The document describes a risk related to construction site thefts that has been identified during interviews. Although the risk of theft from the project site is considered low, the risk is recorded on a watchlist so it can be monitored over time to ensure the probability and impact remain low. Risks with low ratings are included on a watchlist for future monitoring.