Presented By
• High Speed Railways does not have a clear cut definition.
Generally it is referred to as a type of rail that travels significantly
faster than traditional rail traffic. It uses an integrated system of
specialised rolling stock and dedicated tracks.
• While there is no single standard that applies worldwide, new
lines in excess of 250 km/h and existing lines in excess of 200
km/h are widely considered to be high-speed, with some extending
the definition to include much lower speeds (e.g. 160 km/h) in
areas for which these speeds still represent significant
improvements.
• The first such system began operations in Japan in 1964 and was
widely known as the bullet train. High speed rail programs have
been successful in Japan, China and several European countries
such as France, Germany and Spain.
German Engineers sought a high speed train.
Japan Capitalized on High Speed Train.
•Shinkanse ………… also known as “bullet train”
•Went 210km/h and carried 100millian people in fist 3 years
HSR revolution began in Europe starting with France
•A diesel-powered railcar was modified with a gas-turbine,
and was called "TGV".
• It reached 230 km/h
1899
1964
1981
•No level crossings (grade crossings)
•Fenced off
•Concrete foundations
•Wide spacing between lines
•Curves of radius less than 5 km are avoided and
are tilted
•Through stations are constructed with 4 tracks
•Tunnels avoided
 MAGLAV is the principle used in working of modern high speed train
 MAGLAV-derived from MAGnet and LEVitation
 Magnetic levitation transport is a form of transportation that
suspend guides and propels vehicles through the harnessing of
electromagnetic force
A maglev train floats about 10mm above the
guideway on a magnetic field.
It is propelled by the guide way itself rather than
an onboard engine by changing magnetic fields
Once the train is pulled into the next section the
magnetism switches so that the train is pulled on
again.
The Electro-magnets run the length of the guide
way.
There are two primary types of maglev technology:
1. Electromagnetic suspension (EMS)
2. Electrodynamic suspension (EDS)
 In current EMS systems, the train levitates above
a steel rail while electromagnets, attached to the
train, are oriented toward the rail from below.
 The electromagnets use feedback control to
maintain a train at a constant distance from the
track.
In Electrodynamic suspension, both the rail and
the train exert a magnetic field, and the train is
levitated by the repulsive force between these
magnetic fields
The magnetic field in the train is produced by
either electromagnets or by an array of permanent
magnets.
The repulsive force in the track is created by an
induced magnetic field in wires or other conducting
strips in the track.
 Reduction of travel time of passengers
 Fast accessibility to urban centres, lead to
economical and industrial growth
 Cope up higher demand for passenger and
freight traffic
 HSR route will help in commercial growth
 Land required by the HSR is very less, reducing
environmental impact
 It is Energy Efficient mode with compared to
other modes of transportation
 Huge Investment- Financial Viability is major Issue
 Economical factors- Balance of income and out
goings
 Technological factors like Technology for Tracks-
Trains, Technology for Operation & geometrical
changes required
 High Running and maintenance costs
 Safety consideration of Passengers as well as
Surroundings
 High cost of journey will affect the affordability of
Common man
As part of India’s two pronged strategy there is a focus on
upgradation of existing railway system to semi high speed
links parallely with bullet trains.
Indian Railways aims to increase the speed of passenger
trains to 160–200 km/h on dedicated conventional tracks.
They intend to improve their existing conventional lines to
handle speeds of up to 160 km/h, with a goal of speeds above
200 km/h on new tracks with improved technology.
In July 2014, a trial run of a “semi-high speed train” with 10
coaches and 2 generators reached a speed of 160 km/h
between New Delhi and Agra, but no date has been set for
commercial operations.
 Project of the Indian railways to establish high speed rail
network in India.
 Connect the four metro cities:
Delhi, Mumbai, Chennai and Kolkata.
 Track Gauge :1676 mm
 Speed :250-350 km/hr
 Length : 6500-7000 km
According to Forbes India, the costs for
constructing such rail lines in India are
estimated to be Rs 70-100 crores perk.
Therefore the Mumbai-Ahmedabad route of
500km, will cost Rs 37,000 crores to build.
With the cost of land acquisition etc, the
price will go up to about Rs 60,000 crores.
Japan Capitalized on High Speed Train

More Related Content

What's hot

Maglevtrainsnew 150401040530-conversion-gate01
Maglevtrainsnew 150401040530-conversion-gate01Maglevtrainsnew 150401040530-conversion-gate01
Maglevtrainsnew 150401040530-conversion-gate01Ashutosh Kar
 
MAGLEV TRAIN BY GIRISH HARMUKH
MAGLEV TRAIN BY GIRISH HARMUKHMAGLEV TRAIN BY GIRISH HARMUKH
MAGLEV TRAIN BY GIRISH HARMUKHGIRISH HARMUKH
 
Seminar on magnetic levitation (maglav)
Seminar on magnetic levitation (maglav)Seminar on magnetic levitation (maglav)
Seminar on magnetic levitation (maglav)Yash Srivastava
 
Linear Motor In Maglev Train
Linear Motor In Maglev TrainLinear Motor In Maglev Train
Linear Motor In Maglev TrainEng_Ahmad
 
Maglev trains by sumit sanyal
Maglev trains by sumit sanyalMaglev trains by sumit sanyal
Maglev trains by sumit sanyalNeelesh Gupta
 
Science project on Maglev Trains By Ardhendu
Science project on Maglev Trains By ArdhenduScience project on Maglev Trains By Ardhendu
Science project on Maglev Trains By Ardhenduardhendu03
 
Maglevs
MaglevsMaglevs
MaglevsPra Ha
 
High Speed Tilting Trains
High Speed Tilting TrainsHigh Speed Tilting Trains
High Speed Tilting TrainsKonal Singh
 
Magnetic Levitation Train Research Paper
Magnetic Levitation Train Research PaperMagnetic Levitation Train Research Paper
Magnetic Levitation Train Research PaperKatie Dillon
 
Basic Maglev Train and its Working
Basic Maglev Train and its WorkingBasic Maglev Train and its Working
Basic Maglev Train and its WorkingVASAV SHETHNA
 

What's hot (20)

Maglev
MaglevMaglev
Maglev
 
Maglevtrainsnew 150401040530-conversion-gate01
Maglevtrainsnew 150401040530-conversion-gate01Maglevtrainsnew 150401040530-conversion-gate01
Maglevtrainsnew 150401040530-conversion-gate01
 
Maglev Train
Maglev TrainMaglev Train
Maglev Train
 
MAGLEV TRAIN BY GIRISH HARMUKH
MAGLEV TRAIN BY GIRISH HARMUKHMAGLEV TRAIN BY GIRISH HARMUKH
MAGLEV TRAIN BY GIRISH HARMUKH
 
Seminar on magnetic levitation (maglav)
Seminar on magnetic levitation (maglav)Seminar on magnetic levitation (maglav)
Seminar on magnetic levitation (maglav)
 
Maglev train
Maglev trainMaglev train
Maglev train
 
Linear Motor In Maglev Train
Linear Motor In Maglev TrainLinear Motor In Maglev Train
Linear Motor In Maglev Train
 
maglev train
maglev trainmaglev train
maglev train
 
Maglev trains by sumit sanyal
Maglev trains by sumit sanyalMaglev trains by sumit sanyal
Maglev trains by sumit sanyal
 
Maglev Trains
Maglev TrainsMaglev Trains
Maglev Trains
 
Science project on Maglev Trains By Ardhendu
Science project on Maglev Trains By ArdhenduScience project on Maglev Trains By Ardhendu
Science project on Maglev Trains By Ardhendu
 
HOW THEY DO THAT
HOW THEY DO THATHOW THEY DO THAT
HOW THEY DO THAT
 
Maglevs
MaglevsMaglevs
Maglevs
 
MAGLEV
MAGLEVMAGLEV
MAGLEV
 
High Speed Tilting Trains
High Speed Tilting TrainsHigh Speed Tilting Trains
High Speed Tilting Trains
 
Magnetic Levitation Train Research Paper
Magnetic Levitation Train Research PaperMagnetic Levitation Train Research Paper
Magnetic Levitation Train Research Paper
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
Basic Maglev Train and its Working
Basic Maglev Train and its WorkingBasic Maglev Train and its Working
Basic Maglev Train and its Working
 
Magnetic levitation
Magnetic levitationMagnetic levitation
Magnetic levitation
 
Maglev trains
Maglev trains Maglev trains
Maglev trains
 

Similar to Japan Capitalized on High Speed Train

High Speed Train - seminar ppt
High Speed Train - seminar pptHigh Speed Train - seminar ppt
High Speed Train - seminar pptNarayanKumar40
 
2.02 mm agarwal(1)
2.02 mm agarwal(1)2.02 mm agarwal(1)
2.02 mm agarwal(1)A. Jha
 
High speed railway
High speed railwayHigh speed railway
High speed railwaypsammi12345
 
Anuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat Shukla
 
Maglev trains by deepanshu sharma
Maglev trains by deepanshu sharmaMaglev trains by deepanshu sharma
Maglev trains by deepanshu sharmaDeepanshu Sharma
 
Maglev trains
Maglev trainsMaglev trains
Maglev trainshseransan
 
Monorail vs Metrorail
Monorail vs MetrorailMonorail vs Metrorail
Monorail vs MetrorailSuresh7862
 
Presentation Maglev
Presentation Maglev Presentation Maglev
Presentation Maglev Navin Kumar
 
application of superconductors maglev
application of superconductors maglevapplication of superconductors maglev
application of superconductors maglevRajkumar Ajay SK
 
Transport poster
Transport posterTransport poster
Transport posterGordon Best
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)sharda university
 
Railway Engineering by Sharda University
Railway Engineering by Sharda UniversityRailway Engineering by Sharda University
Railway Engineering by Sharda UniversityFatila Carrol
 
20011A0212.pptx
20011A0212.pptx20011A0212.pptx
20011A0212.pptxDHILDAAR
 

Similar to Japan Capitalized on High Speed Train (20)

High Speed Train - seminar ppt
High Speed Train - seminar pptHigh Speed Train - seminar ppt
High Speed Train - seminar ppt
 
2.02 mm agarwal(1)
2.02 mm agarwal(1)2.02 mm agarwal(1)
2.02 mm agarwal(1)
 
MAGLEV TRAIN
MAGLEV TRAIN MAGLEV TRAIN
MAGLEV TRAIN
 
High speed railway
High speed railwayHigh speed railway
High speed railway
 
Anuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILUREAnuvrat_REPORT AT SPRING FAILURE
Anuvrat_REPORT AT SPRING FAILURE
 
D012531923
D012531923D012531923
D012531923
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
Maglev trains by deepanshu sharma
Maglev trains by deepanshu sharmaMaglev trains by deepanshu sharma
Maglev trains by deepanshu sharma
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
Maglev trains
Maglev trainsMaglev trains
Maglev trains
 
Monorail vs Metrorail
Monorail vs MetrorailMonorail vs Metrorail
Monorail vs Metrorail
 
Presentation Maglev
Presentation Maglev Presentation Maglev
Presentation Maglev
 
Magnetic Levitating train
Magnetic Levitating trainMagnetic Levitating train
Magnetic Levitating train
 
application of superconductors maglev
application of superconductors maglevapplication of superconductors maglev
application of superconductors maglev
 
Transport poster
Transport posterTransport poster
Transport poster
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
 
Railway Engineering by Sharda University
Railway Engineering by Sharda UniversityRailway Engineering by Sharda University
Railway Engineering by Sharda University
 
20011A0212.pptx
20011A0212.pptx20011A0212.pptx
20011A0212.pptx
 

More from Kumar M.

Cost Code Presention
Cost Code PresentionCost Code Presention
Cost Code PresentionKumar M.
 
07 data bank
07 data bank07 data bank
07 data bankKumar M.
 
06 production and produtivty reporting
06 production and produtivty reporting06 production and produtivty reporting
06 production and produtivty reportingKumar M.
 
05 method to the determination of percentage completion and forecast cost
05 method to the determination of percentage completion and forecast cost05 method to the determination of percentage completion and forecast cost
05 method to the determination of percentage completion and forecast costKumar M.
 
04 project team duties & accountalilities for cost control
04 project team duties & accountalilities for cost control04 project team duties & accountalilities for cost control
04 project team duties & accountalilities for cost controlKumar M.
 
03 cost report preparation
03 cost report preparation03 cost report preparation
03 cost report preparationKumar M.
 
02 budget preparation and procedures
02 budget preparation and procedures02 budget preparation and procedures
02 budget preparation and proceduresKumar M.
 
01 introduction to the project monitoring system
01 introduction to the project monitoring system01 introduction to the project monitoring system
01 introduction to the project monitoring systemKumar M.
 
Sap - Initiation Manual
Sap - Initiation ManualSap - Initiation Manual
Sap - Initiation ManualKumar M.
 
SAP Project Management
SAP Project ManagementSAP Project Management
SAP Project ManagementKumar M.
 
SAP - Vendor Entries
SAP - Vendor EntriesSAP - Vendor Entries
SAP - Vendor EntriesKumar M.
 
SAP - General Ledger Account
SAP - General Ledger AccountSAP - General Ledger Account
SAP - General Ledger AccountKumar M.
 
Sap solutions presentation
Sap solutions presentationSap solutions presentation
Sap solutions presentationKumar M.
 
Doha Metro Track
Doha Metro TrackDoha Metro Track
Doha Metro TrackKumar M.
 
Depots presentation
Depots presentationDepots presentation
Depots presentationKumar M.
 
Track work presentation
Track work presentationTrack work presentation
Track work presentationKumar M.
 

More from Kumar M. (16)

Cost Code Presention
Cost Code PresentionCost Code Presention
Cost Code Presention
 
07 data bank
07 data bank07 data bank
07 data bank
 
06 production and produtivty reporting
06 production and produtivty reporting06 production and produtivty reporting
06 production and produtivty reporting
 
05 method to the determination of percentage completion and forecast cost
05 method to the determination of percentage completion and forecast cost05 method to the determination of percentage completion and forecast cost
05 method to the determination of percentage completion and forecast cost
 
04 project team duties & accountalilities for cost control
04 project team duties & accountalilities for cost control04 project team duties & accountalilities for cost control
04 project team duties & accountalilities for cost control
 
03 cost report preparation
03 cost report preparation03 cost report preparation
03 cost report preparation
 
02 budget preparation and procedures
02 budget preparation and procedures02 budget preparation and procedures
02 budget preparation and procedures
 
01 introduction to the project monitoring system
01 introduction to the project monitoring system01 introduction to the project monitoring system
01 introduction to the project monitoring system
 
Sap - Initiation Manual
Sap - Initiation ManualSap - Initiation Manual
Sap - Initiation Manual
 
SAP Project Management
SAP Project ManagementSAP Project Management
SAP Project Management
 
SAP - Vendor Entries
SAP - Vendor EntriesSAP - Vendor Entries
SAP - Vendor Entries
 
SAP - General Ledger Account
SAP - General Ledger AccountSAP - General Ledger Account
SAP - General Ledger Account
 
Sap solutions presentation
Sap solutions presentationSap solutions presentation
Sap solutions presentation
 
Doha Metro Track
Doha Metro TrackDoha Metro Track
Doha Metro Track
 
Depots presentation
Depots presentationDepots presentation
Depots presentation
 
Track work presentation
Track work presentationTrack work presentation
Track work presentation
 

Recently uploaded

CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 

Japan Capitalized on High Speed Train

  • 2. • High Speed Railways does not have a clear cut definition. Generally it is referred to as a type of rail that travels significantly faster than traditional rail traffic. It uses an integrated system of specialised rolling stock and dedicated tracks. • While there is no single standard that applies worldwide, new lines in excess of 250 km/h and existing lines in excess of 200 km/h are widely considered to be high-speed, with some extending the definition to include much lower speeds (e.g. 160 km/h) in areas for which these speeds still represent significant improvements. • The first such system began operations in Japan in 1964 and was widely known as the bullet train. High speed rail programs have been successful in Japan, China and several European countries such as France, Germany and Spain.
  • 3. German Engineers sought a high speed train. Japan Capitalized on High Speed Train. •Shinkanse ………… also known as “bullet train” •Went 210km/h and carried 100millian people in fist 3 years HSR revolution began in Europe starting with France •A diesel-powered railcar was modified with a gas-turbine, and was called "TGV". • It reached 230 km/h 1899 1964 1981
  • 4. •No level crossings (grade crossings) •Fenced off •Concrete foundations •Wide spacing between lines •Curves of radius less than 5 km are avoided and are tilted •Through stations are constructed with 4 tracks •Tunnels avoided
  • 5.  MAGLAV is the principle used in working of modern high speed train  MAGLAV-derived from MAGnet and LEVitation  Magnetic levitation transport is a form of transportation that suspend guides and propels vehicles through the harnessing of electromagnetic force
  • 6. A maglev train floats about 10mm above the guideway on a magnetic field. It is propelled by the guide way itself rather than an onboard engine by changing magnetic fields Once the train is pulled into the next section the magnetism switches so that the train is pulled on again. The Electro-magnets run the length of the guide way.
  • 7. There are two primary types of maglev technology: 1. Electromagnetic suspension (EMS) 2. Electrodynamic suspension (EDS)
  • 8.  In current EMS systems, the train levitates above a steel rail while electromagnets, attached to the train, are oriented toward the rail from below.  The electromagnets use feedback control to maintain a train at a constant distance from the track.
  • 9. In Electrodynamic suspension, both the rail and the train exert a magnetic field, and the train is levitated by the repulsive force between these magnetic fields The magnetic field in the train is produced by either electromagnets or by an array of permanent magnets. The repulsive force in the track is created by an induced magnetic field in wires or other conducting strips in the track.
  • 10.  Reduction of travel time of passengers  Fast accessibility to urban centres, lead to economical and industrial growth  Cope up higher demand for passenger and freight traffic  HSR route will help in commercial growth  Land required by the HSR is very less, reducing environmental impact  It is Energy Efficient mode with compared to other modes of transportation
  • 11.  Huge Investment- Financial Viability is major Issue  Economical factors- Balance of income and out goings  Technological factors like Technology for Tracks- Trains, Technology for Operation & geometrical changes required  High Running and maintenance costs  Safety consideration of Passengers as well as Surroundings  High cost of journey will affect the affordability of Common man
  • 12. As part of India’s two pronged strategy there is a focus on upgradation of existing railway system to semi high speed links parallely with bullet trains. Indian Railways aims to increase the speed of passenger trains to 160–200 km/h on dedicated conventional tracks. They intend to improve their existing conventional lines to handle speeds of up to 160 km/h, with a goal of speeds above 200 km/h on new tracks with improved technology. In July 2014, a trial run of a “semi-high speed train” with 10 coaches and 2 generators reached a speed of 160 km/h between New Delhi and Agra, but no date has been set for commercial operations.
  • 13.
  • 14.  Project of the Indian railways to establish high speed rail network in India.  Connect the four metro cities: Delhi, Mumbai, Chennai and Kolkata.  Track Gauge :1676 mm  Speed :250-350 km/hr  Length : 6500-7000 km
  • 15. According to Forbes India, the costs for constructing such rail lines in India are estimated to be Rs 70-100 crores perk. Therefore the Mumbai-Ahmedabad route of 500km, will cost Rs 37,000 crores to build. With the cost of land acquisition etc, the price will go up to about Rs 60,000 crores.