non value added time
before lean
after lean
21
195
180
43
What is KPI?
Key performance indicators (KPI) are a set of
quantifiable measures that a company uses
to gauge its performance in terms of meeting
their strategic and operational goals over
time.
Also referred as Key Success Indicator(KSI)
Why Should KPI Analyzing is needed?
 Determine present performance level
 Assess whether its manufacturing system
need to be improved
 Analyze where need improvements
 Work on that critical points and improve it
 By improving keeps a company on track
In this study for assessment of a RMG industry's
maturity mainly focuses on two sectors –
 OHS maturity assessment
 Lean maturity assessment.
 OHS structure
 Accident Investigation
 Targets & Performance Measurement(OHS)
 Welfare & Job satisfaction
 Workforce Involvement for OHS policy
 Employee Involvement in improvement
 Training for improvement
 Value Stream Mapping
 5S/ Housekeeping
 Preventive Maintenance
For Analyzing KPIs ANFIS tool has been used
What is ANFIS?
 Adaptive Neuro-Fuzzy Inference System
 Similarly to neural networks
 it integrates both neural networks and Fuzzy logic
principles, it has potential to capture the benefits of
both in a single framework
How it works?
 Using a given input/output data set, the toolbox
function ANFIS constructs a fuzzy inference system
(FIS)
 Whose membership function parameters are tuned
(adjusted) using either a back propagation algorithm
alone or in combination with a least squares type of
method. This adjustment allows your fuzzy systems
to learn from the data they are modeling.
Load DATA
Training Error
Design Fuzzy Logic
Insert Membership
Function
Insert Rules
Run ANFIS Model
Structure
 Step1: Load data in ANFIS  Step 2: Fuzzy Logic design
Step 3: Insert MFs for Input & Output
 Step 4: Insert Rules  Step 5: View Rules
 Step 6: Final ANFIS Structure
 For OHS Maturity Assessment : 2.7 (poor but acceptable)
 For Lean Maturity Assessment : 3.3 (Acceptable)
 Output of OHS M.A  Output of Lean M.A
 Expanded into more data sets.
 Implemented in different industries.
 Other methods can also be used or combined.
 Other methods can be used to determine the criteria.
 Increased sufficient data sets, more predictable data
and more precise results.
 More experts’ opinion can give the result more
accuracy.
 Increased the number of membership function or
rule, and selection input
parameters.
 Important to perform KPIs analysis.
 Necessity of performance measurement tool.
 ANFIS provide more accuracy on prediction.
 Applicable to other companies.
 Decision Support System (DSS).
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AND VARIOUS KEY PERFORMANCE INDEX (KPI)

More Related Content

What's hot

Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsTanuj Kujur
 
Lean management in textile processing
Lean management in textile processingLean management in textile processing
Lean management in textile processingIEI GSC
 
Application of Lean Manufacturing tools in Garments Industries
Application of Lean Manufacturing tools in Garments Industries Application of Lean Manufacturing tools in Garments Industries
Application of Lean Manufacturing tools in Garments Industries Nasif Chowdhury
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industryTanmoy Antu
 
Case Study Sri Lanka Lean Wip Reduction
Case Study Sri Lanka   Lean Wip ReductionCase Study Sri Lanka   Lean Wip Reduction
Case Study Sri Lanka Lean Wip ReductionJAMES_MARSH
 
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...ijtsrd
 
industrial engineering in sewing department
industrial engineering in sewing department industrial engineering in sewing department
industrial engineering in sewing department ShivamSagar13
 
Supply Chain
Supply ChainSupply Chain
Supply ChainFNian
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industryzaman parvez
 
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorRakibul Hasan
 
Toolsandmethodsof leanmanufacturing rg
Toolsandmethodsof leanmanufacturing rgToolsandmethodsof leanmanufacturing rg
Toolsandmethodsof leanmanufacturing rgNittamallik216
 
different techniques to productivity improvement
different techniques to productivity improvementdifferent techniques to productivity improvement
different techniques to productivity improvementHemant Patil
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringAmanuzzaman Aman
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Khairul Bashar
 

What's hot (20)

Kanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel InternsKanbanultimate Adi Apparel Interns
Kanbanultimate Adi Apparel Interns
 
Implementation of lean manufacturing in apparel industry
Implementation of lean manufacturing in apparel industryImplementation of lean manufacturing in apparel industry
Implementation of lean manufacturing in apparel industry
 
Lean management in textile processing
Lean management in textile processingLean management in textile processing
Lean management in textile processing
 
Application of Lean Manufacturing tools in Garments Industries
Application of Lean Manufacturing tools in Garments Industries Application of Lean Manufacturing tools in Garments Industries
Application of Lean Manufacturing tools in Garments Industries
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
 
Case Study Sri Lanka Lean Wip Reduction
Case Study Sri Lanka   Lean Wip ReductionCase Study Sri Lanka   Lean Wip Reduction
Case Study Sri Lanka Lean Wip Reduction
 
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...
Productivity Improvement using Lean Manufacturing '“ A Case Study at Muththam...
 
GSD Manual For Students
GSD Manual For StudentsGSD Manual For Students
GSD Manual For Students
 
Garment costing ppt
Garment costing pptGarment costing ppt
Garment costing ppt
 
industrial engineering in sewing department
industrial engineering in sewing department industrial engineering in sewing department
industrial engineering in sewing department
 
Supply Chain
Supply ChainSupply Chain
Supply Chain
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
 
Application of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floorApplication of industrial engineering in garments sewing floor
Application of industrial engineering in garments sewing floor
 
Toolsandmethodsof leanmanufacturing rg
Toolsandmethodsof leanmanufacturing rgToolsandmethodsof leanmanufacturing rg
Toolsandmethodsof leanmanufacturing rg
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
different techniques to productivity improvement
different techniques to productivity improvementdifferent techniques to productivity improvement
different techniques to productivity improvement
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
what is Productivity
what is  Productivitywhat is  Productivity
what is Productivity
 

Viewers also liked

Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing toolsIshmam Ahmed
 
Occupational Health & Safety Presentation
Occupational Health & Safety PresentationOccupational Health & Safety Presentation
Occupational Health & Safety PresentationMark Zeeman
 
Build Tech Startup in Bangladesh in a Lean Way
Build Tech Startup in Bangladesh in a Lean WayBuild Tech Startup in Bangladesh in a Lean Way
Build Tech Startup in Bangladesh in a Lean WayNascenia IT
 
Information and communications technologies
Information and communications technologiesInformation and communications technologies
Information and communications technologiesWilly Mutenza
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityCorey Vodvarka
 
1. introduction to process & process management
1. introduction to process & process management1. introduction to process & process management
1. introduction to process & process managementHakeem-Ur- Rehman
 
History of apparel industry in bnagladesh
History of apparel industry in bnagladeshHistory of apparel industry in bnagladesh
History of apparel industry in bnagladeshLiton Ahmed
 
Footwear industry
Footwear industryFootwear industry
Footwear industryzubinxxx
 
Top 10-violations-fy-16
Top 10-violations-fy-16Top 10-violations-fy-16
Top 10-violations-fy-16John Newquist
 
Rmg sector past present & future
Rmg sector past present & futureRmg sector past present & future
Rmg sector past present & futurerakib41
 
Quality kpi examples
Quality kpi examplesQuality kpi examples
Quality kpi examplesgallasbrows
 
The business case for safety and health at work
The business case for safety and health at workThe business case for safety and health at work
The business case for safety and health at workLuna Oliveira
 
Comparative study of compliant & non compliant RMG
Comparative study of compliant & non  compliant RMGComparative study of compliant & non  compliant RMG
Comparative study of compliant & non compliant RMGAzmir Latif Beg
 
Information System in RMG
Information System in RMGInformation System in RMG
Information System in RMGIslam Sylvia
 
Puma digital strategy
Puma digital strategyPuma digital strategy
Puma digital strategyAmanda Taylor
 

Viewers also liked (20)

Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing tools
 
Occupational Health & Safety Presentation
Occupational Health & Safety PresentationOccupational Health & Safety Presentation
Occupational Health & Safety Presentation
 
Build Tech Startup in Bangladesh in a Lean Way
Build Tech Startup in Bangladesh in a Lean WayBuild Tech Startup in Bangladesh in a Lean Way
Build Tech Startup in Bangladesh in a Lean Way
 
Information and communications technologies
Information and communications technologiesInformation and communications technologies
Information and communications technologies
 
Economic of RMG sector
Economic of RMG sectorEconomic of RMG sector
Economic of RMG sector
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
 
1. introduction to process & process management
1. introduction to process & process management1. introduction to process & process management
1. introduction to process & process management
 
10 OHS Policies
10 OHS Policies10 OHS Policies
10 OHS Policies
 
History of apparel industry in bnagladesh
History of apparel industry in bnagladeshHistory of apparel industry in bnagladesh
History of apparel industry in bnagladesh
 
Lesson 1 cn
Lesson 1 cnLesson 1 cn
Lesson 1 cn
 
Digital Artifact
Digital ArtifactDigital Artifact
Digital Artifact
 
Footwear industry
Footwear industryFootwear industry
Footwear industry
 
Top 10-violations-fy-16
Top 10-violations-fy-16Top 10-violations-fy-16
Top 10-violations-fy-16
 
Rmg sector past present & future
Rmg sector past present & futureRmg sector past present & future
Rmg sector past present & future
 
Quality kpi examples
Quality kpi examplesQuality kpi examples
Quality kpi examples
 
The business case for safety and health at work
The business case for safety and health at workThe business case for safety and health at work
The business case for safety and health at work
 
Comparative study of compliant & non compliant RMG
Comparative study of compliant & non  compliant RMGComparative study of compliant & non  compliant RMG
Comparative study of compliant & non compliant RMG
 
Information System in RMG
Information System in RMGInformation System in RMG
Information System in RMG
 
Puma digital strategy
Puma digital strategyPuma digital strategy
Puma digital strategy
 
Kpi quality assurance
Kpi quality assuranceKpi quality assurance
Kpi quality assurance
 

Similar to IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AND VARIOUS KEY PERFORMANCE INDEX (KPI)

A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringIJECSJournal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryIRJET Journal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...PERUMALSAMY M
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineeringSyed Jafri
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...IRJET Journal
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryijmech
 
About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!Mahibur Rahman
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET Journal
 
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET Journal
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudybejayrocks
 
Implementing 5 s methodology as tool for improving efficiency
Implementing 5 s methodology as tool for improving efficiencyImplementing 5 s methodology as tool for improving efficiency
Implementing 5 s methodology as tool for improving efficiencyLaukik Raut
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET Journal
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining TimeIRJET Journal
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining CellIRJET Journal
 
Production management
Production managementProduction management
Production managementVivan Kumar
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) ConceptIRJET Journal
 
Increase_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfIncrease_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfHasanSajib3
 
Submission of mba spring 2012
Submission of mba spring 2012Submission of mba spring 2012
Submission of mba spring 2012Shraddha Singh
 

Similar to IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AND VARIOUS KEY PERFORMANCE INDEX (KPI) (20)

A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
 
About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
Implementing 5 s methodology as tool for improving efficiency
Implementing 5 s methodology as tool for improving efficiencyImplementing 5 s methodology as tool for improving efficiency
Implementing 5 s methodology as tool for improving efficiency
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
 
Production management
Production managementProduction management
Production management
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
 
Increase_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdfIncrease_the_Efficiency_and_Productivity.pdf
Increase_the_Efficiency_and_Productivity.pdf
 
Submission of mba spring 2012
Submission of mba spring 2012Submission of mba spring 2012
Submission of mba spring 2012
 

Recently uploaded

Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 

IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AND VARIOUS KEY PERFORMANCE INDEX (KPI)

  • 1. IPE:4000- Project and Thesis A Thesis On IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AND VARIOUS KEY PERFORMANCE INDEX (KPI) Supervised By: Dr. Mohammad Sarwar Morshed Submitted By: Karina Islam
  • 2.
  • 3.  The garment industry played a pioneering role in the development of industrial sector of Bangladesh. Bangladesh's exports industry alone comprised USD 31.2 billion in FY 2014-15, 81.69% of which was made up by ready-made garments.  Improving the productivity of RMG industries can be profitable for our country .Productivity can improve by applying lean tools like- 5s, JIT, Muda, Root Cause analysis, KPIs, VSM.
  • 4.  To survive and prosper in today's economic times, companies have to consider both -financial measures -non-financial measures (customer & employee satisfaction etc  We have done our study based on a renowned garments industry and try to improve its overall production by improving its schedule, layout , line balancing, OHS structures & reducing waste .
  • 5. Authors Name Title Sources Findings Remarks Dragana Velimirovic Role & Importance of KPI measureme nt Serbian Journal of Managemen t -way of KPI selection -some practical example - Focused only kpi selection sector Koichi Murata The Evaluation of factory Performanc e Utilized KPI with data envelopmen t analysis Journal of the Operation research society of Japan Constructin g structure of KPI - Utilized DEA -focuses on utilizing DEA
  • 6. Authors Name Title Sources Findings Remarks MD. Jahangir Hossan Improving Working Environmen t & Productivity of a Sewing floor in RMG Inds Kuet.ac.bd -KIZEN focused -Eliminate non-value added activities - Focused only sewing sector P. Breslin Improving OHS standards in the building &constructi on industry through safe design Journal of Occupation al Health and Safety, Australia and New Zealand Occupation al health -Safety Australia: Industries and resources
  • 7. Authors Name Title Sources Findings Remarks Antonsen, S. (2009) Safety culture: theory, method and improveme nt Ashgate Pub Co, UK Industrial safety culture Improving safety standards Productivity required DeJoy D.M. (2005) Behavior change versus culture change: divergent approaches to managing workplace safety, Safety Science Safety culture Maturity model OHS and Productivity model developed
  • 8. Authors Name Title Sources Findings Remarks Reza Hemmati & Hedayat Saboori Short-term bulk energy storage system scheduling for load leveling in unit commitmen t: modeling, optimizatio n, and sensitivity analysis. Journal of Advanced Research scheduling for short term storage system focused only storage system
  • 9.  Develop some inputs based on different criteria.  Input data from qualitative to quantitative expressions.  Generate the data using engineering judgment.  Train, test and check these data using Trial and Error Method (TEM).  Determine the least error.  Develop FIS model using coding.  Measure the ultimate output key performance index. (KPI)  Find the output decision
  • 10.  What Is Scheduling? Assigning an appropriate number of workers to the jobs during each day of work is called scheduling. Scheduling is that phase of production control which rates the work in the order of its priority and then provides for its release to the plant at the proper time and in the correct sequence
  • 11.  Step 1: Identify Available Time  Step 2: Schedule Essential Actions  Step 3: Schedule High-Priority Activities  Step 4: Schedule Contingency Time  Step 5: Schedule Discretionary Time  Step 6: Analyze Your Activities
  • 12.  Scheduling is the way we actually manage a project. Without scheduling, nothing or nobody is managing the project and hence amounts to failure of a project. Scheduling describes guidance and pathway for a project to run.  It defines certain milestones and deliverables which need to be achieved on a timely basis for successful completion of a project. Monitoring the schedule provides an idea of the impact the current problems are having on the project, and provides opportunities to enhance or reduce the scope of a milestone/phase in the project.
  • 13. Category Quantity/Month (May) Quantity/Month (May, June, July) Order Percentage Allocated Number of Machi nes A 198518 577100 23% 1 5 B 9282 301076 12% 8 C 48536 125456 5% 3 D 131674 351354 14% 9 E 7316 100320 4% 3 F 31547 97312 3.8% 3 G 91440 378256 15% 9 H 4209 4209 0.17% Safety Machines of 15 for these rest of irregular categories against 23.2% order percentages I 4209 4209 0.17% J 0 30359 1.2% Others 0 539488 21.5% Total 802407 2509130 99.84% 6 5
  • 14.
  • 15.  We use lekin software for our desired scheduling.We use it in sewing section,washing section and iron section. 1. Accuracy 2. Security 3. People Impact
  • 16.
  • 17.
  • 18.
  • 19.
  • 20. The layout of an operation is concerned with the physical location of its transforming resources, that is deciding where to put the facilities, machines, equipments and other staffs in the operation
  • 21.  Facilitate attainment of product or service quality  Use workers & space efficiently  Avoid bottlenecks  Minimize unnecessary material handling cost  Eliminate unnecessary movement of workers or materials  Minimize production time or customer service time  Design for safety
  • 22.  Requires sustainable investment of money & effort  Involves long term commitments  Has significant impact on cost & efficiency of short term operations
  • 23.  Process Layout  Product Layout  Fixed position Layout  Cellular / Combination Layout In our thesis work , we worked on cellular layout
  • 24.
  • 25.
  • 26.
  • 27. Line balancing means allocation of machine or work to individual operation.  In garments industry , line balancing is the process of -Selecting an effective production line -With competent machines regarding to worker -To produce a specific order - A certain time deadline  We used line balancing technique to achieve : 1.The minimization of the number of workstations 2.The minimization of cycle time 3.The maximization of workload smoothness 4. The maximization of work relatedness - To improve per day production - To minimize the production cost
  • 28.  To maximize the production  To improve per day production  To minimize the production cost  To find out the wasting time during a product making and to minimize the wasting time  Find out the problem restricting the production, generating proper solutions and implement them in a proper way  To analyze what affects productivity in respect to a garment factory  To develop the best method  To balance the line for best utilization of men , machine and material.
  • 29.
  • 30. Process Washing Ironing Sewing PQC Packing Available work time(min/d ay) 480 480 480 480 480 Demand rate (units/day) 2500 2500 2500 2500 2500 Takt time (min/50unit ) 10 10 10 10 10 Current loading (min/50unit ) 15 15 10 7 5
  • 32. Operation Capacity/hour Target/hour Washing 200 313 Ironing 200 313 Sewing 300 313 PQC 428 313 Packing 600 313
  • 33. Balancing case no.1:In Washing section the required capacity will be gained when we add extra 7 machines. Then the no of machines will =(12+7)=19. Balancing case no.2:In Ironing section the required capacity will be gained when we add additional 6 machines. Then the no of machines will be=(10+6)=16. Balancing case no.3: In PQC section we remove 5 machines .Then the no of machines will be =(20-5)=15. Balancing case no.4 :In packing section, there are 17 workstations available. If we remove 8 workstations, then the required capacity will be gained. When we balance these all sections, all of these sections will follow the Takt time(10 min).
  • 34. Process Washing Ironing Sewing PQC Packing Available Work time (min/day) 480 480 480 480 480 Demand rate (units/day) 2500 2500 2500 2500 2500 Takt time (min/50 units) 10 10 10 10 10 Current load – Ing(min/50 units) 9.58 9.58 10 9.58 9.58
  • 35. 0 2 4 6 8 10 12 14 16 Washing Ironing Sewing PQC Packing Loading(min/50 units) Target
  • 36.
  • 37. Lean manufacturing: Eliminating any kind of waste within a manufacturing system that does not add value to the product is called ‘lean manufacturing’ or ‘lean production’, often simply lean. Muda: Anything in the manufacturing process that does not add value from the customer’s perspective. VSM( Value Stream Map): Value stream mapping (VSM) is a lean manufacturing tool that seeks to map a process from supplier to customer, highlighting the flows of product and information and identifying delays and non-value adding processes.
  • 38.
  • 39.
  • 40.
  • 41. Waste Amount Overproduction - Waiting 15 sec (for m/c in iron section) 12sec (for WIP product in sewing section) Transport - Motion 9sec (in sewing section) Over processing - Inventory - Defects Avg 2 defects/batch
  • 42. Process Name Washing Iron Sewing Cycle time (secs) 76 75 69 Average Changeover/day 1 1 1 Changeover time (secs) 0 0 18 Batch Size 300 300 300 Effective Cycle Time (secs) 76 75 87 WIP Inventory 0 0 43 Available time (secs) 43200 43200 43200 Uptime 100% 100% 99.95%
  • 43.
  • 44.
  • 45. Iron Section Sewing section Before lean tools implementation After lean tools implementation Before lean tools implementation After lean tools implementation Effective cycle time (secs) 75 62 87 77 WIP inventory 0 0 43 19 Changeover time (secs) 0 0 18 15
  • 46. 0 50 100 150 200 250 value added time non value added time before lean after lean 21 195 180 43
  • 47.
  • 48. What is KPI? Key performance indicators (KPI) are a set of quantifiable measures that a company uses to gauge its performance in terms of meeting their strategic and operational goals over time. Also referred as Key Success Indicator(KSI)
  • 49. Why Should KPI Analyzing is needed?  Determine present performance level  Assess whether its manufacturing system need to be improved  Analyze where need improvements  Work on that critical points and improve it  By improving keeps a company on track
  • 50. In this study for assessment of a RMG industry's maturity mainly focuses on two sectors –  OHS maturity assessment  Lean maturity assessment.
  • 51.  OHS structure  Accident Investigation  Targets & Performance Measurement(OHS)  Welfare & Job satisfaction  Workforce Involvement for OHS policy
  • 52.  Employee Involvement in improvement  Training for improvement  Value Stream Mapping  5S/ Housekeeping  Preventive Maintenance
  • 53. For Analyzing KPIs ANFIS tool has been used What is ANFIS?  Adaptive Neuro-Fuzzy Inference System  Similarly to neural networks  it integrates both neural networks and Fuzzy logic principles, it has potential to capture the benefits of both in a single framework
  • 54. How it works?  Using a given input/output data set, the toolbox function ANFIS constructs a fuzzy inference system (FIS)  Whose membership function parameters are tuned (adjusted) using either a back propagation algorithm alone or in combination with a least squares type of method. This adjustment allows your fuzzy systems to learn from the data they are modeling.
  • 55.
  • 56. Load DATA Training Error Design Fuzzy Logic Insert Membership Function Insert Rules Run ANFIS Model Structure
  • 57.  Step1: Load data in ANFIS  Step 2: Fuzzy Logic design
  • 58. Step 3: Insert MFs for Input & Output
  • 59.  Step 4: Insert Rules  Step 5: View Rules
  • 60.  Step 6: Final ANFIS Structure
  • 61.  For OHS Maturity Assessment : 2.7 (poor but acceptable)  For Lean Maturity Assessment : 3.3 (Acceptable)  Output of OHS M.A  Output of Lean M.A
  • 62.  Expanded into more data sets.  Implemented in different industries.  Other methods can also be used or combined.  Other methods can be used to determine the criteria.  Increased sufficient data sets, more predictable data and more precise results.  More experts’ opinion can give the result more accuracy.  Increased the number of membership function or rule, and selection input parameters.
  • 63.  Important to perform KPIs analysis.  Necessity of performance measurement tool.  ANFIS provide more accuracy on prediction.  Applicable to other companies.  Decision Support System (DSS).