The document appears to be a resume for Yoedi Padrihi. It outlines his work experience from 2010 to 1990 including roles as a Site Project Manager, Production/Planning and Progress Controller, General Manager, Project Manager, Construction Manager, and Production Engineer. His experience includes managing projects in Indonesia for companies in the energy and construction industries. Key responsibilities involved project planning, budgeting, scheduling, quality control, safety compliance, and managing teams.
1. Sergeant KKO Badaruddin
Street Cempedak Alley
No.604/110, Lemabang,
Palembang, South-Sumatra
Prov ince, Indonesia
+62-812-711-44-310, +62-811-
789-2700
onky _22@y ahoo.co.id
Yoedi Padrihi
Objective Always strive to reach High Standard Performance
Experience Dec.2010 ~ Present Time.
PT. DH ENERGY, JKT.
SITE PROJECT MANAGER
Prepare land for projects.
Solely responsible for all predevelopment activities Projects.
Observations of land for the projects.
Conducted social approach to community at the planning project
locations.
Fully responsible for the implementation of soil investigation work of
land for projects.
Fully responsible for all technical matters at the site locations.
Conducted assessment of existing roads to ensure the smooth
mobilization and demobilization of the tools and equipment’s for
execution of development projects.
Solely responsible for accompanying and explaining technical issues to
the prospective investors during site visit to the location of projects.
Assist the legal team in obtain licenses and permits from local
authorities and a third party in connection with the wishes of potential
investors to see the infrastructure that has been available near the site
plan projects.
o Projects:Coalto CleanEnergyProjects.
Mine Mouth Power Generation.
Coal Upgrading Plant.
Synthetic Gas (Sync gas).
Ammonia, DME and Other Chemical Product.
Coal Liquefaction (CTL).
Carbon Capture & Sequestration (CCS).
Solar Energy, Solar Photo Volte (SPV).
Oil Recovery (EOR), Gas Recovery (EGR).
Coal Bed Methane (CBM).
2. March.2010 ~ August.2010.
PT. TRI SAKTI MITRA PERKASA, BTM, RIAU.
PRODUCTION / PLANNING AND PROGRESS CONTROLLER
Planning and manage all Production Activities.
Monitoring fabrication support for Electrical & Instrumentation
installation work.
Provide regular daily report to Client.
Discuss with Client concerning Project schedule.
Issue site instruction letter to Client concerning site modification, re-
work, etc.
Check actual site installation work based on drawing and compare to
Client MTO.
Provide weekly and monthly progress report to Client.
o Project: Gajah Baru Wellhead Platform Owner by
Eni Saipem.
Jan.2010 ~ March.2010.
PT. CENDRAWASIH ANEKA INDAH. BTM, RIAU.
GENERAL MANAGER
To look for New Projects.
Managed all Company Staff and labors.
To do Bidding work for new project.
Provide quotation prices and estimate man hours and estimate
manpower needed for new project requirement.
Managed all licenses or permit needed for the projects condition.
Monitor budget against actual performance, preparation of forecast and
establishment of price and quotations guidelines.
Permanent analyzing and improvement of company business process
and monitoring effectiveness profitability in the company projects.
Setting up and expanding solid customer relationshipthrough customer
service and follow up customer complaints.
Gathering customer information, maintain customer data base and
observing project market competition and counter measure.
3. Sept.2009 ~ Dec.2009. .
PT. SYSCO BRILLIANT PROSES. BTM, RIAU.
PROJECT MANAGER
To look for and negotiate new project offer from Client.
Planning, Control and monitored production site work activities.
Managed and conducted Storage Tank works fabrication included
fabrication and piping erection work.
Implemented Training course for new recruits-quality and safety work
standard.
Nov.2004 ~ March.2009.
PT. ASRIGITA PRASARANA. PALEMBANG, SS
CONSTRUCTION MANAGER / DEVELOPMENT MANAGER /
CHIEF OF HSE COORDINATOR
Monitored and responsible for the Construction work of 150MW Gas
Fired Combine Cycle [GFCC].
Interface with QA/QC personnel to address quality issues and work
progress and ensure compliance with specification, standard and plan
and procedure.
Monitored work force productivities / progress relative to schedule.
Full of implementation of all safety and quality requirements.
Solve any Non-conformance works in the system during construction
phase.
Control all Sub-contractors works in term of quality and quantity.
Attended daily, weekly and monthly progress meeting with EPC
Contractor, Sub-contractors and Authorities Inspector.
Make notification to Main contractor if observe any modification lines
installed for drawing revise.
Witness all test such as: Equipment performance test, Hydrostatic test,
Air blowing test and Start-up test.
Checked and follow-up preparation work prior commissioning and test
is commenced.
Responsible to manage all Local and Outstation staff.
In charge as Quantity surveyor to source material needed by company
refer to the Standard, Specification and Material prices.
Managed all company Asset and prevent it from damaged.
4. Provide sketching, standard, procedure and specification for repair
work or company development programs.
Provide contract document related to repair or company additional
works.
Fully responsible for Health, Safety and Environmental.
As a core part of HSE team, Establish environmental management
policies, procedure and processed and HSE management system as
well as the focal point for Environmental support
Provide guidance to the Management to ensure compliance with
Environmental Laws, Regulation and policies to ensure the
achievement of Company environmental goals.
Interface and keep in touch with Government representative related to
Company Environmental related to HSE Matter.
Monitored and evaluate environmental performance, included incident
and incident trends.
Prepared regular environmental report for Company, Governmental
after related analysis.
Provide HSE report such as: Air quality sampling, Water and Waste
water sampling, Social economic, Cultural matter, etc.
Keep in touch with Governmental Manpower department related
Company employees such as: Employees wages, Company
regulation, company permit, Equipment inspection and tests.
Attended meeting with PERTAMINA related Gas supply and Standard
operating procedure (SOP).
Attended meeting with Mining, Energy Source and Environmental
department concerning Company Plant Production.
Fully responsible to coordinate Manpower, materials, equipments for
Plant Outage works.
Provide Standard Operation Procedure (SOP) for Safety during
Company Plant Outage.
Fully responsible to monitor, control and check Sub-contractors works
progress during Plant Outage to catch-up Schedule.
Provide all governmental regulations that needed by company related
company operational works.
Fully responsible to provide drawing, standard, procedure, contractual
services, supervision and payment of Sub-contractors work progress.
Managed all aspect related to the facilities technical support during the
project assessment and development engineering phases for new
development.
Integrate the different discipline, i.e. reservoir, geology, facilities,
operation and commercial/economics, to identify and evaluate
optimum field development scenarios.
Interact with other group in the areas where the technical support is
needed.
Assist and work closely with Asset Manager in defining priorities and
creating maximize value for development opportunities.
Work with Cost/Planning Engineer to determine the cost and schedule.
Plan and participate in quantitative risk assessments.
Define Value Improvement Practice (VIP) plans for project.
5. Identify and Implement Contracting Strategies that allow the
preliminary engineering schedule to be achieved.
Checked and approved engineering contractor’s works, calculation and
drawings and assure the compliance with all specification and
regulations.
PT. ASRIGITA PRASARANA, PROJECT.
o THE OWNER OF 150MW GAS FIRED COMBINED CYCLE
(GFCC), POWER PLANT, SOUTH-SUMATRA PROVINCE,
INDONESIA.
Jan.2004 ~ Nov.2004.
HAZAMA CORP, JAPAN. PALEMBANG, SS
Mechanical / Electrical Building Engineer In charge for Site
Superintendent Building Mechanical/Electrical
Oversee site constructors during construction phase.
Develop and maintain Project management plans and monitor works
progress against the schedule and budgets.
Assist Project manager in Project planning and scheduling.
Responsible for overall managements of the construction works and
project progress.
Plan, monitored and evaluate all of assigned construction activities.
Served as member of Project Management Team (PMT).
Provide the PMT interface between the works and Site manager.
Assist in early Site construction planning, construction planning
interface with EPC constructor’s prior Site mobilizations.
Serve as day to day interface with EPC constructors, Craft labors
during construction phase and provided a focus of Safety, cost,
schedule, etc.
Provide technical consultant for field modification.
Provide Safety briefing, monitoring, leadership, etc.
Interface with QA/QC personnel to address quality issues/work
progress.
Provide oversight of constructor’s material management/verification
system.
Ensure compliance, specification, standard, procedure and plans.
Monitored work force productivities/progress relative to schedule.
Monitored environmental compliance as required.
Liaised with constructors for field level changes, e.g. work scope, cost,
etc.
Verified post-site arrival of procured equipment and engineering
equipment’s.
6. Served as liaison with Site manager on barriers emerging issues.
Provide pre-commissioning / mechanical completion oversight /
verification.
Reported to and assisted Project manager.
HAZAMA CORP, JAPAN PROJECT.
o PALEMBANG NEW AIRPORT DEVELOPMENT PROJECT,
SOUTH-SUMATRA PROVINCE, INDONESIA.
Oct.1994 ~ Jan.2003.
OVERSEAS PROJECTS
HITACHI PLANT ENGINEERING & CONSTRUCTION, CO,
LTD, JAPAN.
Local Fabrication Manager / Chief of Materials Controller /
Mechanical Engineer / High Pressure Piping Supervisor
Coordinated Supervisors and assistance in related discipline and
activities.
Supervised piping works and prefabricated, erected and tested works.
Ensure Mechanical completion of piping system as per defined targets
and development of action plan to achieve timely completion.
Fully implementation of all quality requirements.
Timely and regular reported of progress and quality toward
construction managements.
Supervised and instructed Sub-contractors with regards to quality, work
progress and field modification.
Control of field extras, non-conformities and work orders.
Arranged all means and efforts to achieve a maximum extend works
possibilities of Sub-contractors.
Managed, coached assist piping, painting and insulation supervisors.
Controlled and checked all of work of Sub-contractors in term of Quality
and quantity.
Controlled all of works of Sub-contractors progress.
Attended daily, weekly and monthly meeting with Sub-contractors.
Issued written instruction to the Sub-contractors.
Checked planning and physical progress of Sub-contractors work.
Arranged inspection and tests with Client representative and
Authorities inspectors.
Supervised punch-out of installed works.
Supervised execution all of tests and inspections for the completion of
mechanical completion and hand over documents package.
Liaised with Safety officer to achieve the application of site works
method without any accident.
7. Liaised with QA/QC manager to achieve Best quality result.
Participated in Engineering in part of Modification works.
Reviewed new materials request raised by User to ensure adequate
data’s on descriptions, equipment detail, Tag numbers, quantities
requirement and classification, etc.
Select the appropriate request on noun / modifier as per standard
modifier dictionary and populated the templates, material catalogue
and forward to Inventory control section.
Control Data’s entry input.
Identify manufacturability parts for further evaluation of feasibility and
source.
Review product details from suppliers and evaluate its acceptance.
Physically inspect new project spares and ensured that supplied items
are correct specification.
Review 2 Years operation requirements for project materials.
Reviewed and created Bill of Material (BOM).
Responsible to supervise the smooth flow of fabrication of Steel
structure of Stacker reclaimed, Pan conveyors, Bag filters, etc, of Sub-
contractors fabrication areas in Bekasi and Cileungsi, Bogor,
INDONESIA.
Responsible in organized the smooth flow of materials and
equipment’s delivery schedule based on VPD, FOB, ETD, and ETA to
avoid obstruction with erection and installation works at Project site.
Followed-up Materials and equipment’s of Project spare-parts included
to maintain them prior to hand them over to the Customer.
Conducted Spare-parts hand over to the Customer and accompanied
and witness by the Maker.
HITACHI PLANT ENGINEERING & CONSTRUCTION, CO, LTD
OVERSEAS PROJECTS
o THE MECHANICAL & ELECTRICAL INSTALLATION
WORKS OF CEMENT PLANT PROJECT, CITIREUP,
BOGOR, INDONESIA for the INDOCEMENT TUNGGAL
PRAKARSA, Co, LTD.
o THE MECHANICAL & ELECTRICAL INSTALLATION
WORKS OF CONTINUES DECALING AND COLD MILL
PROJECT, MAP THA PHUT, RAYONG, THAILAND for The
SIAM UNITED STEELS (1995) Co, Ltd.
o THE MECHANICAL & ELECTRICAL INSTALLATION
WORKS OF THAI COLD ROLL STEEL SHEET PLANT
PROJECT, BANGSAPHAN, PRACHUAP KHIRIKHAN, and
THAILAND for the SAHAVIRIYA Plc.
o THE MECHANICAL & ELECTRICAL INSTALLATION
WORKS OF STEEL PLANT PROJECT, KEMAMAN,
TERRENGGANU STATE MALAYSIA for PERWAJA
ROLLING MILL DEVELOPMENT Sdn Bhd.
8. June. 1994 ~ Nov 1994.
OVERSEAS PROJECTS
DEUTSHSTALL DILLINGER STAHLBAHN Gmbh,
GERMANY
INSPECTOR / PIPING ENGINEER
Ensure the Fabrication and installation works of Piping, Mechanical &
Electrical works in accordance with Customer Specifications.
Responsible for All kind of welding productions.
Keep in touch with 3rd Parties Inspector regarding the inspection of
Piping, Mechanical, Electrical and Instrumentation installation and
materials.
Prepared all documents related to works method and submitted to the
3rd Parties Inspectors.
DEUSTHSTALL DILLINGER STAHLBAN Gmbh, PROJECT.
o PAKA POWER PLANT PROJECT, DISTRICT OF KERTEH,
KEMAMAN, TERRENGGANU STATE for TENAGA
NASIONAL Berhad, MALAYSIA.
Nov. 1993 ~ May 1994.
OVERSEAS PROJECTS
HYUNDAI ENGINEERING & CONSTRUCTION Co, Ltd,
KOREA
INSPECTOR / QC ENGINEER
Responsible to All of Plant Construction Quality.
Ensure the Fabrication and installation works of Piping, Mechanical &
Electrical works in accordance with Customer Specifications.
Responsible for All kind of welding productions.
Keep in touch with 3rd Parties Inspector regarding the inspection of
Piping, Mechanical, Electrical and Instrumentation installation and
materials.
Prepared all documents related to works method and submitted to the
3rd Parties Inspectors.
HYUNDAI ENGINEERING & CONSTRUCTION Co, Ltd,
PROJECT.
9. o THE CONSTRUCTION OF GPP 4 REFINERIES, KERTEH
OIL & GAS INDUSTRY for PETRONAS GAS & OIL
MALAYSIA Sdn Bhd.
Aug. 1993 ~ Nov 1993.
OVERSEAS PROJECTS.
SEMBAWANG ENGINEERING, SINGAPORE
INSPECTOR / PIPING ENGINEER
Ensure the Fabrication and installation works of Piping, Mechanical &
Electrical works in accordance with Customer Specifications.
Responsible for All kind of welding productions.
Keep in touch with 3rd Parties Inspector regarding the inspection of
Piping, Mechanical, Electrical and Instrumentation installation and
materials.
Prepared all documents related to works method and submitted to the
3rd Parties Inspectors.
SEMBAWANG ENGINEERING PROJECT
o FATTY ALCOHOL PLANT PROJECT for BATAMAS
MEGAH, KABIL, BATAM ISLAND, RIAU PROVINCE.
Oct. 1990 ~ Aug 1993.
PT. McDERMOTT INDONESIA, BATAM YARD, RIAU
PRODUCTION ENGINEER / ESTIMATOR
Responsible managed the Production planning, Quality control,
Materials control and maintain the development of production activities.
Monitored the progress of production activities.
Make sure all of organizations, equipment’s, work methods to adoption
to the work to be performed in accordance with standard, regulation
based on projects requirements.
Monitored and followed-up fabrication, delivery, installation works of
ongoing projects.
Responsible for Materials process controlled and estimated from
Mechanical flow diagrams and structural drawing based on Customer
Specification.
Ensure Structural, Mechanical, Piping system as per define target and
development of action plans to achieve timely completion.
10. Fully implementation of all quality requirements.
Timely and regular reported of progress and quality towards
Construction management.
Supervised and instructed Supervisor with regards to Quality, work
method, work progress and field modification.
Keep in touch with 3rd Parties Inspector related to inspection of
Materials, Piping, Mechanical, Electrical & Instrumentation installation
works.
Prepared all documents related to the works and submitted to the 3rd
Parties Inspectors.
Supervised all of Test executions, and inspection for the completion of
Piping, Mechanical, Electrical & Instrumentation works and hand over
document packages.
Arranged all Inspections and tests with Client representative and 3rd
Parties Inspectors.
PT. McDERMOTT INDONESIA PROJECTS.
o FABRICATION JACKETS AND DECKS FOR MAXUS
WIDURI A, B, C, D AND P.
o FABRICATION JACKETS AND DECKS FOR MAXUS
INTAN A AND B.
o FABRICATION JACKETS AND DECKS FOR AGIP-
CHEVRON-TEXACO (ACT) HZ-21-1
o FABRICATION JACKETS AND DECKS FOR ENTERPRISE
OIL CAMAR CPP & WPP
o FABRICATION JACKETS AND DECKS FOR ARII ARCO
JAVA BL-BNA
o FABRICATION JACKETS AND DECKS FOR TOTAL
THAILAND WP 1, 2 AND 3
o FABRICATION JACKETS FOR TOTAL THAILAND PP
o FABRICATION JACKETS AND LIVING QUARTER TOTAL
THAILAND QP
o FABRICATION JACKETS AND DECKS FOR CONOCO
BELIDA DPP-A
o FABRICATION JACKETS FOR PETRONAS CARIGALI
BNG-B
o FABRICATION JACKETS FOR PHILIP PETROLEUM
XINGJIAN CHINA 24-3 & 30-2
11. o FABRICATION JACKETS AND DECKS FOR ARII ARCO
JAVA KLX-KLY
o FABRICATION JACKETS FOR WOODSIDE AUSTRALIA
OFFSHORE PETROLEUM ENERGY
Sept. 1986 ~ June 1989.
PT. INDAH WARNA, JAKARTA
FIELD ENGINEER
Responsible for all kind Company activities.
Responsible to review materials delivery schedule and identify the
priority materials to be delivered.
Coordinated with Supervisor in charge and Buyer related materials
delivery and order.
Plans work activities based on master plans schedule.
Completed outstanding activities.
Coordinated with materials group to identify and expedite missing
materials and equipment’s.
Ensure all documents system is completed and authorized.
Arranged delivery materials schedule in order can reach the Buyer
schedule.
Responsible for all managements and warehouse controlling.
Managed the delivery schedule of materials day to day execution to
avoid obstruction with others schedule delivery.
Responsible in organized the smooth flow of incoming and outgoing
materials and equipment based on purchased order through receiving,
outgoing and inventory system.
TRAINING AND SEMINAR ATTENDED
35 PDU’s Project Management Professional (PMP) Workshop Trainer
by Knowledge Hut USA (Project Management Institute).
South – Sumatra Mow Energy Seminar, Speaker by South – Sumatra
Governor.
Swagelok Instrumentation Fitting Materials.
Lightning Protection System (LPS) Conducted by DR. Reynaldo Zorro
from Institute Technology Bandung (ITB).
Safety Management System (SMK 3) Training, Speaker by Indonesian
Labors and Transmigration Department (Depnaker) of INDONESIAN
Government.
12. Education 2004–2008 Kader Bangsa University PALEMBANG, SS
Bachelor of Economic Management Studies.
Graduated.
Interests Construction and Management Activities, Production work, Sport,
Motor Sports and Football.
Tips Always be ready to accept New Challenge work in Any kind of work
Activities.
Passport No A 7677759 (date of expiry: Feb 26, 2019)