e-GOVERNANCE PROJECT LIFE CYCLE
Project Management Office/Unit
E-governance Project life cycle
1
Vision &
Strategy
Developme
nt
2
Current
State
Assessment
3
Future
State
Definition
5
Develop
and
implement
IT system
4
Implementatio
n approach
and sourcing
6
Operate
and
sustain
Change Management and Communications
2
Need for a more robust approach for e-governance
 To support government’s education organizations to:
• Get it right first time
• Orient project designs with stakeholder focus and needs
• Achieve heightened focus on business and stakeholder benefits
• Prioritization of requirements in line with business and stakeholder
needs
• Support in adoption of best practices and right approach at each phase
• Manage the private sector participation and project delivery to the
results
• Phased implementation with minimal impact and maximum results to
stakeholders
7
Essential elements of e-government project
 Vision and strategy
 Government Process Re-engineering (BPR/FPR)
 Enterprise Architecture
 Software development and IT Infrastructure implementation
 Business model
 Legal Framework
 Change Management
 Training and Capacity Building
 Project and Program Management
 Monitoring & Evaluation…
8
IT is only a
component
1. Vision &
Strategy
Development
2. Current
State
Assessment
3. Future
State
Definition
4.
Implementati
on approach
and sourcing
5. Develop
and
implement IT
system
6. Operate
and sustain
Project Management Office/Unit
Change Management and Communications
E-governance Project life cycle
9
Vision &
Strategy
Development
2. Current
State
Assessment
3. Future State
Definition
4.
Implementation
approach and
sourcing
5. Develop and
implement IT
system
6. Operate and
sustain
Project Management Office/Unit
Change Management and Communications
??
E-governance Project life cycle
10
e-Governance Project Life Cycle (eGLC)
PHASE 1: VISION & STRATEGY DEVELOPMENT
 KEY ACTIVITIES
 Needs Assessment
 Define clear vision & objectives
 Prioritization of services and projects
 Incorporate domestic and global learnings
 Identify institutional structures & capacities for
implementation
 Define funding requirements
 Define monitoring and evaluation approach…
11
e-Governance Project Life Cycle (eGLC)
Phase 1: Vision & Strategy Development Typically
Includes
 Assessment of department functions and services
 Services listing and prioritization based on vision and objectives
 Identification of projects for achieving the vision and objectives
and prioritization of projects
 Definition of expected benefits, outputs and outcomes
 Definition of implementation roadmap and timelines
 Definition of institutional structures required, including roles
and responsibilities for implementation of identified projects
 Assessment of funding requirements for implementation of
strategy
 Risk assessment and mitigation measures definition…
 Monitoring & Evaluation framework
12
e-Governance Project Life Cycle (eGLC)
13
1. Vision & Strategy
Development
2. Current
State
Assessment
3. Future State
Definition
4. Implementation
approach and
sourcing
5. Develop and
implement IT
system
6. Operate and
sustain
Project Management Office/Unit
Change Management and Communications
??
e-Governance Project Life Cycle (eGLC)
 To perform an in-depth assessment of business functions
and services identified for coverage under e-Governance
project to understand:
 Current approach for performing the business functions
and service delivery
 The key challenges and to identify improvement areas
 Stakeholder needs and expectations
 Good practices and learnings from similar implementations
in similar domains
 Current systems (IT) implemented in the department,
coverage and gaps
 Organization structures and people capacities etc
PHASE 2: CURRENT STATE ASSESSMENT
14
e-Governance Project Life Cycle (eGLC)
PHASE 2: CURRENT STATE (AS-IS) ASSESSMENT
As-Is Assessment is carried out along the following dimensions:
16
AS-IS
ASSESSMENT
IT
Systems
Business
Processes
People
e-Governance Project Life Cycle (eGLC)
 KEY OUTPUTS/DELIVERABLES
17
PHASE 2: CURRENT STATE ASSESSMENT
• Process maps
• Pain points
• Initial
improvement
areas
• Stakeholder
needs
As-Is
Processes
• IT Systems
• Scope and
functionality
• Strengths and
gaps
• IT Infrastructure
(network,
security, data
center)..
As-Is IT
Environment
• Organizational
structures
• Roles and
responsibilities
• Capacities and
skill sets
• Change barriers..
As-Is People
Environment
e-Governance Project Life Cycle (eGLC)
18
1. Vision & Strategy
Development
2. Current State
Assessment
3. Future
State
Definition
4. Implementation
approach and
sourcing
5. Develop and
implement IT
system
6. Operate and
sustain
Project Management Office/Unit
Change Management and Communications
??
e-Governance Project Lifecycle (eGLC)
PHASE 3: DEFINE FUTURE STATE (TO-BE DEFINITION)
 To define how the identified business functions and services
shall be performed going forward
 To define the new business processes
 To define IT solutions and services for automation of new
business processes
 To define people change management, capacity building
and communication requirements for project
implementation
19
e-Governance Project Life Cycle (eGLC)
20
To-be definition is performed along the following dimensions:
PHASE 3: DEFINE FUTURE STATE (TO-BE DEFINITION)
TO-BE
DEFINITION
IT
Systems
Business
Processes
People
e-Governance Project Life Cycle (eGLC)
21
KEY OUTPUTS/DELIVERABLES
• To - be
business
processes
• New process
KPIs/metrics
• Changes to
the legal and
policy
environment
To-be
Processes
Functional Architecture and
Requirements specifications
Enterprise Architecture
covering Application, data,
network, security, data center
architecture
Data digitization and
migration strategy
SLAs
To-be IT
Environment
• Institutional structures
needed for project
implementation
• Training and Capacity
building plan
• Change Management
Plan
• Communications
Management Plan
To-be People
Environment
PHASE 3: DEFINE FUTURE STATE (TO-BE DEFINITION)
e-Governance Project Life Cycle (eGLC)
22
1. Vision & Strategy
Development
2. Current State
Assessment
3. Future State
Definition
4.
Implementation
approach and
sourcing
5. Develop and
implement IT
system
6. Operate and
sustain
Project Management Office/Unit
Change Management and Communications
??
Implementatio
n Approach
and Plan
Business
Model
Definition
RFP and
Contract
Development
Vendor
Evaluation
and Selection
e-Governance Project Life Cycle (eGLC)
 KEY ACTIVITIES/OUT PUTS/DELIVERABLES
23
PHASE 4: IMPLEMENTATION APPROACH AND SOURCING
 Implementation
Approach and Plan
 Implementation
timelines
 Identification of
key stakeholders
and their roles and
responsibilities
 Monitoring and
Evaluation (M & E)
Plan
 Project
investments and
costs
 Business/implem
entation model
 Payment terms
 SLAs
 Procurement
approach
 Request for
Proposals (RFP)
 Contract
Documents/Agre
ements
 Pre-bid minutes
and clarifications
 Vendor
evaluation
reports
 Vendor (s)
identification
 Signed contract
documents
e-Governance Project Life Cycle (eGLC)
24
1. Vision &
Strategy
Development
2. Current State
Assessment
3. Future State
Definition
4.
Implementation
approach and
sourcing
5. Develop
and
implement
IT system
6. Operate and
sustain
Project Management Office/Unit
Change Management and Communications
??
e-Governance Project Life Cycle (eGLC)
25
PHASE 5: DEVELOP AND IMPLEMENT IT SYSTEM
Requirement
Specification
DeploymentTesting
Construction
(development
or coding)
System
Design
SOFTWARE DEVELOPMENT LIFE CYCLE
System design and development
Software quality assurance, acceptance
testing and auditing
Training and capacity building
Change management and project
communications
Definition of
detailed
functional
and
technical
requirements
Project
documentation
Project go-live
e-Governance Project Life Cycle (eGLC)
26
1. Vision &
Strategy
Development
2. Current State
Assessment
3. Future State
Definition
4.
Implementation
approach and
sourcing
5. Develop and
implement IT
system
6. Operate
and
sustain
Project Management Office/Unit
Change Management and Communications
??
e-Governance Project Life Cycle (eGLC)
PHASE 6: OPERATE AND SUSTAIN
 KEY ACTIVITIES
 System operations and maintenance
 Software change management
 Rollout services and systems (functionality and geography)
 Objectives and benefits evaluation and reinforcement
 Sustained change, capacity building and communications..
27
e-Governance Project Lifecycle (eGLC)
28
1. Vision &
Strategy
Development
2. Current State
Assessment
3. Future State
Definition
4. Implementation
approach and
sourcing
5. Develop and
implement IT
system
6. Operate and
sustain
Project Management Office/Unit
Change Management and Communications
??
e-Governance Project Lifecycle (eGLC)
PROJECT MANAGEMENT OFFICE/UNIT
 OBJECTIVES
• To provide direction and to manage the project through out the lifecycle
• To ensure project development and implementation inline with the overall
vision and objectives
• To operationalise the project strategy inline with the defined timelines
• To ensure application of learnings and best practices across
initiatives/geographies/ functions
• Coordinate, monitor and track the project activities…..
 COMPOSITION:
• Consists of management and operations team from Government with
experts/support staff from private sector entities
• Reports to project leadership team for seeking necessary guidance and
support
• To be intact throughout the project lifecycle till successful stabilization of
the systems and operations
• Size of team, roles and responsibilities may vary from phase to phase
29
e-Governance Project Lifecycle (eGLC)
1. Vision & Strategy
Development
2. Current State
Assessment
3. Future State
Definition
4. Implementation
approach and
sourcing
5. Develop and
implement IT
system
6. Operate and
sustain
Project Management Office/Unit
Change Management and Communications
??
30
e-Governance Project Lifecycle (eGLC)
 Generally is driven by Project Management Office/Unit
 Objective is to address and manage the ‘people’ related
aspects in the project implementation including:
• Managing the people change in terms of
addressing the resistance
• Managing people resistance to change
• Communicating the project vision, objectives
and benefits to all the stakeholders
• To build skill sets and capacities across various
levels in the organization to adopt new
processes and systems
31
CHANGE MANAGEMENT AND COMMUNICATIONS
e-Governance Project Lifecycle (eGLC)
32
e-Governance
Strategy
Development
Current State
Assessment
Future State
Definition
Implementation
approach and
sourcing
Develop and
implement IT
system
Operate and
sustain
• Needs Assessment
• Define clear vision &
objectives
• Prioritization of
services and projects
• Incorporate domestic
and global learnings
• Identify institutional
structures &
capacities for
implementation
• Define funding
requirements
• Define monitoring
and evaluation
approach…
• Critical assessment
of current business
processes and pain
areas
• Best practices in
similar environments
• Assess legal
framework and
current limitations
• Assess current ICT
systems and their
ability to support
future plans
• Assessment of
current capacities at
all levels and their
preparedness for e-
governance..
• Process
reengineering and to
–be process
definition
• Identity IT
enablement
opportunities and
requirements
• Define changes to
the legal and
regulatory
environment
• Develop People
change and capacity
building plan
• Develop project
awareness and
communication
requirements…
• Define
implementation
approach and
phasing plan
(functional and
geographic)
• Assess detailed
funding
requirements and
business model
• Develop vendor
evaluation and
selection criteria
• Develop KPIs and
performance levels
for services and
systems
• Develop RFP
• Bid evaluation and
vendor selection
• Definition of detailed
functional and
technical
requirements
• System design and
development
• Software quality
assurance,
acceptance testing
and auditing
• Training and
capacity building
• Change management
and project
communications
• Project
documentation
• Project go-live
• System operations
and maintenance
• Software change
management
• Rollout services and
systems
(functionality and
geography)
• Objectives and
benefits evaluation
and reinforcement
• Sustained change,
capacity building
and
communications..

More Related Content

What's hot

E billing and invoice system
E billing and invoice systemE billing and invoice system
E billing and invoice systemSurya Indira
 
IOT - Design Principles of Connected Devices
IOT - Design Principles of Connected DevicesIOT - Design Principles of Connected Devices
IOT - Design Principles of Connected DevicesDevyani Vasistha
 
E Governance
E GovernanceE Governance
E GovernanceZafour
 
E-Governance : HUL291 Course syllabus
E-Governance : HUL291 Course syllabusE-Governance : HUL291 Course syllabus
E-Governance : HUL291 Course syllabusAkshat Goel
 
Daily Expense Tracker BSc.CSIT Project Nepal
Daily Expense Tracker BSc.CSIT Project NepalDaily Expense Tracker BSc.CSIT Project Nepal
Daily Expense Tracker BSc.CSIT Project NepalRashna Maharjan
 
Contact Management System
Contact Management SystemContact Management System
Contact Management SystemGopal Bhat
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittalsatyaragha786
 
two tier and three tier
two tier and three tiertwo tier and three tier
two tier and three tierKashafnaz2
 
Bs information technology
Bs information technologyBs information technology
Bs information technologyNazakatBhatti
 
Consumer Oriented E-Commerce Q&A
Consumer Oriented E-Commerce Q&AConsumer Oriented E-Commerce Q&A
Consumer Oriented E-Commerce Q&AMurali Mohan
 
Online Banking Project
Online Banking ProjectOnline Banking Project
Online Banking ProjectM.Saber
 
Mobile Application Development Services-MobileApptelligence
Mobile Application Development Services-MobileApptelligenceMobile Application Development Services-MobileApptelligence
Mobile Application Development Services-MobileApptelligenceMobileapptelligence
 
Information Technology Project Management - part 01
Information Technology Project Management - part 01Information Technology Project Management - part 01
Information Technology Project Management - part 01Rizwan Khurram
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software EngineeringFáber D. Giraldo
 
E-com, E-payment & EDI
E-com, E-payment & EDIE-com, E-payment & EDI
E-com, E-payment & EDIAkhil Kaushik
 
Introduction of VLAN and VSAN with its benefits,
Introduction of VLAN and VSAN with its benefits,Introduction of VLAN and VSAN with its benefits,
Introduction of VLAN and VSAN with its benefits,Dr Neelesh Jain
 

What's hot (20)

E billing and invoice system
E billing and invoice systemE billing and invoice system
E billing and invoice system
 
IOT - Design Principles of Connected Devices
IOT - Design Principles of Connected DevicesIOT - Design Principles of Connected Devices
IOT - Design Principles of Connected Devices
 
E Governance
E GovernanceE Governance
E Governance
 
E-Governance : HUL291 Course syllabus
E-Governance : HUL291 Course syllabusE-Governance : HUL291 Course syllabus
E-Governance : HUL291 Course syllabus
 
Daily Expense Tracker BSc.CSIT Project Nepal
Daily Expense Tracker BSc.CSIT Project NepalDaily Expense Tracker BSc.CSIT Project Nepal
Daily Expense Tracker BSc.CSIT Project Nepal
 
Contact Management System
Contact Management SystemContact Management System
Contact Management System
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal
 
two tier and three tier
two tier and three tiertwo tier and three tier
two tier and three tier
 
Bs information technology
Bs information technologyBs information technology
Bs information technology
 
Consumer Oriented E-Commerce Q&A
Consumer Oriented E-Commerce Q&AConsumer Oriented E-Commerce Q&A
Consumer Oriented E-Commerce Q&A
 
Online Banking Project
Online Banking ProjectOnline Banking Project
Online Banking Project
 
Mobile Application Development Services-MobileApptelligence
Mobile Application Development Services-MobileApptelligenceMobile Application Development Services-MobileApptelligence
Mobile Application Development Services-MobileApptelligence
 
Room rental system
Room rental systemRoom rental system
Room rental system
 
Information Technology Project Management - part 01
Information Technology Project Management - part 01Information Technology Project Management - part 01
Information Technology Project Management - part 01
 
Online attendance management system
Online attendance management systemOnline attendance management system
Online attendance management system
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software Engineering
 
E-com, E-payment & EDI
E-com, E-payment & EDIE-com, E-payment & EDI
E-com, E-payment & EDI
 
Wot
WotWot
Wot
 
Introduction to Web Services
Introduction to Web ServicesIntroduction to Web Services
Introduction to Web Services
 
Introduction of VLAN and VSAN with its benefits,
Introduction of VLAN and VSAN with its benefits,Introduction of VLAN and VSAN with its benefits,
Introduction of VLAN and VSAN with its benefits,
 

Similar to Session3 introduction to e governance project lifecycle

BI Presentation Nashville CIO Council
BI Presentation Nashville CIO CouncilBI Presentation Nashville CIO Council
BI Presentation Nashville CIO CouncilThomas Danford
 
IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)jimmcdonaldpmp
 
Frameworks For Predictability
Frameworks For PredictabilityFrameworks For Predictability
Frameworks For Predictabilitytlknecht
 
Course 1 Requirements Definition Overview.pptx
Course 1 Requirements Definition Overview.pptxCourse 1 Requirements Definition Overview.pptx
Course 1 Requirements Definition Overview.pptxadikesavulu
 
SDLC Process_Document.pptx
SDLC Process_Document.pptxSDLC Process_Document.pptx
SDLC Process_Document.pptxSivakumar Pola
 
Developing IT Strategy
Developing IT StrategyDeveloping IT Strategy
Developing IT StrategyMario Navarro
 
Project Management Competency Guide for Digital Transformation
Project Management Competency Guide for Digital TransformationProject Management Competency Guide for Digital Transformation
Project Management Competency Guide for Digital TransformationJohn Macasio
 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1Toe Myint Naing
 
Lc Presentation
Lc PresentationLc Presentation
Lc Presentationreachab7
 
Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017Diana M. Arias
 
Educause Connect, Portland - Becoming a Partner of Choice in Portfolio & Proj...
Educause Connect, Portland - Becoming a Partner of Choice in Portfolio & Proj...Educause Connect, Portland - Becoming a Partner of Choice in Portfolio & Proj...
Educause Connect, Portland - Becoming a Partner of Choice in Portfolio & Proj...Jane Cox
 
Setting Up A Project Management Office
Setting Up A Project Management OfficeSetting Up A Project Management Office
Setting Up A Project Management OfficeKit Rowley
 
Critical Success Factors Influencing SOA implementations in Healthcare
Critical Success Factors Influencing SOA implementations in Healthcare Critical Success Factors Influencing SOA implementations in Healthcare
Critical Success Factors Influencing SOA implementations in Healthcare Drkonk
 
Day 1: ICT Strategic Planning, Mr. Soufiane Ben Moussa, CTO, House of Commons...
Day 1: ICT Strategic Planning, Mr. Soufiane Ben Moussa, CTO, House of Commons...Day 1: ICT Strategic Planning, Mr. Soufiane Ben Moussa, CTO, House of Commons...
Day 1: ICT Strategic Planning, Mr. Soufiane Ben Moussa, CTO, House of Commons...wepc2016
 
Karith_Rungwattana_Resume 201603 v 1.0
Karith_Rungwattana_Resume 201603 v 1.0Karith_Rungwattana_Resume 201603 v 1.0
Karith_Rungwattana_Resume 201603 v 1.0Karith Rungwattana
 
CISOA Presentationv as of 03 08 2015 Final
CISOA Presentationv as of 03 08 2015 FinalCISOA Presentationv as of 03 08 2015 Final
CISOA Presentationv as of 03 08 2015 FinalCalvin B. Madlock
 

Similar to Session3 introduction to e governance project lifecycle (20)

BI Presentation Nashville CIO Council
BI Presentation Nashville CIO CouncilBI Presentation Nashville CIO Council
BI Presentation Nashville CIO Council
 
IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)
 
Frameworks For Predictability
Frameworks For PredictabilityFrameworks For Predictability
Frameworks For Predictability
 
Course 1 Requirements Definition Overview.pptx
Course 1 Requirements Definition Overview.pptxCourse 1 Requirements Definition Overview.pptx
Course 1 Requirements Definition Overview.pptx
 
Cobit5
Cobit5Cobit5
Cobit5
 
SDLC Process_Document.pptx
SDLC Process_Document.pptxSDLC Process_Document.pptx
SDLC Process_Document.pptx
 
Implementing IT Service Management: A Guide to Success
Implementing IT Service Management: A Guide to SuccessImplementing IT Service Management: A Guide to Success
Implementing IT Service Management: A Guide to Success
 
Developing IT Strategy
Developing IT StrategyDeveloping IT Strategy
Developing IT Strategy
 
Software Project Management by Dr. B. J. Mohite
Software Project Management by Dr. B. J. MohiteSoftware Project Management by Dr. B. J. Mohite
Software Project Management by Dr. B. J. Mohite
 
Project Management Competency Guide for Digital Transformation
Project Management Competency Guide for Digital TransformationProject Management Competency Guide for Digital Transformation
Project Management Competency Guide for Digital Transformation
 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1
 
Lc Presentation
Lc PresentationLc Presentation
Lc Presentation
 
Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017
 
Educause Connect, Portland - Becoming a Partner of Choice in Portfolio & Proj...
Educause Connect, Portland - Becoming a Partner of Choice in Portfolio & Proj...Educause Connect, Portland - Becoming a Partner of Choice in Portfolio & Proj...
Educause Connect, Portland - Becoming a Partner of Choice in Portfolio & Proj...
 
Setting Up A Project Management Office
Setting Up A Project Management OfficeSetting Up A Project Management Office
Setting Up A Project Management Office
 
Critical Success Factors Influencing SOA implementations in Healthcare
Critical Success Factors Influencing SOA implementations in Healthcare Critical Success Factors Influencing SOA implementations in Healthcare
Critical Success Factors Influencing SOA implementations in Healthcare
 
Day 1: ICT Strategic Planning, Mr. Soufiane Ben Moussa, CTO, House of Commons...
Day 1: ICT Strategic Planning, Mr. Soufiane Ben Moussa, CTO, House of Commons...Day 1: ICT Strategic Planning, Mr. Soufiane Ben Moussa, CTO, House of Commons...
Day 1: ICT Strategic Planning, Mr. Soufiane Ben Moussa, CTO, House of Commons...
 
Practical experiences of portfolio management
Practical experiences of portfolio managementPractical experiences of portfolio management
Practical experiences of portfolio management
 
Karith_Rungwattana_Resume 201603 v 1.0
Karith_Rungwattana_Resume 201603 v 1.0Karith_Rungwattana_Resume 201603 v 1.0
Karith_Rungwattana_Resume 201603 v 1.0
 
CISOA Presentationv as of 03 08 2015 Final
CISOA Presentationv as of 03 08 2015 FinalCISOA Presentationv as of 03 08 2015 Final
CISOA Presentationv as of 03 08 2015 Final
 

Recently uploaded

Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe NoidaCall Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe NoidaDelhi Escorts Service
 
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCRthapariya601
 
Call Girls In Sector 26, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 26, (Gurgaon) Call Us. 9711911712Call Girls In Sector 26, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 26, (Gurgaon) Call Us. 9711911712Delhi Escorts Service
 
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝thapagita
 
NAGPUR CALL GIRL 92628*71154 NAGPUR CALL
NAGPUR CALL GIRL 92628*71154 NAGPUR CALLNAGPUR CALL GIRL 92628*71154 NAGPUR CALL
NAGPUR CALL GIRL 92628*71154 NAGPUR CALLNiteshKumar82226
 
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCRsoniya singh
 
100% Real Call Girls In New Ashok Nagar Delhi | Just Call 9711911712
100% Real Call Girls In New Ashok Nagar Delhi | Just Call 9711911712100% Real Call Girls In New Ashok Nagar Delhi | Just Call 9711911712
100% Real Call Girls In New Ashok Nagar Delhi | Just Call 9711911712Delhi Escorts Service
 
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...aakahthapa70
 
Call Girls in Paharganj Delhi 💯 Call Us 🔝9667422720🔝
Call Girls in Paharganj Delhi 💯 Call Us 🔝9667422720🔝Call Girls in Paharganj Delhi 💯 Call Us 🔝9667422720🔝
Call Girls in Paharganj Delhi 💯 Call Us 🔝9667422720🔝Lipikasharma29
 
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...aakahthapa70
 
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls ServiceCall Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls ServiceAyesha Khan
 
Call Girls in Janakpuri Delhi 💯 Call Us 🔝9667422720🔝
Call Girls in Janakpuri Delhi 💯 Call Us 🔝9667422720🔝Call Girls in Janakpuri Delhi 💯 Call Us 🔝9667422720🔝
Call Girls in Janakpuri Delhi 💯 Call Us 🔝9667422720🔝Lipikasharma29
 
BEST Call Girls In Near By Svelte Hotel & Personal Suites ✨ 9773824855 ✨ Esco...
BEST Call Girls In Near By Svelte Hotel & Personal Suites ✨ 9773824855 ✨ Esco...BEST Call Girls In Near By Svelte Hotel & Personal Suites ✨ 9773824855 ✨ Esco...
BEST Call Girls In Near By Svelte Hotel & Personal Suites ✨ 9773824855 ✨ Esco...noida100girls
 
Call Girls In Sector 29, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 29, (Gurgaon) Call Us. 9711911712Call Girls In Sector 29, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 29, (Gurgaon) Call Us. 9711911712Delhi Escorts Service
 
Genuine Call Girls In {Mahipalpur Delhi} 9667938988 Indian Russian High Profi...
Genuine Call Girls In {Mahipalpur Delhi} 9667938988 Indian Russian High Profi...Genuine Call Girls In {Mahipalpur Delhi} 9667938988 Indian Russian High Profi...
Genuine Call Girls In {Mahipalpur Delhi} 9667938988 Indian Russian High Profi...aakahthapa70
 
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂door45step
 
Call Girls In Islamabad 💯Call Us 🔝03090999379🔝
Call Girls In Islamabad 💯Call Us 🔝03090999379🔝Call Girls In Islamabad 💯Call Us 🔝03090999379🔝
Call Girls In Islamabad 💯Call Us 🔝03090999379🔝Ayesha Khan
 
NASHIK CALL GIRL 92628*71154 NASHIK CALL
NASHIK CALL GIRL 92628*71154 NASHIK CALLNASHIK CALL GIRL 92628*71154 NASHIK CALL
NASHIK CALL GIRL 92628*71154 NASHIK CALLNiteshKumar82226
 
9643097474 Full Enjoy @24/7 Call Girls In Mahipalpur Delhi Ncr
9643097474 Full Enjoy @24/7 Call Girls In Mahipalpur Delhi Ncr9643097474 Full Enjoy @24/7 Call Girls In Mahipalpur Delhi Ncr
9643097474 Full Enjoy @24/7 Call Girls In Mahipalpur Delhi Ncrthapariya601
 
Call Girls In Islamabad ***03255523555*** Red Hot Call Girls In Islamabad Esc...
Call Girls In Islamabad ***03255523555*** Red Hot Call Girls In Islamabad Esc...Call Girls In Islamabad ***03255523555*** Red Hot Call Girls In Islamabad Esc...
Call Girls In Islamabad ***03255523555*** Red Hot Call Girls In Islamabad Esc...Ayesha Khan
 

Recently uploaded (20)

Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe NoidaCall Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
 
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR
 
Call Girls In Sector 26, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 26, (Gurgaon) Call Us. 9711911712Call Girls In Sector 26, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 26, (Gurgaon) Call Us. 9711911712
 
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝
Call Girls in Majnu ka Tilla Delhi 💯 Call Us 🔝9711014705🔝
 
NAGPUR CALL GIRL 92628*71154 NAGPUR CALL
NAGPUR CALL GIRL 92628*71154 NAGPUR CALLNAGPUR CALL GIRL 92628*71154 NAGPUR CALL
NAGPUR CALL GIRL 92628*71154 NAGPUR CALL
 
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR
 
100% Real Call Girls In New Ashok Nagar Delhi | Just Call 9711911712
100% Real Call Girls In New Ashok Nagar Delhi | Just Call 9711911712100% Real Call Girls In New Ashok Nagar Delhi | Just Call 9711911712
100% Real Call Girls In New Ashok Nagar Delhi | Just Call 9711911712
 
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...
Call Girls In {Green Park Delhi} 9667938988 Indian Russian High Profile Girls...
 
Call Girls in Paharganj Delhi 💯 Call Us 🔝9667422720🔝
Call Girls in Paharganj Delhi 💯 Call Us 🔝9667422720🔝Call Girls in Paharganj Delhi 💯 Call Us 🔝9667422720🔝
Call Girls in Paharganj Delhi 💯 Call Us 🔝9667422720🔝
 
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...
 
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls ServiceCall Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
 
Call Girls in Janakpuri Delhi 💯 Call Us 🔝9667422720🔝
Call Girls in Janakpuri Delhi 💯 Call Us 🔝9667422720🔝Call Girls in Janakpuri Delhi 💯 Call Us 🔝9667422720🔝
Call Girls in Janakpuri Delhi 💯 Call Us 🔝9667422720🔝
 
BEST Call Girls In Near By Svelte Hotel & Personal Suites ✨ 9773824855 ✨ Esco...
BEST Call Girls In Near By Svelte Hotel & Personal Suites ✨ 9773824855 ✨ Esco...BEST Call Girls In Near By Svelte Hotel & Personal Suites ✨ 9773824855 ✨ Esco...
BEST Call Girls In Near By Svelte Hotel & Personal Suites ✨ 9773824855 ✨ Esco...
 
Call Girls In Sector 29, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 29, (Gurgaon) Call Us. 9711911712Call Girls In Sector 29, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 29, (Gurgaon) Call Us. 9711911712
 
Genuine Call Girls In {Mahipalpur Delhi} 9667938988 Indian Russian High Profi...
Genuine Call Girls In {Mahipalpur Delhi} 9667938988 Indian Russian High Profi...Genuine Call Girls In {Mahipalpur Delhi} 9667938988 Indian Russian High Profi...
Genuine Call Girls In {Mahipalpur Delhi} 9667938988 Indian Russian High Profi...
 
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂
 
Call Girls In Islamabad 💯Call Us 🔝03090999379🔝
Call Girls In Islamabad 💯Call Us 🔝03090999379🔝Call Girls In Islamabad 💯Call Us 🔝03090999379🔝
Call Girls In Islamabad 💯Call Us 🔝03090999379🔝
 
NASHIK CALL GIRL 92628*71154 NASHIK CALL
NASHIK CALL GIRL 92628*71154 NASHIK CALLNASHIK CALL GIRL 92628*71154 NASHIK CALL
NASHIK CALL GIRL 92628*71154 NASHIK CALL
 
9643097474 Full Enjoy @24/7 Call Girls In Mahipalpur Delhi Ncr
9643097474 Full Enjoy @24/7 Call Girls In Mahipalpur Delhi Ncr9643097474 Full Enjoy @24/7 Call Girls In Mahipalpur Delhi Ncr
9643097474 Full Enjoy @24/7 Call Girls In Mahipalpur Delhi Ncr
 
Call Girls In Islamabad ***03255523555*** Red Hot Call Girls In Islamabad Esc...
Call Girls In Islamabad ***03255523555*** Red Hot Call Girls In Islamabad Esc...Call Girls In Islamabad ***03255523555*** Red Hot Call Girls In Islamabad Esc...
Call Girls In Islamabad ***03255523555*** Red Hot Call Girls In Islamabad Esc...
 

Session3 introduction to e governance project lifecycle

  • 2. Project Management Office/Unit E-governance Project life cycle 1 Vision & Strategy Developme nt 2 Current State Assessment 3 Future State Definition 5 Develop and implement IT system 4 Implementatio n approach and sourcing 6 Operate and sustain Change Management and Communications 2
  • 3. Need for a more robust approach for e-governance  To support government’s education organizations to: • Get it right first time • Orient project designs with stakeholder focus and needs • Achieve heightened focus on business and stakeholder benefits • Prioritization of requirements in line with business and stakeholder needs • Support in adoption of best practices and right approach at each phase • Manage the private sector participation and project delivery to the results • Phased implementation with minimal impact and maximum results to stakeholders 7
  • 4. Essential elements of e-government project  Vision and strategy  Government Process Re-engineering (BPR/FPR)  Enterprise Architecture  Software development and IT Infrastructure implementation  Business model  Legal Framework  Change Management  Training and Capacity Building  Project and Program Management  Monitoring & Evaluation… 8 IT is only a component
  • 5. 1. Vision & Strategy Development 2. Current State Assessment 3. Future State Definition 4. Implementati on approach and sourcing 5. Develop and implement IT system 6. Operate and sustain Project Management Office/Unit Change Management and Communications E-governance Project life cycle 9
  • 6. Vision & Strategy Development 2. Current State Assessment 3. Future State Definition 4. Implementation approach and sourcing 5. Develop and implement IT system 6. Operate and sustain Project Management Office/Unit Change Management and Communications ?? E-governance Project life cycle 10
  • 7. e-Governance Project Life Cycle (eGLC) PHASE 1: VISION & STRATEGY DEVELOPMENT  KEY ACTIVITIES  Needs Assessment  Define clear vision & objectives  Prioritization of services and projects  Incorporate domestic and global learnings  Identify institutional structures & capacities for implementation  Define funding requirements  Define monitoring and evaluation approach… 11
  • 8. e-Governance Project Life Cycle (eGLC) Phase 1: Vision & Strategy Development Typically Includes  Assessment of department functions and services  Services listing and prioritization based on vision and objectives  Identification of projects for achieving the vision and objectives and prioritization of projects  Definition of expected benefits, outputs and outcomes  Definition of implementation roadmap and timelines  Definition of institutional structures required, including roles and responsibilities for implementation of identified projects  Assessment of funding requirements for implementation of strategy  Risk assessment and mitigation measures definition…  Monitoring & Evaluation framework 12
  • 9. e-Governance Project Life Cycle (eGLC) 13 1. Vision & Strategy Development 2. Current State Assessment 3. Future State Definition 4. Implementation approach and sourcing 5. Develop and implement IT system 6. Operate and sustain Project Management Office/Unit Change Management and Communications ??
  • 10. e-Governance Project Life Cycle (eGLC)  To perform an in-depth assessment of business functions and services identified for coverage under e-Governance project to understand:  Current approach for performing the business functions and service delivery  The key challenges and to identify improvement areas  Stakeholder needs and expectations  Good practices and learnings from similar implementations in similar domains  Current systems (IT) implemented in the department, coverage and gaps  Organization structures and people capacities etc PHASE 2: CURRENT STATE ASSESSMENT 14
  • 11. e-Governance Project Life Cycle (eGLC) PHASE 2: CURRENT STATE (AS-IS) ASSESSMENT As-Is Assessment is carried out along the following dimensions: 16 AS-IS ASSESSMENT IT Systems Business Processes People
  • 12. e-Governance Project Life Cycle (eGLC)  KEY OUTPUTS/DELIVERABLES 17 PHASE 2: CURRENT STATE ASSESSMENT • Process maps • Pain points • Initial improvement areas • Stakeholder needs As-Is Processes • IT Systems • Scope and functionality • Strengths and gaps • IT Infrastructure (network, security, data center).. As-Is IT Environment • Organizational structures • Roles and responsibilities • Capacities and skill sets • Change barriers.. As-Is People Environment
  • 13. e-Governance Project Life Cycle (eGLC) 18 1. Vision & Strategy Development 2. Current State Assessment 3. Future State Definition 4. Implementation approach and sourcing 5. Develop and implement IT system 6. Operate and sustain Project Management Office/Unit Change Management and Communications ??
  • 14. e-Governance Project Lifecycle (eGLC) PHASE 3: DEFINE FUTURE STATE (TO-BE DEFINITION)  To define how the identified business functions and services shall be performed going forward  To define the new business processes  To define IT solutions and services for automation of new business processes  To define people change management, capacity building and communication requirements for project implementation 19
  • 15. e-Governance Project Life Cycle (eGLC) 20 To-be definition is performed along the following dimensions: PHASE 3: DEFINE FUTURE STATE (TO-BE DEFINITION) TO-BE DEFINITION IT Systems Business Processes People
  • 16. e-Governance Project Life Cycle (eGLC) 21 KEY OUTPUTS/DELIVERABLES • To - be business processes • New process KPIs/metrics • Changes to the legal and policy environment To-be Processes Functional Architecture and Requirements specifications Enterprise Architecture covering Application, data, network, security, data center architecture Data digitization and migration strategy SLAs To-be IT Environment • Institutional structures needed for project implementation • Training and Capacity building plan • Change Management Plan • Communications Management Plan To-be People Environment PHASE 3: DEFINE FUTURE STATE (TO-BE DEFINITION)
  • 17. e-Governance Project Life Cycle (eGLC) 22 1. Vision & Strategy Development 2. Current State Assessment 3. Future State Definition 4. Implementation approach and sourcing 5. Develop and implement IT system 6. Operate and sustain Project Management Office/Unit Change Management and Communications ??
  • 18. Implementatio n Approach and Plan Business Model Definition RFP and Contract Development Vendor Evaluation and Selection e-Governance Project Life Cycle (eGLC)  KEY ACTIVITIES/OUT PUTS/DELIVERABLES 23 PHASE 4: IMPLEMENTATION APPROACH AND SOURCING  Implementation Approach and Plan  Implementation timelines  Identification of key stakeholders and their roles and responsibilities  Monitoring and Evaluation (M & E) Plan  Project investments and costs  Business/implem entation model  Payment terms  SLAs  Procurement approach  Request for Proposals (RFP)  Contract Documents/Agre ements  Pre-bid minutes and clarifications  Vendor evaluation reports  Vendor (s) identification  Signed contract documents
  • 19. e-Governance Project Life Cycle (eGLC) 24 1. Vision & Strategy Development 2. Current State Assessment 3. Future State Definition 4. Implementation approach and sourcing 5. Develop and implement IT system 6. Operate and sustain Project Management Office/Unit Change Management and Communications ??
  • 20. e-Governance Project Life Cycle (eGLC) 25 PHASE 5: DEVELOP AND IMPLEMENT IT SYSTEM Requirement Specification DeploymentTesting Construction (development or coding) System Design SOFTWARE DEVELOPMENT LIFE CYCLE System design and development Software quality assurance, acceptance testing and auditing Training and capacity building Change management and project communications Definition of detailed functional and technical requirements Project documentation Project go-live
  • 21. e-Governance Project Life Cycle (eGLC) 26 1. Vision & Strategy Development 2. Current State Assessment 3. Future State Definition 4. Implementation approach and sourcing 5. Develop and implement IT system 6. Operate and sustain Project Management Office/Unit Change Management and Communications ??
  • 22. e-Governance Project Life Cycle (eGLC) PHASE 6: OPERATE AND SUSTAIN  KEY ACTIVITIES  System operations and maintenance  Software change management  Rollout services and systems (functionality and geography)  Objectives and benefits evaluation and reinforcement  Sustained change, capacity building and communications.. 27
  • 23. e-Governance Project Lifecycle (eGLC) 28 1. Vision & Strategy Development 2. Current State Assessment 3. Future State Definition 4. Implementation approach and sourcing 5. Develop and implement IT system 6. Operate and sustain Project Management Office/Unit Change Management and Communications ??
  • 24. e-Governance Project Lifecycle (eGLC) PROJECT MANAGEMENT OFFICE/UNIT  OBJECTIVES • To provide direction and to manage the project through out the lifecycle • To ensure project development and implementation inline with the overall vision and objectives • To operationalise the project strategy inline with the defined timelines • To ensure application of learnings and best practices across initiatives/geographies/ functions • Coordinate, monitor and track the project activities…..  COMPOSITION: • Consists of management and operations team from Government with experts/support staff from private sector entities • Reports to project leadership team for seeking necessary guidance and support • To be intact throughout the project lifecycle till successful stabilization of the systems and operations • Size of team, roles and responsibilities may vary from phase to phase 29
  • 25. e-Governance Project Lifecycle (eGLC) 1. Vision & Strategy Development 2. Current State Assessment 3. Future State Definition 4. Implementation approach and sourcing 5. Develop and implement IT system 6. Operate and sustain Project Management Office/Unit Change Management and Communications ?? 30
  • 26. e-Governance Project Lifecycle (eGLC)  Generally is driven by Project Management Office/Unit  Objective is to address and manage the ‘people’ related aspects in the project implementation including: • Managing the people change in terms of addressing the resistance • Managing people resistance to change • Communicating the project vision, objectives and benefits to all the stakeholders • To build skill sets and capacities across various levels in the organization to adopt new processes and systems 31 CHANGE MANAGEMENT AND COMMUNICATIONS
  • 27. e-Governance Project Lifecycle (eGLC) 32 e-Governance Strategy Development Current State Assessment Future State Definition Implementation approach and sourcing Develop and implement IT system Operate and sustain • Needs Assessment • Define clear vision & objectives • Prioritization of services and projects • Incorporate domestic and global learnings • Identify institutional structures & capacities for implementation • Define funding requirements • Define monitoring and evaluation approach… • Critical assessment of current business processes and pain areas • Best practices in similar environments • Assess legal framework and current limitations • Assess current ICT systems and their ability to support future plans • Assessment of current capacities at all levels and their preparedness for e- governance.. • Process reengineering and to –be process definition • Identity IT enablement opportunities and requirements • Define changes to the legal and regulatory environment • Develop People change and capacity building plan • Develop project awareness and communication requirements… • Define implementation approach and phasing plan (functional and geographic) • Assess detailed funding requirements and business model • Develop vendor evaluation and selection criteria • Develop KPIs and performance levels for services and systems • Develop RFP • Bid evaluation and vendor selection • Definition of detailed functional and technical requirements • System design and development • Software quality assurance, acceptance testing and auditing • Training and capacity building • Change management and project communications • Project documentation • Project go-live • System operations and maintenance • Software change management • Rollout services and systems (functionality and geography) • Objectives and benefits evaluation and reinforcement • Sustained change, capacity building and communications..