1. CO2BIN Energy Solutions
Pre- Audit Questionnaire for FILLING STATION under
PSSP (Petrol Station Solarification Program)
Current Load Estimation for Industry
Installed Load In KW
Installed Load of Lighting Systems on Petrol
Pump
Installed Load of Lighting Systems of
Administrative area
Installed cooling Load of Administrative area
(fan , AC etc)
Other Loads (Computer, CCTV camera etc)
Installed No. of Dispensary Units
Total Load of Dispensary units
Total Load
NOTE: Put N.A. corresponding to load which is not applicable or have no installed capacity
How much Roof space is available?
(NOTE : The mentioned area should be un-shaded for at least 6 hrs daily )
Space Area Available (In Sqm) Area allowed for PV
installation
Area available at rooftop above
Canopy (Assuming complete usage)
Area available at rooftop above
administrative area
Total available area
*For complete ROOF usage for PV Installation put FULL USAGE in ‘Area allowed for PV installation’
Electricity bills past 6 months.
Please attach with this document photocopy electricity bills of past 6 months
Usual Power outages during specific time hours:
TIME HOUR ZONE Expected/usual power cut(No. of hours)
MH (Morning hours)-10am to 12 pm
PH (Peak hours)-12 pm to 4pm
ELH (Evening lean Hours) -4pm to 10pm
SH(Sleep hours )-10pm to 7 am
Total no. of hours
Note : The Time hour Zone have been assumed wrt to GRID and solar generation Peak hours.
2. CO2BIN Energy Solutions
Capacity of current Diesel Generator Installed?
____________________________________________________________________(in Kw)
Expenditure on DIESEL for power back up
Expenditure Amount (In Rs)
Average daily Expenditure on Diesel
Average monthly Expenditure on Diesel
NOTE : PUT whichever DATA is available monthly/daily
Diesel Generator Running Costs
Particulars
Maintenance cost (Monthly) (in Rs)
Assumed replacement time for Diesel
Generator
(in years)
Is there any current inverter back up installed?
(Yes/No) ___________________________________________________________________
If yes
Component Capacity
Inverter capacity (in Kw)
Battery backup installed (In AH)
Do you have a separate Battery bank room
(If yes then approximate area)
(yes/no)
(in sqm)
Which Components of your load would you like to bring under Solar Energy?
o Lighting Loads
o Only Dispensary Units
o Street lighting loads
put tick before required options
What is the basic motivation for you to install Solar Photovoltaic system in your organization?
o Economic benefits
o Tax benefits
o Social Reasons
o Environmental reasons
o other
put tick before required options (can be more than one)
For other, please specify
Have you ever installed solar photovoltaic system earlier in your organization or anywhere else?
(Yes/No) ___________________________________________________________________
3. CO2BIN Energy Solutions
If yes, then please describe
What would be the best solar financing option for you?
o On your own
o Through some govt. financial institution
o Through third party/investors
Put tick before required options
Please specify your views or queries about solar financing.
/