ACADEMIC QUALIFICATIONS
• B.Tech. from PHYDAH Engineering & Technology, Visakhapatnam JNTU University in 2010
• Diploma from(Civil Engineering)M.R.A.G.R. Polytechnic,Vijayanagaram S.B.T.E.T in 2006
• 12th
from ALPHA Junior College, Visakhapatnam Board of Intermediate Education Hyderabad in2003
• 10th
from M.N.R. school, Visakhapatnam Board of Secondary Education in 2000
IT& Other SKILLS
• Packages: AutoCAD& STADD Pro
• Operated Instruments: Auto Level
PROFILE SUMMARY
• An incisive professional with comprehensive experience of 6 years in the field of Project Management,
Site Execution, Construction Management
• Presently associate with L&T ECC, Rajasthan as a Senior Engineer
• Astute manager with a flair for adopting modern site execution methodologies and systems in
compliance with quality standards. Curriculum vita
• Adroit in leading detail programmers for the construction of major bridges, hydro power plants, tunnels,
highways, pipe rack, canals, etc.
• Expertise in swiftly ramping up projects with competent cross-functional skills and on time execution.
• Strong interpersonal relationship management, communication skills with the ability to develop a strong
network with project members, consultants, contractors with consummate ease
CORE COMPETENCIES
Site & Construction Management
• Supervising the entire of site and construction activities encompassing technical inputs for
coordinating site management activities
• Interacting with suppliers for achieving cost effective purchase of equipment, accessories and
material with timely delivery so as to minimize project cost
• Conceptualizing detailed project execution plans after thorough discussion with clients and
handlingselection of sites
ORGANISATIONAL EXPERIENCE
Since 2014- Till L&T ECC, Rajasthan as Senior Engineer
Project Undertaken:
Title : The Construction Works 2-Laning of Railway corridor 625 KM
Duration : 4 years
Description : The basic purpose of the project was to construct 2 - line Railway corridor with
constructed Bridges and formation with level of sub Grade
Client : WDFC
Consultant : RITES
Cost of project : 7000cr
Role:
• Handling structural works in Minor And Major bridges
• Checking of Reinforcement placed & fixed with proper spacing and form work with respect to approved
working Drawing & specifications for foundation, sub-structure, super-structure with respect to RFI
submitted
• Taking care of structures in bridge works RUB, MIB’s, MJB structures and box culverts in railway
corridor
• Involved in the preparation of bar bending schedules for bridge drawings
• Executing the bending and built the structure as per drawings and bar bending schedule
• Shuttering or farm work are done as per drawing built
• Team of under my controle 80 pepoles
Highlight:
• Handled the billing of the site execution work
• Completed 7 MIB’s, 2 RUB’S, 1 MJB up to sub structure
Since 2013 to 2014 Master Associates, Interior Designers & Project Management Consultant as
Engineer at Visakhapatnam
Project Undertaken:
Title : Proposed Vodafone transport hub At Visakhapatnam
Duration : 6 Months
Client : Vodafone
Consultant : Master Associates, Interior Designers & Project Management Consultant
Project Cost : 4 cr
Role:
• Coordinating with Head office, Contractor and Clint site team
• Ensure execution as per design and drawing
• Day to day supervision of Constructional Activities
• Day to day monitoring of progress of work
• Maintaining Quality standards as per contract
• Maintaining a record of constructional activities
• Maintaining safely standards
• Checking of contractor bills
• Keeping a check on actual cost V/s Budgeted cost
Since Nov’2010- Feb’2013 Navayuga Engineering Company Ltd., Jammu Kashmir as Site Engineer
Project Undertaken:
Title : The Construction Works for Rehabilitation, Strengthening and 4-Laning of Quazigund to
BanihalSection of NH-1A from Km189.350 to Km 204.700, including 2 Tunnels (2-lane) of
0.69 Km & 8.45 Km length in the State of Jammu & Kashmir
Duration : 5 years
Description : The basic purpose of the project was to construct Tunnel 1 (approx. 0.69 Km) and Tunnel
2 (approx. 8.45 Km) with cross passages according to the New Austrian Tunneling
Method – NATM. In the method the vital part was Geotechnical Monitoring.
Client : NHAI
Consultant : SMEC
Project Cost : 2200cr
Role:
• Handling benching for tunnels & structural works in bridges
• Checking of Reinforcement placed & fixed with proper spacing and form work with respect to approved
working Drawing & specifications for foundation, sub-structure, super-structure with respect to RFI
submitted
• Taking care of structures in bridge works RUB, open foundation structures and box culverts
• Involved in the preparation of bar bending schedules for bridge drawings
• Executing the bendingand built the structure as per drawings and bar bending schedule
• Carrying out sub contractor bills, monthly R.A. bills and take certifications from client
• Preparing the Monthly Progress Report
• Managing the billing of the site execution work
May’2010 - Oct’2010 Navayuga Engineering Company Ltd., Sikkim as Site Engineer (Site
Execution)
Project undertaken:
Title : Teastha Hydro- Power Plant (Tunneling) Stage-III (Sikkim)
Duration : 5 years
Description : The project was undertaken to carry the tunnel execution works like rock bolting, tunnel
profiling, drilling & blasting and short creation.
Project Cost : 1800cr
Role:
• Handling Profiling and checking the Rock bolts and short-creating for tunnels works in Hydro Power
Plant
• Profiling coordinates of Tunnel Execution work
SinceAug 2006- July 07 IDDCConsultancy,Visakhapatnamas a Site Surveyor & CAD Operator
Project Undertaken NCC
Title : The Project Thotapalli Right main canal of the Distribution canal and Branch canals Survey
and Alignment preparation
Duration : 1 year
Description : The project was One Distributaries canal 25Kms and 32 branch Canals survey and
Alignment preparation
Role:
• Prepared for Branch and Distribution canals
• Handled the Ayacutpreparation for the branch and distribution canals
• Carried the site surveys for the alignments and diverted structures
• Handling alignment Prepared and surveying
Place : Visakhapatnam
Date : (T.RAVI KUMAR)

Civil Engineer Resume

  • 1.
    CURRICULUM VITAE RAVI KUMARTERLAPU Contact: +91-9700635363 Passport No : H9252798 E-Mail : ravipyar@gmail.com JOB OBJECTIVE Seeking middle level assignments in the field of Construction Management and civil Execution preferably in the civil industry PERSONAL DETAILS Date of Birth : 17th April, 1985 Address : D. No. 12-2-9/2, Kannyyapeta, (Behind Green Park Hotel), Visakhapatnam (530002) Languages Known : Telugu, English & Hindi ACADEMIC QUALIFICATIONS • B.Tech. from PHYDAH Engineering & Technology, Visakhapatnam JNTU University in 2010 • Diploma from(Civil Engineering)M.R.A.G.R. Polytechnic,Vijayanagaram S.B.T.E.T in 2006 • 12th from ALPHA Junior College, Visakhapatnam Board of Intermediate Education Hyderabad in2003 • 10th from M.N.R. school, Visakhapatnam Board of Secondary Education in 2000 IT& Other SKILLS • Packages: AutoCAD& STADD Pro • Operated Instruments: Auto Level PROFILE SUMMARY • An incisive professional with comprehensive experience of 6 years in the field of Project Management, Site Execution, Construction Management • Presently associate with L&T ECC, Rajasthan as a Senior Engineer • Astute manager with a flair for adopting modern site execution methodologies and systems in compliance with quality standards. Curriculum vita • Adroit in leading detail programmers for the construction of major bridges, hydro power plants, tunnels, highways, pipe rack, canals, etc. • Expertise in swiftly ramping up projects with competent cross-functional skills and on time execution. • Strong interpersonal relationship management, communication skills with the ability to develop a strong network with project members, consultants, contractors with consummate ease CORE COMPETENCIES Site & Construction Management • Supervising the entire of site and construction activities encompassing technical inputs for coordinating site management activities • Interacting with suppliers for achieving cost effective purchase of equipment, accessories and material with timely delivery so as to minimize project cost • Conceptualizing detailed project execution plans after thorough discussion with clients and handlingselection of sites ORGANISATIONAL EXPERIENCE Since 2014- Till L&T ECC, Rajasthan as Senior Engineer Project Undertaken: Title : The Construction Works 2-Laning of Railway corridor 625 KM Duration : 4 years
  • 2.
    Description : Thebasic purpose of the project was to construct 2 - line Railway corridor with constructed Bridges and formation with level of sub Grade Client : WDFC Consultant : RITES Cost of project : 7000cr Role: • Handling structural works in Minor And Major bridges • Checking of Reinforcement placed & fixed with proper spacing and form work with respect to approved working Drawing & specifications for foundation, sub-structure, super-structure with respect to RFI submitted • Taking care of structures in bridge works RUB, MIB’s, MJB structures and box culverts in railway corridor • Involved in the preparation of bar bending schedules for bridge drawings • Executing the bending and built the structure as per drawings and bar bending schedule • Shuttering or farm work are done as per drawing built • Team of under my controle 80 pepoles Highlight: • Handled the billing of the site execution work • Completed 7 MIB’s, 2 RUB’S, 1 MJB up to sub structure Since 2013 to 2014 Master Associates, Interior Designers & Project Management Consultant as Engineer at Visakhapatnam Project Undertaken: Title : Proposed Vodafone transport hub At Visakhapatnam Duration : 6 Months Client : Vodafone Consultant : Master Associates, Interior Designers & Project Management Consultant Project Cost : 4 cr Role: • Coordinating with Head office, Contractor and Clint site team • Ensure execution as per design and drawing • Day to day supervision of Constructional Activities • Day to day monitoring of progress of work • Maintaining Quality standards as per contract • Maintaining a record of constructional activities • Maintaining safely standards • Checking of contractor bills • Keeping a check on actual cost V/s Budgeted cost Since Nov’2010- Feb’2013 Navayuga Engineering Company Ltd., Jammu Kashmir as Site Engineer Project Undertaken: Title : The Construction Works for Rehabilitation, Strengthening and 4-Laning of Quazigund to BanihalSection of NH-1A from Km189.350 to Km 204.700, including 2 Tunnels (2-lane) of 0.69 Km & 8.45 Km length in the State of Jammu & Kashmir Duration : 5 years Description : The basic purpose of the project was to construct Tunnel 1 (approx. 0.69 Km) and Tunnel 2 (approx. 8.45 Km) with cross passages according to the New Austrian Tunneling Method – NATM. In the method the vital part was Geotechnical Monitoring. Client : NHAI Consultant : SMEC Project Cost : 2200cr Role: • Handling benching for tunnels & structural works in bridges
  • 3.
    • Checking ofReinforcement placed & fixed with proper spacing and form work with respect to approved working Drawing & specifications for foundation, sub-structure, super-structure with respect to RFI submitted • Taking care of structures in bridge works RUB, open foundation structures and box culverts • Involved in the preparation of bar bending schedules for bridge drawings • Executing the bendingand built the structure as per drawings and bar bending schedule • Carrying out sub contractor bills, monthly R.A. bills and take certifications from client • Preparing the Monthly Progress Report • Managing the billing of the site execution work May’2010 - Oct’2010 Navayuga Engineering Company Ltd., Sikkim as Site Engineer (Site Execution) Project undertaken: Title : Teastha Hydro- Power Plant (Tunneling) Stage-III (Sikkim) Duration : 5 years Description : The project was undertaken to carry the tunnel execution works like rock bolting, tunnel profiling, drilling & blasting and short creation. Project Cost : 1800cr Role: • Handling Profiling and checking the Rock bolts and short-creating for tunnels works in Hydro Power Plant • Profiling coordinates of Tunnel Execution work SinceAug 2006- July 07 IDDCConsultancy,Visakhapatnamas a Site Surveyor & CAD Operator Project Undertaken NCC Title : The Project Thotapalli Right main canal of the Distribution canal and Branch canals Survey and Alignment preparation Duration : 1 year Description : The project was One Distributaries canal 25Kms and 32 branch Canals survey and Alignment preparation Role: • Prepared for Branch and Distribution canals • Handled the Ayacutpreparation for the branch and distribution canals • Carried the site surveys for the alignments and diverted structures • Handling alignment Prepared and surveying Place : Visakhapatnam Date : (T.RAVI KUMAR)