 Construction work taking place a beam the active
runaway.20 workers and 7 vehicles involved
• Duration 20 days
• Bad ground repair
• 2x cranes + 5x lorries
• Day and nite
 A paper work need to be done by the Workers to
declare all the document involving the
construction.The Document are including
 Construction kind
 Total workers
 Vehicle in use
 Estimate Time
 Time
This procedure need to be given to SMC(responsible for
the airport "movement" areas) or Airport Authority to plan
the instruction and schedule for aircraft operation
involving the runaway and for workers to crossing runaway
and doing the maintenance and putting all the machine in
use. Need Approval by Authority
• ATC then create a Notams first before proceed with the
instruction and schedule to the construction workers.
 ATC then have to Briefing all the workers all the
instruction and procedure including route to go IN
and go OUT when crossing the runway
 All the worker need to be on standby position and
always alert because runway in use is in active mode
 Workers also have to inspect all the vehicle is in good
condition
 Being handle by qualified personnel
 Crossing runway traffic is control by radio communication
to give directions to guards or vehicles maintenance.
 Any aircraft, vehicle, or person walking or working in these
areas is required to have clearance from Ground Control.
This is normally done via VHF/UHF radio, but there may
be special cases where other processes are used. Most
aircraft and airside vehicles have radios. Aircraft or vehicles
without radios must respond to ATC instructions via
aviation light signals or else be led by vehicles with radios.
People working on the airport surface normally have a
communications link through which they can
communicate with Ground Control, commonly either by
handheld radio or even cell phone. Ground Control is
vital to the smooth operation of the airport, because
this position impacts the sequencing of departure
aircraft, affecting the safety and efficiency of the
airport's operation.
 In this case many big machine and vehicles are in use
and many workers also are involve in the aerodrome
area
 ATC need to create a plan to coordinating all the
vehicles to avoid being obstruction to aircraft and
provide safety movement.
 Coordinating have to be made for construction ,a/c
movement on ground, for take off & landing operation
and aircraft in circuit holding pattern
 Has to be made precisely to avoid collision
 Object should be marked and if the runway is used at
night, lighted if such marking and lighting is
considered necessary to ensure its avoidance.
 object should be coloured
 Exceeds 4.5m in both dimensions.
 Pattern should consists of rectangles of not less
than 1.5m and not more than 3m on a side, the
corners being of darker colour.
 Orange and white or red and white in colour.
 Marker Cones
 Red PERL
<1.5m
<1.5m
> 4.5m
< 4.5m
 During runway construction airport should consider
visible holding position signage for using or maybe
have to close part of the runway. The signage must be
visible at day and illuminated at night.
 Satco or Airport Authority has responsibility to declare
restriction to any area in surrounding aerodrome that
in use .
 All action must be refer to Local Instruction
 Automatic Terminal Information System(ATIS) need to be
issued to provide info to Pilot and other Personnel that
involve in flight operation
 Position & direction of the traffic in relation to aircraft
concerned
 Construction / maintenance work on / near maneuvering
area
 Rough / broken surfaces on / near maneuvering
area, marked or not
 In this case construction near runaway for long time period
and overnight
 Shall be displayed around, on top of or around highest
edge of the object.
 Flags shall not increase the hazard presented by the
object they mark.
 Colour: Orange or combination of two triangular
sections, orange and white or red and white.
 Colour: White and red alternately
or
White and orange alternately
> 45m
 After construction has been done controller need to
write a report in Log Book and cancel NOTAMs
 Continue controlling flight operation normally

More Related Content

What's hot (20)

SPEDAP AIRPORT DESIGN
SPEDAP AIRPORT DESIGNSPEDAP AIRPORT DESIGN
SPEDAP AIRPORT DESIGN
 
Challenges to airport
Challenges to airportChallenges to airport
Challenges to airport
 
Airside Hazards And Risks
Airside Hazards And RisksAirside Hazards And Risks
Airside Hazards And Risks
 
NTSB presents: Air Traffic Control - Trust but Verify
NTSB presents: Air Traffic Control - Trust but VerifyNTSB presents: Air Traffic Control - Trust but Verify
NTSB presents: Air Traffic Control - Trust but Verify
 
Air Traffic Control Organization Lesson
Air Traffic Control Organization LessonAir Traffic Control Organization Lesson
Air Traffic Control Organization Lesson
 
Air traffic management
Air traffic managementAir traffic management
Air traffic management
 
Terminal area
Terminal areaTerminal area
Terminal area
 
Economic impact of ground handling industry
Economic impact of ground handling industryEconomic impact of ground handling industry
Economic impact of ground handling industry
 
Airport facilities
Airport facilitiesAirport facilities
Airport facilities
 
Digitam
DigitamDigitam
Digitam
 
Air Traffic Control and You
Air Traffic Control and YouAir Traffic Control and You
Air Traffic Control and You
 
Acronyms
AcronymsAcronyms
Acronyms
 
Airport Layout
Airport LayoutAirport Layout
Airport Layout
 
Ramp safety
Ramp safetyRamp safety
Ramp safety
 
Air traffic control
Air traffic controlAir traffic control
Air traffic control
 
mi17_EDZ756_2
mi17_EDZ756_2mi17_EDZ756_2
mi17_EDZ756_2
 
ATC
ATCATC
ATC
 
Procedure for Safe Ground Handling Practices - (Sample for Edition)
Procedure for Safe Ground Handling Practices - (Sample for Edition)Procedure for Safe Ground Handling Practices - (Sample for Edition)
Procedure for Safe Ground Handling Practices - (Sample for Edition)
 
Airport Authority of India
Airport Authority of IndiaAirport Authority of India
Airport Authority of India
 
Atc air traffic control
Atc air traffic controlAtc air traffic control
Atc air traffic control
 

Similar to runway crossing

Air Traffic Control.pptx
Air Traffic Control.pptxAir Traffic Control.pptx
Air Traffic Control.pptxbharathikv29
 
FAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield ConstructionFAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield Constructionoffthewallsafety
 
Pilots_Guide_to_Runway_Safety
Pilots_Guide_to_Runway_SafetyPilots_Guide_to_Runway_Safety
Pilots_Guide_to_Runway_SafetyFiona Lawton
 
FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...
FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...
FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...FAA Safety Team Central Florida
 
Ar10x96 barricade how to for construction personnel
Ar10x96 barricade how to for construction personnelAr10x96 barricade how to for construction personnel
Ar10x96 barricade how to for construction personnelRyan Sueoka
 
AVB 6: The Airfield And Safety Precautions - CCPL Fleming - 27 AUG
AVB 6: The Airfield And Safety Precautions - CCPL Fleming - 27 AUGAVB 6: The Airfield And Safety Precautions - CCPL Fleming - 27 AUG
AVB 6: The Airfield And Safety Precautions - CCPL Fleming - 27 AUG715 Squadron
 
Air Traffic Control
Air Traffic ControlAir Traffic Control
Air Traffic ControlParth Desani
 
Lecture 7 (1).pptx
Lecture 7 (1).pptxLecture 7 (1).pptx
Lecture 7 (1).pptxWhUllahWa
 
Aviation terminology by Kalyan S Patil
Aviation terminology by Kalyan S PatilAviation terminology by Kalyan S Patil
Aviation terminology by Kalyan S PatilKalyan S Patil
 
Aircraft Maintenance practices introduction
Aircraft Maintenance practices introduction Aircraft Maintenance practices introduction
Aircraft Maintenance practices introduction Gaurav Garv
 
AIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJANAIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJANNiranjan Varma
 
AIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNAIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNNiranjan Varma
 
Visual approach
Visual approachVisual approach
Visual approachAbuRoma
 
318099023-Internship-at-AAI-Baroda.pdf
318099023-Internship-at-AAI-Baroda.pdf318099023-Internship-at-AAI-Baroda.pdf
318099023-Internship-at-AAI-Baroda.pdfChitranshKadare
 
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMCONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMiQHub
 
Airspace-ATC-systems-Lecture-2.pptx
Airspace-ATC-systems-Lecture-2.pptxAirspace-ATC-systems-Lecture-2.pptx
Airspace-ATC-systems-Lecture-2.pptxkishorekumarsandan
 
Air Traffic Control PPT
Air Traffic Control PPTAir Traffic Control PPT
Air Traffic Control PPTksasidhar007
 

Similar to runway crossing (20)

Air Traffic Control.pptx
Air Traffic Control.pptxAir Traffic Control.pptx
Air Traffic Control.pptx
 
FAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield ConstructionFAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield Construction
 
Pilots_Guide_to_Runway_Safety
Pilots_Guide_to_Runway_SafetyPilots_Guide_to_Runway_Safety
Pilots_Guide_to_Runway_Safety
 
LEVEL 2 ADA 2010
LEVEL 2 ADA 2010LEVEL 2 ADA 2010
LEVEL 2 ADA 2010
 
FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...
FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...
FAA Guide to Operations - A Comprehensive Guide to Safe Driving on the Airpor...
 
Ar10x96 barricade how to for construction personnel
Ar10x96 barricade how to for construction personnelAr10x96 barricade how to for construction personnel
Ar10x96 barricade how to for construction personnel
 
AVB 6: The Airfield And Safety Precautions - CCPL Fleming - 27 AUG
AVB 6: The Airfield And Safety Precautions - CCPL Fleming - 27 AUGAVB 6: The Airfield And Safety Precautions - CCPL Fleming - 27 AUG
AVB 6: The Airfield And Safety Precautions - CCPL Fleming - 27 AUG
 
Airside Safety
Airside SafetyAirside Safety
Airside Safety
 
Air Traffic Control
Air Traffic ControlAir Traffic Control
Air Traffic Control
 
Lecture 7 (1).pptx
Lecture 7 (1).pptxLecture 7 (1).pptx
Lecture 7 (1).pptx
 
Aviation terminology by Kalyan S Patil
Aviation terminology by Kalyan S PatilAviation terminology by Kalyan S Patil
Aviation terminology by Kalyan S Patil
 
Aircraft Maintenance practices introduction
Aircraft Maintenance practices introduction Aircraft Maintenance practices introduction
Aircraft Maintenance practices introduction
 
AIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJANAIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJAN
 
AIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNAIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGN
 
Visual approach
Visual approachVisual approach
Visual approach
 
318099023-Internship-at-AAI-Baroda.pdf
318099023-Internship-at-AAI-Baroda.pdf318099023-Internship-at-AAI-Baroda.pdf
318099023-Internship-at-AAI-Baroda.pdf
 
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMCONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
 
PPt on AAI
PPt on AAIPPt on AAI
PPt on AAI
 
Airspace-ATC-systems-Lecture-2.pptx
Airspace-ATC-systems-Lecture-2.pptxAirspace-ATC-systems-Lecture-2.pptx
Airspace-ATC-systems-Lecture-2.pptx
 
Air Traffic Control PPT
Air Traffic Control PPTAir Traffic Control PPT
Air Traffic Control PPT
 

More from Amidee Azizan Stringfellow

Future outlook of passenger air transport in open 2
Future outlook of  passenger air transport in open 2Future outlook of  passenger air transport in open 2
Future outlook of passenger air transport in open 2Amidee Azizan Stringfellow
 

More from Amidee Azizan Stringfellow (20)

Transcript about Tenerife disaster
Transcript about Tenerife disasterTranscript about Tenerife disaster
Transcript about Tenerife disaster
 
Lebanese twa flight 847 Hijacking fact
Lebanese twa flight 847 Hijacking factLebanese twa flight 847 Hijacking fact
Lebanese twa flight 847 Hijacking fact
 
Turkish airlines flight 1754
Turkish airlines flight 1754Turkish airlines flight 1754
Turkish airlines flight 1754
 
Thai airways
Thai airwaysThai airways
Thai airways
 
Ils and air traffic
Ils and air trafficIls and air traffic
Ils and air traffic
 
Future outlook of passenger air transport in open 2
Future outlook of  passenger air transport in open 2Future outlook of  passenger air transport in open 2
Future outlook of passenger air transport in open 2
 
Challenges airport planning
Challenges airport planningChallenges airport planning
Challenges airport planning
 
Atmospheric science turbulence 2
Atmospheric science  turbulence 2Atmospheric science  turbulence 2
Atmospheric science turbulence 2
 
Airport operation control centre (aocc)
Airport operation control centre (aocc)Airport operation control centre (aocc)
Airport operation control centre (aocc)
 
Air Transport
Air TransportAir Transport
Air Transport
 
Turbulence
TurbulenceTurbulence
Turbulence
 
Traffic controller
Traffic controllerTraffic controller
Traffic controller
 
Radio aids & navigation
Radio aids & navigationRadio aids & navigation
Radio aids & navigation
 
Navigation aids
Navigation aidsNavigation aids
Navigation aids
 
ILS paperwork air traffic control
ILS paperwork air traffic controlILS paperwork air traffic control
ILS paperwork air traffic control
 
Aviation history
Aviation historyAviation history
Aviation history
 
Airport Management 11
Airport Management  11Airport Management  11
Airport Management 11
 
Airport operation
Airport operationAirport operation
Airport operation
 
Flight Instrument .
Flight Instrument .Flight Instrument .
Flight Instrument .
 
Aviation safety n security
Aviation safety n securityAviation safety n security
Aviation safety n security
 

Recently uploaded

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 

Recently uploaded (20)

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 

runway crossing

  • 1.
  • 2.  Construction work taking place a beam the active runaway.20 workers and 7 vehicles involved • Duration 20 days • Bad ground repair • 2x cranes + 5x lorries • Day and nite
  • 3.  A paper work need to be done by the Workers to declare all the document involving the construction.The Document are including  Construction kind  Total workers  Vehicle in use  Estimate Time  Time This procedure need to be given to SMC(responsible for the airport "movement" areas) or Airport Authority to plan the instruction and schedule for aircraft operation involving the runaway and for workers to crossing runaway and doing the maintenance and putting all the machine in use. Need Approval by Authority • ATC then create a Notams first before proceed with the instruction and schedule to the construction workers.
  • 4.  ATC then have to Briefing all the workers all the instruction and procedure including route to go IN and go OUT when crossing the runway  All the worker need to be on standby position and always alert because runway in use is in active mode  Workers also have to inspect all the vehicle is in good condition  Being handle by qualified personnel
  • 5.  Crossing runway traffic is control by radio communication to give directions to guards or vehicles maintenance.  Any aircraft, vehicle, or person walking or working in these areas is required to have clearance from Ground Control. This is normally done via VHF/UHF radio, but there may be special cases where other processes are used. Most aircraft and airside vehicles have radios. Aircraft or vehicles without radios must respond to ATC instructions via aviation light signals or else be led by vehicles with radios. People working on the airport surface normally have a communications link through which they can communicate with Ground Control, commonly either by handheld radio or even cell phone. Ground Control is vital to the smooth operation of the airport, because this position impacts the sequencing of departure aircraft, affecting the safety and efficiency of the airport's operation.
  • 6.  In this case many big machine and vehicles are in use and many workers also are involve in the aerodrome area  ATC need to create a plan to coordinating all the vehicles to avoid being obstruction to aircraft and provide safety movement.  Coordinating have to be made for construction ,a/c movement on ground, for take off & landing operation and aircraft in circuit holding pattern  Has to be made precisely to avoid collision
  • 7.
  • 8.  Object should be marked and if the runway is used at night, lighted if such marking and lighting is considered necessary to ensure its avoidance.  object should be coloured  Exceeds 4.5m in both dimensions.  Pattern should consists of rectangles of not less than 1.5m and not more than 3m on a side, the corners being of darker colour.  Orange and white or red and white in colour.
  • 9.  Marker Cones  Red PERL <1.5m <1.5m > 4.5m < 4.5m
  • 10.  During runway construction airport should consider visible holding position signage for using or maybe have to close part of the runway. The signage must be visible at day and illuminated at night.
  • 11.  Satco or Airport Authority has responsibility to declare restriction to any area in surrounding aerodrome that in use .  All action must be refer to Local Instruction
  • 12.  Automatic Terminal Information System(ATIS) need to be issued to provide info to Pilot and other Personnel that involve in flight operation  Position & direction of the traffic in relation to aircraft concerned  Construction / maintenance work on / near maneuvering area  Rough / broken surfaces on / near maneuvering area, marked or not  In this case construction near runaway for long time period and overnight
  • 13.  Shall be displayed around, on top of or around highest edge of the object.  Flags shall not increase the hazard presented by the object they mark.  Colour: Orange or combination of two triangular sections, orange and white or red and white.
  • 14.  Colour: White and red alternately or White and orange alternately > 45m
  • 15.  After construction has been done controller need to write a report in Log Book and cancel NOTAMs  Continue controlling flight operation normally