SlideShare a Scribd company logo
1 of 7
Full Name : Roy A. Aranas
Contact Address: Blk 18 Lot 38 Lucas Choa Ave. Harmony Hills 1 Muzon,
San Jose Del Monte Bulacan, 3023
Email Address : royjingala@yahoo.com
Mobile Phone no. : , +63)09184260714
Position Desired : Site Engineer
OBJECTIVE : To continue engage in my job as an Engineer that could help base on my experience that
could challenge my skills.
WORKING EXPERIENCE
Employer : TAISEI, CORPORATION
Position Held : Sr. Site Engineer
Period : June 21, 2012-Dec 21, 2014
Project Name : Outer Circular Highway to the City of Colombo
Northern Section 1 from Kadawatha to Kaduwela
DUTIES AND RESPONSIBILITIES
Substructure Works (Viaduct Bridge Structure- Sub Contractor Works)
1. Prepare Approved Plans, Design, details and specifications of works.
2. Arrange Manpower ,materials and Equipment used for Excavation work,Preparation for Lean Concrete,
3. Arrange Manpower for Bored Pile head Chipping Works.
4. Hand over to Sub contractor ready for Rebar Installation for Pile Cap Works.
5. Supervise Subcontractor Work for Rebar ,Formworks and Concreting Works for Pile Cap, Stem and
PierHead.
Superstructures Works
1. Prepare Approved Plans, Design, details and specifications of works.
2. Arrange Manpower ,Materials and Equipment for Superstructure Works.
3. Supervise Girder Installation,RC Panel Fabrication and and Installation.
4. Supervise Intermediate / Contineous Cross Beam staging installation ,Rebar ,Formwork and Concrete
works.
5. Supervise the Tensioning and Grouting Works for the Intermediate and Contineous Cross Beam,
6. Supervise the Installation of staging Works for deckslab and Rebar ,Formworks and Concrete works
for Deckslab.
Employer : Taisei Philippines Construction Incorporated
Position Held : Site Engineer/ Operation Engineer
Period : July 2010 – June 8,2012
Project Involved :
FINISHING WORKS:
• Rohm Mechatech Philippines,Inc.
1.0 Finishing Works, like installation of Dry Wall,using gypsum board ,cement
board,set up of steel doors and windows and painting.
2.0 Floor finish like using FRP material , primer epoxy and final painting.
3.0 Grouting Works.
• Ajinomoto Philippines Corporation (APC)
1.0 Construction of Two-Storey Building for GSS and RSM office
2.0 Renovation of Existing Batching Room
• Toyota Motor Philippines Corp.
Retrofitting of Local Sub- Station and Erection of I-beam column.
• Japanese Embassy
1.0 Waterproofing Works & Painting of Consulate Entrance Roof
• Toshiba Philippines Inc.
1.0 Toshiba Makati Office Fit-Out Projects
1.1 Installation of ceiling acoustic Board,
1.2 Installation of Wall Porcelain tile for company logo
• Kline Marine Ventures
1.0 Waterproofing of Roof and Repainting.
• Unhoop Philippines Inc.
1.0 Unhoop Makati Office Fit-out Project
DUTIES AND RESPONSIBILITIES
1. Prepare all plans and specifications of the projects.
2. Check all plans and works activities in accordance with stipulated contracts.
3. Make works sequences and schedule per item of work.
4. Control and check the availability of materials and resources usage to ensure productivity and economy.
5. Control production and set target schedule to meet the set timeline budget and economy.
Employer : TAISEI, CORPORATION
Position Held : Site Engineer
Period : March 9, 2007-April 15, 2009
Project Name : Double Decking of Doha Road Project (R800/6)
Dubai, United Arab of Emirates
DUTIES AND RESPONSIBILITIES
BORED PILING WORKS:
1. Prepare Approved Plans, Design, details and specifications of works.
2. Prepare and study the access of the machine used like drilling rigs machine , crane and concrete supply.
3. Check and Investigate the underground facilities like powerlines, waterpipes,communication lines and
Other items to expedite the activity.
4. Check stability of soil during working activity.
5. Control and check the availability of materials and resources usage to ensure productivity and economy.
6. Control production and set target schedule to meet the set timeline budget and economy.
7. Supervise and controls the subcontractor accomplishment and methodology of works.
Employer : TAISEI, CORPORATION
Position Held : Site Surveyor
Period : December 12,2003- August 15,2006
Project Name : Samutprakan Industrial Ring Road Project
Bangkok, Kingdom of Thailand
DUTIES AND RESPONSIBILITIES
1. Prepare Approved Plans, Design, details and specifications of works.
2. In charge of Survey line and grade of four (4)Pylons, four (4) concrete deckslab and Two (2) steel main
Slab connecting interchange road.
3. Monitoring the elevation of steel and concrete slab during tensioning of tendons.
Employer : Taisei-Marubeni Joint Venture Project
Position Held : Site Engineer/Surveyor
Period : March 19, 2000- November 20,2003
Project Name : Cebu South Coastal Road Project
Cebu City, Philippines
DUTIES AND RESPONSIBILITIES
SHEET PILING AND DREDGING WORKS:
1. Prepare Approved Plans, Design, details and specifications of works.
2. Supervise sheet piling works activity used as protection of shoreline during dredging works of the sea
Bed.
3. Check the actual depth of the seabed using hydrographic survey (sounding) during dredging works.
4. Coordinate the Onwer’s representative regarding the disposal og dreging materials.
5. Supervise and controls the subcontractor accomplishment and methodology of works.
CONCRETE GIRDER SETTING AND SLAB CONCRETE :
1. Prepare and check all plans ,specification before implementations.
2. Supervise and monitoring of installation of concrete girder and precast slab,
rebars,scaffolds formworks,grouting and concreting works.
3. Monitor progress accomplishment and reports.
4. Check bar chart scheduling and monitoring.
5. Supervise and controls subcontractors methodology of works.
Employer : Pan Asia-Ratio-Taisei-Kawada JV (PRTK) Project
Position Held : Site Engineer/Surveyor
Period : March 19,1998-December 23,1999
Project Name : Kao Ping Shi Stayed Cable Bridge
Kaoshiung, Taiwan, Republic of China
DUTIES AND RESPONSIBILITIES
1. Prepare Approved Plans, Design, details and specifications of works.
2. In charge of Survey line and grade of concrete and steel girders and Pylon structure.
3. Monitoring the elevation of steel and concrete slab during tensioning of tendons.
Employer : D.A. ABCEDE & ASSOCIATES
Position Held : Site Engineer/inspector
Period : October 1, 1996- March 18,1998
Project Name : Construction of Sheraton SM Cebu Hotels &Towers
North Reclamation, Cebu City, Philippines
DUTIES AND RESPONSIBILITIES
1. As an owner’s representative, Responsible of acceptance of materials delivered at site such as
identification and testing based on the design specifications.
2. Control the proportioning of mixing concrete.
3. Checking of excavation of foundation, formshutter, reinforcing steel and other embedded items prior to
concrete.
4. Preparing concrete specimens for laboratory testing,general observation of contractor’s manpower ,
plant and equipments.
5. Evaluation of contractor’s billing according to their accomplishments.
Employer : Acre Surveying & Development
Position Held : Survey Engineer
Period : July 1993-September 1996
Project undertaken :
• Japan International Cooperation Agency (JICA)
Project Name : Road Survey of Pan-Phil Highway Project (PPHP)
Location : Surigao – Davao ,Philippines
Period Covered : October 1995-September 1996
• TCGI ENGINEERS
Project Name : Circumferential Road (C5)
Location : Metro Manila ,Philippines
Period Covered : February 1995- October 1995
• Capitol Industrial Construction Group (CICG)
Project Name : Vista de Loro Heigths
Location : Puerto Azul , ternate, Cavite ,Philippines
Period Covered : July 1993- February 1994
• Katahira and Engineers International
Project Name : Construction of Roads and Bridges
• Benfres Prime Holdings
Project Name : Rockwell Thermal Plant Detail Topographic survey
• Laguna Estates and Development Corporation
Project Name : Topographic and Relocation of 200 hectares sugar cane area
• Department of Public Works and Highways (DPWH)
Project Name : Construction of Multi Purpose Pavement, school buildings Asphalting of roads and
construction of kerbs and gutter.
REFERENCES:
1.) Mr. Katsumi Yamazaki - Project Manager
Taisei Philippine Construction Inc.
23rd
flr. Equitable Bank Tower, Paseo de Roxas
Makati City, Metro Manila, Philippines
2.) Mr. Nobuhiro akisato - Project Manager
Double Decking of Doha Road Project (R800/60
Dubai , United Arab of Emirates
3.) Mr. Nobushi Kuno - Deputy Project Manager
Samutprakan Industrial Ring Road Project
Bangkok, kingdom of Thailand
4.) Mr Hiroshi Yoshikawa - Project Manager
Cebu South Coastal Road Project (CSCRP)
Cebu City , Philippines
5.) Mr Dennis Abcede - D. A. ABCEDE & ASSOCIATES
President
EDUCATIONAL / ACADEMIC RECORDS
Elementary : Maular Elementary School March 1979
High School : Aloran National High School March 1983
College : Misamis University October 1987
Course : Bachelor of Science in Civil Engineering ( B.S.C.E )
PROFESSIONAL & OTHER EXAMINATION PASSED
Title / Category : Civil Engineer Licensure Examination
Date Taken : November 1988
License Number : 0054956
Skills: Computer Literate (Microsoft Word ,Excel and Powerpoint)
PERSONAL INFORMATION
Address : Blk 18 Lot 38 Lucas Choa Ave. Harmony Hills 1 Muzon,
San Jose Del Monte Bulacan, 3023
Date : September 19,1966
Place of birth : Langcangan ,Oroquieta City ,Misamis Occidental
Civil Status : Married
Nationality : Filipino
Height : 165 cm
Weight : 62 kgs
Religion : Assembly of God
Dialects : English, Tagalog, Cebuano
S.S.S Number : 33-0448701-2
T.I.N. Number : 152-923-822
PhilHealth : 19-051858630-4
Pag-IBIG MID : 1020-0154-2177
I hereby certify that the above information given are true and correct.
ROY A. ARANAS
Passport Number : XX1682600
Place of Issue : Manila
Date of Issue : 25 July 2008
Valid Until : 24 July 2013
Address : Blk 18 Lot 38 Lucas Choa Ave. Harmony Hills 1 Muzon,
San Jose Del Monte Bulacan, 3023
Date : September 19,1966
Place of birth : Langcangan ,Oroquieta City ,Misamis Occidental
Civil Status : Married
Nationality : Filipino
Height : 165 cm
Weight : 62 kgs
Religion : Assembly of God
Dialects : English, Tagalog, Cebuano
S.S.S Number : 33-0448701-2
T.I.N. Number : 152-923-822
PhilHealth : 19-051858630-4
Pag-IBIG MID : 1020-0154-2177
I hereby certify that the above information given are true and correct.
ROY A. ARANAS
Passport Number : XX1682600
Place of Issue : Manila
Date of Issue : 25 July 2008
Valid Until : 24 July 2013

More Related Content

What's hot

Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Ray Freiha
 
Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati∴
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil EngineerBinu Babu
 
Mai gabica cv 2020
Mai gabica cv 2020Mai gabica cv 2020
Mai gabica cv 2020maigabica
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resumecarlos betts
 
CURICULUM VITAE (CV)
CURICULUM VITAE (CV)CURICULUM VITAE (CV)
CURICULUM VITAE (CV)Apr Eddie
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro PE
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1Eamon Hannaway
 
Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Daniel X. O'Neil
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley ParsonsShane Reynolds
 
Jim markey thru 2011
Jim markey thru 2011Jim markey thru 2011
Jim markey thru 2011j4359markey
 
VMC Career Portfolio Aug 15
VMC Career Portfolio Aug 15VMC Career Portfolio Aug 15
VMC Career Portfolio Aug 15Victor Couto
 

What's hot (20)

New Jersey Projects
New Jersey ProjectsNew Jersey Projects
New Jersey Projects
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016
 
Resume
ResumeResume
Resume
 
Francisco Quintana Resume
Francisco Quintana Resume Francisco Quintana Resume
Francisco Quintana Resume
 
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
 
Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer
 
Mai gabica cv 2020
Mai gabica cv 2020Mai gabica cv 2020
Mai gabica cv 2020
 
MRA Portfolio
MRA PortfolioMRA Portfolio
MRA Portfolio
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resume
 
NA
NANA
NA
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
CURICULUM VITAE (CV)
CURICULUM VITAE (CV)CURICULUM VITAE (CV)
CURICULUM VITAE (CV)
 
CV - Jerwin
CV - JerwinCV - Jerwin
CV - Jerwin
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
Jim markey thru 2011
Jim markey thru 2011Jim markey thru 2011
Jim markey thru 2011
 
VMC Career Portfolio Aug 15
VMC Career Portfolio Aug 15VMC Career Portfolio Aug 15
VMC Career Portfolio Aug 15
 

Viewers also liked

Saqib Revised CV
Saqib Revised CVSaqib Revised CV
Saqib Revised CVMr Saqib
 
Top 5 geotechnical engineer interview questions with answers
Top 5 geotechnical engineer interview questions with answersTop 5 geotechnical engineer interview questions with answers
Top 5 geotechnical engineer interview questions with answersfacemedi10
 
CURRICULUM VITAE-1
CURRICULUM VITAE-1CURRICULUM VITAE-1
CURRICULUM VITAE-1Roland Dilao
 
Edison Ho Liang Ee resume 2016 Mar final
Edison Ho Liang Ee resume 2016 Mar finalEdison Ho Liang Ee resume 2016 Mar final
Edison Ho Liang Ee resume 2016 Mar finalEdison Ho
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 

Viewers also liked (9)

Saqib Revised CV
Saqib Revised CVSaqib Revised CV
Saqib Revised CV
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
CV-THIAGARAJ
CV-THIAGARAJCV-THIAGARAJ
CV-THIAGARAJ
 
Geologist cv
Geologist cvGeologist cv
Geologist cv
 
Top 5 geotechnical engineer interview questions with answers
Top 5 geotechnical engineer interview questions with answersTop 5 geotechnical engineer interview questions with answers
Top 5 geotechnical engineer interview questions with answers
 
CURRICULUM VITAE-1
CURRICULUM VITAE-1CURRICULUM VITAE-1
CURRICULUM VITAE-1
 
SRIDHARAN.R RESUME
SRIDHARAN.R RESUMESRIDHARAN.R RESUME
SRIDHARAN.R RESUME
 
Edison Ho Liang Ee resume 2016 Mar final
Edison Ho Liang Ee resume 2016 Mar finalEdison Ho Liang Ee resume 2016 Mar final
Edison Ho Liang Ee resume 2016 Mar final
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 

Similar to resume of Mr Roy2 (20)

CV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IICV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer II
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
QA/QC Inspector or Engineer
QA/QC Inspector or EngineerQA/QC Inspector or Engineer
QA/QC Inspector or Engineer
 
PROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF bennyPROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF benny
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 
Resume Tanawat
Resume TanawatResume Tanawat
Resume Tanawat
 
Remi Lumbo_12082016
Remi Lumbo_12082016Remi Lumbo_12082016
Remi Lumbo_12082016
 
RMJugueta Resume 01172016
RMJugueta Resume 01172016RMJugueta Resume 01172016
RMJugueta Resume 01172016
 
bmc cv (2)
bmc cv (2)bmc cv (2)
bmc cv (2)
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Cv Thenappan
Cv ThenappanCv Thenappan
Cv Thenappan
 
Quality Control Engineer
Quality Control EngineerQuality Control Engineer
Quality Control Engineer
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Slk m india
Slk m indiaSlk m india
Slk m india
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
CV
CVCV
CV
 

resume of Mr Roy2

  • 1. Full Name : Roy A. Aranas Contact Address: Blk 18 Lot 38 Lucas Choa Ave. Harmony Hills 1 Muzon, San Jose Del Monte Bulacan, 3023 Email Address : royjingala@yahoo.com Mobile Phone no. : , +63)09184260714 Position Desired : Site Engineer OBJECTIVE : To continue engage in my job as an Engineer that could help base on my experience that could challenge my skills. WORKING EXPERIENCE Employer : TAISEI, CORPORATION Position Held : Sr. Site Engineer Period : June 21, 2012-Dec 21, 2014 Project Name : Outer Circular Highway to the City of Colombo Northern Section 1 from Kadawatha to Kaduwela DUTIES AND RESPONSIBILITIES Substructure Works (Viaduct Bridge Structure- Sub Contractor Works) 1. Prepare Approved Plans, Design, details and specifications of works. 2. Arrange Manpower ,materials and Equipment used for Excavation work,Preparation for Lean Concrete, 3. Arrange Manpower for Bored Pile head Chipping Works. 4. Hand over to Sub contractor ready for Rebar Installation for Pile Cap Works. 5. Supervise Subcontractor Work for Rebar ,Formworks and Concreting Works for Pile Cap, Stem and PierHead. Superstructures Works 1. Prepare Approved Plans, Design, details and specifications of works. 2. Arrange Manpower ,Materials and Equipment for Superstructure Works. 3. Supervise Girder Installation,RC Panel Fabrication and and Installation. 4. Supervise Intermediate / Contineous Cross Beam staging installation ,Rebar ,Formwork and Concrete works. 5. Supervise the Tensioning and Grouting Works for the Intermediate and Contineous Cross Beam, 6. Supervise the Installation of staging Works for deckslab and Rebar ,Formworks and Concrete works for Deckslab.
  • 2. Employer : Taisei Philippines Construction Incorporated Position Held : Site Engineer/ Operation Engineer Period : July 2010 – June 8,2012 Project Involved : FINISHING WORKS: • Rohm Mechatech Philippines,Inc. 1.0 Finishing Works, like installation of Dry Wall,using gypsum board ,cement board,set up of steel doors and windows and painting. 2.0 Floor finish like using FRP material , primer epoxy and final painting. 3.0 Grouting Works. • Ajinomoto Philippines Corporation (APC) 1.0 Construction of Two-Storey Building for GSS and RSM office 2.0 Renovation of Existing Batching Room • Toyota Motor Philippines Corp. Retrofitting of Local Sub- Station and Erection of I-beam column. • Japanese Embassy 1.0 Waterproofing Works & Painting of Consulate Entrance Roof • Toshiba Philippines Inc. 1.0 Toshiba Makati Office Fit-Out Projects 1.1 Installation of ceiling acoustic Board, 1.2 Installation of Wall Porcelain tile for company logo • Kline Marine Ventures 1.0 Waterproofing of Roof and Repainting. • Unhoop Philippines Inc. 1.0 Unhoop Makati Office Fit-out Project DUTIES AND RESPONSIBILITIES 1. Prepare all plans and specifications of the projects. 2. Check all plans and works activities in accordance with stipulated contracts. 3. Make works sequences and schedule per item of work. 4. Control and check the availability of materials and resources usage to ensure productivity and economy. 5. Control production and set target schedule to meet the set timeline budget and economy. Employer : TAISEI, CORPORATION Position Held : Site Engineer Period : March 9, 2007-April 15, 2009 Project Name : Double Decking of Doha Road Project (R800/6) Dubai, United Arab of Emirates DUTIES AND RESPONSIBILITIES BORED PILING WORKS: 1. Prepare Approved Plans, Design, details and specifications of works. 2. Prepare and study the access of the machine used like drilling rigs machine , crane and concrete supply.
  • 3. 3. Check and Investigate the underground facilities like powerlines, waterpipes,communication lines and Other items to expedite the activity. 4. Check stability of soil during working activity. 5. Control and check the availability of materials and resources usage to ensure productivity and economy. 6. Control production and set target schedule to meet the set timeline budget and economy. 7. Supervise and controls the subcontractor accomplishment and methodology of works. Employer : TAISEI, CORPORATION Position Held : Site Surveyor Period : December 12,2003- August 15,2006 Project Name : Samutprakan Industrial Ring Road Project Bangkok, Kingdom of Thailand DUTIES AND RESPONSIBILITIES 1. Prepare Approved Plans, Design, details and specifications of works. 2. In charge of Survey line and grade of four (4)Pylons, four (4) concrete deckslab and Two (2) steel main Slab connecting interchange road. 3. Monitoring the elevation of steel and concrete slab during tensioning of tendons. Employer : Taisei-Marubeni Joint Venture Project Position Held : Site Engineer/Surveyor Period : March 19, 2000- November 20,2003 Project Name : Cebu South Coastal Road Project Cebu City, Philippines DUTIES AND RESPONSIBILITIES SHEET PILING AND DREDGING WORKS: 1. Prepare Approved Plans, Design, details and specifications of works. 2. Supervise sheet piling works activity used as protection of shoreline during dredging works of the sea Bed. 3. Check the actual depth of the seabed using hydrographic survey (sounding) during dredging works. 4. Coordinate the Onwer’s representative regarding the disposal og dreging materials. 5. Supervise and controls the subcontractor accomplishment and methodology of works. CONCRETE GIRDER SETTING AND SLAB CONCRETE : 1. Prepare and check all plans ,specification before implementations. 2. Supervise and monitoring of installation of concrete girder and precast slab, rebars,scaffolds formworks,grouting and concreting works. 3. Monitor progress accomplishment and reports. 4. Check bar chart scheduling and monitoring. 5. Supervise and controls subcontractors methodology of works. Employer : Pan Asia-Ratio-Taisei-Kawada JV (PRTK) Project Position Held : Site Engineer/Surveyor Period : March 19,1998-December 23,1999
  • 4. Project Name : Kao Ping Shi Stayed Cable Bridge Kaoshiung, Taiwan, Republic of China DUTIES AND RESPONSIBILITIES 1. Prepare Approved Plans, Design, details and specifications of works. 2. In charge of Survey line and grade of concrete and steel girders and Pylon structure. 3. Monitoring the elevation of steel and concrete slab during tensioning of tendons. Employer : D.A. ABCEDE & ASSOCIATES Position Held : Site Engineer/inspector Period : October 1, 1996- March 18,1998 Project Name : Construction of Sheraton SM Cebu Hotels &Towers North Reclamation, Cebu City, Philippines DUTIES AND RESPONSIBILITIES 1. As an owner’s representative, Responsible of acceptance of materials delivered at site such as identification and testing based on the design specifications. 2. Control the proportioning of mixing concrete. 3. Checking of excavation of foundation, formshutter, reinforcing steel and other embedded items prior to concrete. 4. Preparing concrete specimens for laboratory testing,general observation of contractor’s manpower , plant and equipments. 5. Evaluation of contractor’s billing according to their accomplishments. Employer : Acre Surveying & Development Position Held : Survey Engineer Period : July 1993-September 1996 Project undertaken : • Japan International Cooperation Agency (JICA) Project Name : Road Survey of Pan-Phil Highway Project (PPHP) Location : Surigao – Davao ,Philippines Period Covered : October 1995-September 1996 • TCGI ENGINEERS Project Name : Circumferential Road (C5) Location : Metro Manila ,Philippines Period Covered : February 1995- October 1995 • Capitol Industrial Construction Group (CICG) Project Name : Vista de Loro Heigths Location : Puerto Azul , ternate, Cavite ,Philippines Period Covered : July 1993- February 1994 • Katahira and Engineers International Project Name : Construction of Roads and Bridges • Benfres Prime Holdings Project Name : Rockwell Thermal Plant Detail Topographic survey • Laguna Estates and Development Corporation
  • 5. Project Name : Topographic and Relocation of 200 hectares sugar cane area • Department of Public Works and Highways (DPWH) Project Name : Construction of Multi Purpose Pavement, school buildings Asphalting of roads and construction of kerbs and gutter. REFERENCES: 1.) Mr. Katsumi Yamazaki - Project Manager Taisei Philippine Construction Inc. 23rd flr. Equitable Bank Tower, Paseo de Roxas Makati City, Metro Manila, Philippines 2.) Mr. Nobuhiro akisato - Project Manager Double Decking of Doha Road Project (R800/60 Dubai , United Arab of Emirates 3.) Mr. Nobushi Kuno - Deputy Project Manager Samutprakan Industrial Ring Road Project Bangkok, kingdom of Thailand 4.) Mr Hiroshi Yoshikawa - Project Manager Cebu South Coastal Road Project (CSCRP) Cebu City , Philippines 5.) Mr Dennis Abcede - D. A. ABCEDE & ASSOCIATES President EDUCATIONAL / ACADEMIC RECORDS Elementary : Maular Elementary School March 1979 High School : Aloran National High School March 1983 College : Misamis University October 1987 Course : Bachelor of Science in Civil Engineering ( B.S.C.E ) PROFESSIONAL & OTHER EXAMINATION PASSED Title / Category : Civil Engineer Licensure Examination Date Taken : November 1988 License Number : 0054956 Skills: Computer Literate (Microsoft Word ,Excel and Powerpoint) PERSONAL INFORMATION
  • 6. Address : Blk 18 Lot 38 Lucas Choa Ave. Harmony Hills 1 Muzon, San Jose Del Monte Bulacan, 3023 Date : September 19,1966 Place of birth : Langcangan ,Oroquieta City ,Misamis Occidental Civil Status : Married Nationality : Filipino Height : 165 cm Weight : 62 kgs Religion : Assembly of God Dialects : English, Tagalog, Cebuano S.S.S Number : 33-0448701-2 T.I.N. Number : 152-923-822 PhilHealth : 19-051858630-4 Pag-IBIG MID : 1020-0154-2177 I hereby certify that the above information given are true and correct. ROY A. ARANAS Passport Number : XX1682600 Place of Issue : Manila Date of Issue : 25 July 2008 Valid Until : 24 July 2013
  • 7. Address : Blk 18 Lot 38 Lucas Choa Ave. Harmony Hills 1 Muzon, San Jose Del Monte Bulacan, 3023 Date : September 19,1966 Place of birth : Langcangan ,Oroquieta City ,Misamis Occidental Civil Status : Married Nationality : Filipino Height : 165 cm Weight : 62 kgs Religion : Assembly of God Dialects : English, Tagalog, Cebuano S.S.S Number : 33-0448701-2 T.I.N. Number : 152-923-822 PhilHealth : 19-051858630-4 Pag-IBIG MID : 1020-0154-2177 I hereby certify that the above information given are true and correct. ROY A. ARANAS Passport Number : XX1682600 Place of Issue : Manila Date of Issue : 25 July 2008 Valid Until : 24 July 2013