Samrat R Khanorkar 
Contact No.: +91 99 3010 7740 
Email: samrat.khanorkar@gmail.com 
in.linkedin.com/pub/samrat-khanorkar/23/19a/218/ 
Seeking assignments in Project Management with an organisation of high repute in Project 
Construction Management 
Professional Synopsis 
 Management Consultant with over 10 years of experience in the areas of Project 
Management, Project Controls, Business Transformation, Operational excellence in capital 
projects. 
 Adept in managing project activities (Planning, Coordination, execution, monitoring & project 
engineering), streamlining processes / procedures to facilitate smooth production process, 
enhance productivity and cost reduction. 
 An effective communicator with exceptional analytical, negotiation, relationship management 
and problem solving skills. 
Organisational Experience 
EY (Ernst & Young Advisory Services) : As Project Manager- Capital Program 
Advisory Services (EPC Projects) 
(Sep’13 – Present) 
Accenture Services Pvt. Ltd. : As a Manager Management Consulting – 
Infrastructure Practice (EPC Projects) 
(Nov’10 – Sep’13) 
ADANI Power Limited : As a Deputy Manager Projects – Power 
Generation - 
(May’10 - Nov’10) 
TATA Projects Limited : As a Sr. Project Engineer in Project 
Management – Power Generation 
(Feb’07-May’10) 
INDO RAMA Synthetics (I) Ltd. : Thermal Power Plant (CPP) - Joined as Project 
Engineer Nagpur and rose to the post of 
Engineer – Operation 
(Jul’04 – Feb’07) 
NECO Steel : SMS Division, Graduate Engineer Trainee 
(2004) 
Key Deliverables: 
Project Management – EY (Ernst & Young Advisory Services), 
 Development and implementation of solutions for client business needs through structured 
engagements.
 Identification of new business opportunities for EY and development of business proposals including 
solution approach, effort estimation, skill requirement and pricing. 
 Augmenting thought capital and delivery capabilities by generating research reports and delivery 
assets. 
 Core member of EY’s Capital Program Advisory Services (CPAS) offering development team. 
 Developed Go-To Market point of view on Indian Power Generation Industry and prioritizing power 
projects. 
 Developed operation model framework for capital project management. 
Project Management & Project Controls – Accenture Management Consulting, 
 Led a team of consultants to establish operating model for project management for a large green-field 
steel plant build. Developed and implemented Project control processes . 
 Led a team of consultants to drive implementation of project controls and expedite project execution 
for multiple mega-projects across power, crude pipeline, steel with focus on reduction in execution 
time and cost and bringing predictability and transparency in forecasting and reporting. 
 Development and implementation of Management Information System across all functions . 
 Worked on multiple business opportunities across process implementation and time and cost 
reduction 
 Preparing & Monitoring Schedules by visiting site and interacting with stakeholders, Preparing list of 
balance activities to be performed for construction completion, materials balance for delivery, 
package vendors work status & support required from client management to contractors for f ast 
work execution. 
 Tracking of actions planned & progress on deliverables to be obtained. Update & release the report. 
 Supplier Performance Evaluation by creating approach and further details to highlight on mechanism 
to conduct the exercise of rating supplier and capture key learning. 
 Implementation of best practice in Project Management & Project Controls at Client Organization. 
Project Management – ADANI Power Limited 
 Managing the project operations with a view to ensure timely accomplishment of project targets 
within the time and cost parameters. 
 Engineering coordination by reviving technical document / drawing schedule. Reviewing Drg. & 
giving clearance for mfg. and issuing technical recommendations and approving. 
 Progress Review for projects. 
 Preparing Supply & Erection and Payment schedule. And Co-ordination with vendor for supply 
against schedule and the same with site. 
 Arranging for mobilization of vendor / contractor at site. 
 Expediting of dispatch / tracking and invoicing of Project. 
 Responding the client / vendor queries and resolving the issues. 
 Final documentation for handover of project. 
Project Management – Tata Projects Ltd. 
 Get specifications’. Reviewing it & approving. And Inviting offer against specs. & making 
comparative Statement. 
 Awarding LOI to vendor (Vendor documentation) 
 Engineering coordination by reviving technical document / drawing schedule. Reviewing Drg. & 
giving clearance for mfg. and issuing technical recommendations and approving. 
 Preparing Supply & Erection and Payment schedule. And Co-ordination with vendor for supply 
against schedule and the same with site.
 Arranging for mobilization of vendor / contractor at site. 
 Expediting of dispatch / tracking and invoicing of Project. 
 Responding the client / vendor queries and resolving the issues. 
 Regularization of billing & forwarding it to finance dept. 
 Erection and commissioning of equipments as per protocol. 
 Final documentation for handover of project. 
 Managing the project operations with a view to ensure timely accomplishment of project targets 
within the time and cost parameters. 
Project Management – Indo Rama Synthetics (I) Ltd. 
 Regularization of supplies as per schedule by coordinating with vendor. 
 Determining the future inventory needs and production capacity timely completion of project as per 
pre-defined standards and within financial costs. 
 Preparing MIS for the Power Plant for apprising management of Daily / Monthly progress. 
 Maintaining operational data for monthly / yearly audit. 
 Controlling inventory of consumables / procurement & maintaining consumables data for MIS / 
costing on monthly / yearly basis. 
Installation & Commissioning 
 Anchoring installation & commissioning of machines & equipments and ensuring completion of project 
in minimum turnaround time effective resource utilisation to maximise the output. 
 Installing and commissioning as well as conducting tests & inspections preparing protocols to ensure 
operational effectiveness of utilities / Equipments. 
Operations & Maintenance 
 Implementing the preventive & predictive maintenance schedules for improving the overall reliability 
and safety of plant equipments & machinery. 
 Maintaining all the activities in the area of Generation, Maintenance, New Facility Planning and 
Training as per set standards. 
Statutory Compliances 
 Conducting statutory compliances of Pollution Control Board regarding water chess and drafting 
documentation related to consent. 
 Maintaining IBR Documentation & formalities. 
Major Assignments Handled: 
 Accenture Services Pvt. Ltd.,: 
o EPC Process Consultant – Pt. Indika Energy Tbk., Jakarta Indonesia 
o Supported client on EPC business process optimization, and ensure implementation of 
Project management leading practices 
o Led team of integrators and project controls engineer for SAP & primavera Integration 
o Developed and implemented Standard WBS structure and coding mask for SAP & Primavera
o Project Management & Controls – L&T Minerals and Metals; 
o Developed and Implemented project controls processes leading to 10-14 % reduction in 
schedule overruns for key project with capital investment of 2000Cr. with a significant 
cost implication. 
o Led team of 3 consultants and 6 planning engineers for implementation of project 
control processes. 
o Engaging with stakeholders for identifying issues related to Project Controls 
o Developed and Implemented project progress review mechanism 
o Reviewed all major Project Schedules for Blast Furnace, Sinter Plant and Coke Oven for 
BSL Angul Project, Tata Steel JSR, BSP Bhilai, Tata Steel KPO, to identify set of findings 
and recommend client to develop an Integrated EPC Project Schedule 
o Create re-usable solutions for Client: 
1. Develop a standard / reference Work Breakdown Structure (WBS) 
2. Develop standard / reference EPC Project Schedule 
3. Development of process flow presentation for schedule preparation and 
updation 
4. Standard MIS formats 
o Project Management – Hindustan Mittal Energy Ltd. (HMEL) 
o Integral member of the Program Management Office, responsible for building the green 
field 9 mmtpa, USD 4 bn refinery in North India along with the crude pipeline from the 
West Coast 
o Develop and Implement project schedule for pipeline build. 
o Implement project progress reviewing mechanism. 
o Project Management - L&T-MHI (Boilers) 
o Implementing enterprise project management solution. 
o Implementing leading Industry practices in project management. Reducing the project 
completion time by significant amount through implementation of Innovative 
construction methodologies and project controls processes. 
o Led team of 2 consultant’s and 3 planning engineers for developing and implementing 
Integrated EPC Project Schedule and MIS to access project critical information 
instantly, thereby reducing the delay in decision making and archive the project 
documentation for future reference. 
o Manage the project knowledge in a structure manner for future projects. 
 ADANI Power Limited: 
o 5 x 660 MW Tiroda Power Project, assignment handled Ash Handling System, Water Treatment 
Plant, Chlorination System, Mill reject System, Hydrogen Generation System, Compressed Air 
System, Air Conditioning & Ventilation System. 
 TATA Projects Limited: 
o 2 x 800 MW SDSTPS Krishnapatnam Project, assignment handled Ash Handling System, Air 
Conditioning & Ventilation System. 
o 2 x 80 MW Tuticorin Project, Sterlite Industries Limited. 
o 2 x 80 MW Hindustan Zinc Limited, Dariba Project, assignment handled Ahs Handling System, 
Fuel Oil System, Fire Protection System and Air Conditioning & Ventilation System.(Project 
under commissioning)
o 2 x 80 MW Hindustan Zinc Limited, Zawar Project, assignment handled Ahs Handling System, 
Fuel Oil System, Fire Protection System and Air Conditioning & Ventilation System. (Project 
Commissioned) 
 INDO RAMA Synthetics (I) Ltd: 
Erection & Commissioning of; 
o 2 x 15.0 MW Turbine with 04 extraction of M/s Siemens Make. 
o 2 x 90 TPH AFBC Boilers, Pr. 85 Kg/cm2 & Temp. 510 Deg. C of M/s Cethar Vessels Make. 
o 125 TPH Coal Handling Plant with 2 sets of Primary, Secondary Crusher & Primary & 
Secondary vibrating screen with DES & DSS. 
o 45 m3 DM Plant with 3 streams of RO & UF Plant of M/s Triveni Engg. 
o IBR & BOP (DM Water & Condensate) of INDORAMA Scope, Making BOM, Procurement of 
Material and Execution of Job. 
 Layout finalization of Steam Piping for hook up with existing plants, erection of IBR piping & 
commissioning in coordination with M/s AKPG. 
 Construction 85 Mtr. RCC Chimney in coordination with M/s SRS Enviro. 
 Civil Work of Coal Handling Plant & BOP in coordination with M/s Shaprooji & Palonji (Civil 
Contracting Agency). 
Scholastics 
 B.E (Mechanical) in 2003 with 70.14 % 
 HSSC from Maharashtra State Board in 1998 with 72.33 % 
 SSC from Maharashtra State Board with 1996 78.80 % 
IT Skills: Well versed with Primavera – P6 
Personal Profile 
Date of Birth : 17th June 1980 
Passport Number : G4522867

More Related Content

What's hot

Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CVSajith Nair
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
Vinay Mangrulkar
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_shailendra kumar
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3Sunil Mall
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarALPESH CONTRACTOR
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY AROKIAM
 
2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CVBalaji Manivel
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
David Fitzsimmons Resume
David Fitzsimmons ResumeDavid Fitzsimmons Resume
David Fitzsimmons Resume
David Fitzsimmons
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar Khan
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projectspramod patel
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016Brian Hannigan
 

What's hot (20)

Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
Gaurav Shukla_CV
Gaurav Shukla_CVGaurav Shukla_CV
Gaurav Shukla_CV
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 
2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV2016 - Balaji Manivel - CV
2016 - Balaji Manivel - CV
 
Srinivaskumar_cv_16
Srinivaskumar_cv_16Srinivaskumar_cv_16
Srinivaskumar_cv_16
 
Varun Garg_CV
Varun Garg_CVVarun Garg_CV
Varun Garg_CV
 
Henry CV
Henry CVHenry CV
Henry CV
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
David Fitzsimmons Resume
David Fitzsimmons ResumeDavid Fitzsimmons Resume
David Fitzsimmons Resume
 
Senior Project Engineer
Senior Project EngineerSenior Project Engineer
Senior Project Engineer
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
 
C.V
C.VC.V
C.V
 
Ska3
Ska3Ska3
Ska3
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016
 

Similar to Samrat Khanorkar_Resume

Resume- Project Management Analyst
Resume- Project Management AnalystResume- Project Management Analyst
Resume- Project Management AnalystAmol Gaikwad
 
Jois Lakshmipathy - CV
Jois Lakshmipathy - CVJois Lakshmipathy - CV
Jois Lakshmipathy - CVJois L.pathy
 
Saptak_CV
Saptak_CVSaptak_CV
Saptak_CV
Saptak Thakkar
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
Sayantan Dhar
 
Resume-Naresh.B (1).pdf
Resume-Naresh.B (1).pdfResume-Naresh.B (1).pdf
Resume-Naresh.B (1).pdf
ssuser9237b9
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015Ismail Shaikh
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Fergani
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Souptik Sarkar
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 New
Austin Mattson II
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerSankar Sundaram PMP
 

Similar to Samrat Khanorkar_Resume (20)

Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Resume- Project Management Analyst
Resume- Project Management AnalystResume- Project Management Analyst
Resume- Project Management Analyst
 
Resume of SSK
Resume of SSKResume of SSK
Resume of SSK
 
Jois Lakshmipathy - CV
Jois Lakshmipathy - CVJois Lakshmipathy - CV
Jois Lakshmipathy - CV
 
Saptak_CV
Saptak_CVSaptak_CV
Saptak_CV
 
Ravi CV 2016
Ravi CV 2016Ravi CV 2016
Ravi CV 2016
 
Ketan's resume
Ketan's resumeKetan's resume
Ketan's resume
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 
resume
resumeresume
resume
 
Resume
ResumeResume
Resume
 
Resume-Naresh.B (1).pdf
Resume-Naresh.B (1).pdfResume-Naresh.B (1).pdf
Resume-Naresh.B (1).pdf
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 New
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 

Samrat Khanorkar_Resume

  • 1. Samrat R Khanorkar Contact No.: +91 99 3010 7740 Email: samrat.khanorkar@gmail.com in.linkedin.com/pub/samrat-khanorkar/23/19a/218/ Seeking assignments in Project Management with an organisation of high repute in Project Construction Management Professional Synopsis  Management Consultant with over 10 years of experience in the areas of Project Management, Project Controls, Business Transformation, Operational excellence in capital projects.  Adept in managing project activities (Planning, Coordination, execution, monitoring & project engineering), streamlining processes / procedures to facilitate smooth production process, enhance productivity and cost reduction.  An effective communicator with exceptional analytical, negotiation, relationship management and problem solving skills. Organisational Experience EY (Ernst & Young Advisory Services) : As Project Manager- Capital Program Advisory Services (EPC Projects) (Sep’13 – Present) Accenture Services Pvt. Ltd. : As a Manager Management Consulting – Infrastructure Practice (EPC Projects) (Nov’10 – Sep’13) ADANI Power Limited : As a Deputy Manager Projects – Power Generation - (May’10 - Nov’10) TATA Projects Limited : As a Sr. Project Engineer in Project Management – Power Generation (Feb’07-May’10) INDO RAMA Synthetics (I) Ltd. : Thermal Power Plant (CPP) - Joined as Project Engineer Nagpur and rose to the post of Engineer – Operation (Jul’04 – Feb’07) NECO Steel : SMS Division, Graduate Engineer Trainee (2004) Key Deliverables: Project Management – EY (Ernst & Young Advisory Services),  Development and implementation of solutions for client business needs through structured engagements.
  • 2.  Identification of new business opportunities for EY and development of business proposals including solution approach, effort estimation, skill requirement and pricing.  Augmenting thought capital and delivery capabilities by generating research reports and delivery assets.  Core member of EY’s Capital Program Advisory Services (CPAS) offering development team.  Developed Go-To Market point of view on Indian Power Generation Industry and prioritizing power projects.  Developed operation model framework for capital project management. Project Management & Project Controls – Accenture Management Consulting,  Led a team of consultants to establish operating model for project management for a large green-field steel plant build. Developed and implemented Project control processes .  Led a team of consultants to drive implementation of project controls and expedite project execution for multiple mega-projects across power, crude pipeline, steel with focus on reduction in execution time and cost and bringing predictability and transparency in forecasting and reporting.  Development and implementation of Management Information System across all functions .  Worked on multiple business opportunities across process implementation and time and cost reduction  Preparing & Monitoring Schedules by visiting site and interacting with stakeholders, Preparing list of balance activities to be performed for construction completion, materials balance for delivery, package vendors work status & support required from client management to contractors for f ast work execution.  Tracking of actions planned & progress on deliverables to be obtained. Update & release the report.  Supplier Performance Evaluation by creating approach and further details to highlight on mechanism to conduct the exercise of rating supplier and capture key learning.  Implementation of best practice in Project Management & Project Controls at Client Organization. Project Management – ADANI Power Limited  Managing the project operations with a view to ensure timely accomplishment of project targets within the time and cost parameters.  Engineering coordination by reviving technical document / drawing schedule. Reviewing Drg. & giving clearance for mfg. and issuing technical recommendations and approving.  Progress Review for projects.  Preparing Supply & Erection and Payment schedule. And Co-ordination with vendor for supply against schedule and the same with site.  Arranging for mobilization of vendor / contractor at site.  Expediting of dispatch / tracking and invoicing of Project.  Responding the client / vendor queries and resolving the issues.  Final documentation for handover of project. Project Management – Tata Projects Ltd.  Get specifications’. Reviewing it & approving. And Inviting offer against specs. & making comparative Statement.  Awarding LOI to vendor (Vendor documentation)  Engineering coordination by reviving technical document / drawing schedule. Reviewing Drg. & giving clearance for mfg. and issuing technical recommendations and approving.  Preparing Supply & Erection and Payment schedule. And Co-ordination with vendor for supply against schedule and the same with site.
  • 3.  Arranging for mobilization of vendor / contractor at site.  Expediting of dispatch / tracking and invoicing of Project.  Responding the client / vendor queries and resolving the issues.  Regularization of billing & forwarding it to finance dept.  Erection and commissioning of equipments as per protocol.  Final documentation for handover of project.  Managing the project operations with a view to ensure timely accomplishment of project targets within the time and cost parameters. Project Management – Indo Rama Synthetics (I) Ltd.  Regularization of supplies as per schedule by coordinating with vendor.  Determining the future inventory needs and production capacity timely completion of project as per pre-defined standards and within financial costs.  Preparing MIS for the Power Plant for apprising management of Daily / Monthly progress.  Maintaining operational data for monthly / yearly audit.  Controlling inventory of consumables / procurement & maintaining consumables data for MIS / costing on monthly / yearly basis. Installation & Commissioning  Anchoring installation & commissioning of machines & equipments and ensuring completion of project in minimum turnaround time effective resource utilisation to maximise the output.  Installing and commissioning as well as conducting tests & inspections preparing protocols to ensure operational effectiveness of utilities / Equipments. Operations & Maintenance  Implementing the preventive & predictive maintenance schedules for improving the overall reliability and safety of plant equipments & machinery.  Maintaining all the activities in the area of Generation, Maintenance, New Facility Planning and Training as per set standards. Statutory Compliances  Conducting statutory compliances of Pollution Control Board regarding water chess and drafting documentation related to consent.  Maintaining IBR Documentation & formalities. Major Assignments Handled:  Accenture Services Pvt. Ltd.,: o EPC Process Consultant – Pt. Indika Energy Tbk., Jakarta Indonesia o Supported client on EPC business process optimization, and ensure implementation of Project management leading practices o Led team of integrators and project controls engineer for SAP & primavera Integration o Developed and implemented Standard WBS structure and coding mask for SAP & Primavera
  • 4. o Project Management & Controls – L&T Minerals and Metals; o Developed and Implemented project controls processes leading to 10-14 % reduction in schedule overruns for key project with capital investment of 2000Cr. with a significant cost implication. o Led team of 3 consultants and 6 planning engineers for implementation of project control processes. o Engaging with stakeholders for identifying issues related to Project Controls o Developed and Implemented project progress review mechanism o Reviewed all major Project Schedules for Blast Furnace, Sinter Plant and Coke Oven for BSL Angul Project, Tata Steel JSR, BSP Bhilai, Tata Steel KPO, to identify set of findings and recommend client to develop an Integrated EPC Project Schedule o Create re-usable solutions for Client: 1. Develop a standard / reference Work Breakdown Structure (WBS) 2. Develop standard / reference EPC Project Schedule 3. Development of process flow presentation for schedule preparation and updation 4. Standard MIS formats o Project Management – Hindustan Mittal Energy Ltd. (HMEL) o Integral member of the Program Management Office, responsible for building the green field 9 mmtpa, USD 4 bn refinery in North India along with the crude pipeline from the West Coast o Develop and Implement project schedule for pipeline build. o Implement project progress reviewing mechanism. o Project Management - L&T-MHI (Boilers) o Implementing enterprise project management solution. o Implementing leading Industry practices in project management. Reducing the project completion time by significant amount through implementation of Innovative construction methodologies and project controls processes. o Led team of 2 consultant’s and 3 planning engineers for developing and implementing Integrated EPC Project Schedule and MIS to access project critical information instantly, thereby reducing the delay in decision making and archive the project documentation for future reference. o Manage the project knowledge in a structure manner for future projects.  ADANI Power Limited: o 5 x 660 MW Tiroda Power Project, assignment handled Ash Handling System, Water Treatment Plant, Chlorination System, Mill reject System, Hydrogen Generation System, Compressed Air System, Air Conditioning & Ventilation System.  TATA Projects Limited: o 2 x 800 MW SDSTPS Krishnapatnam Project, assignment handled Ash Handling System, Air Conditioning & Ventilation System. o 2 x 80 MW Tuticorin Project, Sterlite Industries Limited. o 2 x 80 MW Hindustan Zinc Limited, Dariba Project, assignment handled Ahs Handling System, Fuel Oil System, Fire Protection System and Air Conditioning & Ventilation System.(Project under commissioning)
  • 5. o 2 x 80 MW Hindustan Zinc Limited, Zawar Project, assignment handled Ahs Handling System, Fuel Oil System, Fire Protection System and Air Conditioning & Ventilation System. (Project Commissioned)  INDO RAMA Synthetics (I) Ltd: Erection & Commissioning of; o 2 x 15.0 MW Turbine with 04 extraction of M/s Siemens Make. o 2 x 90 TPH AFBC Boilers, Pr. 85 Kg/cm2 & Temp. 510 Deg. C of M/s Cethar Vessels Make. o 125 TPH Coal Handling Plant with 2 sets of Primary, Secondary Crusher & Primary & Secondary vibrating screen with DES & DSS. o 45 m3 DM Plant with 3 streams of RO & UF Plant of M/s Triveni Engg. o IBR & BOP (DM Water & Condensate) of INDORAMA Scope, Making BOM, Procurement of Material and Execution of Job.  Layout finalization of Steam Piping for hook up with existing plants, erection of IBR piping & commissioning in coordination with M/s AKPG.  Construction 85 Mtr. RCC Chimney in coordination with M/s SRS Enviro.  Civil Work of Coal Handling Plant & BOP in coordination with M/s Shaprooji & Palonji (Civil Contracting Agency). Scholastics  B.E (Mechanical) in 2003 with 70.14 %  HSSC from Maharashtra State Board in 1998 with 72.33 %  SSC from Maharashtra State Board with 1996 78.80 % IT Skills: Well versed with Primavera – P6 Personal Profile Date of Birth : 17th June 1980 Passport Number : G4522867