SlideShare a Scribd company logo
MED in Italy
Processo di progettazione, realizzazione e gestione del prototipo abitativo ad alta efficienza energetica
per Solar Decathlon Europe 2012
Architetto Mario Grimaudo
Energy strategy management
Contest Captain
Il team e il processo
2
MODELLO 3D
BIM – Building Information Modeling
IPD – Integrated Project Delivery
costruzione – struttura- fasi – piani di carico – liste di materiali per computo
e calcolo pesi – valutazioni energetiche statiche e dinamiche- LCA –
generazione tavole e abachi per progetto esecutivo e realizzazione
Form Production
Analysis
Form Production
Analysis
Cloud Design
Form Production
Analysis
Cloud Design
Acousti
cs
structur
e
Thermal
Lighting
CFD
Math
Parametric
Modeling
CNC
F2F
Data
Energy
Lighting
BAS HVAC
Plumbing
Structure
CAM
Site
Ops.
Furniture
Interiors
Revit
CentralCristiano
Claudio
Maria
Vincenzo
Stefano
Valeria
Pietro
Ugo
Stefano
Giulia
Mario
Andrea
Render
Mario
Mario
MODELLO 3D – BIM – MULTI-USER
Il sistema digitale di modellazione e gestione riflette la struttura “a rete”
del gruppo di progettazione, con contributi che arrivano in modo multidirezionale
e asincrono
MODELLO 3D – BIM – FASI DI CANTIERE
Il sistema digitale di modellazione e gestione include fin dall'inizio
Le fasi di cantiere, per pianficare opportunamente la sicurezza
Come richiesto dalle consegne intermedie del concorso.
MODELLO 3D – BIM – FASI DI CANTIERE
Il sistema digitale di modellazione e gestione include fin dall'inizio
Le fasi di cantiere, per pianficare opportunamente la sicurezza
Come richiesto dalle consegne intermedie del concorso.
MODELLO 3D – BIM – PIANI DI CARICO
Il sistema di progetto costruisce una relazione tra gli elementi prefabbricati
e la loro ripartizione nei piani di carico – tenendo conto delle variazioni del
progetto, ma anche di quelle dei mezzi disponibili.
MODELLO 3D – BIM – PIANI DI CARICO
Il sistema di progetto costruisce una relazione tra gli elementi prefabbricati
e la loro ripartizione nei piani di carico – tenendo conto delle variazioni del
progetto, ma anche di quelle dei mezzi disponibili.
MODELLO 3D – BIM – ORDINATIVI E COSTRUTTIVI
Il modello è stato costruito tenendo conto delle tolleranze realizzative, oltre che
dei vincoli dei diversi sistemi costruttivi, concordati con le aziende. In molti casi
le informazioni sono state direttamente trasferite alle aziende produttrici
MODELLO 3D – BIM – LIGHTING E RENDERING
Il modello include anche la modellazione dei corpi lampada e dei corpi illuminanti, in
collegamento bidirezionale con i software di analisi
MODELLO 3D – BIM – LIGHTING E RENDERING
Il modello include anche la modellazione dei corpi lampada e dei corpi illuminanti, in
collegamento bidirezionale con i software di analisi
Software: Revit MEP, Ecotect, Energy Plus – Open Studio – Window- Therm
MODELLO 3D – BIM – SIMULAZIONE ENERGETICA
Il modello include anche la modellazione dei corpi lampada e dei corpi illuminanti, in
collegamento bidirezionale con i software di analisi
MODELLO 3D – BIM – STRUTTURE
Il modello geometrico ha generato in continuo disegni e dati per il parallelo
calcolo strutturale, mantenendo sempre ferma la relazione tra la
geometria costruttiva e quella effettivamente calcolata
MODELLO 3D – BIM – STRUTTURE
Il modello geometrico ha in continuo generato disegni e dati per il parallelo
calcolo strutturale, mantenendo sempre ferma la relazione tra la
geometria costruttiva e quella effettivamente calcolata
Il progetto
27
Fate clic per modificare
il formato del testo
della struttura
Secondo livello
struttura
− Terzo livello
struttura
Quarto livello
struttura
− Quinto
livello
passiva
A3
A2
A1
A4
A5
A6
A7 A8
A9
A10
B1
B2
B3
C2
C1
C3
C4
C5
D1
D2
D3
A11
IMHOME
CONTROLSYSTEM
E3
E2
E1
F2
F3
SAIE 2012 18/10/2012
A
B
C
TEMP.& RH
TEMP.WITH INT.WALLPROBE
CO2
D LIGHT
E POWER
POSITION(under definition)F
F1
SENSORS
GRAFICI GENERATI SUL WEB
veloce
densa
ecoattenta
Dopo SDE2012?
…la sperimentazione continua…
Spin-off con alcune delle aziende partner
Solar Decathlon Europe 2014
Densità
Mobilità (approccio globale che mette insieme alloggi,
progetto urbano e trasporto pubblico)
Sobrietà (limite della potenza PV installata)
Innovazione
Grazie per l’attenzione!

More Related Content

What's hot

Iuavcamp presentazione-DesignBuilder e la razionalizzazione dell'iter progett...
Iuavcamp presentazione-DesignBuilder e la razionalizzazione dell'iter progett...Iuavcamp presentazione-DesignBuilder e la razionalizzazione dell'iter progett...
Iuavcamp presentazione-DesignBuilder e la razionalizzazione dell'iter progett...nicolesabbadin
 
I migliori motivi per lavorare in bim
I migliori motivi per lavorare in bimI migliori motivi per lavorare in bim
I migliori motivi per lavorare in bimRiccardo Romaniello
 
Iuavcamp presentazione
Iuavcamp presentazioneIuavcamp presentazione
Iuavcamp presentazioneClaudia
 
La tecnologia BIM
La tecnologia BIMLa tecnologia BIM
La tecnologia BIMIUAV
 
Iuavcamp presentazione
Iuavcamp presentazioneIuavcamp presentazione
Iuavcamp presentazionesimonemanfreo
 
LanCity Revolution 2016 - IFC: il linguaggio del BIM - Vittorio Frego (BIM So...
LanCity Revolution 2016 - IFC: il linguaggio del BIM - Vittorio Frego (BIM So...LanCity Revolution 2016 - IFC: il linguaggio del BIM - Vittorio Frego (BIM So...
LanCity Revolution 2016 - IFC: il linguaggio del BIM - Vittorio Frego (BIM So...giovanni biallo
 
Building information Modeling
Building information ModelingBuilding information Modeling
Building information ModelingValentinaMason
 
Iuavcamp presentazione (1)
Iuavcamp presentazione (1)Iuavcamp presentazione (1)
Iuavcamp presentazione (1)edoardosovrani
 
Iuavcamp presentazione definitiva-BIMserver
Iuavcamp presentazione definitiva-BIMserverIuavcamp presentazione definitiva-BIMserver
Iuavcamp presentazione definitiva-BIMserverElisa
 
La progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina CecchiniLa progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina CecchiniBIM group @ University of Padua
 
Il BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativaIl BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativaBIM group @ University of Padua
 
Perroen Vito_Presentazione
Perroen Vito_PresentazionePerroen Vito_Presentazione
Perroen Vito_Presentazioneperronevito
 

What's hot (14)

Iuavcamp presentazione-DesignBuilder e la razionalizzazione dell'iter progett...
Iuavcamp presentazione-DesignBuilder e la razionalizzazione dell'iter progett...Iuavcamp presentazione-DesignBuilder e la razionalizzazione dell'iter progett...
Iuavcamp presentazione-DesignBuilder e la razionalizzazione dell'iter progett...
 
I migliori motivi per lavorare in bim
I migliori motivi per lavorare in bimI migliori motivi per lavorare in bim
I migliori motivi per lavorare in bim
 
Iuavcamp presentazione
Iuavcamp presentazioneIuavcamp presentazione
Iuavcamp presentazione
 
La tecnologia BIM
La tecnologia BIMLa tecnologia BIM
La tecnologia BIM
 
Iuavcamp presentazione
Iuavcamp presentazioneIuavcamp presentazione
Iuavcamp presentazione
 
LanCity Revolution 2016 - IFC: il linguaggio del BIM - Vittorio Frego (BIM So...
LanCity Revolution 2016 - IFC: il linguaggio del BIM - Vittorio Frego (BIM So...LanCity Revolution 2016 - IFC: il linguaggio del BIM - Vittorio Frego (BIM So...
LanCity Revolution 2016 - IFC: il linguaggio del BIM - Vittorio Frego (BIM So...
 
Building information Modeling
Building information ModelingBuilding information Modeling
Building information Modeling
 
Iuavcamp presentazione (1)
Iuavcamp presentazione (1)Iuavcamp presentazione (1)
Iuavcamp presentazione (1)
 
Iuavcamp presentazione definitiva-BIMserver
Iuavcamp presentazione definitiva-BIMserverIuavcamp presentazione definitiva-BIMserver
Iuavcamp presentazione definitiva-BIMserver
 
Interoperabilità dei modelli informativi
Interoperabilità dei modelli informativiInteroperabilità dei modelli informativi
Interoperabilità dei modelli informativi
 
La progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina CecchiniLa progettazione energetica nella progettazione integrata - Cristina Cecchini
La progettazione energetica nella progettazione integrata - Cristina Cecchini
 
Gruppo 05 Intro Gruppo
Gruppo 05 Intro GruppoGruppo 05 Intro Gruppo
Gruppo 05 Intro Gruppo
 
Il BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativaIl BIM come srumento di controllo della fase realizzativa
Il BIM come srumento di controllo della fase realizzativa
 
Perroen Vito_Presentazione
Perroen Vito_PresentazionePerroen Vito_Presentazione
Perroen Vito_Presentazione
 

Similar to Solar Decathlon 17.04.2014 @ TIS | Mario Grimaudo (MED in Italy)

Learned lessons and suggestions from BIM applications at Italferr - Matteo Tr...
Learned lessons and suggestions from BIM applications at Italferr - Matteo Tr...Learned lessons and suggestions from BIM applications at Italferr - Matteo Tr...
Learned lessons and suggestions from BIM applications at Italferr - Matteo Tr...Giacomo Bergonzoni
 
Convegno 07-05-2024 | Presentazione Antonio De Vito
Convegno 07-05-2024 | Presentazione Antonio De VitoConvegno 07-05-2024 | Presentazione Antonio De Vito
Convegno 07-05-2024 | Presentazione Antonio De VitoServizi a rete
 
Iuavcamp presentazione
Iuavcamp presentazioneIuavcamp presentazione
Iuavcamp presentazionesimonemanfreo
 
CEIm-magazine-Novembre-Dicembre-2022
CEIm-magazine-Novembre-Dicembre-2022CEIm-magazine-Novembre-Dicembre-2022
CEIm-magazine-Novembre-Dicembre-2022Massimo Talia
 
Webinar 20/09 Workflow di progettazione per le reti di drenaggio e/o di adduz...
Webinar 20/09 Workflow di progettazione per le reti di drenaggio e/o di adduz...Webinar 20/09 Workflow di progettazione per le reti di drenaggio e/o di adduz...
Webinar 20/09 Workflow di progettazione per le reti di drenaggio e/o di adduz...Servizi a rete
 
Revit conceptual energy analysis
Revit conceptual energy analysisRevit conceptual energy analysis
Revit conceptual energy analysisenricodelfy
 
la tecnologia BIM
la tecnologia BIMla tecnologia BIM
la tecnologia BIMIUAV
 
BSc Thesis Federico Chinnici [ITA]
BSc Thesis Federico Chinnici [ITA]BSc Thesis Federico Chinnici [ITA]
BSc Thesis Federico Chinnici [ITA]FedericoChinnici
 
Cloud computing (Andrea Cavicchini)
Cloud computing (Andrea Cavicchini)Cloud computing (Andrea Cavicchini)
Cloud computing (Andrea Cavicchini)Andrea Cavicchini
 
Iuavcamp presentazione
Iuavcamp presentazioneIuavcamp presentazione
Iuavcamp presentazioneenricodelfy
 
Convegno 07-05-2024 | Presentazione Romina Bonaccorsi
Convegno 07-05-2024 | Presentazione Romina BonaccorsiConvegno 07-05-2024 | Presentazione Romina Bonaccorsi
Convegno 07-05-2024 | Presentazione Romina BonaccorsiServizi a rete
 
Convegno 16/11 | ROCCHI Daniele
Convegno 16/11 | ROCCHI DanieleConvegno 16/11 | ROCCHI Daniele
Convegno 16/11 | ROCCHI DanieleServizi a rete
 
Caso operativo di Interoperabilità Revit - Midas Gen
Caso operativo di Interoperabilità Revit - Midas GenCaso operativo di Interoperabilità Revit - Midas Gen
Caso operativo di Interoperabilità Revit - Midas GenArchLiving
 
BIMagination 2016: Intervento di Simone Di Biase (Project Manager DBAGroup)
BIMagination 2016: Intervento di Simone Di Biase (Project Manager DBAGroup)BIMagination 2016: Intervento di Simone Di Biase (Project Manager DBAGroup)
BIMagination 2016: Intervento di Simone Di Biase (Project Manager DBAGroup)DBAGroup2016
 
Product Information Tour 2019
Product Information Tour 2019Product Information Tour 2019
Product Information Tour 2019massimominguzzi
 
Il futuro della progettazione e della gestione dei processi delle aziende di...
Il futuro della progettazione e della gestione  dei processi delle aziende di...Il futuro della progettazione e della gestione  dei processi delle aziende di...
Il futuro della progettazione e della gestione dei processi delle aziende di...Servizi a rete
 
Mobile, BPM e Cloud tramite MDD: Una leva tecnologica per il business [ITA]
Mobile, BPM e Cloud tramite MDD: Una leva tecnologica per il business [ITA]Mobile, BPM e Cloud tramite MDD: Una leva tecnologica per il business [ITA]
Mobile, BPM e Cloud tramite MDD: Una leva tecnologica per il business [ITA]Marco Brambilla
 
BIM System Group - LA PRIMA LIBRERIA BIM DEDICATA AI PROFESSIONISTI DELL'IDRA...
BIM System Group - LA PRIMA LIBRERIA BIM DEDICATA AI PROFESSIONISTI DELL'IDRA...BIM System Group - LA PRIMA LIBRERIA BIM DEDICATA AI PROFESSIONISTI DELL'IDRA...
BIM System Group - LA PRIMA LIBRERIA BIM DEDICATA AI PROFESSIONISTI DELL'IDRA...Giovanna Falconi
 

Similar to Solar Decathlon 17.04.2014 @ TIS | Mario Grimaudo (MED in Italy) (20)

Learned lessons and suggestions from BIM applications at Italferr - Matteo Tr...
Learned lessons and suggestions from BIM applications at Italferr - Matteo Tr...Learned lessons and suggestions from BIM applications at Italferr - Matteo Tr...
Learned lessons and suggestions from BIM applications at Italferr - Matteo Tr...
 
Convegno 07-05-2024 | Presentazione Antonio De Vito
Convegno 07-05-2024 | Presentazione Antonio De VitoConvegno 07-05-2024 | Presentazione Antonio De Vito
Convegno 07-05-2024 | Presentazione Antonio De Vito
 
Iuavcamp presentazione
Iuavcamp presentazioneIuavcamp presentazione
Iuavcamp presentazione
 
CEIm-magazine-Novembre-Dicembre-2022
CEIm-magazine-Novembre-Dicembre-2022CEIm-magazine-Novembre-Dicembre-2022
CEIm-magazine-Novembre-Dicembre-2022
 
Ance bim 888_sp
Ance bim 888_spAnce bim 888_sp
Ance bim 888_sp
 
Webinar 20/09 Workflow di progettazione per le reti di drenaggio e/o di adduz...
Webinar 20/09 Workflow di progettazione per le reti di drenaggio e/o di adduz...Webinar 20/09 Workflow di progettazione per le reti di drenaggio e/o di adduz...
Webinar 20/09 Workflow di progettazione per le reti di drenaggio e/o di adduz...
 
Revit conceptual energy analysis
Revit conceptual energy analysisRevit conceptual energy analysis
Revit conceptual energy analysis
 
la tecnologia BIM
la tecnologia BIMla tecnologia BIM
la tecnologia BIM
 
IICBIM Lezione Remotizzata Gratuita - MEP Impianti virtuali nel BIM 31 marzo ...
IICBIM Lezione Remotizzata Gratuita - MEP Impianti virtuali nel BIM 31 marzo ...IICBIM Lezione Remotizzata Gratuita - MEP Impianti virtuali nel BIM 31 marzo ...
IICBIM Lezione Remotizzata Gratuita - MEP Impianti virtuali nel BIM 31 marzo ...
 
BSc Thesis Federico Chinnici [ITA]
BSc Thesis Federico Chinnici [ITA]BSc Thesis Federico Chinnici [ITA]
BSc Thesis Federico Chinnici [ITA]
 
Cloud computing (Andrea Cavicchini)
Cloud computing (Andrea Cavicchini)Cloud computing (Andrea Cavicchini)
Cloud computing (Andrea Cavicchini)
 
Iuavcamp presentazione
Iuavcamp presentazioneIuavcamp presentazione
Iuavcamp presentazione
 
Convegno 07-05-2024 | Presentazione Romina Bonaccorsi
Convegno 07-05-2024 | Presentazione Romina BonaccorsiConvegno 07-05-2024 | Presentazione Romina Bonaccorsi
Convegno 07-05-2024 | Presentazione Romina Bonaccorsi
 
Convegno 16/11 | ROCCHI Daniele
Convegno 16/11 | ROCCHI DanieleConvegno 16/11 | ROCCHI Daniele
Convegno 16/11 | ROCCHI Daniele
 
Caso operativo di Interoperabilità Revit - Midas Gen
Caso operativo di Interoperabilità Revit - Midas GenCaso operativo di Interoperabilità Revit - Midas Gen
Caso operativo di Interoperabilità Revit - Midas Gen
 
BIMagination 2016: Intervento di Simone Di Biase (Project Manager DBAGroup)
BIMagination 2016: Intervento di Simone Di Biase (Project Manager DBAGroup)BIMagination 2016: Intervento di Simone Di Biase (Project Manager DBAGroup)
BIMagination 2016: Intervento di Simone Di Biase (Project Manager DBAGroup)
 
Product Information Tour 2019
Product Information Tour 2019Product Information Tour 2019
Product Information Tour 2019
 
Il futuro della progettazione e della gestione dei processi delle aziende di...
Il futuro della progettazione e della gestione  dei processi delle aziende di...Il futuro della progettazione e della gestione  dei processi delle aziende di...
Il futuro della progettazione e della gestione dei processi delle aziende di...
 
Mobile, BPM e Cloud tramite MDD: Una leva tecnologica per il business [ITA]
Mobile, BPM e Cloud tramite MDD: Una leva tecnologica per il business [ITA]Mobile, BPM e Cloud tramite MDD: Una leva tecnologica per il business [ITA]
Mobile, BPM e Cloud tramite MDD: Una leva tecnologica per il business [ITA]
 
BIM System Group - LA PRIMA LIBRERIA BIM DEDICATA AI PROFESSIONISTI DELL'IDRA...
BIM System Group - LA PRIMA LIBRERIA BIM DEDICATA AI PROFESSIONISTI DELL'IDRA...BIM System Group - LA PRIMA LIBRERIA BIM DEDICATA AI PROFESSIONISTI DELL'IDRA...
BIM System Group - LA PRIMA LIBRERIA BIM DEDICATA AI PROFESSIONISTI DELL'IDRA...
 

More from IDM Südtirol - Alto Adige

Façade innovation management Ingrid Demanega (Frener & Reifer)
Façade innovation management Ingrid Demanega (Frener & Reifer)Façade innovation management Ingrid Demanega (Frener & Reifer)
Façade innovation management Ingrid Demanega (Frener & Reifer)IDM Südtirol - Alto Adige
 
Sabine Hoffmann, Technische Universität Kaiserslautern (DE) “How facades impa...
Sabine Hoffmann, Technische Universität Kaiserslautern (DE) “How facades impa...Sabine Hoffmann, Technische Universität Kaiserslautern (DE) “How facades impa...
Sabine Hoffmann, Technische Universität Kaiserslautern (DE) “How facades impa...IDM Südtirol - Alto Adige
 
Michael Reifer, Frener & Reifer, Brixen (IT) “Development and implementation ...
Michael Reifer, Frener & Reifer, Brixen (IT) “Development and implementation ...Michael Reifer, Frener & Reifer, Brixen (IT) “Development and implementation ...
Michael Reifer, Frener & Reifer, Brixen (IT) “Development and implementation ...IDM Südtirol - Alto Adige
 
Chiara Pozzuoli, RWDI, London (UK) “The Art of Shaping the Building Envelope ...
Chiara Pozzuoli, RWDI, London (UK) “The Art of Shaping the Building Envelope ...Chiara Pozzuoli, RWDI, London (UK) “The Art of Shaping the Building Envelope ...
Chiara Pozzuoli, RWDI, London (UK) “The Art of Shaping the Building Envelope ...IDM Südtirol - Alto Adige
 
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...IDM Südtirol - Alto Adige
 
Facade Fire Safety Engineering Stefano Prosseda (IDM South Tyrol)
Facade Fire Safety Engineering Stefano Prosseda (IDM South Tyrol)Facade Fire Safety Engineering Stefano Prosseda (IDM South Tyrol)
Facade Fire Safety Engineering Stefano Prosseda (IDM South Tyrol)IDM Südtirol - Alto Adige
 
FACEcamp CoCe: Vision, Mission & Sustainability plan Carlo Battisti (IDM Sout...
FACEcamp CoCe: Vision, Mission & Sustainability plan Carlo Battisti (IDM Sout...FACEcamp CoCe: Vision, Mission & Sustainability plan Carlo Battisti (IDM Sout...
FACEcamp CoCe: Vision, Mission & Sustainability plan Carlo Battisti (IDM Sout...IDM Südtirol - Alto Adige
 
FACE course as a market driven success story Carlo Battisti (IDM South Tyrol)
FACE course as a market driven success story Carlo Battisti (IDM South Tyrol)FACE course as a market driven success story Carlo Battisti (IDM South Tyrol)
FACE course as a market driven success story Carlo Battisti (IDM South Tyrol)IDM Südtirol - Alto Adige
 
Approaches and technologies for daylight Non-visual comfort in indoor space W...
Approaches and technologies for daylight Non-visual comfort in indoor space W...Approaches and technologies for daylight Non-visual comfort in indoor space W...
Approaches and technologies for daylight Non-visual comfort in indoor space W...IDM Südtirol - Alto Adige
 
A new modelling approach for Complex Fenestration system via CFD and Radiance...
A new modelling approach for Complex Fenestration system via CFD and Radiance...A new modelling approach for Complex Fenestration system via CFD and Radiance...
A new modelling approach for Complex Fenestration system via CFD and Radiance...IDM Südtirol - Alto Adige
 
FaçadeGIS as tool for performance driven facade design Luca Papaiz (glassAdvi...
FaçadeGIS as tool for performance driven facade design Luca Papaiz (glassAdvi...FaçadeGIS as tool for performance driven facade design Luca Papaiz (glassAdvi...
FaçadeGIS as tool for performance driven facade design Luca Papaiz (glassAdvi...IDM Südtirol - Alto Adige
 
Modelling tool chain for advanced façade performance assessment Daniel Plorer...
Modelling tool chain for advanced façade performance assessment Daniel Plorer...Modelling tool chain for advanced façade performance assessment Daniel Plorer...
Modelling tool chain for advanced façade performance assessment Daniel Plorer...IDM Südtirol - Alto Adige
 
Stefano Avesani, Eurac Research, Institute for Renewable Energy - FACEcamp ov...
Stefano Avesani, Eurac Research, Institute for Renewable Energy - FACEcamp ov...Stefano Avesani, Eurac Research, Institute for Renewable Energy - FACEcamp ov...
Stefano Avesani, Eurac Research, Institute for Renewable Energy - FACEcamp ov...IDM Südtirol - Alto Adige
 
The Future Envelope 12. It’s all about performances.
The Future Envelope 12. It’s all about performances.The Future Envelope 12. It’s all about performances.
The Future Envelope 12. It’s all about performances.IDM Südtirol - Alto Adige
 
Darren Woolf, Hoare Lea, London (UK) “How flow can you go?”
Darren Woolf, Hoare Lea, London (UK) “How flow can you go?”Darren Woolf, Hoare Lea, London (UK) “How flow can you go?”
Darren Woolf, Hoare Lea, London (UK) “How flow can you go?”IDM Südtirol - Alto Adige
 
Harald Spitaler, Stahlbau Pichler, Bolzano (IT) “The design assist approach f...
Harald Spitaler, Stahlbau Pichler, Bolzano (IT) “The design assist approach f...Harald Spitaler, Stahlbau Pichler, Bolzano (IT) “The design assist approach f...
Harald Spitaler, Stahlbau Pichler, Bolzano (IT) “The design assist approach f...IDM Südtirol - Alto Adige
 
Paolo Rosato, University of Trieste (IT) “Managing economic analysis of build...
Paolo Rosato, University of Trieste (IT) “Managing economic analysis of build...Paolo Rosato, University of Trieste (IT) “Managing economic analysis of build...
Paolo Rosato, University of Trieste (IT) “Managing economic analysis of build...IDM Südtirol - Alto Adige
 
Wilfried Pohl, Bartenbach GmbH, Aldrans (AT) “Visual comfort, well-being and ...
Wilfried Pohl, Bartenbach GmbH, Aldrans (AT) “Visual comfort, well-being and ...Wilfried Pohl, Bartenbach GmbH, Aldrans (AT) “Visual comfort, well-being and ...
Wilfried Pohl, Bartenbach GmbH, Aldrans (AT) “Visual comfort, well-being and ...IDM Südtirol - Alto Adige
 
Roberto Lollini, Eurac Research, Institute for Renewable Energy
Roberto Lollini, Eurac Research, Institute for Renewable EnergyRoberto Lollini, Eurac Research, Institute for Renewable Energy
Roberto Lollini, Eurac Research, Institute for Renewable EnergyIDM Südtirol - Alto Adige
 
Christina Hopfe, Loughborough University (UK) “Addressing uncertainties in si...
Christina Hopfe, Loughborough University (UK) “Addressing uncertainties in si...Christina Hopfe, Loughborough University (UK) “Addressing uncertainties in si...
Christina Hopfe, Loughborough University (UK) “Addressing uncertainties in si...IDM Südtirol - Alto Adige
 

More from IDM Südtirol - Alto Adige (20)

Façade innovation management Ingrid Demanega (Frener & Reifer)
Façade innovation management Ingrid Demanega (Frener & Reifer)Façade innovation management Ingrid Demanega (Frener & Reifer)
Façade innovation management Ingrid Demanega (Frener & Reifer)
 
Sabine Hoffmann, Technische Universität Kaiserslautern (DE) “How facades impa...
Sabine Hoffmann, Technische Universität Kaiserslautern (DE) “How facades impa...Sabine Hoffmann, Technische Universität Kaiserslautern (DE) “How facades impa...
Sabine Hoffmann, Technische Universität Kaiserslautern (DE) “How facades impa...
 
Michael Reifer, Frener & Reifer, Brixen (IT) “Development and implementation ...
Michael Reifer, Frener & Reifer, Brixen (IT) “Development and implementation ...Michael Reifer, Frener & Reifer, Brixen (IT) “Development and implementation ...
Michael Reifer, Frener & Reifer, Brixen (IT) “Development and implementation ...
 
Chiara Pozzuoli, RWDI, London (UK) “The Art of Shaping the Building Envelope ...
Chiara Pozzuoli, RWDI, London (UK) “The Art of Shaping the Building Envelope ...Chiara Pozzuoli, RWDI, London (UK) “The Art of Shaping the Building Envelope ...
Chiara Pozzuoli, RWDI, London (UK) “The Art of Shaping the Building Envelope ...
 
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
 
Facade Fire Safety Engineering Stefano Prosseda (IDM South Tyrol)
Facade Fire Safety Engineering Stefano Prosseda (IDM South Tyrol)Facade Fire Safety Engineering Stefano Prosseda (IDM South Tyrol)
Facade Fire Safety Engineering Stefano Prosseda (IDM South Tyrol)
 
FACEcamp CoCe: Vision, Mission & Sustainability plan Carlo Battisti (IDM Sout...
FACEcamp CoCe: Vision, Mission & Sustainability plan Carlo Battisti (IDM Sout...FACEcamp CoCe: Vision, Mission & Sustainability plan Carlo Battisti (IDM Sout...
FACEcamp CoCe: Vision, Mission & Sustainability plan Carlo Battisti (IDM Sout...
 
FACE course as a market driven success story Carlo Battisti (IDM South Tyrol)
FACE course as a market driven success story Carlo Battisti (IDM South Tyrol)FACE course as a market driven success story Carlo Battisti (IDM South Tyrol)
FACE course as a market driven success story Carlo Battisti (IDM South Tyrol)
 
Approaches and technologies for daylight Non-visual comfort in indoor space W...
Approaches and technologies for daylight Non-visual comfort in indoor space W...Approaches and technologies for daylight Non-visual comfort in indoor space W...
Approaches and technologies for daylight Non-visual comfort in indoor space W...
 
A new modelling approach for Complex Fenestration system via CFD and Radiance...
A new modelling approach for Complex Fenestration system via CFD and Radiance...A new modelling approach for Complex Fenestration system via CFD and Radiance...
A new modelling approach for Complex Fenestration system via CFD and Radiance...
 
FaçadeGIS as tool for performance driven facade design Luca Papaiz (glassAdvi...
FaçadeGIS as tool for performance driven facade design Luca Papaiz (glassAdvi...FaçadeGIS as tool for performance driven facade design Luca Papaiz (glassAdvi...
FaçadeGIS as tool for performance driven facade design Luca Papaiz (glassAdvi...
 
Modelling tool chain for advanced façade performance assessment Daniel Plorer...
Modelling tool chain for advanced façade performance assessment Daniel Plorer...Modelling tool chain for advanced façade performance assessment Daniel Plorer...
Modelling tool chain for advanced façade performance assessment Daniel Plorer...
 
Stefano Avesani, Eurac Research, Institute for Renewable Energy - FACEcamp ov...
Stefano Avesani, Eurac Research, Institute for Renewable Energy - FACEcamp ov...Stefano Avesani, Eurac Research, Institute for Renewable Energy - FACEcamp ov...
Stefano Avesani, Eurac Research, Institute for Renewable Energy - FACEcamp ov...
 
The Future Envelope 12. It’s all about performances.
The Future Envelope 12. It’s all about performances.The Future Envelope 12. It’s all about performances.
The Future Envelope 12. It’s all about performances.
 
Darren Woolf, Hoare Lea, London (UK) “How flow can you go?”
Darren Woolf, Hoare Lea, London (UK) “How flow can you go?”Darren Woolf, Hoare Lea, London (UK) “How flow can you go?”
Darren Woolf, Hoare Lea, London (UK) “How flow can you go?”
 
Harald Spitaler, Stahlbau Pichler, Bolzano (IT) “The design assist approach f...
Harald Spitaler, Stahlbau Pichler, Bolzano (IT) “The design assist approach f...Harald Spitaler, Stahlbau Pichler, Bolzano (IT) “The design assist approach f...
Harald Spitaler, Stahlbau Pichler, Bolzano (IT) “The design assist approach f...
 
Paolo Rosato, University of Trieste (IT) “Managing economic analysis of build...
Paolo Rosato, University of Trieste (IT) “Managing economic analysis of build...Paolo Rosato, University of Trieste (IT) “Managing economic analysis of build...
Paolo Rosato, University of Trieste (IT) “Managing economic analysis of build...
 
Wilfried Pohl, Bartenbach GmbH, Aldrans (AT) “Visual comfort, well-being and ...
Wilfried Pohl, Bartenbach GmbH, Aldrans (AT) “Visual comfort, well-being and ...Wilfried Pohl, Bartenbach GmbH, Aldrans (AT) “Visual comfort, well-being and ...
Wilfried Pohl, Bartenbach GmbH, Aldrans (AT) “Visual comfort, well-being and ...
 
Roberto Lollini, Eurac Research, Institute for Renewable Energy
Roberto Lollini, Eurac Research, Institute for Renewable EnergyRoberto Lollini, Eurac Research, Institute for Renewable Energy
Roberto Lollini, Eurac Research, Institute for Renewable Energy
 
Christina Hopfe, Loughborough University (UK) “Addressing uncertainties in si...
Christina Hopfe, Loughborough University (UK) “Addressing uncertainties in si...Christina Hopfe, Loughborough University (UK) “Addressing uncertainties in si...
Christina Hopfe, Loughborough University (UK) “Addressing uncertainties in si...
 

Solar Decathlon 17.04.2014 @ TIS | Mario Grimaudo (MED in Italy)

  • 1. MED in Italy Processo di progettazione, realizzazione e gestione del prototipo abitativo ad alta efficienza energetica per Solar Decathlon Europe 2012 Architetto Mario Grimaudo Energy strategy management Contest Captain
  • 2. Il team e il processo 2
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8. MODELLO 3D BIM – Building Information Modeling IPD – Integrated Project Delivery costruzione – struttura- fasi – piani di carico – liste di materiali per computo e calcolo pesi – valutazioni energetiche statiche e dinamiche- LCA – generazione tavole e abachi per progetto esecutivo e realizzazione
  • 9.
  • 10.
  • 15.
  • 16. MODELLO 3D – BIM – MULTI-USER Il sistema digitale di modellazione e gestione riflette la struttura “a rete” del gruppo di progettazione, con contributi che arrivano in modo multidirezionale e asincrono
  • 17. MODELLO 3D – BIM – FASI DI CANTIERE Il sistema digitale di modellazione e gestione include fin dall'inizio Le fasi di cantiere, per pianficare opportunamente la sicurezza Come richiesto dalle consegne intermedie del concorso.
  • 18. MODELLO 3D – BIM – FASI DI CANTIERE Il sistema digitale di modellazione e gestione include fin dall'inizio Le fasi di cantiere, per pianficare opportunamente la sicurezza Come richiesto dalle consegne intermedie del concorso.
  • 19. MODELLO 3D – BIM – PIANI DI CARICO Il sistema di progetto costruisce una relazione tra gli elementi prefabbricati e la loro ripartizione nei piani di carico – tenendo conto delle variazioni del progetto, ma anche di quelle dei mezzi disponibili.
  • 20. MODELLO 3D – BIM – PIANI DI CARICO Il sistema di progetto costruisce una relazione tra gli elementi prefabbricati e la loro ripartizione nei piani di carico – tenendo conto delle variazioni del progetto, ma anche di quelle dei mezzi disponibili.
  • 21. MODELLO 3D – BIM – ORDINATIVI E COSTRUTTIVI Il modello è stato costruito tenendo conto delle tolleranze realizzative, oltre che dei vincoli dei diversi sistemi costruttivi, concordati con le aziende. In molti casi le informazioni sono state direttamente trasferite alle aziende produttrici
  • 22. MODELLO 3D – BIM – LIGHTING E RENDERING Il modello include anche la modellazione dei corpi lampada e dei corpi illuminanti, in collegamento bidirezionale con i software di analisi
  • 23. MODELLO 3D – BIM – LIGHTING E RENDERING Il modello include anche la modellazione dei corpi lampada e dei corpi illuminanti, in collegamento bidirezionale con i software di analisi
  • 24. Software: Revit MEP, Ecotect, Energy Plus – Open Studio – Window- Therm MODELLO 3D – BIM – SIMULAZIONE ENERGETICA Il modello include anche la modellazione dei corpi lampada e dei corpi illuminanti, in collegamento bidirezionale con i software di analisi
  • 25. MODELLO 3D – BIM – STRUTTURE Il modello geometrico ha generato in continuo disegni e dati per il parallelo calcolo strutturale, mantenendo sempre ferma la relazione tra la geometria costruttiva e quella effettivamente calcolata
  • 26. MODELLO 3D – BIM – STRUTTURE Il modello geometrico ha in continuo generato disegni e dati per il parallelo calcolo strutturale, mantenendo sempre ferma la relazione tra la geometria costruttiva e quella effettivamente calcolata
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34. Fate clic per modificare il formato del testo della struttura Secondo livello struttura − Terzo livello struttura Quarto livello struttura − Quinto livello
  • 35.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45. A3 A2 A1 A4 A5 A6 A7 A8 A9 A10 B1 B2 B3 C2 C1 C3 C4 C5 D1 D2 D3 A11 IMHOME CONTROLSYSTEM E3 E2 E1 F2 F3 SAIE 2012 18/10/2012 A B C TEMP.& RH TEMP.WITH INT.WALLPROBE CO2 D LIGHT E POWER POSITION(under definition)F F1 SENSORS
  • 48.
  • 49.
  • 50.
  • 51.
  • 52. densa
  • 53.
  • 54.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
  • 62. …la sperimentazione continua… Spin-off con alcune delle aziende partner Solar Decathlon Europe 2014 Densità Mobilità (approccio globale che mette insieme alloggi, progetto urbano e trasporto pubblico) Sobrietà (limite della potenza PV installata) Innovazione