SAP PROJECT SYSTEM
OBJECTIVES
BY THE END OF THIS SECESSION, YOU SHALL BE ABLE TO UNDERSTAND:
• SAP PROJECT SYSTEMS OVERVIEW
• SAP PS PROJECT STRUCTURE
• SAP PS PROJECT PLANNING
• SAP PS PROJECT BUDGETING
• SAP PS PROJECT EXECUTION
• SAP PS PROJECT CLOSURE
Overview Structuring Planning Budgeting Execution Closure
SAP
R3
PS
MM
QM
PM
SD
HR
FI
CO
DMS
Overview Structuring Planning Budgeting Execution Closure
• SAP PS OVERVIEW: SAP PS COMPONENTS
Overview Structuring Planning Budgeting Execution Closure
Project Structure
WBS
Activity
Milestone
Time Planning Cost Planning
Budgeting
Actual booking/Progress
Confirmations
Project Reporting
OBJECTS IN SAP PS
• PROJECT DEFINITION
• WBS
• NETWORK
• ACTIVITY
• MILESTONE
• PS TEXT
• PS DOCUMENT
• PROJECT SYSTEM USES THE ORGANIZATION STRUCTURE DEFINED BY OTHER MODULES.
Overview Structuring Planning Budgeting Execution Closure
Controlling Area
Company Code
Business Area
Profit Center
Plant
Business Area
Profit Center
Plant
Plant
Work Center
Purchasing Organization
Purchasing group
Plant
Purchasing Organization
Purchasing group
Service master record
MASTER DATA IN PROJECT SYSTEMS
Note: ALL CCA MASTER DATA IS MAINTAINED CENTRALLY
WBS elements
Hierarchicaloriented
Network / Activities
Process-oriented
1
13-
Assignments
WBS elements
and activities
 Actual Costs
 Basic Dates
 Scheduled Dates
 Actual Dates
 Original Budget
 Budget Updates
 Release Budgets
 Availability Control
 Purchase Requisition
 Purchase Order
Commitments:
WHAT ARE WORK BREAKDOWN STRUCTURES USED FOR?
Dates:
Budget:
Execution:
“WBS Structure”
 Planned Costs
Planning:
 Overheads
 Settlement
 Earned Value Analysis
Periodic Processing:
OPERATIVE INDICATORS AND ATTRIBUTES
Key
 Account assignment element
 For posting actual costs
 Network / Maintenance Order
assignments
 Planning Element
 For planning costs
 Plan/actual cost comparison
WBS 1
WBS 1.3
Released
WBS 1.2
Partially Rel
Released Released Released Released
WBS 1.4
Partially Rel
WBS 1.2.1 WBS 1.2.2 WBS 1.4.1 WBS 1.4.2


 Billing element
 Planning for Revenue
 Raise bill to customer
Project Definitions
Work Breakdown Structures
WBS Elements
Project Definitions
PROJECT DEFINITION AND WORK BREAKDOWN STRUCTURE
1 V-06
2 V-06.01
3 V-06.01.01
3 V-06.01.02
2 V-06.02
Entries Goal
Automatic
derivation
1 V-06
1 V-06.01
1 V-06.02
1 V-06.01.01
1 V-06.01.02
Hierarchy Key
level
DERIVATION OF THE WBS HIERARCHY
V-06
V-06.01 V-06.02
V-06.01.01 V-06.01.02
SAP PS Project Structure: Project Definition
Overview Structuring Planning Budgeting Execution Closure
PROJECT LEVELS
Project Levels:
 Each project must have a single Level 1 WBS
 Allows for ease of reporting at a project level
 Structure below Level 1 is determined by phase and other
reporting requirements
This is an example of a typical project structure
V-1111111 V-0691001
V-1111111.02 V-1111111.03 V-0691001.02
Template Operative
TEMPLATES AND WORK BREAKDOWN STRUCTURES
V-0691001.03
ACTIVITIES AND ACTIVITY ELEMENTS
 Reference Dates from Activity
 Start or Finish
 Activity Elements
 Work
 External
 Costs
 Service
 Four Types of Activities
 Internal Processing
 External Processing
 Costs, services
 General Cost Activities
Internal External
General
Costs
Service
SAP PS Project Structure: Activities and Networks
Overview Structuring Planning Budgeting Execution Closure
NETWORK ACTIVITIES
 Work / Services
performed inhouse
Internal Processing:
 Purchasing of work /
services
External Processing:
 Planning of additional
primary costs
Costs Activity:
 Purchasing of services
with service specifications
Services:
1200
Cost Center
INTERNAL PROCESSING
Work: 500hrs Output provided to complete activities
Work Center
Organizational unit Where an activity is
carried out or work output is provided.
Scheduling Data
Cost Center Data
Responsible
Persons
1300
Purchasing Group
EXTERNAL PROCESSING
Description
Material Group
Work Performed by a third
party (Vendor)
Price per Unit
Quantity & Unit
Vendor 1000
Purchase
Order
Quotation
Entry
Vendor
Selection
PO
Processing
Entry of
Services
performed
Good Receipt /
Service Receipt
Invoice
Verfication
PR
Commitments
Purchase
Requisition
Bid
Invitation
PO
Committments
Actual
Costs
WBS 1.4
WBS 1
WBS 1.5
WBS 1.3
WORK BREAKDOWN STRUCTURES & NETWORKS COMPARED
1000
1200
5000 Network
WBS 1.3.1 WBS 1.3.2 WBS 1.5.1 WBS 1.5.2
1100
 WBS
 Cost Control and Reporting
 Reflects Ownership
 NETWORK
 Work Control
 Reflects Execution
Versus
WBS 1.4
WBS 1
WBS 1.5
WBS 1.3
ACTIVITY ASSIGNMENT TO WBS
1000
1200
5000 Network
WBS 1.3.1 WBS 1.3.2 WBS 1.5.1 WBS 1.5.2
1100
 Date Planning
 Cost Planning
 Generating Settlement rules
Logical Sequence Time Sequence
FS Relationship
SS Relationship
FF Relationship
SF Relationship
RELATIONSHIPS
Activity
number
Control
key
Duration
Description
Earliest
finish
Latest
finish
Floats
Relationship
Activity
Days Days
Days
Specification Mechanical Layout
Days
Procurement
FS FS
16.02.2000 34 18.02.2000 21.02.2000 34 17.05.2000 18.05.2000 34 08.06.2000
04.04.2000 0 06.04.2000
FS
07.04.2000 0 07.07.2000
FS
10.07.2000 34 28.07.2000
Electronic Layout
21.02.2000 64 31.03.2000
24.05.2000 30 07.07.2000
NETWORK GRAPHIC DETAILS
Project Structure: Milestones
Overview Structuring Planning Budgeting Execution Closure
SYSTEM STATUS AND USER STATUS CONTROL
CRTD
CRTD CRTD
CRTD CRTD CRTD CRTD
PREL
PREL REL
CRTD REL REL REL
 What is Status control used for?
 To allow or forbid certain business
transactions.
 How?
 Status are activated manually or
automatically by the system.
 Which elements?
 Project definition and WBS
elements are affected.
 Why system and user status?
 User status adds detail to the
system Status.
SYSTEM STATUS’S
SYSTEM STATUS
The following status are set by the system/user as the project goes through
Its different stages:
 CRTD Created (Automatic)
 REL Released (Manual)
 LKD Locked (Manual)
 UNLK Unlock (Manual)
 BUDG Project Budgeted (Automatic)
 AVAC Availability Control Activated (Automatic)
Project Version

“Project Snapshot”
Can’t be changed!!!
Simulation Version
CO Plan Version
Can be changed!!!
Versions
VERSIONS IN PROJECT SYSTEMS
January February March April
Project V-0691001
Version 001
Project V-0691001
Version 002
SIMULATION
SIM 001 SIM 002 SIM 003
WHAT ARE SIMULATION VERSIONS USED FOR?
Update
Operative Project
Comparisons
Create
SAP PS PROJECT PLANNING: TIME PLANNING
Time Planning Cost Planning Revenue Planning
SAP PS PROJECT PLANNING: COST PLANNING
Time Planning Cost Planning Revenue Planning
COST PLANNING
TYPES OF COST PLANNING
 HIERARCHICAL COST PLANNING
 UNIT COST PLANNING
 EASY COST PLANNING
 COST ELEMENT-BASED COST PLANNING
 AUTOMATIC COST PLANNING
Time Planning Cost Planning Revenue Planning
SAP PS PROJECT PLANNING: COST PLANNING CONT.
PROJECT COST PLANNING: REVENUE PLANNING
Time Planning Cost Planning Revenue Planning
Approved
budget
Budget
Top-down
distribution
Budget
applied for
Annual plan value
Bottom-up
extrapolation
1 E-1399
2 E-1399-1
3 E-1399-1-1
3 E-1399-1-2
2 E-1399-2
.
.
.
O
R
I
G
I
N
A
L
P
L
N
D
T
O
T
A
L
D
I
S
T
R
B
T
Total
...
...
...
...
2000
2001
Cost Planning Cost Budgeting
COST PLANNING AND BUDGETING
Release
EUR 8.0 m
Budget 10m Budget 10m
EUR EUR
EUR
EUR
Release
EUR 2 m
EUR EUR
EUR EUR
RELEASING THE BUDGET
Release
EUR 3 m
Add 1 m Add 5 m
2002
2001
Budget Values
Budget Updates
BUDGETING OVERVIEW
 Availability Control:
 Against Current
Budget
 Against Budget
Releases
Budget Carryforward Release Budget
Invoice
Business Events
Purchase
order
Availability
Check
No more
Funds
available!!
Purchase
Requisition
Business Events Budget Check (AVAC)
Budget
Total 5
0
2015 3
0
2
0
WBS 1.1.1
Comm Actual
1
0
4
0
5
5
2
5
1
5
Checks overall
funds available
2016
Overview Structuring Planning Budgeting Execution Closure
SAP PS Project Budgeting: Budget Control
SAP PS PROJECT BUDGETING: BUDGET CYCLE
Overview Structuring Planning Budgeting Execution Closure
Budget
exceeded error
message
SAP PS PROJECT BUDGETING: BUDGET SUPPLEMENT
WBS 1
WBS 1.1
WBS 1.1.1 WBS 1.1.2
WBS 1.2
WBS 1.2.1
Company’
s Fund
Overview Structuring Planning Budgeting Execution Closure
SAP PS Project Budgeting: Budget Return
WBS 1
WBS 1.1
WBS 1.1.1 WBS 1.1.2
WBS 1.2
WBS 1.2.1
Company’
s Fund
Overview Structuring Planning Budgeting Execution Closure
SAP PS Project Budgeting: Budget Transfers
WBS 1
WBS 1.1
WBS 1.1.1 WBS 1.1.2
WBS 1.2
WBS 1.2.1
Overview
Structurin
g
Planning Budgeting Execution Closure
PROCUREMENT STEPS
WBS 1.1
WBS 1.1.1
WBS 1.1.1
T-20600
10
Vendor Purchase
Components
Goods receipt
For Purchase
order
Goods issue
to Network
Activity
(Consumption)
COMMITMENT MANAGEMENT (2)
WBS Element V-0691001.01
Purchase
Requisition
Purchase
Order
Goods
Receipt
MM CO
WBS Element V-0691001.01
C/Elem Committed Actual Assigned
4000000 0 11000 11000
C/Elem
4000000
Committed
6000
Actual
5000
Assigned
11000
WBS Element V-0691001.01
WBS Element V-0691001.01
SAP PS PROJECT CLOSURE: PROJECT CLOSURE FLOWCHART
Clear
project
stocks
Clear
pendin
g
settlem
ents
Delete
unused
WBS
elements
Reduce
release
d
budget
Return
original
budget
Update
all WBS
element
s status
to TECO
Close
project
definitio
n
Overview Structuring Planning Budgeting Execution Closure
SAP PS PROJECT CLOSURE: TECO STATUS
Overview Structuring Planning Budgeting Execution Closure
SAP PS PROJECT CLOSURE: CLOSED STATUS
Overview Structuring Planning Budgeting Execution Closure
REPORT: BUDGET / ACTUAL / VARIANCE
REPORT: BUDGET / ACTUAL / COMMITMENT
REPORT: ACTUAL / COMMITMENT / PLAN
THANK YOU

SAP Project system.pptx

  • 1.
  • 2.
    OBJECTIVES BY THE ENDOF THIS SECESSION, YOU SHALL BE ABLE TO UNDERSTAND: • SAP PROJECT SYSTEMS OVERVIEW • SAP PS PROJECT STRUCTURE • SAP PS PROJECT PLANNING • SAP PS PROJECT BUDGETING • SAP PS PROJECT EXECUTION • SAP PS PROJECT CLOSURE
  • 3.
    Overview Structuring PlanningBudgeting Execution Closure
  • 4.
  • 5.
    • SAP PSOVERVIEW: SAP PS COMPONENTS Overview Structuring Planning Budgeting Execution Closure Project Structure WBS Activity Milestone Time Planning Cost Planning Budgeting Actual booking/Progress Confirmations Project Reporting
  • 6.
    OBJECTS IN SAPPS • PROJECT DEFINITION • WBS • NETWORK • ACTIVITY • MILESTONE • PS TEXT • PS DOCUMENT
  • 7.
    • PROJECT SYSTEMUSES THE ORGANIZATION STRUCTURE DEFINED BY OTHER MODULES. Overview Structuring Planning Budgeting Execution Closure Controlling Area Company Code Business Area Profit Center Plant Business Area Profit Center Plant Plant Work Center Purchasing Organization Purchasing group Plant Purchasing Organization Purchasing group Service master record
  • 8.
    MASTER DATA INPROJECT SYSTEMS Note: ALL CCA MASTER DATA IS MAINTAINED CENTRALLY WBS elements Hierarchicaloriented Network / Activities Process-oriented 1 13- Assignments WBS elements and activities
  • 9.
     Actual Costs Basic Dates  Scheduled Dates  Actual Dates  Original Budget  Budget Updates  Release Budgets  Availability Control  Purchase Requisition  Purchase Order Commitments: WHAT ARE WORK BREAKDOWN STRUCTURES USED FOR? Dates: Budget: Execution: “WBS Structure”  Planned Costs Planning:  Overheads  Settlement  Earned Value Analysis Periodic Processing:
  • 10.
    OPERATIVE INDICATORS ANDATTRIBUTES Key  Account assignment element  For posting actual costs  Network / Maintenance Order assignments  Planning Element  For planning costs  Plan/actual cost comparison WBS 1 WBS 1.3 Released WBS 1.2 Partially Rel Released Released Released Released WBS 1.4 Partially Rel WBS 1.2.1 WBS 1.2.2 WBS 1.4.1 WBS 1.4.2    Billing element  Planning for Revenue  Raise bill to customer
  • 11.
    Project Definitions Work BreakdownStructures WBS Elements Project Definitions PROJECT DEFINITION AND WORK BREAKDOWN STRUCTURE
  • 12.
    1 V-06 2 V-06.01 3V-06.01.01 3 V-06.01.02 2 V-06.02 Entries Goal Automatic derivation 1 V-06 1 V-06.01 1 V-06.02 1 V-06.01.01 1 V-06.01.02 Hierarchy Key level DERIVATION OF THE WBS HIERARCHY V-06 V-06.01 V-06.02 V-06.01.01 V-06.01.02
  • 13.
    SAP PS ProjectStructure: Project Definition Overview Structuring Planning Budgeting Execution Closure
  • 14.
    PROJECT LEVELS Project Levels: Each project must have a single Level 1 WBS  Allows for ease of reporting at a project level  Structure below Level 1 is determined by phase and other reporting requirements This is an example of a typical project structure
  • 15.
    V-1111111 V-0691001 V-1111111.02 V-1111111.03V-0691001.02 Template Operative TEMPLATES AND WORK BREAKDOWN STRUCTURES V-0691001.03
  • 16.
    ACTIVITIES AND ACTIVITYELEMENTS  Reference Dates from Activity  Start or Finish  Activity Elements  Work  External  Costs  Service  Four Types of Activities  Internal Processing  External Processing  Costs, services  General Cost Activities Internal External General Costs Service
  • 17.
    SAP PS ProjectStructure: Activities and Networks Overview Structuring Planning Budgeting Execution Closure
  • 18.
    NETWORK ACTIVITIES  Work/ Services performed inhouse Internal Processing:  Purchasing of work / services External Processing:  Planning of additional primary costs Costs Activity:  Purchasing of services with service specifications Services:
  • 19.
    1200 Cost Center INTERNAL PROCESSING Work:500hrs Output provided to complete activities Work Center Organizational unit Where an activity is carried out or work output is provided. Scheduling Data Cost Center Data Responsible Persons
  • 20.
    1300 Purchasing Group EXTERNAL PROCESSING Description MaterialGroup Work Performed by a third party (Vendor) Price per Unit Quantity & Unit Vendor 1000 Purchase Order Quotation Entry Vendor Selection PO Processing Entry of Services performed Good Receipt / Service Receipt Invoice Verfication PR Commitments Purchase Requisition Bid Invitation PO Committments Actual Costs
  • 21.
    WBS 1.4 WBS 1 WBS1.5 WBS 1.3 WORK BREAKDOWN STRUCTURES & NETWORKS COMPARED 1000 1200 5000 Network WBS 1.3.1 WBS 1.3.2 WBS 1.5.1 WBS 1.5.2 1100  WBS  Cost Control and Reporting  Reflects Ownership  NETWORK  Work Control  Reflects Execution Versus
  • 22.
    WBS 1.4 WBS 1 WBS1.5 WBS 1.3 ACTIVITY ASSIGNMENT TO WBS 1000 1200 5000 Network WBS 1.3.1 WBS 1.3.2 WBS 1.5.1 WBS 1.5.2 1100  Date Planning  Cost Planning  Generating Settlement rules
  • 23.
    Logical Sequence TimeSequence FS Relationship SS Relationship FF Relationship SF Relationship RELATIONSHIPS
  • 24.
    Activity number Control key Duration Description Earliest finish Latest finish Floats Relationship Activity Days Days Days Specification MechanicalLayout Days Procurement FS FS 16.02.2000 34 18.02.2000 21.02.2000 34 17.05.2000 18.05.2000 34 08.06.2000 04.04.2000 0 06.04.2000 FS 07.04.2000 0 07.07.2000 FS 10.07.2000 34 28.07.2000 Electronic Layout 21.02.2000 64 31.03.2000 24.05.2000 30 07.07.2000 NETWORK GRAPHIC DETAILS
  • 25.
    Project Structure: Milestones OverviewStructuring Planning Budgeting Execution Closure
  • 26.
    SYSTEM STATUS ANDUSER STATUS CONTROL CRTD CRTD CRTD CRTD CRTD CRTD CRTD PREL PREL REL CRTD REL REL REL  What is Status control used for?  To allow or forbid certain business transactions.  How?  Status are activated manually or automatically by the system.  Which elements?  Project definition and WBS elements are affected.  Why system and user status?  User status adds detail to the system Status.
  • 27.
    SYSTEM STATUS’S SYSTEM STATUS Thefollowing status are set by the system/user as the project goes through Its different stages:  CRTD Created (Automatic)  REL Released (Manual)  LKD Locked (Manual)  UNLK Unlock (Manual)  BUDG Project Budgeted (Automatic)  AVAC Availability Control Activated (Automatic)
  • 28.
    Project Version  “Project Snapshot” Can’tbe changed!!! Simulation Version CO Plan Version Can be changed!!! Versions VERSIONS IN PROJECT SYSTEMS
  • 29.
    January February MarchApril Project V-0691001 Version 001 Project V-0691001 Version 002 SIMULATION
  • 30.
    SIM 001 SIM002 SIM 003 WHAT ARE SIMULATION VERSIONS USED FOR? Update Operative Project Comparisons Create
  • 31.
    SAP PS PROJECTPLANNING: TIME PLANNING Time Planning Cost Planning Revenue Planning
  • 32.
    SAP PS PROJECTPLANNING: COST PLANNING Time Planning Cost Planning Revenue Planning
  • 33.
    COST PLANNING TYPES OFCOST PLANNING  HIERARCHICAL COST PLANNING  UNIT COST PLANNING  EASY COST PLANNING  COST ELEMENT-BASED COST PLANNING  AUTOMATIC COST PLANNING
  • 34.
    Time Planning CostPlanning Revenue Planning SAP PS PROJECT PLANNING: COST PLANNING CONT.
  • 35.
    PROJECT COST PLANNING:REVENUE PLANNING Time Planning Cost Planning Revenue Planning
  • 36.
    Approved budget Budget Top-down distribution Budget applied for Annual planvalue Bottom-up extrapolation 1 E-1399 2 E-1399-1 3 E-1399-1-1 3 E-1399-1-2 2 E-1399-2 . . . O R I G I N A L P L N D T O T A L D I S T R B T Total ... ... ... ... 2000 2001 Cost Planning Cost Budgeting COST PLANNING AND BUDGETING
  • 37.
    Release EUR 8.0 m Budget10m Budget 10m EUR EUR EUR EUR Release EUR 2 m EUR EUR EUR EUR RELEASING THE BUDGET Release EUR 3 m Add 1 m Add 5 m
  • 38.
    2002 2001 Budget Values Budget Updates BUDGETINGOVERVIEW  Availability Control:  Against Current Budget  Against Budget Releases Budget Carryforward Release Budget
  • 39.
    Invoice Business Events Purchase order Availability Check No more Funds available!! Purchase Requisition BusinessEvents Budget Check (AVAC) Budget Total 5 0 2015 3 0 2 0 WBS 1.1.1 Comm Actual 1 0 4 0 5 5 2 5 1 5 Checks overall funds available 2016 Overview Structuring Planning Budgeting Execution Closure SAP PS Project Budgeting: Budget Control
  • 40.
    SAP PS PROJECTBUDGETING: BUDGET CYCLE Overview Structuring Planning Budgeting Execution Closure Budget exceeded error message
  • 41.
    SAP PS PROJECTBUDGETING: BUDGET SUPPLEMENT WBS 1 WBS 1.1 WBS 1.1.1 WBS 1.1.2 WBS 1.2 WBS 1.2.1 Company’ s Fund Overview Structuring Planning Budgeting Execution Closure
  • 42.
    SAP PS ProjectBudgeting: Budget Return WBS 1 WBS 1.1 WBS 1.1.1 WBS 1.1.2 WBS 1.2 WBS 1.2.1 Company’ s Fund Overview Structuring Planning Budgeting Execution Closure
  • 43.
    SAP PS ProjectBudgeting: Budget Transfers WBS 1 WBS 1.1 WBS 1.1.1 WBS 1.1.2 WBS 1.2 WBS 1.2.1 Overview Structurin g Planning Budgeting Execution Closure
  • 44.
    PROCUREMENT STEPS WBS 1.1 WBS1.1.1 WBS 1.1.1 T-20600 10 Vendor Purchase Components Goods receipt For Purchase order Goods issue to Network Activity (Consumption)
  • 45.
    COMMITMENT MANAGEMENT (2) WBSElement V-0691001.01 Purchase Requisition Purchase Order Goods Receipt MM CO WBS Element V-0691001.01 C/Elem Committed Actual Assigned 4000000 0 11000 11000 C/Elem 4000000 Committed 6000 Actual 5000 Assigned 11000 WBS Element V-0691001.01 WBS Element V-0691001.01
  • 46.
    SAP PS PROJECTCLOSURE: PROJECT CLOSURE FLOWCHART Clear project stocks Clear pendin g settlem ents Delete unused WBS elements Reduce release d budget Return original budget Update all WBS element s status to TECO Close project definitio n Overview Structuring Planning Budgeting Execution Closure
  • 47.
    SAP PS PROJECTCLOSURE: TECO STATUS Overview Structuring Planning Budgeting Execution Closure
  • 48.
    SAP PS PROJECTCLOSURE: CLOSED STATUS Overview Structuring Planning Budgeting Execution Closure
  • 49.
    REPORT: BUDGET /ACTUAL / VARIANCE
  • 50.
    REPORT: BUDGET /ACTUAL / COMMITMENT
  • 51.
    REPORT: ACTUAL /COMMITMENT / PLAN
  • 52.