Assessment Requirements
And
Student Checklist
Student Name
TEOH PEI NI , SOO BEE CHIEN
Student ID No.
LJMU BQSCM 17020044 , LJMU BQSCM17020043
NRIC No.
950708-01-5398 , 960418-10-6776
Lecturer Name
MS. NADIRAH
SCHOOL OF THE BUILT ENVIRONMENT
BSc (Hons) QUANTITY SURVEYING & COST
MANAGEMENT
PROJECT FINANCIAL MANAGEMENT
(6518 BEKL)
INDIVIDUAL ASSIGNMENT
FEBRUARY 2018 SEMESTER
Table of Contents
1.0 Introduction......................................................................................................................3
2.0 Project Summary...............................................................................................................3
3.0 Observation and Questions ................................................................................................4
4.0 Activities Progress of Works..............................................................................................4
5.0 Material on Site ................................................................................................................6
6.0 Plant and Equipment .........................................................................................................8
7.0 Site Valuation Process.....................................................................................................10
8.0 Conclusion .....................................................................................................................10
1.0 Introduction
Lecturer conducted a site visit to a construction site on 18th April 2018. Before the
day go to site, lecturer provide safety helmet and safety shoes to the student that didn’t
had this safety equipment. Student includes a group of diploma student and degree
student. On the day, all students depart to the site and reach there around 10am. The
person in charge is our college’s senior, he also reach the site at the same time and guide
us into the site and brief about the project.
The purpose of this site visit is help student to gain an experience that they will
face in the future and get to know the environment in construction site. Besides that,
students learned that the safety equipment is important when get into a site to prevent any
injured. Students can see the real thing instead of see it from the paper such as tower
crane, scaffolding, and reinforcement bar.
2.0 Project Summary
The project is located at Mukim Morib, Daerah Kuala Langat, Selangor Darul
Ehsan and it’s belonging to Sentoria Morib Bay Sdn Bhd. This project is to build a water
park which requires RM 63,217,500 of contract sum. The construction is start from 1st
Nov 2015 and plans to complete in 23rd May 2020. Below will listed out the companies
that take place in this project:
 Architect: SAM Arkitek Perunding
 C&S: HTM Consultants Sdn Bhd
 M&E: ICL Associates Sdn Bhd
 QS: NIL (in house)
 Contractor: Sentoria Bina Sdn Bhd
3.0 Observation and Questions
 Earthwork – How they process the disposal material?
 Structural work – Is it the size of beam or column can support the building load?
- Slab is suspended slab or non-suspended slab?
 Worker - every worker is wearing the safety equipment and they are laying the BRC
and collaborate with each other.
 Health and Safety – Does every worker wear safety equipment?
4.0 Activities Progress of Works
4.1 Mobile crane lifts the material
In the picture, the mobile crane is lifting the reinforcement bars to the 4th floor for
construction work.
4.2 Laying BRC steel
In the picture, the site workers are taking a BRC steel.
The picture shows that the site workers are laying the BRC steel. The BRC steel
must has the space with each other if not considers fail.
4.3 Reinforcement bar cut and bend
In the picture shows that the workers are cutting the reinforcement bars.
4.4 Excavate the topsoil
In the picture, the excavator is excavating the topsoil for the piling process.
4.5 Installation of reinforcement bar
In the picture, the worker tie the links of the reinforcement bars.
5.0 Material on Site
5.1 Reinforcement bar
Reinforcement bars are widely used in the construction industry. It installs in the
wall, slab, column and more.
5.2 Concrete
Concrete also used in the construction by poured with reinforcing materials
embedded to provide tensile strength, yielding reinforced concrete.
5.3 Damp Proof Course Membrane
Damp proofing in construction is a type of moisture control applied to building
walls and floors to prevent moisture from passing into the interior spaces.
6.0 Plant and Equipment
6.1 Tower crane
The tower crane is a modern form of a balance crane. When fixed to the ground,
tower cranes will often give the best combination of height and lifting capacity and are
also used when constructing tall buildings.
In the construction site, the tower crane passes through the 18 meters height of the
floor.
6.2 Mobile crane
The mobile crane is the common type of crane used in construction today. The
mobile crane consists of a steel truss or telescopic boom mounted on a mobile platform,
which could be a rail, wheeled, or even on a cat truck. The boom is hinged at the bottom
and can be either raised or lowered by cables or hydraulic cylinders.
6.3 Scaffolding
The scaffolding is a temporary structure used to support a work crew and
materials to aid in the construction, maintenance and repair of buildings, bridges and all
other manmade structures. Scaffolds are widely used on site to get access to heights and
areas that would be otherwise hard to get to.
6.4 Cut and Bend machine
This machine is used to cut and bend the reinforcement bar on the
construction site.
6.5 Temporary staircase
7.0 Site Valuation Process
The date of site valuation meeting must be set if the contractor wants to
issue the claim to client. The parties involve the meeting are contractor, architect
consultant, M&E Consultant and C&S consultant. The project manager and all the
consultants will visit the construction site and record the construction works progress.
During the meeting , the contractor must provide the progress report, dairy report and
progress claim certificate for the consultants.
After the meeting, the quantity surveyor of the contractor will submits the claim
certificate to all the consultants by email for review verify and approve then just pass to
the client.
8.0 Conclusion
After the site visit, we realized the construction works are different with what we
imagine before we visit the site. We can see the real building instead of just looking on
the drawings. Working in construction site is not that easy because the worker should
climb up the temporary stairs everyday which is just stand a piece of steel. They also
need to work under the hot weather with sweat a lot and easy to get thirst.
From this site visit, we learned that the safety equipment is very important to take
care ourselves. Although the site worker will give us instruction what to do, we still need
to beware everything that may make us injured.

More Related Content

Similar to Site visit report (Soo Bee Chien & Teoh Pei Ni)

ICI Project Brief
ICI Project BriefICI Project Brief
ICI Project Brief
J-Sern Phua
 
Ici j sern unit employer brief v2
Ici j sern unit employer brief v2Ici j sern unit employer brief v2
Ici j sern unit employer brief v2
Arthur Wilson
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
pranay kumar
 
Bcon report final 4.0
Bcon report final 4.0Bcon report final 4.0
Bcon report final 4.0
Yu Xian Liew
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final Report
jolynnTJL
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
Yung Kai
 
Site report
Site reportSite report
Site report
vaylu
 
Final Report
Final Report Final Report
Final Report
Jack Ng
 
Site visit report
Site visit reportSite visit report
Site visit report
Jordon Wong
 
om industrial training report.pptx
om industrial training report.pptxom industrial training report.pptx
om industrial training report.pptx
RohitYadav530108
 
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...
Tehmas Saeed
 
Intern report
Intern reportIntern report
Intern report
Samuel Chuah
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report
Poojan Patel
 
summer practice report(CVE 400)
summer practice report(CVE 400)summer practice report(CVE 400)
summer practice report(CVE 400)
Ali Can OKUR
 
Site visit report
Site visit reportSite visit report
Site visit report
wleying
 
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
IRJET Journal
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
Firdaurs Abdullah
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
Jia Hong Mui
 
Resume
ResumeResume
Resume
Khawar Saeed
 
Synopsis for insustrial training of Civil engineering
Synopsis for insustrial training of Civil engineering Synopsis for insustrial training of Civil engineering
Synopsis for insustrial training of Civil engineering
Ram1239
 

Similar to Site visit report (Soo Bee Chien & Teoh Pei Ni) (20)

ICI Project Brief
ICI Project BriefICI Project Brief
ICI Project Brief
 
Ici j sern unit employer brief v2
Ici j sern unit employer brief v2Ici j sern unit employer brief v2
Ici j sern unit employer brief v2
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
 
Bcon report final 4.0
Bcon report final 4.0Bcon report final 4.0
Bcon report final 4.0
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final Report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Site report
Site reportSite report
Site report
 
Final Report
Final Report Final Report
Final Report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
om industrial training report.pptx
om industrial training report.pptxom industrial training report.pptx
om industrial training report.pptx
 
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...
 
Intern report
Intern reportIntern report
Intern report
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report
 
summer practice report(CVE 400)
summer practice report(CVE 400)summer practice report(CVE 400)
summer practice report(CVE 400)
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
Resume
ResumeResume
Resume
 
Synopsis for insustrial training of Civil engineering
Synopsis for insustrial training of Civil engineering Synopsis for insustrial training of Civil engineering
Synopsis for insustrial training of Civil engineering
 

Recently uploaded

DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
introduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdfintroduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdf
ravindarpurohit26
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 
Adaptive synchronous sliding control for a robot manipulator based on neural ...
Adaptive synchronous sliding control for a robot manipulator based on neural ...Adaptive synchronous sliding control for a robot manipulator based on neural ...
Adaptive synchronous sliding control for a robot manipulator based on neural ...
IJECEIAES
 

Recently uploaded (20)

DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
introduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdfintroduction to solar energy for engineering.pdf
introduction to solar energy for engineering.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 
Adaptive synchronous sliding control for a robot manipulator based on neural ...
Adaptive synchronous sliding control for a robot manipulator based on neural ...Adaptive synchronous sliding control for a robot manipulator based on neural ...
Adaptive synchronous sliding control for a robot manipulator based on neural ...
 

Site visit report (Soo Bee Chien & Teoh Pei Ni)

  • 1. Assessment Requirements And Student Checklist Student Name TEOH PEI NI , SOO BEE CHIEN Student ID No. LJMU BQSCM 17020044 , LJMU BQSCM17020043 NRIC No. 950708-01-5398 , 960418-10-6776 Lecturer Name MS. NADIRAH SCHOOL OF THE BUILT ENVIRONMENT BSc (Hons) QUANTITY SURVEYING & COST MANAGEMENT PROJECT FINANCIAL MANAGEMENT (6518 BEKL) INDIVIDUAL ASSIGNMENT FEBRUARY 2018 SEMESTER
  • 2. Table of Contents 1.0 Introduction......................................................................................................................3 2.0 Project Summary...............................................................................................................3 3.0 Observation and Questions ................................................................................................4 4.0 Activities Progress of Works..............................................................................................4 5.0 Material on Site ................................................................................................................6 6.0 Plant and Equipment .........................................................................................................8 7.0 Site Valuation Process.....................................................................................................10 8.0 Conclusion .....................................................................................................................10
  • 3. 1.0 Introduction Lecturer conducted a site visit to a construction site on 18th April 2018. Before the day go to site, lecturer provide safety helmet and safety shoes to the student that didn’t had this safety equipment. Student includes a group of diploma student and degree student. On the day, all students depart to the site and reach there around 10am. The person in charge is our college’s senior, he also reach the site at the same time and guide us into the site and brief about the project. The purpose of this site visit is help student to gain an experience that they will face in the future and get to know the environment in construction site. Besides that, students learned that the safety equipment is important when get into a site to prevent any injured. Students can see the real thing instead of see it from the paper such as tower crane, scaffolding, and reinforcement bar. 2.0 Project Summary The project is located at Mukim Morib, Daerah Kuala Langat, Selangor Darul Ehsan and it’s belonging to Sentoria Morib Bay Sdn Bhd. This project is to build a water park which requires RM 63,217,500 of contract sum. The construction is start from 1st Nov 2015 and plans to complete in 23rd May 2020. Below will listed out the companies that take place in this project:
  • 4.  Architect: SAM Arkitek Perunding  C&S: HTM Consultants Sdn Bhd  M&E: ICL Associates Sdn Bhd  QS: NIL (in house)  Contractor: Sentoria Bina Sdn Bhd 3.0 Observation and Questions  Earthwork – How they process the disposal material?  Structural work – Is it the size of beam or column can support the building load? - Slab is suspended slab or non-suspended slab?  Worker - every worker is wearing the safety equipment and they are laying the BRC and collaborate with each other.  Health and Safety – Does every worker wear safety equipment? 4.0 Activities Progress of Works 4.1 Mobile crane lifts the material In the picture, the mobile crane is lifting the reinforcement bars to the 4th floor for construction work.
  • 5. 4.2 Laying BRC steel In the picture, the site workers are taking a BRC steel. The picture shows that the site workers are laying the BRC steel. The BRC steel must has the space with each other if not considers fail. 4.3 Reinforcement bar cut and bend In the picture shows that the workers are cutting the reinforcement bars.
  • 6. 4.4 Excavate the topsoil In the picture, the excavator is excavating the topsoil for the piling process. 4.5 Installation of reinforcement bar In the picture, the worker tie the links of the reinforcement bars. 5.0 Material on Site 5.1 Reinforcement bar
  • 7. Reinforcement bars are widely used in the construction industry. It installs in the wall, slab, column and more. 5.2 Concrete Concrete also used in the construction by poured with reinforcing materials embedded to provide tensile strength, yielding reinforced concrete. 5.3 Damp Proof Course Membrane Damp proofing in construction is a type of moisture control applied to building walls and floors to prevent moisture from passing into the interior spaces.
  • 8. 6.0 Plant and Equipment 6.1 Tower crane The tower crane is a modern form of a balance crane. When fixed to the ground, tower cranes will often give the best combination of height and lifting capacity and are also used when constructing tall buildings. In the construction site, the tower crane passes through the 18 meters height of the floor. 6.2 Mobile crane The mobile crane is the common type of crane used in construction today. The mobile crane consists of a steel truss or telescopic boom mounted on a mobile platform, which could be a rail, wheeled, or even on a cat truck. The boom is hinged at the bottom and can be either raised or lowered by cables or hydraulic cylinders.
  • 9. 6.3 Scaffolding The scaffolding is a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings, bridges and all other manmade structures. Scaffolds are widely used on site to get access to heights and areas that would be otherwise hard to get to. 6.4 Cut and Bend machine This machine is used to cut and bend the reinforcement bar on the construction site. 6.5 Temporary staircase
  • 10. 7.0 Site Valuation Process The date of site valuation meeting must be set if the contractor wants to issue the claim to client. The parties involve the meeting are contractor, architect consultant, M&E Consultant and C&S consultant. The project manager and all the consultants will visit the construction site and record the construction works progress. During the meeting , the contractor must provide the progress report, dairy report and progress claim certificate for the consultants. After the meeting, the quantity surveyor of the contractor will submits the claim certificate to all the consultants by email for review verify and approve then just pass to the client. 8.0 Conclusion After the site visit, we realized the construction works are different with what we imagine before we visit the site. We can see the real building instead of just looking on the drawings. Working in construction site is not that easy because the worker should climb up the temporary stairs everyday which is just stand a piece of steel. They also need to work under the hot weather with sweat a lot and easy to get thirst. From this site visit, we learned that the safety equipment is very important to take care ourselves. Although the site worker will give us instruction what to do, we still need to beware everything that may make us injured.