 Background includes +13 yrs. project management, pipelines and facilities engineering with upstream and midstream
experience (conventional developments as well as unconventional shale plays) in both gas/liquids gathering systems and
transmission pipelines, project delivery performance metrics, benchmarking & process improvement, working for several
owner/operator companies as well as EPCM consulting engineering.
 Strengths include team work, communication skills, problem solving, project management fundamentals, with a focus on
execution planning & project controls, technical analysis and data visualization and construction management & contractor
oversight.
 Familiar with DOT CFR-192 & 195, ASME B31.3, B31.4, B31.8, ANSI B16.5, USACE & USFWS regs, Air Quality & City /
Municipalities and Utilities permitting, HCA (High Consequence Area) Studies and USA (Unusually Sensitive Area)
classifications; understanding of T&E (Threated & Endangered) species and mitigation and safe work practices and planning.
Project Manager - Pipelines & Facilities Engineering in Asset Integrity
Jan 2017 - Jul 2017 Centurion Pipeline, L.P. Houston, TX
 Performed job function as a Project Manager in Pipeline Integrity Management (Engineering Services) for In-Service Repair
Projects and DOT/PHMSA Compliance Programs for both gathering and transmission lines centered across the Permian
Basin and extending to delivery destinations and market centers located in West Texas and Cushing , Oklahoma.
 Manage projects from project initiation and scope development, preliminary engineering, planning and implementation
activities to directing and overseeing execution of project objectives. Key focus areas consist of FEL (Front-End Loading),
Project Framing and developing the scope, and identifying project drivers in conjunction with operating conditions,
scheduling and project frequency, cost forecasting, risk assessment and thorough planning and procedural development.
 Provide expertise in pipeline and facilities engineering and Project Management knowledge to perform technical analysis,
outline project controls and formal management practices including resource planning, cost control, contracting and supply
chain strategies, performance monitoring and up-to-date status reporting and full lifecycle tracking.
 Tasked with critical role in process development to enhance Asset Integrity and Compliance Program FEL activates and
Execution Planning. Contributions include dashboard reporting, identifying UDC (Unit Development Costs), benchmarking,
action item reporting and team integration initiatives.
SUMMARY
EXPERIENCE
D A V I D P A T R I C K F I T Z S I M M O N S
david_fitzsimmons@live.com
www.linkedin.com/in/davidfitzsimmons1
949-554-4272 Page 1 of 3
Project Manger - Consulting Engineering Team Lead
Jul 2017 - Jan 2018 STV Energy Services, Inc. Houston, TX
 Assigned senior leadership role in Project Management to support Midstream Pipeline & Facilities Owner/Operator
companies, to provide engineering and PM support responsible for coordination of Project Delivery (Full Lifecycle) from
Project Initiation & Conceptual Development to overseeing Engr. & Design activities & Deliverables and Construction
Implementation. Projects consisting of new build Capital Expansion projects, pump stations & distribution terminals,
pipeline gathering and transmission lines for Petroleum Liquids (Crude Oil, Refined Products & NGL’s) as well as Asset
Integrity & Maintenance Upgrade Projects.
 Provided expertise and advisement in core Project Management practices and Organizational Processes, holding paramount
the delivery of quality work product and achieving project milestones and cost/schedule objectives. Crucial to project
success, required consistent & hands-on engagement, communication and direction of task assignments and working
collaboratively to establish a High-Performance Project Team, maintaining forward momentum and integrating planning
and review processes with learning and constructive problem solving initiatives.
 Managed and supported projects including several new pump stations for added Natural Gas Liquids (NGLs) capacity, a 24”
approx. 2 mile pipeline segment with an HDD and pump system for Brine Water transfer for Crude Oil Storage (Cavern Salt
Dome Storage), Pipeline Exposure & Line Lowering Program (Creek Crossing) with E&S mitigation. Additionally managed
maintenance upgrade Program Project to bring tank outlet/rack line piping aboveground at a refined products terminal and
supported a high-capital expansion Pipeline Crude Oil gathering system greenfield project in Big Spring, TX with numerous
source points and lateral sections including new tank batteries and LACT units, intermediate tank storage and mainline
pumps and metering.
 Additional core functions included proposal development and scope definition involving project location onsite evaluation
and identifying objectives, project drivers, assessing constructability & operability considerations and providing
recommendation on optimal plan selection, potential process variables and risk factors to ensure accuracy of scope and
allow for precise business investment decisions and successful execution of the project.
Project Engineer in Conceptual Engineering & Pre-Development Planning
2012 - 2013 Hess Corporation Houston, TX
 Performed global developments project portfolio analysis to examine an expanding portfolio of projects with increased
costs and higher risk potential for $35 billion developments portfolio. Examined project concepts and characteristics such as
size, scope, complexity of design, location and reservoir conditions to identify fit-for-purpose project organizational
structures and processes, capital utilization needs, and project staffing and resource requirements.
 Contributed to Conceptual Engineering Group benchmarking study for industry unit development costs. Performed data
collection and analysis to examine project cost components in relation to total recoverable reserves; cost components
reported in $/boe consisted of exploration & appraisal, development drilling, facilities and operating costs. Study involved
the use of cost escalation, trend line derivation and data normalization techniques to provide cost competitiveness analysis
for portfolio performance measurement and an indicative estimate for key variables for new project appraisal.
 Performed a lead role for conducting an organizational study to assess the company’s capability to plan, execute and deliver
capital projects across the global portfolio. Acted as liaison with Westney Consulting Group to facilitate data gathering and
analysis to provide a qualitative review of the company’s organizational structure effectiveness, project team competencies,
decision making processes, project controls and assurance programs.
 Engaged with consultant group Independent Project Analysis (IPA) to conduct individual project evaluations to perform
quantitative benchmarking assessments to measure projects completed and give indication of ongoing project expectant
performance. Project evaluation metrics consisted of Front-End-Loading (FEL) effectiveness, cost predictability and
deviations, NPV change, schedule slip and production attainment, each measured against industry peer companies to
indicate competitiveness standing. Provided contractor oversight, reviewed data findings and collaborated with analysts to
refine data reporting and presentation material.
Project Engineer (EPCM Consulting Engineer/PM)
2009 - 2012 Sun Engineering Services, Inc. Westminster, CA
 Provided project management & engineering expertise to client operator companies to support projects from Front-End-
Loading and execution planning, cost estimating, to detailed engineering, construction management & system start-up.
 Managed and supported projects by overseeing and directing internal cross-functional engineering and CAD design teams
and interfacing with client project managers to provide engineering deliverables including detailed design drawing packages
(PFD’s, P&ID’s, Alignment Sheets, E&S Plans, Piping Plan and Cross Sectional dwgs, 3D Models, Isometrics, and BoM’s), flow
assurance and flow modeling, hydraulic and stress analysis calculations, MAOP calcs, equipment and material selection in
addition to onsite construction support and contractor oversight.
Project Manager - Pipelines & Facilities Engineering in Asset Development
2013 - 2015 Statoil Houston, TX
 Provided project management expertise for unconventional development in Marcellus/Utica Asset managing pipeline gas
gathering system projects ranging in $50MM - $100MM in capital expenditure. Managed projects throughout project
lifecycle from scope definition, AFE preparation and execution planning to route selection and ROW acquisition, detailed
engineering, permitting, HAZOP review, procurement, and construction execution and commissioning.
 Performed project scope definition and schedule planning in conjunction with full field development planning. Acted as lead
facilitator engaging with project stakeholders and team members including Statoil Midstream Group, Field Dev Planning,
Drilling and Completions, Subsurface, Operations, Safety and Sustainability Unit, Supply Chain, Land, Inspection Personnel
and Consulting Engineering to develop project objectives and execution planning.
 Managed Southern Monroe County, Ohio Pipelines Project with capital costs at $80MM. Project attributes consisted of 6.5
miles of ROW (30+ miles of pipeline construction) with six line services for L.P. and H.P. gas, condensate, produced water,
treated water and freshwater (frac water) and included carbon steel pipe, HDPE and Zap-Lok piping, along with a fiber optic
network SCADA system. Managed Ohio River Pump Station Project ($5MM) to provide frac water for well completion
purposes.
 Conducted Lessons Learned Sessions and Project Look-Backs to identify areas of improvements. Identified project best
practices in areas such as project scope development and planning, risk assessment, roles and responsibilities, design
standardization, engineering deliverables and project controls and status reporting.
 Assisted in expanding contractor network to serve Statoil in consulting engineering and labor resources. Developed
effective working relationships and teams to deliver projects.
D A V I D P A T R I C K F I T Z S I M M O N S
david_fitzsimmons@live.com
www.linkedin.com/in/davidfitzsimmons1
949-554-4272 Page 2 of 3
Project Engineer (EPCM Consulting Engineer/PM)
Sun Engineering Services, Inc. (Project Engineer position info cont’d from page-2) 2009 - 2012
 Supported projects at petroleum products and crude oil storage and distribution terminals and pipelines as well as pipeline
integrity management programs and repair projects. Engineered and designed new systems and upgrades ranging from skid
based equipment designs, pump systems, separation and storage vessels and tankage loading/offloading equipment,
launchers/receivers, custody transfer meter installations, instrumentation and valve and piping systems.
 Engaged in quality assurance/quality control reviews for project drawings and deliverables to ensure service efficiency and
accuracy. Conducted post project assessment meetings to establish Lessons Learned and Best Practices.
Project Engineer in Facilities Engineering Group
2007 - 2008 Kinder Morgan Energy Partners, L.P. Orange, CA
 Managed projects by overseeing and coordinating initial planning and scope definition, submitting cost forecasts and AFE
requests and handling permitting requirements. Duties also included detailed engineering, material procurement, cost
control and accrual reporting, project scheduling, construction management and project commencement.
 Completed Eugene, OR Terminal major expansion project ($3.5MM) with an accelerated schedule to comply with state
mandated ethanol blending fuel requirements. Project consisted of load rack modifications and upgrades, storage tank
conversion and fire protection system upgrades and installation of an automated ethanol offloading system.
 Other projects included biodiesel blending, underground storage tank removal and replacement, vapor recovery upgrades,
additive system conversion, and water draw piping upgrades.
 Coordinated construction scheduling and sequencing consisting of rack and pipeline shutdown synchronization, tie-in
procedures and safety planning and execution.
Field Engineer in Reservoir Performance Monitoring & Completion Tools
2005 - 2007 Halliburton Energy Services Group Bakersfield, CA
 Deployed Fiber Optic Distributed Temperature Sensors for permanent and retrievable monitoring operations to gather
down- hole information. Data uses included stimwatch, steamflood management, casing damage identification, fluid entry
point identification, and per zone quantification.
 Developed fiber optic “end-of-fiber” preparation and installation procedures to test new sensor technology and mitigate
“end- of-fiber” light loss and data abnormalities. Advanced installations safety procedures and job situational awareness.
 Operated pressure acquisition equipment to monitor bottom-hole pressure determination for San Joaquin Valley, CA
operations. Serviced and refurbished tools prior to job execution as well as troubleshot and repaired in field settings.
B.S. Petroleum Engineering
2001 - 2005 Texas A&M University College Station, TX
 SPE (Society of Petroleum Engineers) - GCS (Gulf Coast Section) Scholarship Recipient.
 Participated in the Texas A&M Student Chapter of the Society of Petroleum Engineers (member since 2001).
Internships
2001 - 2005 (2) Chevron / (1) Anadarko US GoM (Gulf of Mexico) & Rockies Division, WY
 Observed / assisted with wellwork projects and offshore ops on both deepwater (Genesis Spar) and shelf facilities.
 Performed post job studies to determine success rates and allow for improved pre-job evaluations.
EDUCATION & TRAINING
D A V I D P A T R I C K F I T Z S I M M O N S
david_fitzsimmons@live.com
www.linkedin.com/in/davidfitzsimmons1
949-554-4272 Page 3 of 3

More Related Content

What's hot

Ashwin_Planning Engineer-new
Ashwin_Planning Engineer-newAshwin_Planning Engineer-new
Ashwin_Planning Engineer-newASHWIN VISHAL
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016Brian Hannigan
 
CV04.16.16 P. McAlpine
CV04.16.16  P. McAlpineCV04.16.16  P. McAlpine
CV04.16.16 P. McAlpinePenny McAlpine
 
Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5
WarrenFaeth
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CVSajith Nair
 
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghuRaghu p
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef samNermeen gerges
 
Samir Patil 16 YRs EXP
Samir Patil 16 YRs EXPSamir Patil 16 YRs EXP
Samir Patil 16 YRs EXPSamir Patil
 
Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5
WarrenFaeth
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar Khan
 
Matthew J Rockey Resume
Matthew J Rockey ResumeMatthew J Rockey Resume
Matthew J Rockey ResumeMatthew Rockey
 
Value engineering practical
Value engineering practicalValue engineering practical
Value engineering practicalAbada Saad
 

What's hot (18)

Ashwin_Planning Engineer-new
Ashwin_Planning Engineer-newAshwin_Planning Engineer-new
Ashwin_Planning Engineer-new
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
New Updated 7.62 Resume8
New Updated 7.62 Resume8New Updated 7.62 Resume8
New Updated 7.62 Resume8
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016
 
RINAL_PATEL
RINAL_PATELRINAL_PATEL
RINAL_PATEL
 
CV04.16.16 P. McAlpine
CV04.16.16  P. McAlpineCV04.16.16  P. McAlpine
CV04.16.16 P. McAlpine
 
Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
 
CustomerCopy raghu
CustomerCopy raghuCustomerCopy raghu
CustomerCopy raghu
 
Resume
ResumeResume
Resume
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
Samir Patil 16 YRs EXP
Samir Patil 16 YRs EXPSamir Patil 16 YRs EXP
Samir Patil 16 YRs EXP
 
Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
 
Matthew J Rockey Resume
Matthew J Rockey ResumeMatthew J Rockey Resume
Matthew J Rockey Resume
 
Value engineering practical
Value engineering practicalValue engineering practical
Value engineering practical
 

Similar to David Fitzsimmons Resume

EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016
Erwin D. Gibson
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
Erwin D. Gibson
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Aew Sanmai
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
Brian Nicholls
 
UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16Ken Simmons
 
Jois Lakshmipathy - CV
Jois Lakshmipathy - CVJois Lakshmipathy - CV
Jois Lakshmipathy - CVJois L.pathy
 
Ong-Gross, Lena Solvera Resume 2014 updated
Ong-Gross, Lena Solvera Resume 2014 updatedOng-Gross, Lena Solvera Resume 2014 updated
Ong-Gross, Lena Solvera Resume 2014 updatedlena ong-gross
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7Sam Ghosh
 
Project controls function
Project controls functionProject controls function
Project controls function
Hatem Hegazi
 
U pdated resume #7.pdf
U pdated resume #7.pdfU pdated resume #7.pdf
U pdated resume #7.pdf
Sonny Daigrepont
 
Job resume
Job resumeJob resume
Job resume
Warner Sherman
 
Martez Johnson 2016 Resume
Martez Johnson 2016 ResumeMartez Johnson 2016 Resume
Martez Johnson 2016 Resume
Marty Johnson
 
Johnson Martez 2016 Resume
Johnson Martez 2016 ResumeJohnson Martez 2016 Resume
Johnson Martez 2016 ResumeMarty Johnson
 
B Nicholls resume 2016-07-17
B Nicholls resume   2016-07-17B Nicholls resume   2016-07-17
B Nicholls resume 2016-07-17
Brian Nicholls
 
Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee
 

Similar to David Fitzsimmons Resume (20)

EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
 
UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16UpdatedResumeasof10-17-16
UpdatedResumeasof10-17-16
 
Henry CV
Henry CVHenry CV
Henry CV
 
Jois Lakshmipathy - CV
Jois Lakshmipathy - CVJois Lakshmipathy - CV
Jois Lakshmipathy - CV
 
Ong-Gross, Lena Solvera Resume 2014 updated
Ong-Gross, Lena Solvera Resume 2014 updatedOng-Gross, Lena Solvera Resume 2014 updated
Ong-Gross, Lena Solvera Resume 2014 updated
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7
 
Project controls function
Project controls functionProject controls function
Project controls function
 
CV
CVCV
CV
 
U pdated resume #7.pdf
U pdated resume #7.pdfU pdated resume #7.pdf
U pdated resume #7.pdf
 
Job resume
Job resumeJob resume
Job resume
 
fac mgt 2016
fac mgt 2016fac mgt 2016
fac mgt 2016
 
Martez Johnson 2016 Resume
Martez Johnson 2016 ResumeMartez Johnson 2016 Resume
Martez Johnson 2016 Resume
 
Johnson Martez 2016 Resume
Johnson Martez 2016 ResumeJohnson Martez 2016 Resume
Johnson Martez 2016 Resume
 
B Nicholls resume 2016-07-17
B Nicholls resume   2016-07-17B Nicholls resume   2016-07-17
B Nicholls resume 2016-07-17
 
Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2
 
cv_rajesh_kachhawah
cv_rajesh_kachhawahcv_rajesh_kachhawah
cv_rajesh_kachhawah
 
Randolph Angelito CV
Randolph Angelito CVRandolph Angelito CV
Randolph Angelito CV
 

Recently uploaded

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 

Recently uploaded (20)

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 

David Fitzsimmons Resume

  • 1.  Background includes +13 yrs. project management, pipelines and facilities engineering with upstream and midstream experience (conventional developments as well as unconventional shale plays) in both gas/liquids gathering systems and transmission pipelines, project delivery performance metrics, benchmarking & process improvement, working for several owner/operator companies as well as EPCM consulting engineering.  Strengths include team work, communication skills, problem solving, project management fundamentals, with a focus on execution planning & project controls, technical analysis and data visualization and construction management & contractor oversight.  Familiar with DOT CFR-192 & 195, ASME B31.3, B31.4, B31.8, ANSI B16.5, USACE & USFWS regs, Air Quality & City / Municipalities and Utilities permitting, HCA (High Consequence Area) Studies and USA (Unusually Sensitive Area) classifications; understanding of T&E (Threated & Endangered) species and mitigation and safe work practices and planning. Project Manager - Pipelines & Facilities Engineering in Asset Integrity Jan 2017 - Jul 2017 Centurion Pipeline, L.P. Houston, TX  Performed job function as a Project Manager in Pipeline Integrity Management (Engineering Services) for In-Service Repair Projects and DOT/PHMSA Compliance Programs for both gathering and transmission lines centered across the Permian Basin and extending to delivery destinations and market centers located in West Texas and Cushing , Oklahoma.  Manage projects from project initiation and scope development, preliminary engineering, planning and implementation activities to directing and overseeing execution of project objectives. Key focus areas consist of FEL (Front-End Loading), Project Framing and developing the scope, and identifying project drivers in conjunction with operating conditions, scheduling and project frequency, cost forecasting, risk assessment and thorough planning and procedural development.  Provide expertise in pipeline and facilities engineering and Project Management knowledge to perform technical analysis, outline project controls and formal management practices including resource planning, cost control, contracting and supply chain strategies, performance monitoring and up-to-date status reporting and full lifecycle tracking.  Tasked with critical role in process development to enhance Asset Integrity and Compliance Program FEL activates and Execution Planning. Contributions include dashboard reporting, identifying UDC (Unit Development Costs), benchmarking, action item reporting and team integration initiatives. SUMMARY EXPERIENCE D A V I D P A T R I C K F I T Z S I M M O N S david_fitzsimmons@live.com www.linkedin.com/in/davidfitzsimmons1 949-554-4272 Page 1 of 3 Project Manger - Consulting Engineering Team Lead Jul 2017 - Jan 2018 STV Energy Services, Inc. Houston, TX  Assigned senior leadership role in Project Management to support Midstream Pipeline & Facilities Owner/Operator companies, to provide engineering and PM support responsible for coordination of Project Delivery (Full Lifecycle) from Project Initiation & Conceptual Development to overseeing Engr. & Design activities & Deliverables and Construction Implementation. Projects consisting of new build Capital Expansion projects, pump stations & distribution terminals, pipeline gathering and transmission lines for Petroleum Liquids (Crude Oil, Refined Products & NGL’s) as well as Asset Integrity & Maintenance Upgrade Projects.  Provided expertise and advisement in core Project Management practices and Organizational Processes, holding paramount the delivery of quality work product and achieving project milestones and cost/schedule objectives. Crucial to project success, required consistent & hands-on engagement, communication and direction of task assignments and working collaboratively to establish a High-Performance Project Team, maintaining forward momentum and integrating planning and review processes with learning and constructive problem solving initiatives.  Managed and supported projects including several new pump stations for added Natural Gas Liquids (NGLs) capacity, a 24” approx. 2 mile pipeline segment with an HDD and pump system for Brine Water transfer for Crude Oil Storage (Cavern Salt Dome Storage), Pipeline Exposure & Line Lowering Program (Creek Crossing) with E&S mitigation. Additionally managed maintenance upgrade Program Project to bring tank outlet/rack line piping aboveground at a refined products terminal and supported a high-capital expansion Pipeline Crude Oil gathering system greenfield project in Big Spring, TX with numerous source points and lateral sections including new tank batteries and LACT units, intermediate tank storage and mainline pumps and metering.  Additional core functions included proposal development and scope definition involving project location onsite evaluation and identifying objectives, project drivers, assessing constructability & operability considerations and providing recommendation on optimal plan selection, potential process variables and risk factors to ensure accuracy of scope and allow for precise business investment decisions and successful execution of the project.
  • 2. Project Engineer in Conceptual Engineering & Pre-Development Planning 2012 - 2013 Hess Corporation Houston, TX  Performed global developments project portfolio analysis to examine an expanding portfolio of projects with increased costs and higher risk potential for $35 billion developments portfolio. Examined project concepts and characteristics such as size, scope, complexity of design, location and reservoir conditions to identify fit-for-purpose project organizational structures and processes, capital utilization needs, and project staffing and resource requirements.  Contributed to Conceptual Engineering Group benchmarking study for industry unit development costs. Performed data collection and analysis to examine project cost components in relation to total recoverable reserves; cost components reported in $/boe consisted of exploration & appraisal, development drilling, facilities and operating costs. Study involved the use of cost escalation, trend line derivation and data normalization techniques to provide cost competitiveness analysis for portfolio performance measurement and an indicative estimate for key variables for new project appraisal.  Performed a lead role for conducting an organizational study to assess the company’s capability to plan, execute and deliver capital projects across the global portfolio. Acted as liaison with Westney Consulting Group to facilitate data gathering and analysis to provide a qualitative review of the company’s organizational structure effectiveness, project team competencies, decision making processes, project controls and assurance programs.  Engaged with consultant group Independent Project Analysis (IPA) to conduct individual project evaluations to perform quantitative benchmarking assessments to measure projects completed and give indication of ongoing project expectant performance. Project evaluation metrics consisted of Front-End-Loading (FEL) effectiveness, cost predictability and deviations, NPV change, schedule slip and production attainment, each measured against industry peer companies to indicate competitiveness standing. Provided contractor oversight, reviewed data findings and collaborated with analysts to refine data reporting and presentation material. Project Engineer (EPCM Consulting Engineer/PM) 2009 - 2012 Sun Engineering Services, Inc. Westminster, CA  Provided project management & engineering expertise to client operator companies to support projects from Front-End- Loading and execution planning, cost estimating, to detailed engineering, construction management & system start-up.  Managed and supported projects by overseeing and directing internal cross-functional engineering and CAD design teams and interfacing with client project managers to provide engineering deliverables including detailed design drawing packages (PFD’s, P&ID’s, Alignment Sheets, E&S Plans, Piping Plan and Cross Sectional dwgs, 3D Models, Isometrics, and BoM’s), flow assurance and flow modeling, hydraulic and stress analysis calculations, MAOP calcs, equipment and material selection in addition to onsite construction support and contractor oversight. Project Manager - Pipelines & Facilities Engineering in Asset Development 2013 - 2015 Statoil Houston, TX  Provided project management expertise for unconventional development in Marcellus/Utica Asset managing pipeline gas gathering system projects ranging in $50MM - $100MM in capital expenditure. Managed projects throughout project lifecycle from scope definition, AFE preparation and execution planning to route selection and ROW acquisition, detailed engineering, permitting, HAZOP review, procurement, and construction execution and commissioning.  Performed project scope definition and schedule planning in conjunction with full field development planning. Acted as lead facilitator engaging with project stakeholders and team members including Statoil Midstream Group, Field Dev Planning, Drilling and Completions, Subsurface, Operations, Safety and Sustainability Unit, Supply Chain, Land, Inspection Personnel and Consulting Engineering to develop project objectives and execution planning.  Managed Southern Monroe County, Ohio Pipelines Project with capital costs at $80MM. Project attributes consisted of 6.5 miles of ROW (30+ miles of pipeline construction) with six line services for L.P. and H.P. gas, condensate, produced water, treated water and freshwater (frac water) and included carbon steel pipe, HDPE and Zap-Lok piping, along with a fiber optic network SCADA system. Managed Ohio River Pump Station Project ($5MM) to provide frac water for well completion purposes.  Conducted Lessons Learned Sessions and Project Look-Backs to identify areas of improvements. Identified project best practices in areas such as project scope development and planning, risk assessment, roles and responsibilities, design standardization, engineering deliverables and project controls and status reporting.  Assisted in expanding contractor network to serve Statoil in consulting engineering and labor resources. Developed effective working relationships and teams to deliver projects. D A V I D P A T R I C K F I T Z S I M M O N S david_fitzsimmons@live.com www.linkedin.com/in/davidfitzsimmons1 949-554-4272 Page 2 of 3
  • 3. Project Engineer (EPCM Consulting Engineer/PM) Sun Engineering Services, Inc. (Project Engineer position info cont’d from page-2) 2009 - 2012  Supported projects at petroleum products and crude oil storage and distribution terminals and pipelines as well as pipeline integrity management programs and repair projects. Engineered and designed new systems and upgrades ranging from skid based equipment designs, pump systems, separation and storage vessels and tankage loading/offloading equipment, launchers/receivers, custody transfer meter installations, instrumentation and valve and piping systems.  Engaged in quality assurance/quality control reviews for project drawings and deliverables to ensure service efficiency and accuracy. Conducted post project assessment meetings to establish Lessons Learned and Best Practices. Project Engineer in Facilities Engineering Group 2007 - 2008 Kinder Morgan Energy Partners, L.P. Orange, CA  Managed projects by overseeing and coordinating initial planning and scope definition, submitting cost forecasts and AFE requests and handling permitting requirements. Duties also included detailed engineering, material procurement, cost control and accrual reporting, project scheduling, construction management and project commencement.  Completed Eugene, OR Terminal major expansion project ($3.5MM) with an accelerated schedule to comply with state mandated ethanol blending fuel requirements. Project consisted of load rack modifications and upgrades, storage tank conversion and fire protection system upgrades and installation of an automated ethanol offloading system.  Other projects included biodiesel blending, underground storage tank removal and replacement, vapor recovery upgrades, additive system conversion, and water draw piping upgrades.  Coordinated construction scheduling and sequencing consisting of rack and pipeline shutdown synchronization, tie-in procedures and safety planning and execution. Field Engineer in Reservoir Performance Monitoring & Completion Tools 2005 - 2007 Halliburton Energy Services Group Bakersfield, CA  Deployed Fiber Optic Distributed Temperature Sensors for permanent and retrievable monitoring operations to gather down- hole information. Data uses included stimwatch, steamflood management, casing damage identification, fluid entry point identification, and per zone quantification.  Developed fiber optic “end-of-fiber” preparation and installation procedures to test new sensor technology and mitigate “end- of-fiber” light loss and data abnormalities. Advanced installations safety procedures and job situational awareness.  Operated pressure acquisition equipment to monitor bottom-hole pressure determination for San Joaquin Valley, CA operations. Serviced and refurbished tools prior to job execution as well as troubleshot and repaired in field settings. B.S. Petroleum Engineering 2001 - 2005 Texas A&M University College Station, TX  SPE (Society of Petroleum Engineers) - GCS (Gulf Coast Section) Scholarship Recipient.  Participated in the Texas A&M Student Chapter of the Society of Petroleum Engineers (member since 2001). Internships 2001 - 2005 (2) Chevron / (1) Anadarko US GoM (Gulf of Mexico) & Rockies Division, WY  Observed / assisted with wellwork projects and offshore ops on both deepwater (Genesis Spar) and shelf facilities.  Performed post job studies to determine success rates and allow for improved pre-job evaluations. EDUCATION & TRAINING D A V I D P A T R I C K F I T Z S I M M O N S david_fitzsimmons@live.com www.linkedin.com/in/davidfitzsimmons1 949-554-4272 Page 3 of 3