Sigma Test & Research Centre
Cleaning & Sanitation
 Daily / weekly, Master cleaning schedule for all
equipments, general area and building.
 Spring / Master cleaning frequency
 Cleaning records duly signed by staff and
supervisor
Traceability
Material Traceability
SOP for tracing Raw Material,
ingredients, primary packaging must
be laid
Each product must be traceable back
and forth
Product Recall
 SOP must be in place for performing Product recall and
withdrawal.
 Product Recall costs 50 Billion Dollars each year
worldwide
 Recently, car manufacturers Toyota, General Motors,
and Honda have suffered the embarrassing
consequences of product recalls. In addition to the
automobile industry, product recalls have also occurred
in the food, medicine and consumer electronics
industries.
Product Coding, Return,
Salvaging
 Must have procedure for detailing the
requirement of finished goods, case, carton,
pallet: code and date label
 Written procedure for return, receipt, storage
and control of return products.
 Rejected products are effectively destroyed and
documented for record keeping and future
reference.
Pest Control
 Must have SOP on pest control that takes care of rats,
insects and birds
 Inspection records to be maintained along with
documentation of corrective action taken and its effects
after pest control treatment
 Installation of rat traps in receiving docks, entryways.
 Installation of fly traps and regular cleaning of the
equipment with documentation and operational bulbs
always.
 Installation of Air Curtains at employee entrance
 Storage inside the plant must not contribute to rodent
harborage
Internal Audit
 An Internal Audit must be held once a year.
 There must be a Master Schedule for Internal Audit.
 An Audit Manager is required to oversee the procedure.
 Qualification & Training needs for the internal audit
staff to be laid in black and white
 Auditors need to be independent of the area where
audit is being conducted
 There must be a procedure in place to track
corrective action and ensure timely follow up for the
findings from the reports and same must be
documented
GMP / Personal Practices
 Personal Protective Equipment must be worn by
employees, contractors and visitors always in the site.
 Proper Uniform to be worn by the staff in the designated
lab.
 Warning signs to be installed and clearly visible to avoid
accidents.
 Designated Hand Washing area and staff need to wash &
dry hands before returning to work.
 Employee suffering from infectious illness need to refrain
from entering labs.
 Doctor’s medical certificate stating fitness of the employee
while returning to work.
 Designated food storage and consumption area and need
to be clean and well maintained.
 No employees to be allowed to eat or drink in the lab or
production area.
Customer Service
 A Happy Customer is a Returning Customer
 Facility to keep & maintain Customer Service and
complaint process well documented.
 It includes internal communication, investigation, and
timely response.
 Effectively work on feedbacks to improve the services
 Fact:- Very few customers complain rest never turn up
again and approach our competitors instead.
Supply Chain Control
 There must be SOP for handling inspections, testing,
and acceptance of incoming materials as per set
specification prior to use.
 Rejected materials to be controlled and stored
separately from usable materials.
 Non-Conforming Products:- SOP to identify, quarantine
and dispose off nonconforming items to avoid accidents.
 SOP for rework handling process and subsequent
documentation for future reference.
Raw Material & Finished
Goods
 Prevent deterioration of stored materials by
monitoring
1. Physical Storage Condition.
2. Temperature.
3. Humidity.
4. Pallet Spacing.
5. Appropriate positioning to avoid cross
contamination.
 No raw materials to be stored outside the facility
temporarily or permanently in containers with or without
covers.
 FIFO First In First Out to be always maintained to
maintain the quality of the product.
 Storage Inspections- Material area need to be routinely
inspected for the storage condition, product condition,
cleanliness and housekeeping and to be documented for
corrective actions if need be.
 Vendor Approval:-
1. Facility need to have documented Vendor
Approval Process for raw materials, ingredients.
2. Facility need to have vendor performance
evaluation system to critically analysis and
assess vendors for quality and timely product
delivery.
Good Lab Practice
Laboratory Methods
 Appropriate test methods must be available for
testing all the materials and products.
 Must have specific procedure laid for handling out of
specification test results.
 A finished good retain sample program must be in
place
 All lab equipments and instruments needs to be
calibrated as per the calibration schedule.
 Calibration Standards are traceable to National
Standards.
 The Facility must have procedure for handling products
produced with lab equipment that is found to be out of
calibration.
 The lab mixtures are verified regularly to ensure the
validity for use.
 There must be documented program to verify analyst’s
proficiency.
Inspection & Testing
 The products needs to be tested as per the
specifications and well documented.
 Labels are examined for identity before labeling
operations to avoid mix-up.
 The equipment for processing, transfer and filling the
utensils, and the containers for holding raw and bulk
materials are clean, in good repair and in sanitary
condition.
Production & Process
Control
Process & Quality Control
 SOP for the Manufacturing of the product. It must
detail all the activities starting from issue of the raw
materials till the formation of the final product.
 It must include in process quality monitoring
methods, frequency of checks and verification
compliance
 Ensure Quality checks of products are conducted by
trained staff and well documented for corrective
action, if any.
Control of Inspection,
Measuring & Test Equipment
 An Identification system must be in place for all
process equipments to know the equipments that
require calibration.
 Above said process needs to be well documented with
the frequency of inspection.
 Reference Standard needs to identified for critical test
equipments.
 Equipments to be calibrated against certified industry
Standards.
 Documentation for future reference for corrective
actions, if any.
Maintenance
 Facility to have SOP for Preventive Maintenance program. It
must include a list of critical production equipment, the
frequency and accountability for maintenance.
 The Maintenance program must include work instructions for
preventive maintenance.
 The Breakdown Maintenance records to be kept for all the
machines and to be reviewed time to time.
 Refrain from using temporary repairs such as duct tape, or
cardboard on machines.
Contact Us
99, Badli Industrial
Area, Phase 2, New
Delhi, Delhi 110042
+91 - 9560222333
mail@sigmatest.org
Thank You
https://www.sigmatest.org

Sigma Test and Research Centre

  • 1.
    Sigma Test &Research Centre
  • 2.
  • 3.
     Daily /weekly, Master cleaning schedule for all equipments, general area and building.  Spring / Master cleaning frequency  Cleaning records duly signed by staff and supervisor
  • 4.
  • 5.
    Material Traceability SOP fortracing Raw Material, ingredients, primary packaging must be laid Each product must be traceable back and forth
  • 6.
  • 7.
     SOP mustbe in place for performing Product recall and withdrawal.  Product Recall costs 50 Billion Dollars each year worldwide  Recently, car manufacturers Toyota, General Motors, and Honda have suffered the embarrassing consequences of product recalls. In addition to the automobile industry, product recalls have also occurred in the food, medicine and consumer electronics industries.
  • 8.
    Product Coding, Return, Salvaging Must have procedure for detailing the requirement of finished goods, case, carton, pallet: code and date label  Written procedure for return, receipt, storage and control of return products.  Rejected products are effectively destroyed and documented for record keeping and future reference.
  • 9.
  • 10.
     Must haveSOP on pest control that takes care of rats, insects and birds  Inspection records to be maintained along with documentation of corrective action taken and its effects after pest control treatment  Installation of rat traps in receiving docks, entryways.
  • 11.
     Installation offly traps and regular cleaning of the equipment with documentation and operational bulbs always.  Installation of Air Curtains at employee entrance  Storage inside the plant must not contribute to rodent harborage
  • 12.
  • 13.
     An InternalAudit must be held once a year.  There must be a Master Schedule for Internal Audit.  An Audit Manager is required to oversee the procedure.  Qualification & Training needs for the internal audit staff to be laid in black and white
  • 14.
     Auditors needto be independent of the area where audit is being conducted  There must be a procedure in place to track corrective action and ensure timely follow up for the findings from the reports and same must be documented
  • 15.
    GMP / PersonalPractices
  • 16.
     Personal ProtectiveEquipment must be worn by employees, contractors and visitors always in the site.  Proper Uniform to be worn by the staff in the designated lab.  Warning signs to be installed and clearly visible to avoid accidents.  Designated Hand Washing area and staff need to wash & dry hands before returning to work.
  • 17.
     Employee sufferingfrom infectious illness need to refrain from entering labs.  Doctor’s medical certificate stating fitness of the employee while returning to work.  Designated food storage and consumption area and need to be clean and well maintained.  No employees to be allowed to eat or drink in the lab or production area.
  • 18.
  • 19.
     A HappyCustomer is a Returning Customer  Facility to keep & maintain Customer Service and complaint process well documented.  It includes internal communication, investigation, and timely response.  Effectively work on feedbacks to improve the services  Fact:- Very few customers complain rest never turn up again and approach our competitors instead.
  • 20.
  • 21.
     There mustbe SOP for handling inspections, testing, and acceptance of incoming materials as per set specification prior to use.  Rejected materials to be controlled and stored separately from usable materials.  Non-Conforming Products:- SOP to identify, quarantine and dispose off nonconforming items to avoid accidents.  SOP for rework handling process and subsequent documentation for future reference.
  • 22.
    Raw Material &Finished Goods  Prevent deterioration of stored materials by monitoring 1. Physical Storage Condition. 2. Temperature. 3. Humidity. 4. Pallet Spacing. 5. Appropriate positioning to avoid cross contamination.
  • 23.
     No rawmaterials to be stored outside the facility temporarily or permanently in containers with or without covers.  FIFO First In First Out to be always maintained to maintain the quality of the product.  Storage Inspections- Material area need to be routinely inspected for the storage condition, product condition, cleanliness and housekeeping and to be documented for corrective actions if need be.
  • 24.
     Vendor Approval:- 1.Facility need to have documented Vendor Approval Process for raw materials, ingredients. 2. Facility need to have vendor performance evaluation system to critically analysis and assess vendors for quality and timely product delivery.
  • 25.
  • 26.
    Laboratory Methods  Appropriatetest methods must be available for testing all the materials and products.  Must have specific procedure laid for handling out of specification test results.  A finished good retain sample program must be in place  All lab equipments and instruments needs to be calibrated as per the calibration schedule.
  • 27.
     Calibration Standardsare traceable to National Standards.  The Facility must have procedure for handling products produced with lab equipment that is found to be out of calibration.  The lab mixtures are verified regularly to ensure the validity for use.  There must be documented program to verify analyst’s proficiency.
  • 28.
    Inspection & Testing The products needs to be tested as per the specifications and well documented.  Labels are examined for identity before labeling operations to avoid mix-up.  The equipment for processing, transfer and filling the utensils, and the containers for holding raw and bulk materials are clean, in good repair and in sanitary condition.
  • 29.
  • 30.
    Process & QualityControl  SOP for the Manufacturing of the product. It must detail all the activities starting from issue of the raw materials till the formation of the final product.  It must include in process quality monitoring methods, frequency of checks and verification compliance  Ensure Quality checks of products are conducted by trained staff and well documented for corrective action, if any.
  • 31.
    Control of Inspection, Measuring& Test Equipment  An Identification system must be in place for all process equipments to know the equipments that require calibration.  Above said process needs to be well documented with the frequency of inspection.  Reference Standard needs to identified for critical test equipments.  Equipments to be calibrated against certified industry Standards.  Documentation for future reference for corrective actions, if any.
  • 32.
  • 33.
     Facility tohave SOP for Preventive Maintenance program. It must include a list of critical production equipment, the frequency and accountability for maintenance.  The Maintenance program must include work instructions for preventive maintenance.  The Breakdown Maintenance records to be kept for all the machines and to be reviewed time to time.  Refrain from using temporary repairs such as duct tape, or cardboard on machines.
  • 34.