The document proposes two solar power plans to provide energy for MSAG units and associated lights. Plan I involves a 1KW solar power system that would provide 5 hours of daily power and cost 7,00,366.01. Plan II is a 2KW system that would provide 10 hours of daily power and cost 9,90,943.84. Both plans would be installed by Autonic Energy Systems Pvt Ltd in collaboration with HAT Integerated Consulting Group, Inc. and use Sharp solar panels with about 20 years of lifetime. The solar systems provide clean energy without carbon emissions and would pay for themselves within 4.5 years.